Replacement of the N5/E420 water main

INASEPBelgiumClosed
Offers due 10 November 2026 at 10:00 CET.
09:00 AM · UTC
Contract value
Not stated in the notice
Classification
Water distribution pipeline works
Published
October 26, 2026

INASEP via Belgian e-Procurement

Overview

INASEP is seeking works to replace a water main near the N5 between Philippeville and Fraire, following road rehabilitation by SPW Routes. The stated work includes laying and encasing the distribution pipe and accessories, installing inspection chambers, and connecting private users to the new main. The water utility supplies the pipes and fittings. The SPW road works cover trenching and backfill. The public notice does not provide a contract value or duration.

Information based on the public notice

What the buyer needs

Replacement works on a water distribution main near the N5 between Philippeville and Fraire.

  • The water utility supplies the pipes and accessories. Trenching and backfill are carried out as part of SPW road works.

Tender details

Buyer
INASEP
Country
Belgium
Procedure
OPEN
Classification
Water distribution pipeline works · CPV 45000000-7 · NUTS BE353
Notice reference
dc60d9eb-455b-49f1-a675-6c7ed2923e09
Key fact
CPV 45000000-7 · Location: NUTS BE353 · Offer deadline 10 November 2026 at 10:00 CET

What to check in the tender documents

  • The official workspace exposed only its application shell and its public API returned an error. No value, duration or detailed award criteria could be verified.
Get started with Ziva

Original notice

Read the original description

Remplacement adduction N5/E420

Le remplacement de l'adduction à proximité de la N5 entre Philippeville et Fraire Ces travaux de remplacement de l'adduction font suite aux travaux de réfection de la N5 (Travaux du SPW – Routes). Les travaux comprennent principalement les opérations suivantes : - Pose (et enrobage) de la conduite de distribution et ses accessoires ; - Construction et pose des chambres de visite ; - Raccordement des particuliers sur la nouvelle conduite - Les tuyaux et accessoires de distribution d’eau sont fournis par le concessionnaire. – Les tranchées et le remblayage des conduites seront réalisées dans le cadre des travaux du SPW

Official source: INASEP via Belgian e-Procurement ↗

Notice updates

November 6, 2026 · Version 2

Buyer updated · Classification updated · Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Source updated · Source notice details updated · Source references updated

Remplacement adduction N5/E420

Le remplacement de l'adduction à proximité de la N5 entre Philippeville et Fraire Ces travaux de remplacement de l'adduction font suite aux travaux de réfection de la N5 (Travaux du SPW – Routes). Les travaux comprennent principalement les opérations suivantes : - Pose (et enrobage) de la conduite de distribution et ses accessoires ; - Construction et pose des chambres de visite ; - Raccordement des particuliers sur la nouvelle conduite - Les tuyaux et accessoires de distribution d’eau sont fournis par le concessionnaire. – Les tranchées et le remblayage des conduites seront réalisées dans le cadre des travaux du SPW

October 12, 2026 · Version 1

Published

Remplacement adduction N5/E420

Le remplacement de l'adduction à proximité de la N5 entre Philippeville et Fraire Ces travaux de remplacement de l'adduction font suite aux travaux de réfection de la N5 (Travaux du SPW – Routes). Les travaux comprennent principalement les opérations suivantes : - Pose (et enrobage) de la conduite de distribution et ses accessoires ; - Construction et pose des chambres de visite ; - Raccordement des particuliers sur la nouvelle conduite - Les tuyaux et accessoires de distribution d’eau sont fournis par le concessionnaire. – Les tranchées et le remblayage des conduites seront réalisées dans le cadre des travaux du SPW