Construction of the double 220 kV Lanabregas–Traktora line
Outcome
Submissions closed on 28 October 2026. No award has been published yet. Open tenders like this one are listed below.
- Place
- Lanabregas–Traktora, Albania
- The notice states 28 October 2026 at 10:00 for submission and opening, without specifying a timezone. The canonical snapshot instead records 22:59:59 UTC; conflict unresolved.
- Time not stated
- Contract value
- ALL 645,067,253
- Limit fund excluding VAT; EUR 7,013,887.7 is the notice’s stated currency conversion.
- Contract period
- 18 months from entry into force of the contract
- Published
- September 27, 2026
- Operatori i Sistemit të Transmetimit (OST), official summary contract notice
Overview
The Transmission System Operator (OST) is seeking construction of a double 220 kV line between Lanabregas and Traktora, partly overhead and partly underground, including a split of the 220-6 Tirana 1–Elbasan 1 line. The open, electronically conducted works procedure has a published limit fund of 645,067,253 ALL excluding VAT, funded from OST’s own revenues. The notice also gives an exchange conversion of EUR 7,013,887.7 excluding VAT using the rate dated 25 September 2026. The contract period is 18 months from entry into force. Offers are due on 28 October 2026 at 10:00; the notice does not state a timezone, and the canonical UTC time conflicts.
Information based on the public notice
Ask about this tender
What the buyer needs
Construction of the described double 220 kV line, partly overhead and partly cable, including the specified line split.
Tender details
- Buyer
- Transmission System Operator (OST sh.a.)
- Country
Albania
- Procedure
- Open INT
- Classification
- Electrical power lines · CPV 31321000-2
- Notice reference
- ref:REF-01663-09-25-2026
- Works
- Double 220 kV Lanabregas–Traktora line, partly overhead and partly cable
- Estimated/limit value
- 645,067,253 ALL excluding VAT; EUR 7,013,887.7 conversion also stated
- Funding
- Revenue of OST sh.a.
- Duration
- 18 months from contract entry into force
- Published deadline
- 28 October 2026 at 10:00; timezone unstated and canonical UTC conflicts
What to check in the tender documents
- The notice does not state the timezone for 10:00. Detailed qualification and award criteria are not included in the short notice.
Original notice
Read the original description
Ndërtimi i linjës dyfishe 220 kV Lanabregas – Traktora (pjesërisht ajrore dhe pjesërisht kabllore, çarja e linjës 220-6 Tirana 1 – Elbasan 1).
Official source: Operatori i Sistemit të Transmetimit (OST), official summary contract notice ↗