Collection units for glass and metal packaging

Outcome

Submissions closed on 2 November 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Oslo, Norway
Tender submission deadline (UTC as printed)
11:00 AM · UTC
Contract value
Not stated in the notice
Lots
1 lot
Contract period
48 months
Published
September 30, 2026
TED official notice API

Overview

Oslo municipality seeks new collection units for glass and metal packaging and replacement units. The notice reports 1,067 existing units across 955 sites as of 1 June 2026. The term is 48 months. The notice says its estimates are indicative only and do not bind the authority; the retrieved fields provide no numeric amount. Quality, price and environmental criteria emphasize circularity. Offers are due 2 November 2026 at 11:00 UTC, exactly as printed.

Information based on the public notice

What the buyer needs

  • Electronic submission is required where the notice says required.
  • Norwegian is the stated submission language.

Lots

7741 ·Collection units for glass and metal packaging

Tender details

Buyer
Oslo kommune v/ Renovasjons- og gjenvinningsetaten
Country
Norway
Procedure
open
Classification
Water, waste and environmental services · CPV 90000000 · CPV 90500000 · CPV 90510000 · CPV 90511000 · CPV 90514000 · CPV 34000000 · CPV 34928480
Notice reference
674521-2026
Scope
New collection units for glass and metal packaging and replacement of existing units in Oslo. The notice reports 1,067 units at 955 sites as of 1 June 2026.
Contract period
48 months
Estimated value
The notice says estimates are for guidance only and are not a commitment; no numeric amount is present in the retrieved fields.
Criteria
Price, quality and environmental requirements, with emphasis on circularity.
Deadline
2 November 2026 at 11:00 UTC, as explicitly printed.

What to check in the tender documents

  • No numeric estimate is included in the retrieved fields; the notice expressly limits estimates to guidance and disclaims any commitment.
Get started with Ziva

Original notice

Read the original description

Collection units for glass and metal packaging

TED publication reference: 674521-2026 TED publication number: 674521-2026 Procedure title: [eng] Collection units for glass and metal packaging Notice type: cn-standard Procedure description: [eng] As of 1 June 2026, the Agency for Waste Management and Recycling (REG) has 1,067 freestanding collection units for glass and metal packaging in various sizes, distributed across 955 collection sites in the City of Oslo. A procurement process will now be carried out for new collection units as part of the measures to achieve the targeted collection volumes, as well as for the replacement of existing collection units for the City of Oslo. The Contracting Authority draws attention to the fact that the estimated value is based on historical data, anticipated future requirements, or similar information. The estimates are provided for guidance only and do not entail any obligation on the part of the Contracting Authority. Lot description: [eng] [1] As of 1 June 2026, the Agency for Waste Management and Recycling (REG) has 1,067 freestanding collection units for glass and metal packaging in various sizes, distributed across 955 collection sites in the City of Oslo. A procurement process will now be carried out for new collection units as part of the measures to achieve the targeted collection volumes, as well as for the replacement of existing collection units for the City of Oslo. The Contracting Authority draws attention to the fact that the estimated value is based on historical data, anticipated future requirements, or similar information. The estimates are provided for guidance only and do not entail any obligation on the part of the Contracting Authority. Lot title: [eng] [1] Collection units for glass and metal packaging Internal lot identifier: [1] 7741 Main lot classification: [1] 90000000 Procedure classification: [1] 90000000 CPV classification: [1] 90000000 [2] 90500000 [3] 90510000 [4] 90511000 [5] 90514000 [6] 34000000 [7] 34928480 [8] 90000000 [9] 90500000 [10] 90510000 [11] 90511000 [12] 90514000 [13] 34000000 [14] 34928480 Procedure identifier: e507ade2-4efc-4618-b8d3-f097af1b73a9 Procedure type: open Publication date: 2026-10-01+02:00 Tender receipt deadline date by lot: [1] 2026-11-02Z Tender receipt deadline time by lot: [1] 11:00:00Z Deadline for receipt of requests/offers: [1] 2026-11-02T11:00:00Z Buyer country: [1] NOR Contracting authority name: [eng] [1] Oslo kommune v/ Renovasjons- og gjenvinningsetaten Contracting authority identifier: [1] 923954791 Buyer city: [mul] [1] Oslo Buyer postcode: [1] 0581 Contract duration by lot: [1] [unit] MONTH [value] 48 Electronic submission by lot: [1] required Submission language: [1] NOB Award criterion description by lot: [eng] [1] Price. [2] Quality. [3] Climate and environmental requirements have been given high priority in the requirements specification, with particular emphasis on circularity requirements. Award criterion type by lot: [1] price [2] quality [3] quality Selection criterion description by lot: [eng] [1] The supplier shall be a legally established undertaking. Documentation requirements: Norwegian companies: Certificate of Registration. Foreign companies: Documentation demonstrating that the company is registered in a trade register or company register, as prescribed by the legislation of the country in which the supplier is established. [2] The supplier shall have sufficient economic and financial standing to be able to fulfil the contract. Documentation requirements: The company’s most recent annual financial statements, including the notes to the financial statements, the Board of Directors’ annual report and the auditor’s report, as well as any more recent information relevant to the company’s financial position. The Contracting Authority reserves the right to obtain a credit assessment on its own initiative. If the supplier has a valid reason (e.g. a newly established company) for being unable to provide the documentation required by the Contracting Authority, the supplier may demonstrate its economic and financial standing by means of any other document that the Contracting Authority considers appropriate. [3] The supplier is required to have implemented environmental management measures that ensure that the supplier is capable of complying with the environmental requirements of the contract. This means that the supplier shall have methods in place for actively and systematically working to reduce the negative environmental impact of activities related to the performance of this contract. Documentation requirements: A description of the supplier’s environmental management measures. If the supplier holds certificates issued by independent bodies documenting its environmental management system, these may be submitted as documentation. In this connection, reference is made to the EU Eco-Management and Audit Scheme (EMAS), other recognised environmental management systems referred to in Article 45 of Regulation (EC) No 1221/2009, such as Eco-Lighthouse (Miljøfyrtårn) or equivalent, and other environmental management standards based on relevant European or international standards issued by accredited bodies, such as ISO 14001 or equivalent. [4] The supplier shall have a quality assurance system relevant to the subject matter of the contract. Documentation requirements: A description of the supplier’s quality assurance methods. [5] The supplier shall have experience from similar contracts. Documentation requirements: A brief description of the most important deliveries carried out during the past three years, including information on the contract value, the date of delivery, the name of the contracting authority/client, and a description of the scope and content of the contract. [6] All three sizes of collection units shall be delivered within a maximum of 16 weeks from the date the order is placed. Documentation requirements: Signed written confirmation. [7] The Supplier shall have implemented measures and systems used in its work to safeguard fundamental human rights and decent working conditions, as well as to prevent environmental damage and corruption. Documentation requirements: A description of the Supplier’s systems for conducting due diligence assessments in accordance with the UN Guiding Principles on Business and Human Rights (UNGPs) and the OECD Guidelines for Multinational Enterprises. The documentation shall include: * Formal policies/guidelines that include a commitment to comply with responsible business conduct requirements. * Formal policies/guidelines concerning responsible conduct by subcontractors and throughout the supply chain (Supplier Code of Conduct). [This shall only be submitted if subcontractors are used.] * Descriptions of the Supplier’s processes and procedures for conducting due diligence assessments. * A description of how the Supplier will obtain and maintain an overview of the countries of origin and production sites for the goods offered by the Supplier. In addition: * Completed due diligence assessment form (Part 2 – Appendix 4). Execution requirements by lot: [1] performance Estimated procedure value currency: NOK Main contract nature: services Main contract nature by lot: [1] services

Official source: TED official notice API ↗

Notice updates

October 24, 2026 · Version 2

Classification updated

Норвегия – Услуги, свързани с отпадъчните води, битовите отпадъци, чистотата и околната среда – Collection units for glass and metal packaging

TED publication reference: 674521-2026 TED publication number: 674521-2026 Procedure title: [eng] Collection units for glass and metal packaging Notice type: cn-standard Procedure description: [eng] As of 1 June 2026, the Agency for Waste Management and Recycling (REG) has 1,067 freestanding collection units for glass and metal packaging in various sizes, distributed across 955 collection sites in the City of Oslo. A procurement process will now be carried out for new collection units as part of the measures to achieve the targeted collection volumes, as well as for the replacement of existing collection units for the City of Oslo. The Contracting Authority draws attention to the fact that the estimated value is based on historical data, anticipated future requirements, or similar information. The estimates are provided for guidance only and do not entail any obligation on the part of the Contracting Authority. Lot description: [eng] [1] As of 1 June 2026, the Agency for Waste Management and Recycling (REG) has 1,067 freestanding collection units for glass and metal packaging in various sizes, distributed across 955 collection sites in the City of Oslo. A procurement process will now be carried out for new collection units as part of the measures to achieve the targeted collection volumes, as well as for the replacement of existing collection units for the City of Oslo. The Contracting Authority draws attention to the fact that the estimated value is based on historical data, anticipated future requirements, or similar information. The estimates are provided for guidance only and do not entail any obligation on the part of the Contracting Authority. Lot title: [eng] [1] Collection units for glass and metal packaging Internal lot identifier: [1] 7741 Main lot classification: [1] 90000000 Procedure classification: [1] 90000000 CPV classification: [1] 90000000 [2] 90500000 [3] 90510000 [4] 90511000 [5] 90514000 [6] 34000000 [7] 34928480 [8] 90000000 [9] 90500000 [10] 90510000 [11] 90511000 [12] 90514000 [13] 34000000 [14] 34928480 Procedure identifier: e507ade2-4efc-4618-b8d3-f097af1b73a9 Procedure type: open Publication date: 2026-10-01+02:00 Tender receipt deadline date by lot: [1] 2026-11-02Z Tender receipt deadline time by lot: [1] 11:00:00Z Deadline for receipt of requests/offers: [1] 2026-11-02T11:00:00Z Buyer country: [1] NOR Contracting authority name: [eng] [1] Oslo kommune v/ Renovasjons- og gjenvinningsetaten Contracting authority identifier: [1] 923954791 Buyer city: [mul] [1] Oslo Buyer postcode: [1] 0581 Contract duration by lot: [1] [unit] MONTH [value] 48 Electronic submission by lot: [1] required Submission language: [1] NOB Award criterion description by lot: [eng] [1] Price. [2] Quality. [3] Climate and environmental requirements have been given high priority in the requirements specification, with particular emphasis on circularity requirements. Award criterion type by lot: [1] price [2] quality [3] quality Selection criterion description by lot: [eng] [1] The supplier shall be a legally established undertaking. Documentation requirements: Norwegian companies: Certificate of Registration. Foreign companies: Documentation demonstrating that the company is registered in a trade register or company register, as prescribed by the legislation of the country in which the supplier is established. [2] The supplier shall have sufficient economic and financial standing to be able to fulfil the contract. Documentation requirements: The company’s most recent annual financial statements, including the notes to the financial statements, the Board of Directors’ annual report and the auditor’s report, as well as any more recent information relevant to the company’s financial position. The Contracting Authority reserves the right to obtain a credit assessment on its own initiative. If the supplier has a valid reason (e.g. a newly established company) for being unable to provide the documentation required by the Contracting Authority, the supplier may demonstrate its economic and financial standing by means of any other document that the Contracting Authority considers appropriate. [3] The supplier is required to have implemented environmental management measures that ensure that the supplier is capable of complying with the environmental requirements of the contract. This means that the supplier shall have methods in place for actively and systematically working to reduce the negative environmental impact of activities related to the performance of this contract. Documentation requirements: A description of the supplier’s environmental management measures. If the supplier holds certificates issued by independent bodies documenting its environmental management system, these may be submitted as documentation. In this connection, reference is made to the EU Eco-Management and Audit Scheme (EMAS), other recognised environmental management systems referred to in Article 45 of Regulation (EC) No 1221/2009, such as Eco-Lighthouse (Miljøfyrtårn) or equivalent, and other environmental management standards based on relevant European or international standards issued by accredited bodies, such as ISO 14001 or equivalent. [4] The supplier shall have a quality assurance system relevant to the subject matter of the contract. Documentation requirements: A description of the supplier’s quality assurance methods. [5] The supplier shall have experience from similar contracts. Documentation requirements: A brief description of the most important deliveries carried out during the past three years, including information on the contract value, the date of delivery, the name of the contracting authority/client, and a description of the scope and content of the contract. [6] All three sizes of collection units shall be delivered within a maximum of 16 weeks from the date the order is placed. Documentation requirements: Signed written confirmation. [7] The Supplier shall have implemented measures and systems used in its work to safeguard fundamental human rights and decent working conditions, as well as to prevent environmental damage and corruption. Documentation requirements: A description of the Supplier’s systems for conducting due diligence assessments in accordance with the UN Guiding Principles on Business and Human Rights (UNGPs) and the OECD Guidelines for Multinational Enterprises. The documentation shall include: * Formal policies/guidelines that include a commitment to comply with responsible business conduct requirements. * Formal policies/guidelines concerning responsible conduct by subcontractors and throughout the supply chain (Supplier Code of Conduct). [This shall only be submitted if subcontractors are used.] * Descriptions of the Supplier’s processes and procedures for conducting due diligence assessments. * A description of how the Supplier will obtain and maintain an overview of the countries of origin and production sites for the goods offered by the Supplier. In addition: * Completed due diligence assessment form (Part 2 – Appendix 4). Execution requirements by lot: [1] performance Estimated procedure value currency: NOK Main contract nature: services Main contract nature by lot: [1] services

October 13, 2026 · Version 1

Published

Норвегия – Услуги, свързани с отпадъчните води, битовите отпадъци, чистотата и околната среда – Collection units for glass and metal packaging

TED publication reference: 674521-2026 TED publication number: 674521-2026 Procedure title: [eng] Collection units for glass and metal packaging Notice type: cn-standard Procedure description: [eng] As of 1 June 2026, the Agency for Waste Management and Recycling (REG) has 1,067 freestanding collection units for glass and metal packaging in various sizes, distributed across 955 collection sites in the City of Oslo. A procurement process will now be carried out for new collection units as part of the measures to achieve the targeted collection volumes, as well as for the replacement of existing collection units for the City of Oslo. The Contracting Authority draws attention to the fact that the estimated value is based on historical data, anticipated future requirements, or similar information. The estimates are provided for guidance only and do not entail any obligation on the part of the Contracting Authority. Lot description: [eng] [1] As of 1 June 2026, the Agency for Waste Management and Recycling (REG) has 1,067 freestanding collection units for glass and metal packaging in various sizes, distributed across 955 collection sites in the City of Oslo. A procurement process will now be carried out for new collection units as part of the measures to achieve the targeted collection volumes, as well as for the replacement of existing collection units for the City of Oslo. The Contracting Authority draws attention to the fact that the estimated value is based on historical data, anticipated future requirements, or similar information. The estimates are provided for guidance only and do not entail any obligation on the part of the Contracting Authority. Lot title: [eng] [1] Collection units for glass and metal packaging Internal lot identifier: [1] 7741 Main lot classification: [1] 90000000 Procedure classification: [1] 90000000 CPV classification: [1] 90000000 [2] 90500000 [3] 90510000 [4] 90511000 [5] 90514000 [6] 34000000 [7] 34928480 [8] 90000000 [9] 90500000 [10] 90510000 [11] 90511000 [12] 90514000 [13] 34000000 [14] 34928480 Procedure identifier: e507ade2-4efc-4618-b8d3-f097af1b73a9 Procedure type: open Publication date: 2026-10-01+02:00 Tender receipt deadline date by lot: [1] 2026-11-02Z Tender receipt deadline time by lot: [1] 11:00:00Z Deadline for receipt of requests/offers: [1] 2026-11-02T11:00:00Z Buyer country: [1] NOR Contracting authority name: [eng] [1] Oslo kommune v/ Renovasjons- og gjenvinningsetaten Contracting authority identifier: [1] 923954791 Buyer city: [mul] [1] Oslo Buyer postcode: [1] 0581 Contract duration by lot: [1] [unit] MONTH [value] 48 Electronic submission by lot: [1] required Submission language: [1] NOB Award criterion description by lot: [eng] [1] Price. [2] Quality. [3] Climate and environmental requirements have been given high priority in the requirements specification, with particular emphasis on circularity requirements. Award criterion type by lot: [1] price [2] quality [3] quality Selection criterion description by lot: [eng] [1] The supplier shall be a legally established undertaking. Documentation requirements: Norwegian companies: Certificate of Registration. Foreign companies: Documentation demonstrating that the company is registered in a trade register or company register, as prescribed by the legislation of the country in which the supplier is established. [2] The supplier shall have sufficient economic and financial standing to be able to fulfil the contract. Documentation requirements: The company’s most recent annual financial statements, including the notes to the financial statements, the Board of Directors’ annual report and the auditor’s report, as well as any more recent information relevant to the company’s financial position. The Contracting Authority reserves the right to obtain a credit assessment on its own initiative. If the supplier has a valid reason (e.g. a newly established company) for being unable to provide the documentation required by the Contracting Authority, the supplier may demonstrate its economic and financial standing by means of any other document that the Contracting Authority considers appropriate. [3] The supplier is required to have implemented environmental management measures that ensure that the supplier is capable of complying with the environmental requirements of the contract. This means that the supplier shall have methods in place for actively and systematically working to reduce the negative environmental impact of activities related to the performance of this contract. Documentation requirements: A description of the supplier’s environmental management measures. If the supplier holds certificates issued by independent bodies documenting its environmental management system, these may be submitted as documentation. In this connection, reference is made to the EU Eco-Management and Audit Scheme (EMAS), other recognised environmental management systems referred to in Article 45 of Regulation (EC) No 1221/2009, such as Eco-Lighthouse (Miljøfyrtårn) or equivalent, and other environmental management standards based on relevant European or international standards issued by accredited bodies, such as ISO 14001 or equivalent. [4] The supplier shall have a quality assurance system relevant to the subject matter of the contract. Documentation requirements: A description of the supplier’s quality assurance methods. [5] The supplier shall have experience from similar contracts. Documentation requirements: A brief description of the most important deliveries carried out during the past three years, including information on the contract value, the date of delivery, the name of the contracting authority/client, and a description of the scope and content of the contract. [6] All three sizes of collection units shall be delivered within a maximum of 16 weeks from the date the order is placed. Documentation requirements: Signed written confirmation. [7] The Supplier shall have implemented measures and systems used in its work to safeguard fundamental human rights and decent working conditions, as well as to prevent environmental damage and corruption. Documentation requirements: A description of the Supplier’s systems for conducting due diligence assessments in accordance with the UN Guiding Principles on Business and Human Rights (UNGPs) and the OECD Guidelines for Multinational Enterprises. The documentation shall include: * Formal policies/guidelines that include a commitment to comply with responsible business conduct requirements. * Formal policies/guidelines concerning responsible conduct by subcontractors and throughout the supply chain (Supplier Code of Conduct). [This shall only be submitted if subcontractors are used.] * Descriptions of the Supplier’s processes and procedures for conducting due diligence assessments. * A description of how the Supplier will obtain and maintain an overview of the countries of origin and production sites for the goods offered by the Supplier. In addition: * Completed due diligence assessment form (Part 2 – Appendix 4). Execution requirements by lot: [1] performance Estimated procedure value currency: NOK Main contract nature: services Main contract nature by lot: [1] services