Deployment and operation of charging infrastructure for electric and plug-in hybrid vehicles in Erquy

Commune of ErquyFranceClosed
The official page states 4 November 2026 at 12:00 without a timezone; canonical data gives 11:00 UTC the same date. Their relationship is unverified.
Time not stated
Contract value
Not stated in the notice
Classification
Electric vehicle charging infrastructure
Published
October 8, 2026

Mégalis Bretagne public consultation AMI_IRVE (reference 242036)

Overview

The Commune of Erquy seeks proposals for the deployment and operation of charging infrastructure for electric and plug-in hybrid vehicles. The official consultation is reference AMI_IRVE, classified as a service, with no lots and CPV 65320000. The public detail page gives no infrastructure quantities, locations beyond Côtes-d’Armor, pricing or concession terms; the consultation and regulation documents are listed but were not opened. The page gives a deadline of 4 November 2026 at 12:00 without timezone; data gives 11:00 UTC on the same date, so only the date is used. No award is shown.

Information based on the public notice

What the buyer needs

Deployment and operation of charging infrastructure for electric and plug-in hybrid vehicles in a consultation issued by the Commune of Erquy. The detail page provides no quantities or specific charging-site scope.

Tender details

Buyer
Commune of Erquy
Country
France
Procedure
Procédure autre
Classification
Electric vehicle charging infrastructure · 65320000
Notice reference
242036 · AMI_IRVE; consultation 242036
Purpose
Deployment and operation of charging infrastructure for electric and plug-in hybrid vehicles
Category and lots
Services; no lots
Location
Côtes-d’Armor, France
Submission deadline
4 November 2026 at 12:00 on the official page without timezone; canonical 11:00 UTC same date

What to check in the tender documents

  • The public detail page does not state the number or locations of charging points, technical requirements, pricing or concession/operating terms; the consultation and regulation files were listed but not opened.
  • The official deadline is 4 November 2026 at 12:00 without timezone; data gives 11:00 UTC on that date. Conversion is unverified. No award is shown.
Get started with Ziva

Original notice

Read the original description

DÉPLOIEMENT ET L’EXPLOITATION D’INFRASTRUCTURES DE RECHARGE POUR VÉHICULES ÉLECTRIQUES ET HYBRIDES RECHARGEABLES

Référence : AMI_IRVE Intitulé : DÉPLOIEMENT ET L’EXPLOITATION D’INFRASTRUCTURES DE RECHARGE POUR VÉHICULES ÉLECTRIQUES ET HYBRIDES RECHARGEABLES Objet : DÉPLOIEMENT ET L’EXPLOITATION D’INFRASTRUCTURES DE RECHARGE POUR VÉHICULES ÉLECTRIQUES ET HYBRIDES RECHARGEABLES Date et heure limite de remise des plis : 04/11/2026 12:00 Organisme : COMMUNE DE ERQUY (22430 - ERQUY) Entité publique : COMMUNE DE ERQUY Service : COMMUNE DE ERQUY - COMMUNE DE ERQUY Type d’annonce : Annonce de consultation Catégorie principale : Services Allotissement : Non Lieu d’exécution : (22) Côtes-d’Armor Code CPV : 65320000 (code principal)

Official source: Mégalis Bretagne public consultation AMI_IRVE (reference 242036) ↗