Containerized data centre for three campuses

The procuring entity states that the procurement reference changed from PR No. 2026-03-228 to PR No. 2026-09-649.

19 October 2026 at 9:00 AM Philippine time
01:00 AM · UTC
Contract value
₱8,416,920

Approved budget for the contract

Contract period
90 days
Published
September 28, 2026

PhilGEPS

Overview

Davao de Oro State College invited bids to establish a containerized data centre and upgrade ICT utilities for Montevista, New Bataan and Maragusan campuses. The approved budget is PHP 8,416,920, delivery is 90 days and bids were due 19 October 2026 at 9:00 AM Philippine time. The notice corrects the procurement reference to PR No. 2026-09-649.

Information based on the public notice

What the buyer needs

Supply, delivery and installation of containerized data-centre infrastructure, cooling, electrical and grounding systems, networking, fibre-optic equipment, cabinets, CCTV and biometric access control.

  • Submit a bid under the public bidding procedure by the stated deadline.

Lots

1 ·Containerized data centre for Montevista, New Bataan and Maragusan campuses

Tender details

Buyer
DAVAO DE ORO STATE COLLEGE
Country
Philippines
Procedure
Not stated in the notice
Classification
IT, software and telecoms
Notice reference
13261219
Current procurement reference
PR No. 2026-09-649
Approved budget
PHP 8,416,920.00
Delivery period
90 days
Bid deadline
19 October 2026, 9:00 AM Philippine time

Original notice

Read the original description

ESTABLISHMENT OF DATA CENTER AND UPGRADING OF ICT UTILITIES: SUPPLY, DELIVERY AND INSTALLATION OF CONTAINERIZED DATA CENTER FOR MONTEVISTA, NEW BATAAN AND MARAGUSAN CAMPUS

Supply, delivery, and installation of Containerized Data Center for Montevista, New Bataan and Maragusan Campuses, PRELIMINARIES 1 lot Mobilization & Demobilization - Manpower, Equipment & Material Logistics 1 lot Project Management - On-site Management, Accommodation & Logistics 1 lot Tools Rental & PPE 1 lot Delivery Cost (Container van) 1 lot Bonds and Taxes CIVIL WORKS 6 sets Concrete Pedestal 1 unit Modified Container Van (3m x 6m x 2.8m) 18 sqm Basic Secondary Roofing Structure COOLING SYSTEM 2 units 3HP ACU Inverter Split Type 2 lots Engineering Services (Mechanical & Electrical Works) CABLE TRAY SYSTEM 6 lengths Cable Tray, 150mm (W) x 100mm (H) 12 sets Cable Tray Support & Brackets 1 lot Engineering Services (Installation & Delivery) ELECTRICAL SYSTEM 1 set Main Distribution Panel (MDP): - Main Breaker: 80/2P; - 8-Branches: 4x30A/2P, 4x20A/2P -Grounding Bus Bar 1 length THHN Wire, 5.5mm2 (Wire from MDP to ACU1 & ACU2) 1 length THHN Wire, 3.5mm2 (Wire from MDP to CO & Light) 20 units Royal Cord, 5.5mm2/3 (Wire from MDP to PDU) 1 units Engineering Services (Installation & Delivery) GROUNDING SYSTEM 3 units Grounding Rod with Standard Clamp 35 mtrs Bare Copper Wire, 8mm2 20 mtrs Bare Copper Wire, 5.5mm2 1 lot Connectors, Terminal Lugs & Miscellaneous 1 lot Engineering Services (Installation & Delivery) LIGHTING SYSTEM 3 units LED Panel Lights 2 units Emergency Lights, Wallmounted 1 lot Engineering Services (Installation & Delivery) NETWORK EQUIPMENT 1 unit TP-Link Omada 16- Port 10GE SFP+ L2+ Managed Switch, Model: SX3016F 2 units TP-Link Omada 24-Port PoE+ GE L2+ Managed Switch with 4 x 10G SFP+, Model: SG3428XMP 4 units TP-Link Omada 10GBase-SR SFP+ LC Transceiver, Model: SM5110-SR 1 lot Engineering Services (Installation & Delivery) , Network FOC SYSTEM 150 meters Premium Line Fiber Optic Cable, 4-Core, OM4 3 units Premium Line Fiber Optic Patch Panel, Main Body 3 units Premium Line 4-port Adapter Panel UPC, Unloaded, Black 9 units Premium Line Fiber Optic Patch Panel,Blank Panel 8 units Premium Line Fiber Adapter, LC, Duplex, MM with Zirconia Ceramic Sleeve 8 units Premium Line Fiber Optic Pigtail, LC, MM OM4, 0.9mm, LSOH, 1m 4 units Premium Line Fiber Patch Cord, LC - LC, Duplex, MM OM4, LSOH, 2M 1 unit Premium Line 19” Cable Management, Duct Type, Black, 1U 1 lot Local Materials, Piping Conduit - PVC Pipes 8 core ep Engineering Services, Fiber Fusion Splicing 1 lot Engineering Services (Installation & Delivery) , FOC DATA CABINETS 1 unit Premium Line Design Enhanced Server Cabinet with perforated front door, 42U, 800mm (D) 2 units Premium Line Wall Mount Cabinet, 15U (H), 600mm (W), 600mm (D) 4 units Premium Line Cooling Fan, with three pins German-type plug, 1wire/2 fans 3 units Premium Line Horizontal PDU, US (NEMA5- 15P) Plug, 6 Universal Outlets, 1U 1 lot Engineering Services (Installation & Delivery) OTHERS 1 lot CCTV, Biometrics, and other peripherals/systems as illustrated in the plan 1 lot Hikvision 4MP AcuSense Network Dome Camera, Model: DS-2CD2143G2-IS Hikvision 8-Channel AcuSense 4K Network Video Recorder with 8- Port PoE, Model: DS-7608NXI-I2/8P/4S 1 lot ZKTeco Fingerprint and Facial Recognition Time Attendance / Access Control Terminal, Model: MB560-VL ZKTeco Biometric Door Access Accessories, Electric Lock, Exit Button and Power Supply, Model: Complete Set / Equivalent Pre-bid conference: 6 October 2026 at 9:00 AM at the College Board Room, Purok 10, Poblacion, Compostela, Davao de Oro, or by Zoom. Official remark: PR No. 2026-03-228 changed to PR No. 2026-09-649. Further information: BAC Secretariat, P-10 Poblacion, Compostela, Davao de Oro 8803; telephone 63-955-5905086 and 63-949-8233796; procurement@ddosc.edu.ph.

Official source: PhilGEPS ↗

Notice updates

October 20, 2026 · Version 2

Buyer updated · Classification updated · Contract period updated · Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Location updated · Source updated · Source notice details updated · Source references updated · Status changed · Notice update added

ESTABLISHMENT OF DATA CENTER AND UPGRADING OF ICT UTILITIES: SUPPLY, DELIVERY AND INSTALLATION OF CONTAINERIZED DATA CENTER FOR MONTEVISTA, NEW BATAAN AND MARAGUSAN CAMPUS

Supply, delivery, and installation of Containerized Data Center for Montevista, New Bataan and Maragusan Campuses, PRELIMINARIES 1 lot Mobilization & Demobilization - Manpower, Equipment & Material Logistics 1 lot Project Management - On-site Management, Accommodation & Logistics 1 lot Tools Rental & PPE 1 lot Delivery Cost (Container van) 1 lot Bonds and Taxes CIVIL WORKS 6 sets Concrete Pedestal 1 unit Modified Container Van (3m x 6m x 2.8m) 18 sqm Basic Secondary Roofing Structure COOLING SYSTEM 2 units 3HP ACU Inverter Split Type 2 lots Engineering Services (Mechanical & Electrical Works) CABLE TRAY SYSTEM 6 lengths Cable Tray, 150mm (W) x 100mm (H) 12 sets Cable Tray Support & Brackets 1 lot Engineering Services (Installation & Delivery) ELECTRICAL SYSTEM 1 set Main Distribution Panel (MDP): - Main Breaker: 80/2P; - 8-Branches: 4x30A/2P, 4x20A/2P -Grounding Bus Bar 1 length THHN Wire, 5.5mm2 (Wire from MDP to ACU1 & ACU2) 1 length THHN Wire, 3.5mm2 (Wire from MDP to CO & Light) 20 units Royal Cord, 5.5mm2/3 (Wire from MDP to PDU) 1 units Engineering Services (Installation & Delivery) GROUNDING SYSTEM 3 units Grounding Rod with Standard Clamp 35 mtrs Bare Copper Wire, 8mm2 20 mtrs Bare Copper Wire, 5.5mm2 1 lot Connectors, Terminal Lugs & Miscellaneous 1 lot Engineering Services (Installation & Delivery) LIGHTING SYSTEM 3 units LED Panel Lights 2 units Emergency Lights, Wallmounted 1 lot Engineering Services (Installation & Delivery) NETWORK EQUIPMENT 1 unit TP-Link Omada 16- Port 10GE SFP+ L2+ Managed Switch, Model: SX3016F 2 units TP-Link Omada 24-Port PoE+ GE L2+ Managed Switch with 4 x 10G SFP+, Model: SG3428XMP 4 units TP-Link Omada 10GBase-SR SFP+ LC Transceiver, Model: SM5110-SR 1 lot Engineering Services (Installation & Delivery) , Network FOC SYSTEM 150 meters Premium Line Fiber Optic Cable, 4-Core, OM4 3 units Premium Line Fiber Optic Patch Panel, Main Body 3 units Premium Line 4-port Adapter Panel UPC, Unloaded, Black 9 units Premium Line Fiber Optic Patch Panel,Blank Panel 8 units Premium Line Fiber Adapter, LC, Duplex, MM with Zirconia Ceramic Sleeve 8 units Premium Line Fiber Optic Pigtail, LC, MM OM4, 0.9mm, LSOH, 1m 4 units Premium Line Fiber Patch Cord, LC - LC, Duplex, MM OM4, LSOH, 2M 1 unit Premium Line 19” Cable Management, Duct Type, Black, 1U 1 lot Local Materials, Piping Conduit - PVC Pipes 8 core ep Engineering Services, Fiber Fusion Splicing 1 lot Engineering Services (Installation & Delivery) , FOC DATA CABINETS 1 unit Premium Line Design Enhanced Server Cabinet with perforated front door, 42U, 800mm (D) 2 units Premium Line Wall Mount Cabinet, 15U (H), 600mm (W), 600mm (D) 4 units Premium Line Cooling Fan, with three pins German-type plug, 1wire/2 fans 3 units Premium Line Horizontal PDU, US (NEMA5- 15P) Plug, 6 Universal Outlets, 1U 1 lot Engineering Services (Installation & Delivery) OTHERS 1 lot CCTV, Biometrics, and other peripherals/systems as illustrated in the plan 1 lot Hikvision 4MP AcuSense Network Dome Camera, Model: DS-2CD2143G2-IS Hikvision 8-Channel AcuSense 4K Network Video Recorder with 8- Port PoE, Model: DS-7608NXI-I2/8P/4S 1 lot ZKTeco Fingerprint and Facial Recognition Time Attendance / Access Control Terminal, Model: MB560-VL ZKTeco Biometric Door Access Accessories, Electric Lock, Exit Button and Power Supply, Model: Complete Set / Equivalent Pre-bid conference: 6 October 2026 at 9:00 AM at the College Board Room, Purok 10, Poblacion, Compostela, Davao de Oro, or by Zoom. Official remark: PR No. 2026-03-228 changed to PR No. 2026-09-649. Further information: BAC Secretariat, P-10 Poblacion, Compostela, Davao de Oro 8803; telephone 63-955-5905086 and 63-949-8233796; procurement@ddosc.edu.ph.

October 14, 2026 · Version 1

Published

ESTABLISHMENT OF DATA CENTER AND UPGRADING OF ICT UTILITIES: SUPPLY, DELIVERY AND INSTALLATION OF CONTAINERIZED DATA CENTER FOR MONTEVISTA, NEW BATAAN AND MARAGUSAN CAMPUS

ESTABLISHMENT OF DATA CENTER AND UPGRADING OF ICT UTILITIES: SUPPLY, DELIVERY AND INSTALLATION OF CONTAINERIZED DATA CENTER FOR MONTEVISTA, NEW BATAAN AND MARAGUSAN CAMPUS