Installation of chilled-water production and cooling in corridors at two Centre Hospitalier Jura Sud sites
BOAMP
Overview
Centre Hospitalier Jura Sud is procuring works to install chilled-water production and cool corridors in the north wing of the medicine building at Lons-le-Saunier and in the Chalet building at Champagnole. The official BOAMP record identifies an open procedure, works contract, plumbing and air-conditioning descriptors, and a deadline of 16 November 2026 at 11:00 UTC. Estimated value, detailed technical design and participation conditions are not included in the selected public notice fields.
Information based on the public notice
Ask about this tender
What the buyer needs
Install chilled-water production and cool corridors at the two named hospital sites, including the north wing of the medicine building in Lons-le-Saunier and the Chalet building in Champagnole.
Tender details
- Buyer
- Centre Hospitalier Jura Sud
- Country
France
- Procedure
- Open procedure
- Classification
- Hospital cooling-system installation works · BOAMP_DESCRIPTOR: 270; BOAMP_DESCRIPTOR: 62; CPV: 45331230
- Notice reference
- 26-96417
- Submission deadline
- 2026-11-16T11:00:00+00:00
- BOAMP notice classification
- Works; plumbing and air-conditioning descriptors.
- Contract type
- Works
What to check in the tender documents
- The selected BOAMP fields do not provide an estimated value, detailed technical design or participation conditions.
Original notice
Read the original description
AOO- Installation d'une production d'eau glacée et rafraichissement des couloirs de l'Aile Nord du Bâtiment Médecine du CHJS-Site de Lons-le-Saunier et du Bâtiment Chalet du CHJS-Site de Champagnole
Official source: BOAMP ↗
https://www.boamp.fr/pages/avis/?q=idweb:26-96417
Source retrieved: 2026-10-13T13:27:53.988747Z