Steel-frame doors for Building 7

Outcome

Submissions closed on 11 November 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Dortmund, Germany
11 November 2026, 10:00 UTC
10:00 AM · UTC
Contract value
Not stated in the notice
Classification
Steel-frame door installation
Published
October 9, 2026
Official notice snapshot from the German procurement publication feed

Overview

The Dortmund Chamber of Skilled Crafts plans a new, single-storey reinforced-concrete hall at Barbarastraße 7 for training in plastics processing. The snapshot describes a masonry-clad facade and identifies steel-frame doors as the procurement. The published submission timestamp is 11 November 2026 at 10:00 UTC; it is preserved as provided by the source snapshot. No value, quantity, detailed door specification or award criteria are available in the captured notice text.

Information based on the public notice

What the buyer needs

Supply/install steel-frame doors for a new training hall at the Dortmund Chamber of Skilled Crafts; the captured snapshot gives no detailed door specification.

  • Detailed technical and qualification requirements are not stated in the captured public snapshot.

Tender details

Buyer
Handwerkskammer Dortmund
Country
Germany
Procedure
open
Classification
Steel-frame door installation · CPV 44221200 · CPV 44221220 · CPV 45421131
Notice reference
ocds-mnwr74-fd77cfed-3a16-433f-81a3-265a0dda8998
Building
Single-storey reinforced-concrete training hall with masonry-clad facade

What to check in the tender documents

  • No award information is present in the captured notice text.
  • Im erfassten Bekanntmachungstext sind keine Zuschlagsinformationen enthalten.
  • Le texte d’avis capturé ne contient pas d’information d’attribution.
Get started with Ziva

Original notice

Read the original description

Stahlrahmentüren Haus 7

Die Handwerkskammer Dortmund beabsichtigt an ihrem Standort Barbarastraße 7 in Dortmund einen freistehenden Neubau zu errichten. Die erdgeschossige, als Massivbau in Stahlbeton, bauseits, errichtete Halle dient dem Schulungsbetrieb für die Verarbeitung von Kunststoffbauteilen. Der Neubau erhält eine vorgehängte Fassade aus Verblendmauerwerk.

Official source: Official notice snapshot from the German procurement publication feed ↗