Heating replacement at the Bollwies multi-purpose building

Outcome

Submissions closed on 5 November 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Jona, canton of St. Gallen
Submission deadline: 2026-11-05T16:30:00+01:00
03:30 PM · UTC
Contract value
Not stated in the notice
Contract period
2027-02-01 to 2027-09-30
Published
September 21, 2026
SIMAP

Overview

The Jona multi-purpose building heating system will be replaced by a new heat-pump plant connected to the EZL ambient-energy network. The works also include domestic-hot-water production with thermal storage and fresh-water stations, a temporary hot-water arrangement, and a new four-group heating distributor with controls, pumps, heat meters and insulation required by energy law. The contract period is February, September 2027, with execution planned from mid-February to mid-August. German offers are due 5 November 2026 at 16:30 CET. Award weighting is price 50%, quality 25%, performance capacity 20% and sustainability 5%. The submission deadline has passed and the notice is closed.

Information based on the public notice

What the buyer needs

Replace the building heating system with a heat pump connected to the EZL ambient-energy network, including hot-water storage and fresh-water stations, temporary supply, and a four-group heating distributor with controls, pumps, meters and insulation.

  • Angebote sind auf Deutsch über SIMAP einzureichen.
  • Varianten sind zugelassen.
  • Teilangebote sind nicht zugelassen.
  • Arbeitsgemeinschaften sind zugelassen.
  • Subunternehmer sind zugelassen.
  • Vollständig ausgefülltes und unterzeichnetes Offerttitelblatt und Selbstdeklaration mit Handelsregister-, Betreibungs-/Konkursregister-, Organisations-, Schlüsselpersonal-, Referenz-, Steuer-, MWST- und Sozialversicherungsnachweisen einreichen.

Tender details

Buyer
Stadt Rapperswil-Jona; Ressort Bau und Liegenschaften; Fachbereich Infrastruktur
Country
Switzerland
Procedure
Open procedure
Classification
Heat pump system replacement · CPV 45213150
Notice reference
40821 · 40821-01
Offer deadline
2026-11-05T16:30:00+01:00
Contract period
2027-02-01, 2027-09-30
Price
50%
Quality
25%
Performance capacity
20%
Sustainability
5%

What to check in the tender documents

  • The notice gives no estimated value or detailed project reference specifications beyond the stated scoring and qualification documents; the separate tender documents were not reviewed.
Get started with Ziva

Original notice

Read the original description

Mehrzweckgebäude Bollwies, Bollwiesstrasse 4, 8645 Jona - BKP 242 Heizungsersatz

Mehrzweckgebäude Bollwies, Bollwiesstrasse 4, 8645 Jona - BKP 242 Heizungsersatz Heizungsersatz Neue Wärmepumpenanlage mit Anschluss an das Anergienetz der Energie Zürichsee Linth AG (EZL) inkl. neue BWW-Erwärmung mit Energiespeicher und Frischwasserstationen inkl. WW-Provisorium. Der Anergieanschluss wurde bereits ins Haus geführt. Neuer Heizverteiler mit 4 Heizgruppen kompl. mit Regulierungen, Pumpen, Wärmemessungen wie notwendig inkl. Dämmungen nach Energiegesetz. SIMAP project-info/dialog: no SIMAP project-info/title/de: Mehrzweckgebäude Bollwies, Bollwiesstrasse 4, 8645 Jona - BKP 242 Heizungsersatz SIMAP project-info/offerSpecificNote/de: Couvert beschriften: NICHT ÖFFNEN: 2026-227 MZG Bollwies; BKP 242 Heizungsersatz SIMAP project-info/offerAddress/countryId: CH SIMAP project-info/offerAddress/name/de: Stadt Rapperswil-Jona; Ressort Bau und Liegenschaften SIMAP project-info/offerAddress/city/de: Jona SIMAP procurement/orderDescription/de: Heizungsersatz Neue Wärmepumpenanlage mit Anschluss an das Anergienetz der Energie Zürichsee Linth AG (EZL) inkl. neue BWW-Erwärmung mit Energiespeicher und Frischwasserstationen inkl. WW-Provisorium. Der Anergieanschluss wurde bereits ins Haus geführt. Neuer Heizverteiler mit 4 Heizgruppen kompl. mit Regulierungen, Pumpen, Wärmemessungen wie notwendig inkl. Dämmungen nach Energiegesetz. SIMAP procurement/bkpCodes/0/code: 242 SIMAP procurement/bkpCodes/0/label/de: Heizungsanlagen SIMAP procurement/bkpCodes/0/label/en: Heating installations SIMAP procurement/bkpCodes/0/label/fr: Installations de chauffage SIMAP procurement/bkpCodes/0/label/it: Impianti di riscaldamento SIMAP procurement/bkpCodes/1/code: 250 SIMAP procurement/bkpCodes/1/label/de: Übergangsposition SIMAP procurement/bkpCodes/1/label/en: Transitional item SIMAP procurement/bkpCodes/1/label/fr: Poste d'attente SIMAP procurement/bkpCodes/1/label/it: Posizione transitoria SIMAP procurement/oagCodes/0/code: 1.3.7 SIMAP procurement/oagCodes/0/label/de: Büro- und Verwaltungsgebäude SIMAP procurement/oagCodes/0/label/en: Office and administrative building SIMAP procurement/oagCodes/0/label/fr: Bâtiment administratif SIMAP procurement/oagCodes/0/label/it: Edificio amministrativo SIMAP procurement/oagCodes/1/code: 1.5.4 SIMAP procurement/oagCodes/1/label/de: Feuer- und Rettungswache SIMAP procurement/oagCodes/1/label/en: Fire and rescue station SIMAP procurement/oagCodes/1/label/fr: Caserne de pompiers et poste de sauvetage SIMAP procurement/oagCodes/1/label/it: Caserma dei pompieri, stazione di soccorso SIMAP procurement/orderAddressOnlyDescription: no SIMAP procurement/executionPeriod/dateRange/0: 2027-02-15 SIMAP procurement/executionPeriod/dateRange/1: 2027-08-15 SIMAP procurement/variants: yes SIMAP procurement/partialOffers: no SIMAP procurement/orderAddress/countryId: CH SIMAP procurement/orderAddress/cantonId: SG SIMAP procurement/orderAddress/city/de: Jona SIMAP procurement/contractDeadlineType: date_time SIMAP procurement/contractPeriod/dateRange/0: 2027-02-01 SIMAP procurement/contractPeriod/dateRange/1: 2027-09-30 SIMAP procurement/canContractBeExtended: no SIMAP procurement/options: no SIMAP procurement/cpvCode/code: 45213150 SIMAP procurement/cpvCode/label/de: Bau von Bürogebäuden SIMAP procurement/cpvCode/label/en: Office block construction work SIMAP procurement/cpvCode/label/fr: Travaux de construction d'immeubles de bureaux SIMAP procurement/cpvCode/label/it: Lavori di costruzione di complessi di uffici SIMAP dates/publicOfferOpening: no SIMAP dates/qnas/0/date: 2026-10-05 SIMAP dates/qnas/0/note/de: Fragenbeantwortung bis 08.10.2026 SIMAP dates/publicationDate: 2026-09-22 SIMAP dates/offerDeadline: 2026-11-05T16:30:00+01:00 SIMAP dates/offerValidityDeadlineDate: 2027-04-30 SIMAP dates/offerOpening/dateTime: 2026-11-06T00:00:00+01:00 SIMAP terms/termsCriteria/0/description/de: Einhaltung der Arbeitsschutzbestimmungen und Arbeitsbedingungen gemäss Art. 12 Abs. 1, 2 und 4 der interkantonalen Vereinbarung über das öffentliche Beschaffungswesen vom 15.11.2019 (SsGS 841.32; abgekürzt IVöB 2019) SIMAP terms/termsCriteria/1/description/de: Einhaltung des Umweltrechts (Art. 12 Abs. 3 und 4 IVöB 2019 und Anhang 4 zur IVöB 2019) SIMAP terms/termsCriteria/2/description/de: Bezahlte Steuern und Sozialleistungen (soweit fällig) SIMAP terms/termsCriteria/3/description/de: Gleichstellung von Mann und Frau (gemäss Art. 5 der Verordnung über das öffentliche Beschaffungswesen des Kantons St. Gallen vom 25.04.2023 [sGS 841.11; abgekürzt VöB 2023] i.V.m. Art. 12 Abs. 1IVöB 2019) SIMAP terms/consortiumAllowed: yes SIMAP terms/consortiumMultiApplicationAllowed: no SIMAP terms/subContractorAllowed: yes SIMAP terms/subContractorMultiApplicationAllowed: no SIMAP terms/remediesNotice/de: Gegen diese Verfügung kann innert 20 Tagen seit Publikation auf www.simap.ch beim Verwaltungsgericht des Kantons St.Gallen, Webergasse 8, 9001 St.Gallen, schriftlich Beschwerde erhoben werden (Art. 52 Abs. 1 i.V.m. Art. 56 der Interkantonalen Vereinbarung über das öffentliche Beschaffungswesen [sGS 841.51]). Die Beschwerde muss einen Antrag sowie eine Darstellung des Sachverhaltes und eine Begründung enthalten. Sie ist zu unterzeichnen und im Doppel einzureichen. Diese Verfügung ist beizulegen. Es gelten keine Gerichtsferien. SIMAP criteria/qualificationCriteria/0/description/de: (unterschrieben und vollständig ausgefüllt) SIMAP criteria/qualificationCriteria/0/title/de: EK 1: Formular Offerttitelblatt SIMAP criteria/qualificationCriteria/1/description/de: (unterschrieben und vollständig ausgefüllt) SIMAP criteria/qualificationCriteria/1/title/de: EK 2: Formular Selbstdeklaration mit geforderten Nachweisen SIMAP criteria/awardCriteria/0/description/de: Die Punktzahl für den Angebotspreis nach Bereinigung (ZK 1: Preis) wird mit dem KBOB-Preisbewertungsmodell und auf Grund einer linearen Kurve mit folgenden Eckwerten festgelegt und ermittelt: Maximalpunktzahl (3 Punkte) für das tiefste gültige Angebot nach Bereinigung. Punktzahl 0 für Angebote von 145% und grösser des tiefsten gültigen Angebotes nach Bereinigung SIMAP criteria/awardCriteria/0/title/de: ZK 1: Preis SIMAP criteria/awardCriteria/0/weighting: 50 SIMAP criteria/awardCriteria/0/maxPoints: 150 SIMAP criteria/awardCriteria/1/description/de: Die Wertung der Referenzen bezieht sich auf deren Qualität und deren Projektvergleichbarkeit mit dem Projekt: Ersatz Gasheizkessel durch Wärmepumpe (Wärmequelle: Fernwärme Jona, EZL) und Frischwasserstationen mit Energiespeichern für die BWW-Erzeugung in Bezug auf die Grösse, Komplexität und Aufgabenstellung des referenzierten Projekts. Die Wertung des technischen Berichts (sofern einzureichen, vgl. Dokument A - Ziff. 3.2) erfolgt nach der Qualität der Analyse, welche inhaltlich das Verständnis der Aufgabe wiedergibt und nach der Qualität und Relevanz der Risikoanalyse und der Lösungsansätze, die objektbezogen und nachvollziehbar formuliert sind. Es erfolgt eine Wertung nach Punkten zwischen 0 - 3. SIMAP criteria/awardCriteria/1/title/de: ZK 2: Qualität SIMAP criteria/awardCriteria/1/weighting: 25 SIMAP criteria/awardCriteria/1/maxPoints: 75 SIMAP criteria/awardCriteria/2/description/de: Die Wertung des Bauprogramms erfolgt in der Bewertung, ob das Bauprogramm garantiert, mit wenig Vorbehalten, mit Vorbehalten oder nicht gewährleistet werden kann. Die Wertung der Schlüsselpersonen erfolgt nach der ausgewiesenen Berufserfahrung mit adäquater Ausbildung. Die hauptverantwortliche Schlüsselperson weist eine Berufserfahrung von mind. 10 Jahren auf. Die Wertung des Angebotspreises (exkl. MwSt.) in Bezug auf den Betriebs-Umsatz (netto, exkl. MwSt.) erfolgt nachfolgender Gewichtung: 3 Punkte Verhältnis Angebotspreis (exkl. MwSt.) / Betriebs-Umsatz (netto, exkl. MwSt.) 0 - 9.999% 2 Punkte Verhältnis Angebotspreis (exkl. MwSt.) / Betriebs-Umsatz (netto, exkl. MwSt.) 10 - 19.999% 1 Punkte Verhältnis Angebotspreis (exkl. MwSt.) / Betriebs-Umsatz (netto, exkl. MwSt.) 20 - 49.999% 0 Punkte Verhältnis Angebotspreis (exkl. MwSt.) / Betriebs-Umsatz (netto, exkl. MwSt.) 50 - 100% Es erfolgt jeweils eine Wertung nach Punkten zwischen 0 - 3. SIMAP criteria/awardCriteria/2/title/de: ZK 3: Leistungsfähigkeit SIMAP criteria/awardCriteria/2/weighting: 20 SIMAP criteria/awardCriteria/2/maxPoints: 60 SIMAP criteria/awardCriteria/3/description/de: Die Punktzahl für das Zuschlagskriterium Nachhaltigkeit wird nach den erklärten zusätzlichen Massnahmen in Ergänzung zu den geforderten Bedingungen (KBOB) bewertet. Dabei wird die vorbehaltlose Bestätigung der geforderten Bedingungen mit einem Punkt bewertet. Die weitere Bewertung erfolgt von 0 - 3. SIMAP criteria/awardCriteria/3/title/de: ZK 4: Nachhaltigkeit SIMAP criteria/awardCriteria/3/weighting: 5 SIMAP criteria/awardCriteria/3/maxPoints: 15 Procurement office: Stadt Rapperswil-Jona; Ressort Bau und Liegenschaften; Fachbereich Infrastruktur Procurement office telephone: +41552257006

Official source: SIMAP ↗

Notice updates

November 6, 2026 · Version 2

Contract period updated · Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Source notice details updated · Source references updated · Status changed

Mehrzweckgebäude Bollwies, Bollwiesstrasse 4, 8645 Jona - BKP 242 Heizungsersatz

Mehrzweckgebäude Bollwies, Bollwiesstrasse 4, 8645 Jona - BKP 242 Heizungsersatz Heizungsersatz Neue Wärmepumpenanlage mit Anschluss an das Anergienetz der Energie Zürichsee Linth AG (EZL) inkl. neue BWW-Erwärmung mit Energiespeicher und Frischwasserstationen inkl. WW-Provisorium. Der Anergieanschluss wurde bereits ins Haus geführt. Neuer Heizverteiler mit 4 Heizgruppen kompl. mit Regulierungen, Pumpen, Wärmemessungen wie notwendig inkl. Dämmungen nach Energiegesetz. SIMAP project-info/dialog: no SIMAP project-info/title/de: Mehrzweckgebäude Bollwies, Bollwiesstrasse 4, 8645 Jona - BKP 242 Heizungsersatz SIMAP project-info/offerSpecificNote/de: Couvert beschriften: NICHT ÖFFNEN: 2026-227 MZG Bollwies; BKP 242 Heizungsersatz SIMAP project-info/offerAddress/countryId: CH SIMAP project-info/offerAddress/name/de: Stadt Rapperswil-Jona; Ressort Bau und Liegenschaften SIMAP project-info/offerAddress/city/de: Jona SIMAP procurement/orderDescription/de: Heizungsersatz Neue Wärmepumpenanlage mit Anschluss an das Anergienetz der Energie Zürichsee Linth AG (EZL) inkl. neue BWW-Erwärmung mit Energiespeicher und Frischwasserstationen inkl. WW-Provisorium. Der Anergieanschluss wurde bereits ins Haus geführt. Neuer Heizverteiler mit 4 Heizgruppen kompl. mit Regulierungen, Pumpen, Wärmemessungen wie notwendig inkl. Dämmungen nach Energiegesetz. SIMAP procurement/bkpCodes/0/code: 242 SIMAP procurement/bkpCodes/0/label/de: Heizungsanlagen SIMAP procurement/bkpCodes/0/label/en: Heating installations SIMAP procurement/bkpCodes/0/label/fr: Installations de chauffage SIMAP procurement/bkpCodes/0/label/it: Impianti di riscaldamento SIMAP procurement/bkpCodes/1/code: 250 SIMAP procurement/bkpCodes/1/label/de: Übergangsposition SIMAP procurement/bkpCodes/1/label/en: Transitional item SIMAP procurement/bkpCodes/1/label/fr: Poste d'attente SIMAP procurement/bkpCodes/1/label/it: Posizione transitoria SIMAP procurement/oagCodes/0/code: 1.3.7 SIMAP procurement/oagCodes/0/label/de: Büro- und Verwaltungsgebäude SIMAP procurement/oagCodes/0/label/en: Office and administrative building SIMAP procurement/oagCodes/0/label/fr: Bâtiment administratif SIMAP procurement/oagCodes/0/label/it: Edificio amministrativo SIMAP procurement/oagCodes/1/code: 1.5.4 SIMAP procurement/oagCodes/1/label/de: Feuer- und Rettungswache SIMAP procurement/oagCodes/1/label/en: Fire and rescue station SIMAP procurement/oagCodes/1/label/fr: Caserne de pompiers et poste de sauvetage SIMAP procurement/oagCodes/1/label/it: Caserma dei pompieri, stazione di soccorso SIMAP procurement/orderAddressOnlyDescription: no SIMAP procurement/executionPeriod/dateRange/0: 2027-02-15 SIMAP procurement/executionPeriod/dateRange/1: 2027-08-15 SIMAP procurement/variants: yes SIMAP procurement/partialOffers: no SIMAP procurement/orderAddress/countryId: CH SIMAP procurement/orderAddress/cantonId: SG SIMAP procurement/orderAddress/city/de: Jona SIMAP procurement/contractDeadlineType: date_time SIMAP procurement/contractPeriod/dateRange/0: 2027-02-01 SIMAP procurement/contractPeriod/dateRange/1: 2027-09-30 SIMAP procurement/canContractBeExtended: no SIMAP procurement/options: no SIMAP procurement/cpvCode/code: 45213150 SIMAP procurement/cpvCode/label/de: Bau von Bürogebäuden SIMAP procurement/cpvCode/label/en: Office block construction work SIMAP procurement/cpvCode/label/fr: Travaux de construction d'immeubles de bureaux SIMAP procurement/cpvCode/label/it: Lavori di costruzione di complessi di uffici SIMAP dates/publicOfferOpening: no SIMAP dates/qnas/0/date: 2026-10-05 SIMAP dates/qnas/0/note/de: Fragenbeantwortung bis 08.10.2026 SIMAP dates/publicationDate: 2026-09-22 SIMAP dates/offerDeadline: 2026-11-05T16:30:00+01:00 SIMAP dates/offerValidityDeadlineDate: 2027-04-30 SIMAP dates/offerOpening/dateTime: 2026-11-06T00:00:00+01:00 SIMAP terms/termsCriteria/0/description/de: Einhaltung der Arbeitsschutzbestimmungen und Arbeitsbedingungen gemäss Art. 12 Abs. 1, 2 und 4 der interkantonalen Vereinbarung über das öffentliche Beschaffungswesen vom 15.11.2019 (SsGS 841.32; abgekürzt IVöB 2019) SIMAP terms/termsCriteria/1/description/de: Einhaltung des Umweltrechts (Art. 12 Abs. 3 und 4 IVöB 2019 und Anhang 4 zur IVöB 2019) SIMAP terms/termsCriteria/2/description/de: Bezahlte Steuern und Sozialleistungen (soweit fällig) SIMAP terms/termsCriteria/3/description/de: Gleichstellung von Mann und Frau (gemäss Art. 5 der Verordnung über das öffentliche Beschaffungswesen des Kantons St. Gallen vom 25.04.2023 [sGS 841.11; abgekürzt VöB 2023] i.V.m. Art. 12 Abs. 1IVöB 2019) SIMAP terms/consortiumAllowed: yes SIMAP terms/consortiumMultiApplicationAllowed: no SIMAP terms/subContractorAllowed: yes SIMAP terms/subContractorMultiApplicationAllowed: no SIMAP terms/remediesNotice/de: Gegen diese Verfügung kann innert 20 Tagen seit Publikation auf www.simap.ch beim Verwaltungsgericht des Kantons St.Gallen, Webergasse 8, 9001 St.Gallen, schriftlich Beschwerde erhoben werden (Art. 52 Abs. 1 i.V.m. Art. 56 der Interkantonalen Vereinbarung über das öffentliche Beschaffungswesen [sGS 841.51]). Die Beschwerde muss einen Antrag sowie eine Darstellung des Sachverhaltes und eine Begründung enthalten. Sie ist zu unterzeichnen und im Doppel einzureichen. Diese Verfügung ist beizulegen. Es gelten keine Gerichtsferien. SIMAP criteria/qualificationCriteria/0/description/de: (unterschrieben und vollständig ausgefüllt) SIMAP criteria/qualificationCriteria/0/title/de: EK 1: Formular Offerttitelblatt SIMAP criteria/qualificationCriteria/1/description/de: (unterschrieben und vollständig ausgefüllt) SIMAP criteria/qualificationCriteria/1/title/de: EK 2: Formular Selbstdeklaration mit geforderten Nachweisen SIMAP criteria/awardCriteria/0/description/de: Die Punktzahl für den Angebotspreis nach Bereinigung (ZK 1: Preis) wird mit dem KBOB-Preisbewertungsmodell und auf Grund einer linearen Kurve mit folgenden Eckwerten festgelegt und ermittelt: Maximalpunktzahl (3 Punkte) für das tiefste gültige Angebot nach Bereinigung. Punktzahl 0 für Angebote von 145% und grösser des tiefsten gültigen Angebotes nach Bereinigung SIMAP criteria/awardCriteria/0/title/de: ZK 1: Preis SIMAP criteria/awardCriteria/0/weighting: 50 SIMAP criteria/awardCriteria/0/maxPoints: 150 SIMAP criteria/awardCriteria/1/description/de: Die Wertung der Referenzen bezieht sich auf deren Qualität und deren Projektvergleichbarkeit mit dem Projekt: Ersatz Gasheizkessel durch Wärmepumpe (Wärmequelle: Fernwärme Jona, EZL) und Frischwasserstationen mit Energiespeichern für die BWW-Erzeugung in Bezug auf die Grösse, Komplexität und Aufgabenstellung des referenzierten Projekts. Die Wertung des technischen Berichts (sofern einzureichen, vgl. Dokument A - Ziff. 3.2) erfolgt nach der Qualität der Analyse, welche inhaltlich das Verständnis der Aufgabe wiedergibt und nach der Qualität und Relevanz der Risikoanalyse und der Lösungsansätze, die objektbezogen und nachvollziehbar formuliert sind. Es erfolgt eine Wertung nach Punkten zwischen 0 - 3. SIMAP criteria/awardCriteria/1/title/de: ZK 2: Qualität SIMAP criteria/awardCriteria/1/weighting: 25 SIMAP criteria/awardCriteria/1/maxPoints: 75 SIMAP criteria/awardCriteria/2/description/de: Die Wertung des Bauprogramms erfolgt in der Bewertung, ob das Bauprogramm garantiert, mit wenig Vorbehalten, mit Vorbehalten oder nicht gewährleistet werden kann. Die Wertung der Schlüsselpersonen erfolgt nach der ausgewiesenen Berufserfahrung mit adäquater Ausbildung. Die hauptverantwortliche Schlüsselperson weist eine Berufserfahrung von mind. 10 Jahren auf. Die Wertung des Angebotspreises (exkl. MwSt.) in Bezug auf den Betriebs-Umsatz (netto, exkl. MwSt.) erfolgt nachfolgender Gewichtung: 3 Punkte Verhältnis Angebotspreis (exkl. MwSt.) / Betriebs-Umsatz (netto, exkl. MwSt.) 0 - 9.999% 2 Punkte Verhältnis Angebotspreis (exkl. MwSt.) / Betriebs-Umsatz (netto, exkl. MwSt.) 10 - 19.999% 1 Punkte Verhältnis Angebotspreis (exkl. MwSt.) / Betriebs-Umsatz (netto, exkl. MwSt.) 20 - 49.999% 0 Punkte Verhältnis Angebotspreis (exkl. MwSt.) / Betriebs-Umsatz (netto, exkl. MwSt.) 50 - 100% Es erfolgt jeweils eine Wertung nach Punkten zwischen 0 - 3. SIMAP criteria/awardCriteria/2/title/de: ZK 3: Leistungsfähigkeit SIMAP criteria/awardCriteria/2/weighting: 20 SIMAP criteria/awardCriteria/2/maxPoints: 60 SIMAP criteria/awardCriteria/3/description/de: Die Punktzahl für das Zuschlagskriterium Nachhaltigkeit wird nach den erklärten zusätzlichen Massnahmen in Ergänzung zu den geforderten Bedingungen (KBOB) bewertet. Dabei wird die vorbehaltlose Bestätigung der geforderten Bedingungen mit einem Punkt bewertet. Die weitere Bewertung erfolgt von 0 - 3. SIMAP criteria/awardCriteria/3/title/de: ZK 4: Nachhaltigkeit SIMAP criteria/awardCriteria/3/weighting: 5 SIMAP criteria/awardCriteria/3/maxPoints: 15 Procurement office: Stadt Rapperswil-Jona; Ressort Bau und Liegenschaften; Fachbereich Infrastruktur Procurement office telephone: +41552257006

October 11, 2026 · Version 1

Published

Mehrzweckgebäude Bollwies, Bollwiesstrasse 4, 8645 Jona - BKP 242 Heizungsersatz

Titel: Mehrzweckgebäude Bollwies, Bollwiesstrasse 4, 8645 Jona - BKP 242 Heizungsersatz Beschreibung: Heizungsersatz Neue Wärmepumpenanlage mit Anschluss an das Anergienetz der Energie Zürichsee Linth AG (EZL) inkl. neue BWW-Erwärmung mit Energiespeicher und Frischwasserstationen inkl. WW-Provisorium. Der Anergieanschluss wurde bereits ins Haus geführt. Neuer Heizverteiler mit 4 Heizgruppen kompl. mit Regulierungen, Pumpen, Wärmemessungen wie notwendig inkl. Dämmungen nach Energiegesetz. Verfahren: Offenes Verfahren Angebotssprache: de Varianten: zugelassen Teilangebote: nicht zugelassen Consortia: zugelassen Subcontractors: zugelassen Angebotsfrist: 2026-11-05T16:30:00+01:00 Frist für Fragen: 2026-10-05 Vertragsdauer: 2027-02-01 – 2027-09-30 Eignungskriterium: EK 1: Formular Offerttitelblatt (unterschrieben und vollständig ausgefüllt) Eignungskriterium: EK 2: Formular Selbstdeklaration mit geforderten Nachweisen (unterschrieben und vollständig ausgefüllt) Nachweis: • Handelsregisterauszug • Detaillierter Auszug aus dem Betreibungs- und Konkursregister (nicht summarischer Auszug) • Organigramm • Liste des eingesetzten Schlüsselpersonals • Referenzen • Bestätigung der Steuerbehörde am Geschäftssitz bezüglich Bezahlung aller geschuldeten Steuern (Gemeinde-, Kantons- und Bundessteuern) • Bestätigung der Mehrwertsteuerbehörde bezüglich Bezahlung der geschuldeten Mehrwertsteuer • Bestätigung der AHV-Ausgleichskasse bezüglich Bezahlung der geschuldeten AHV-, IV-, EO-, ALV- und FAK-Beiträge Zuschlagskriterium: ZK 1: Preis Die Punktzahl für den Angebotspreis nach Bereinigung (ZK 1: Preis) wird mit dem KBOB-Preisbewertungsmodell und auf Grund einer linearen Kurve mit folgenden Eckwerten festgelegt und ermittelt: • Maximalpunktzahl (3 Punkte) für das tiefste gültige Angebot nach Bereinigung. • Punktzahl 0 für Angebote von 145% und grösser des tiefsten gültigen Angebotes nach Bereinigung Gewichtung: 50 % Zuschlagskriterium: ZK 2: Qualität Die Wertung der Referenzen bezieht sich auf deren Qualität und deren Projektvergleichbarkeit mit dem Projekt: Ersatz Gasheizkessel durch Wärmepumpe (Wärmequelle: Fernwärme Jona, EZL) und Frischwasserstationen mit Energiespeichern für die BWW-Erzeugung in Bezug auf die Grösse, Komplexität und Aufgabenstellung des referenzierten Projekts. Die Wertung des technischen Berichts (sofern einzureichen, vgl. Dokument A - Ziff. 3.2) erfolgt nach der Qualität der Analyse, welche inhaltlich das Verständnis der Aufgabe wiedergibt und nach der Qualität und Relevanz der Risikoanalyse und der Lösungsansätze, die objektbezogen und nachvollziehbar formuliert sind. Es erfolgt eine Wertung nach Punkten zwischen 0 - 3. Gewichtung: 25 % Zuschlagskriterium: ZK 3: Leistungsfähigkeit Die Wertung des Bauprogramms erfolgt in der Bewertung, ob das Bauprogramm garantiert, mit wenig Vorbehalten, mit Vorbehalten oder nicht gewährleistet werden kann. Die Wertung der Schlüsselpersonen erfolgt nach der ausgewiesenen Berufserfahrung mit adäquater Ausbildung. Die hauptverantwortliche Schlüsselperson weist eine Berufserfahrung von mind. 10 Jahren auf. Die Wertung des Angebotspreises (exkl. MwSt.) in Bezug auf den Betriebs-Umsatz (netto, exkl. MwSt.) erfolgt nachfolgender Gewichtung: • 3 Punkte Verhältnis Angebotspreis (exkl. MwSt.) / Betriebs-Umsatz (netto, exkl. MwSt.) 0 - 9.999% • 2 Punkte Verhältnis Angebotspreis (exkl. MwSt.) / Betriebs-Umsatz (netto, exkl. MwSt.) 10 - 19.999% • 1 Punkte Verhältnis Angebotspreis (exkl. MwSt.) / Betriebs-Umsatz (netto, exkl. MwSt.) 20 - 49.999% • 0 Punkte Verhältnis Angebotspreis (exkl. MwSt.) / Betriebs-Umsatz (netto, exkl. MwSt.) 50 - 100% Es erfolgt jeweils eine Wertung nach Punkten zwischen 0 - 3. Gewichtung: 20 % Zuschlagskriterium: ZK 4: Nachhaltigkeit Die Punktzahl für das Zuschlagskriterium Nachhaltigkeit wird nach den erklärten zusätzlichen Massnahmen in Ergänzung zu den geforderten Bedingungen (KBOB) bewertet. Dabei wird die vorbehaltlose Bestätigung der geforderten Bedingungen mit einem Punkt bewertet. Die weitere Bewertung erfolgt von 0 - 3. Gewichtung: 5 %