Wastewater-network and overflow assessment for Padania Acque

16 November 2026, 12:00 Europe/Rome
11:00 AM · UTC
Contract value
€9,000,000

Framework agreement budget as expressly labelled; not an award amount. VAT treatment not stated.

Contract period
48 months
Published
October 6, 2026

Padania Acque public procurement detail

Overview

Padania Acque S.p.A. is procuring engineering and architecture services to complete its knowledge base for planning the reorganization of sewer networks and overflow structures. The official page describes georeferenced geometric and topographic surveys, overflow analysis, hydraulic modelling, and monitoring of flows and rainfall. The procurement is a framework agreement evaluated on the most economically advantageous tender basis, with a stated framework budget of €9,000,000; €6,000,000 is listed as subject to price reduction. Its duration is 48 months. The page shows a 16 November 2026, 12:00 Europe/Rome deadline, consistent with the canonical 11:00 UTC timestamp. No award is reported.

Information based on the public notice

What the buyer needs

Engineering studies and monitoring to complete the information base for sewer-network and overflow-structure reorganization in Padania Acque’s territory.

Tender details

Buyer
Padania Acque S.p.A.
Country
Italy
Procedure
Aperta
Classification
Sewer-network engineering · CIG BD32AAE3E2 · CPV Servizi di ingegneria
Notice reference
5344d222-3389-4424-9277-d349acc557a3
Scope
Engineering and architecture services for georeferenced sewer-network surveys, overflow analysis, hydraulic modelling, and flow and rainfall monitoring.
Procedure and evaluation
Electronic framework agreement; most economically advantageous tender.
Framework budget
€9,000,000, labelled “Budget Accordo Quadro”; this is a stated budget, not an award. VAT treatment is not stated.
Price-reducible amount
€6,000,000, labelled as the amount subject to price reduction, net of charges.
Term and deadline
Framework duration: 48 months. Submission deadline: 16 November 2026 at 12:00 Europe/Rome (11:00 UTC).

What to check in the tender documents

  • No award result, lot structure, or VAT treatment is stated on the public detail page.
Get started with Ziva

Original notice

Read the original description

Completamento del quadro conoscitivo per la redazione del programma di riassetto delle fognature e degli sfioratori in attuazione al R.R. 6/2019 mediante rilievo geometrico e topografico georeferenziato, analisi sfioratori di piena, modellazione idraulica e monitoraggio portate e piogge – CUP D93F26000040005

Dettagli procedura Completamento del quadro conoscitivo per la redazione del programma di riassetto delle fognature e degli sfioratori in attuazione al R.R. 6/2019 mediante rilievo geometrico e topografico georeferenziato, analisi sfioratori di piena, modellazione idraulica e monitoraggio portate e piogge Ente: Padania Acque S.p.A. Oggetto: Completamento del quadro conoscitivo per la redazione del programma di riassetto delle fognature e degli sfioratori in attuazione al R.R. 6/2019 mediante rilievo geometrico e topografico georeferenziato, analisi sfioratori di piena, modellazione idraulica e monitoraggio portate e piogge Tipo di fornitura: Ingegneria e Architettura Tipologia di gara: Accordo Quadro Criterio di valutazione: Offerta economicamente più vantaggiosa Modalità di espletamento della gara: Telematica Importo complessivo dell'appalto: 9.000.000,00 € Importo, al netto di oneri, soggetto a ribasso: 6.000.000,00 € CIG: BD32AAE3E2 CUP: D93F26000040005 Stato: In corso Centro di costo: Servizio ingegneria Data pubblicazione : 05 ottobre 2026 8:30:00 Termine ultimo per la presentazione di quesiti: 29 ottobre 2026 12:00:00 Data scadenza: 16 novembre 2026 12:00:00 Budget Accordo Quadro: 9.000.000,00 € Durata dell'accordo quadro: 48 mesi

Official source: Padania Acque public procurement detail ↗