Dahl Park restroom and storage building renovation
Outcome
Submissions closed on 4 November 2026. No award has been published yet. Open tenders like this one are listed below.
The current City of Seattle project listing gives a bid deadline of 4 November 2026 at 2:00 p.m. PST (UTC−08:00); the previously published page displayed 28 October 2026 at 2:00 p.m. PDT (UTC−07:00). This page shows the date in the current City listing.
- Buyer
- City of Seattle
- Place
- Dahl Park, Seattle, Washington
- Bid deadline
- 10:00 PM · UTC
- Contract value
- $968,676
- Engineer’s Estimate; not an award amount
- Classification
- Construction and civil works
- Published
- October 7, 2026
- OpenGov Procurement Seattle project notice
Overview
The City of Seattle is renovating a fire-damaged storage and restroom building at Dahl Park, 7700 25th Ave NE. The listed work includes two single-occupancy restrooms; replacement of fire-damaged structural timber and the roof; shear walls; removal of the stone chimney; and replacement of the electrical system. Accessibility work includes changes to accessible parking stalls and the affected sidewalk, plus an improved path between the parking lot and restrooms. The Engineer’s Estimate is USD 968,676. The current City listing gives a 4 November 2026, 2:00 p.m. PST deadline; the previously published page showed 28 October at 2:00 p.m. PDT.
Information based on the public notice
Ask about this tender
What the buyer needs
Renovation of Dahl Park’s fire-damaged storage and restroom building, including structural, roofing, electrical and accessibility work.
Tender details
- Buyer
- City of Seattle
- Country
United States
- Procedure
- Solicitation (Attach a Document) - Construction
- Classification
- Construction and civil works
- Notice reference
- 309490
- Project reference
- OpenGov project 309490
- Engineer’s estimate
- USD 968,676, an estimate and not an award amount
- Project location
- 7700 25th Ave NE, Seattle, WA 98115
- Bid deadline
- 4 November 2026 at 2:00 p.m. PST (UTC−08:00), as shown in the current City listing
- Status
- Open in the current City listing
What to check in the tender documents
- The available project information does not state detailed eligibility criteria, evaluation criteria, a construction period or bid submission instructions.
- The current published information provides no award notice or award amount; later lifecycle changes could not be confirmed.
Original notice
Read the original description
Dahl Restroom Renovation
Official source: OpenGov Procurement Seattle project notice ↗
Notice updates
October 23, 2026 · Version 2
Buyer updated · Classification updated · Deadline information updated · Summary and analysis updated · Tender facts updated · Deadline updated · Location updated · Source updated · Source notice details updated · Source references updated · Notice update added
Dahl Restroom Renovation
Project Description: Renovation of an existing Park's storage and restroom building which has received fire damage. Works include but not limited to renovating the restrooms to become two single occupancy restrooms, replacing fired damaged structural timber frames, adding shear walls, replacing existing roof, removing existing stone chimney, and replacing entire electrical system. Other accessibility related site improvements include revising existing accessible parking stalls and affected sidewalk, improving pathway between parking lot to the restrooms. Engineer's Estimate: $968,676.00. Project Location: 7700 25th Ave NE Seattle, WA 98115
October 13, 2026 · Version 1
Published
Dahl Restroom Renovation
Project Description: Renovation of an existing Park's storage and restroom building which has received fire damage. Works include but not limited to renovating the restrooms to become two single occupancy restrooms, replacing fired damaged structural timber frames, adding shear walls, replacing existing roof, removing existing stone chimney, and replacing entire electrical system. Other accessibility related site improvements include revising existing accessible parking stalls and affected sidewalk, improving pathway between parking lot to the restrooms. Engineer's Estimate: $968,676.00. Project Location: 7700 25th Ave NE Seattle, WA 98115
https://procurement.opengov.com/portal/seattle/projects/309490
Source retrieved: 2026-10-23T12:02:39.969460Z