New sewer separation system between Harzbüchel and Lindenstrasse

Entsorgung St.GallenSwitzerlandOpen
Place
St. Gallen, canton of St. Gallen
23 December 2026 at 23:59 CET
10:59 PM · UTC
Contract value
Not stated in the notice
Contract period
1 March to 31 July 2027
Published
November 12, 2026
SIMAP

Overview

Entsorgung St.Gallen is building a sewer separation system between Harzbüchelstrasse and Lindenstrasse. The published quantities include polypropylene pipes of DN 315 and DN 400, glass-fibre reinforced pipes of DN 600 and DN 1200, several standard and GRP manholes, about 2,040 m³ of excavation, trench shoring, about 4,050 tonnes of excavated material transport, 480 m³ of base and encasement concrete, and temporary pavement. The execution period is 1 March to 31 July 2027. Offers are due by 23 December 2026 at 23:59 CET.

Information based on the public notice

What the buyer needs

Construction of a sewer separation system with specified pipe sizes, manholes, excavation, shoring, concrete, material delivery, and temporary pavement.

  • Submit an offer for the full sewer works. The notice permits consortia; it does not state subcontractor rules.

Tender details

Buyer
Entsorgung St.Gallen
Country
Switzerland
Procedure
open
Classification
Water, waste and environmental services · CPV 45000000
Notice reference
47499 · 47499-01
Pipe lengths
PP DN 315: 73 m; PP DN 400: 18 m; GRP DN 600: 25 m; GRP DN 1200: 60 m
Excavation
About 2,040 m³; about 4,050 tonnes of excavated material for transport
Execution period
1 March to 31 July 2027
Offer deadline
23 December 2026 at 23:59 CET

What to check in the tender documents

  • The notice does not state a contract value or publish award criteria.
Get started with Ziva

Original notice

Read the original description

Neubau Trennsystem Harzbüchel-Lindenstrasse

Kanalneubau: PP DN 315 mm m 73 PP DN 400 mm m 18 GF-UP DN 600 mm m 25 GF-UP DN 1200 mm m 60 Aushub fest m3 ~ 2040 Normschacht DN 1000 mm St 1 Normschacht DN 1500 mm St 1 GF-UP Schacht DN 2000 mm St 2 Ortbetonschacht St 1 Grabensicherung (Kanaldielen) m2 ~880 Grabensicherung (Dielenkammerverbau) m² ~600 Transport Aushub Masse t ~4050 Sohlen- und Hüllbeton m3 480 Materiallieferungen lose m3 ~1300 Provisorischer Belag t 100

Official source: SIMAP ↗