Thun transport future: feasibility study of two tunnel options
- Buyer
- Entwicklungsraum Thun
- Place
- Thun, canton of Bern
- Offers due 1 December 2026 at 14:00 CET
- 01:00 PM · UTC
- Contract value
- Not stated in the notice
- Contract period
- 2027-01-04 to 2028-03-31
- Published
- October 18, 2026
- Official SIMAP public notice
Overview
The Entwicklungsraum Thun seeks a general planner for a detailed urban, transport, structural and environmental feasibility study of the Hübelitunnel and Aarequerung Süd options. The work builds on the regional transport study and targets an evidence-based comparison, including costs, construction, urban effects and public participation.
Information based on the public notice
Ask about this tender
What the buyer needs
The study compares the Hübelitunnel and Aarequerung Süd options at approximately SIA phase 2, including alignment, portals, road junctions, dependencies, construction, logistics, cost estimates and environmental effects.
- Submit one electronic PDF through SIMAP by the deadline; offers and documents are in German. Questions are due in German through the SIMAP forum by 29 October 2026.
- Provide five qualifying urban references, the requested turnover evidence, and confirmation of key-person continuity and availability.
- Each consortium member may participate in only one bid; each subcontractor may serve only one bidder. Variants and partial offers are not accepted. Earlier study authors may participate, but EBP Schweiz AG, Infras AG and Naturaqua are excluded.
- An appeal may be filed within 20 days of publication with the Regierungsstatthalteramt Thun.
Tender details
- Buyer
- Entwicklungsraum Thun
- Country
Switzerland
- Procedure
- open
- Classification
- Architecture and engineering services · CPV 71000000
- Notice reference
- 43020 · 43020-02
- Scope
- The study compares the Hübelitunnel and Aarequerung Süd options at approximately SIA phase 2, including alignment, portals, road junctions, dependencies, construction, logistics, cost estimates and environmental effects.
- Contract period
- 4 January 2027 to 31 March 2028
- Offer deadline
- Offers due 1 December 2026 at 14:00 CET
- Qualification
- Five comparable urban references are required, one for each of urban development/public realm, transport planning or modelling, tunnel design, road design, and environmental planning/sustainability assessment. Each must be completed within ten years and reach at least SIA phase 2 preliminary-study level. Participating firms must show combined average turnover above CHF 1 million per year over the last three years and confirm key-person availability.
- Award criteria
- Price 20% (calculated on 3,000 prescribed hours); key-person competence 55% (overall lead 15%, each of four specialist roles 10%); approach and organisation 25%.
- Participation conditions
- Consortium members may take part in only one bid and each subcontractor may work for only one bidder. Earlier study authors may participate. EBP Schweiz AG, Infras AG and Naturaqua are excluded as procurement advisers.
What to check in the tender documents
- The public notice does not state an estimated contract value.
- The public notice does not state an award result.
Original notice
Read the original description
Verkehrszukunft Region Thun, Arbeitspaket 3: stadträumliche, verkehrliche, bautechnische und umweltplanerische Machbarkeitsstudie von zwei Tunnelvarianten
Official source: Official SIMAP public notice ↗
Notice updates
October 23, 2026 · Version 2
Summary and analysis updated · Tender facts updated · Original notice updated · Location updated · Source notice details updated
Verkehrszukunft Region Thun, Arbeitspaket 3: stadträumliche, verkehrliche, bautechnische und umweltplanerische Machbarkeitsstudie von zwei Tunnelvarianten
Arbeitspaket 3: Vertiefte städtebauliche bzw. stadträumliche, siedlungsräumliche, verkehrliche, bautechnische und umweltplanerische Machbarkeitsstudie für die beiden Tunnellösungen «Hübelitunnel» und «Aarequerung Süd» (Generalplaner) Das Projekt «Verkehrszukunft Region Thun» baut auf der Verkehrsstudie Thun Innenstadt – rechte Seeseite auf, die im Auftrag des Entwicklungsraums Thun bis Ende 2023 erarbeitet wurde. Untersucht wurden drei Varianten zur langfristigen Verbesserung der Verkehrssituation: der Hübelitunnel, die Aarequerung Süd sowie eine Gesamtverkehrsvariante mit Verkehrssteuerungen und Ausbauten für ÖV und Veloverkehr. Alle Varianten gelten grundsätzlich als machbar; die Gesamtverkehrsvariante wurde jedoch als kostengünstigste und wirksamste Lösung bewertet. Für den Fall, dass diese nicht ausreicht, sollen die beiden Tunnelvarianten vertieft geprüft werden. Der Bund betonte in Gesprächen zur möglichen Mitfinanzierung, dass ein Tunnelprojekt nicht isoliert betrachtet werden darf, sondern in ein überzeugendes Gesamtkonzept eingebettet sein muss. Zentral sind die Abstimmung von Siedlungs- und Verkehrsentwicklung, die Wirkung auf Stadtentwicklung und Arbeitsplätze, die Einbettung ins Gesamtverkehrssystem sowie flankierende Massnahmen. Die Nutzen der Varianten sind nachvollziehbar anhand der Kriterien der Agglomerationsprogramme darzustellen. Zudem braucht es einen klar begründeten Variantenentscheid, der zeigt, dass andere Optionen ausgeschöpft wurden und die gewählte Lösung breit akzeptiert ist. Die Region folgt dieser Empfehlung und vertieft die beiden Varianten Hübelitunnel und Aarequerung Süd parallel. Ziel ist ein politisch konsolidierter Entscheid bis Ende 2028 sowie die fachliche Einbettung in das Agglomerationsprogramm 6. Generation Thun. Dabei sollen die Anliegen von Bevölkerung, Politik und Verwaltung der betroffenen Gemeinden berücksichtigt und die Varianten anhand transparenter qualitativer und quantitativer Kriterien bewertet werden. Alternative Entlastungsvarianten sind nicht Gegenstand des Projekts; die bestehenden Tunnelvarianten können jedoch optimiert oder bei schwerwiegenden No-Gos ausgeschlossen werden. Neben der fachlichen Bewertung soll das Projekt einen öffentlichen Diskurs über Chancen, Risiken, Nutzen und Kosten einer Tunnellösung ermöglichen. Dabei geht es nicht um eine pauschale Tunnel-ja-oder-nein-Debatte, sondern um eine differenzierte Auseinandersetzung mit verkehrlichen, städtebaulichen, finanziellen und gesellschaftlichen Auswirkungen. Die Auftraggeberschaft liegt beim Entwicklungsraum Thun (ERT). Die strategische Führung übernimmt die Projektsteuerung durch den Ausschuss «Verkehrszukunft». Sie entscheidet über Zwischenergebnisse, Vergaben und Vorgaben. Die operative Projektleitung führt das Projekt. Ergänzend wirken politische, fachliche und öffentliche Begleitstellen mit. Die politische Begleitung reflektiert Zwischenstände aus politischer Sicht, die fachliche Begleitung sichert die Koordination mit parallelen Projekten und fachlichen Anforderungen, und die öffentliche Begleitung ermöglicht insbesondere Betroffenen in Thun und Steffisburg, Anliegen einzubringen. Die BHU bzw. Auftragnehmenden aus AP1 unterstützen fachlich, organisatorisch und in der Qualitätssicherung. Die externen Auftragnehmenden der Arbeitspakete AP1 bis AP4 erbringen Leistungen, haben aber keine Entscheidungskompetenz. Der Projektablauf gliedert sich in vier Arbeitspakete: AP1 umfasst Vorbereitung, Beschaffung, Prozessbegleitung und Qualitätssicherung; AP2 Partizipation und Kommunikation; AP3 die vertiefte Machbarkeitsstudie zu den beiden Tunnelvarianten; AP4 Zielsystem, Methodik, Variantenbeurteilung und Empfehlung der Bestvariante. Die Kernschritte AP4a (Zielsystem, Methodik), AP3 und AP4c (Variantenbeurteilung und Empfehlung) laufen grundsätzlich nacheinander. Für beide Tunnelvarianten wird mindestens ein inhaltlicher Planungsstand angestrebt, welcher unter dem Begriff «Machbarkeitsstudie» subsummiert wird. Hinsichtlich Planungstiefe bewegen sich die Leistungen im Bereich der SIA-Phase 2 Vorstudie. Für einzelne Aspekte (z.B. Bauablauf) müssen vertieftere Abklärungen über das übliche Planungsniveau einer Vorstudie hinaus vorgenommen werden, um Aussagen machen zu können, damit die Ziele der Machbarkeitsstudie erreichen zu können. Zu anderen Aspekten können gröbere Abklärungen ausreichend sein: — Festlegung der Normalprofile und der horizontalen und vertikalen Linienführungen (Berücksichtigung der Hindernisse an der Oberfläche und im Untergrund) — Anordnung der Portalbereiche und der weiteren Zugänge (Eingriff in Stadtraum) — Dimensionierung von betroffenen Strassen und Knoten (Flächenbedarf) und Angabe der Steuerungsform der Knoten (Leistungsfähigkeit) — Nutzung Entwicklungspotenzial in entlasteten Räumen (städtebaulich/siedlungsräumlich) — Abhängigkeiten/Wechselwirkung zu Drittprojekten (Beeinflussung, Behinderung, Etappierung) — Flankierende Massnahmen (verkehrlich, gestalterisch) — Bauablauf/-Verfahren (inkl. Impakt während Bau) und Bauzeit (Dauer) — Installationsplätze und Bau-/Materiallogistik (Flächenbedarf, Emissionen) — Bau- und Betriebskosten (angestrebt +/- 25% inkl. Chancen / Risiken monetär und Reserven) — Stärken / Schwächen bzw. Chancen / Risiken beider Varianten (ganzheitlich qualitativ) — Aufbereitung der und Mithilfe bei den relevanten technischen Arbeiten für die Partizipation/Kommunikation (anschauliche Pläne und Visualisierungen, textliche Erläuterungen) Zur Untersuchung verschiedener Portalvarianten «West» der Aarequerung ist eine Vorphase vorzusehen, in welcher verschiedene Alternativen zum aktuell vorgesehenen Standort grob untersucht werden. Nur die Bestvariante aus dieser Voruntersuchung wird anschliessend mit allen weiteren Elementen im Detail untersucht und bewertet. Die Ergebnisse der Machbarkeitsstudie werden einerseits strukturiert dokumentiert. Andererseits werden aus diesen die erforderlichen Messgrössen für die nachfolgende Bewertung (durch AP4) zusammengestellt. Es sind mehrere fachliche Kompetenzen im Bereich von Infrastrukturprojekten im Siedlungsraum auf Stufe Machbarkeit / Vorstudie (SIA-Phase 2) gefragt. Von Bedeutung sind zudem die fachlichen Kompetenzen im Bereich Grobkostenschätzung und Grobterminplanung: — Stadtentwicklung/Stadtraum/Freiraum: Gestaltung öffentlicher Raum in Abstimmung mit Stadtentwicklung — Verkehrsplanung: Verkehrsplanung/-modellierung, Flankierende Massnahmen, Knotengrobdimensionierung — Tunnelprojektierung: Bauverfahren-/-technik, Lüftung, Sicherheit, Grobkostenschätzung, Grobterminplanung — Strassenprojektierung: Layout Strassen/Knoten, Grobkostenschätzung, Grobterminplanung — Umweltplanung: Umweltimpakt/Klimawirkung (Relevanzmatrix, SNBS) Die vielen Abhängigkeiten zwischen den einzelnen Disziplinen sind über die gesamte Auftragsdauer zu koordinieren und bei Bedarf zu kommunizieren. Entsprechend sind auch organisatorische und kommunikative Fähigkeiten erwartet (Kompetenz primär der Gesamtleitung des Generalplaners). Ein PDF elektronisch über SIMAP einreichen. Fragen auf Deutsch bis 29. Oktober 2026 im SIMAP-Forum. Arbeitsgemeinschaften und Subunternehmen sind zulässig; Varianten und Teilangebote nicht. Entwicklungsraum Thun, Marktgasse 17, 3600 Thun; +41 33 225 61 61; info@erthun.ch; https://entwicklungsraum-thun.ch Title [simap_api#project-info.title]: Verkehrszukunft Region Thun, Arbeitspaket 3: stadträumliche, verkehrliche, bautechnische und umweltplanerische Machbarkeitsstudie von zwei Tunnelvarianten Offer submission instructions [simap_api#project-info.offerSpecificNote]: siehe Ausschreibungsunterlagen Place of performance [simap_api#procurement.orderAddressDescription]: Die Mehrheit der Leistungen können am Ort der beauftragten Firmen erbracht werden. Physische Besprechungen finden in Thun statt, grundsätzlich beim ERT. Deadline and formal requirements [simap_api#dates.specificDeadlinesAndFormalRequirements]: Das Angebot in elektronischer Form als eine PDF-Datei unter www.simap.ch einzureichen. Consortium rules [simap_api#terms.consortiumNote]: Firmen einer Bietergemeinschaft dürfen sich nur einmal bewerben. Subcontractor rules [simap_api#terms.subContractorNote]: Subunternehmungen können sich nur bei einem Anbieter bewerben. Other requirements [simap_api#terms.otherRequirements]: Vorbefassung: Die Verfasser bisheriger Studien sind zur Teilnahme an der Ausschreibung zugelassen. Die durch die Verfasser massgeblichen erarbeiteten Projektunterlagen bzw. Ergebnisse werden der Ausschreibung beigefügt. EBP Schweiz AG, Zürich, Infras AG Bern, Bern und Naturaqua, Bern begleiten den Beschaffungsprozess. Sie sind für diese Beschaffung als Anbieterinnen ausgeschlossen. Review procedure [simap_api#terms.remediesNotice]: Diese Ausschreibung kann innert 20 Tagen seit ihrer Publikation auf www.simap.ch mit Beschwerde beim Regierungsstatthalteramt Thun, Scheibenstrasse 3, 3600 Thun, angefochten werden. Eine allfällige Beschwerde muss einen Antrag, die Angabe von Tatsachen und Beweismitteln, eine Begründung sowie eine Unterschrift enthalten. Die angefochtene Ausschreibung und greifbare Beweismittel sind beizulegen Qualification criterion [simap_api#criteria.qualificationCriteria[1].title]: EK 1 Fachliche Leistungsfähigkeit Qualification criterion description [simap_api#criteria.qualificationCriteria[1].description]: EK 1.1 Referenzprojekt 1 Stadtentwicklung/Stadtraum/Freiraum EK 1.2 Referenzprojekt 2 Verkehrsplanung-/modellierung EK 1.3 Referenzprojekt 3 Tunnelprojektierung EK 1.4 Referenzprojekt 4 Strassenprojektierung EK 1.5 Referenzprojekt 5 Umweltplanung/Nachhaltigkeitsbeurteilung Qualification criterion verification [simap_api#criteria.qualificationCriteria[1].verification]: Je ein vergleichbares Referenzprojekt im urbanen Raum aus dem genannten Fachbereich, mindestens über die SIA-Teilphase 2 Vorstudie, nicht länger als 10 Jahre abgeschlossen. Qualification criterion [simap_api#criteria.qualificationCriteria[2].title]: EK 2 Wirtschaftliche Leistungsfähigkeit Qualification criterion description [simap_api#criteria.qualificationCriteria[2].description]: Mittlerer Jahresumsatz der letzten drei Jahre in Summe der am Auftrag beteiligten Unternehmen beträgt mehr als 1.0 Mio. CHF/Jahr. Qualification criterion verification [simap_api#criteria.qualificationCriteria[2].verification]: Nachweis Jahresumsätze. Qualification criterion [simap_api#criteria.qualificationCriteria[3].title]: EK 3 Organisatorische Leistungsfähigkeit Qualification criterion description [simap_api#criteria.qualificationCriteria[3].description]: Die Kontinuität bzw. Verfügbarkeit der eingesetzten Schlüsselpersonen ist für die Dauer des Auftrags gewährleistet. Award criterion [simap_api#criteria.awardCriteria[1].title]: ZK 1 Angebotspreis Award criterion description [simap_api#criteria.awardCriteria[1].description]: Angebotspreis gemäss Honorarkalkulation. Der Aufwand wird in Form von Stunden von der Beschaffungsstelle vorgegeben (total 3'000 Std.). Award criterion [simap_api#criteria.awardCriteria[2].title]: ZK 2 Kompetenz Schlüsselpersonen Award criterion description [simap_api#criteria.awardCriteria[2].description]: ZK 2.1 Schlüsselperson 1 Gesamtleitung (15%) ZK 2.2 Schlüsselperson 2 Stadtentwicklung/Stadtraum/Freiraum (10%) ZK 2.3 Schlüsselperson 3 Verkehrsplanung/-modellierung (10%) ZK 2.4 Schlüsselperson 4 Tunnelprojektierung (10%) ZK 2.5 Schlüsselperson 5 Strassenprojektierung (10%) Award criterion [simap_api#criteria.awardCriteria[3].title]: ZK 3 Vorgehen und Organisation Award criterion description [simap_api#criteria.awardCriteria[3].description]: Erläuterung des Vorgehens (Vorschlag zum Ablauf) sowie Erläuterung des Aufbaus (Organigramm) und Ablaufs (Kommunikation und Koordination) des interdisziplinären Generalplanerteams Participation requirement description [simap_api#terms.termsCriteria[1].description]: Angebote, welche unvollständig oder nicht fristgerecht eingereicht wurden oder andere Mängel nach Art. 44 IVöB 2019 aufweisen und die Teilnahmebedingungen (Selbstdeklaration) verletzen, werden vom weiteren Verfahren ausgeschlossen. Participation requirement verification [simap_api#terms.termsCriteria[1].verification]: Selbstdeklaration Questions and answers [simap_api#dates.qnas[1]]: Question deadline: 2026-10-29. Fragen sind in deutscher Sprache unter www.simap.ch im "Forum" einzureichen. Zuschlagsgewichtung laut SIMAP: ZK 1 Angebotspreis 20 %; ZK 2 Kompetenz der Schlüsselpersonen 55 % (Gesamtleitung 15 %, Stadtentwicklung/Stadtraum/Freiraum 10 %, Verkehrsplanung/-modellierung 10 %, Tunnelprojektierung 10 %, Strassenprojektierung 10 %); ZK 3 Vorgehen und Organisation 25 %. EK 3 Nachweis: Bestätigung zur Kontinuität bzw. Verfügbarkeit der Schlüsselpersonen.
October 19, 2026 · Version 1
Published
Verkehrszukunft Region Thun, Arbeitspaket 3: stadträumliche, verkehrliche, bautechnische und umweltplanerische Machbarkeitsstudie von zwei Tunnelvarianten
Arbeitspaket 3: Vertiefte städtebauliche bzw. stadträumliche, siedlungsräumliche, verkehrliche, bautechnische und umweltplanerische Machbarkeitsstudie für die beiden Tunnellösungen «Hübelitunnel» und «Aarequerung Süd» (Generalplaner) Das Projekt «Verkehrszukunft Region Thun» baut auf der Verkehrsstudie Thun Innenstadt – rechte Seeseite auf, die im Auftrag des Entwicklungsraums Thun bis Ende 2023 erarbeitet wurde. Untersucht wurden drei Varianten zur langfristigen Verbesserung der Verkehrssituation: der Hübelitunnel, die Aarequerung Süd sowie eine Gesamtverkehrsvariante mit Verkehrssteuerungen und Ausbauten für ÖV und Veloverkehr. Alle Varianten gelten grundsätzlich als machbar; die Gesamtverkehrsvariante wurde jedoch als kostengünstigste und wirksamste Lösung bewertet. Für den Fall, dass diese nicht ausreicht, sollen die beiden Tunnelvarianten vertieft geprüft werden. Der Bund betonte in Gesprächen zur möglichen Mitfinanzierung, dass ein Tunnelprojekt nicht isoliert betrachtet werden darf, sondern in ein überzeugendes Gesamtkonzept eingebettet sein muss. Zentral sind die Abstimmung von Siedlungs- und Verkehrsentwicklung, die Wirkung auf Stadtentwicklung und Arbeitsplätze, die Einbettung ins Gesamtverkehrssystem sowie flankierende Massnahmen. Die Nutzen der Varianten sind nachvollziehbar anhand der Kriterien der Agglomerationsprogramme darzustellen. Zudem braucht es einen klar begründeten Variantenentscheid, der zeigt, dass andere Optionen ausgeschöpft wurden und die gewählte Lösung breit akzeptiert ist. Die Region folgt dieser Empfehlung und vertieft die beiden Varianten Hübelitunnel und Aarequerung Süd parallel. Ziel ist ein politisch konsolidierter Entscheid bis Ende 2028 sowie die fachliche Einbettung in das Agglomerationsprogramm 6. Generation Thun. Dabei sollen die Anliegen von Bevölkerung, Politik und Verwaltung der betroffenen Gemeinden berücksichtigt und die Varianten anhand transparenter qualitativer und quantitativer Kriterien bewertet werden. Alternative Entlastungsvarianten sind nicht Gegenstand des Projekts; die bestehenden Tunnelvarianten können jedoch optimiert oder bei schwerwiegenden No-Gos ausgeschlossen werden. Neben der fachlichen Bewertung soll das Projekt einen öffentlichen Diskurs über Chancen, Risiken, Nutzen und Kosten einer Tunnellösung ermöglichen. Dabei geht es nicht um eine pauschale Tunnel-ja-oder-nein-Debatte, sondern um eine differenzierte Auseinandersetzung mit verkehrlichen, städtebaulichen, finanziellen und gesellschaftlichen Auswirkungen. Die Auftraggeberschaft liegt beim Entwicklungsraum Thun (ERT). Die strategische Führung übernimmt die Projektsteuerung durch den Ausschuss «Verkehrszukunft». Sie entscheidet über Zwischenergebnisse, Vergaben und Vorgaben. Die operative Projektleitung führt das Projekt. Ergänzend wirken politische, fachliche und öffentliche Begleitstellen mit. Die politische Begleitung reflektiert Zwischenstände aus politischer Sicht, die fachliche Begleitung sichert die Koordination mit parallelen Projekten und fachlichen Anforderungen, und die öffentliche Begleitung ermöglicht insbesondere Betroffenen in Thun und Steffisburg, Anliegen einzubringen. Die BHU bzw. Auftragnehmenden aus AP1 unterstützen fachlich, organisatorisch und in der Qualitätssicherung. Die externen Auftragnehmenden der Arbeitspakete AP1 bis AP4 erbringen Leistungen, haben aber keine Entscheidungskompetenz. Der Projektablauf gliedert sich in vier Arbeitspakete: AP1 umfasst Vorbereitung, Beschaffung, Prozessbegleitung und Qualitätssicherung; AP2 Partizipation und Kommunikation; AP3 die vertiefte Machbarkeitsstudie zu den beiden Tunnelvarianten; AP4 Zielsystem, Methodik, Variantenbeurteilung und Empfehlung der Bestvariante. Die Kernschritte AP4a (Zielsystem, Methodik), AP3 und AP4c (Variantenbeurteilung und Empfehlung) laufen grundsätzlich nacheinander. Für beide Tunnelvarianten wird mindestens ein inhaltlicher Planungsstand angestrebt, welcher unter dem Begriff «Machbarkeitsstudie» subsummiert wird. Hinsichtlich Planungstiefe bewegen sich die Leistungen im Bereich der SIA-Phase 2 Vorstudie. Für einzelne Aspekte (z.B. Bauablauf) müssen vertieftere Abklärungen über das übliche Planungsniveau einer Vorstudie hinaus vorgenommen werden, um Aussagen machen zu können, damit die Ziele der Machbarkeitsstudie erreichen zu können. Zu anderen Aspekten können gröbere Abklärungen ausreichend sein: — Festlegung der Normalprofile und der horizontalen und vertikalen Linienführungen (Berücksichtigung der Hindernisse an der Oberfläche und im Untergrund) — Anordnung der Portalbereiche und der weiteren Zugänge (Eingriff in Stadtraum) — Dimensionierung von betroffenen Strassen und Knoten (Flächenbedarf) und Angabe der Steuerungsform der Knoten (Leistungsfähigkeit) — Nutzung Entwicklungspotenzial in entlasteten Räumen (städtebaulich/siedlungsräumlich) — Abhängigkeiten/Wechselwirkung zu Drittprojekten (Beeinflussung, Behinderung, Etappierung) — Flankierende Massnahmen (verkehrlich, gestalterisch) — Bauablauf/-Verfahren (inkl. Impakt während Bau) und Bauzeit (Dauer) — Installationsplätze und Bau-/Materiallogistik (Flächenbedarf, Emissionen) — Bau- und Betriebskosten (angestrebt +/- 25% inkl. Chancen / Risiken monetär und Reserven) — Stärken / Schwächen bzw. Chancen / Risiken beider Varianten (ganzheitlich qualitativ) — Aufbereitung der und Mithilfe bei den relevanten technischen Arbeiten für die Partizipation/Kommunikation (anschauliche Pläne und Visualisierungen, textliche Erläuterungen) Zur Untersuchung verschiedener Portalvarianten «West» der Aarequerung ist eine Vorphase vorzusehen, in welcher verschiedene Alternativen zum aktuell vorgesehenen Standort grob untersucht werden. Nur die Bestvariante aus dieser Voruntersuchung wird anschliessend mit allen weiteren Elementen im Detail untersucht und bewertet. Die Ergebnisse der Machbarkeitsstudie werden einerseits strukturiert dokumentiert. Andererseits werden aus diesen die erforderlichen Messgrössen für die nachfolgende Bewertung (durch AP4) zusammengestellt. Es sind mehrere fachliche Kompetenzen im Bereich von Infrastrukturprojekten im Siedlungsraum auf Stufe Machbarkeit / Vorstudie (SIA-Phase 2) gefragt. Von Bedeutung sind zudem die fachlichen Kompetenzen im Bereich Grobkostenschätzung und Grobterminplanung: — Stadtentwicklung/Stadtraum/Freiraum: Gestaltung öffentlicher Raum in Abstimmung mit Stadtentwicklung — Verkehrsplanung: Verkehrsplanung/-modellierung, Flankierende Massnahmen, Knotengrobdimensionierung — Tunnelprojektierung: Bauverfahren-/-technik, Lüftung, Sicherheit, Grobkostenschätzung, Grobterminplanung — Strassenprojektierung: Layout Strassen/Knoten, Grobkostenschätzung, Grobterminplanung — Umweltplanung: Umweltimpakt/Klimawirkung (Relevanzmatrix, SNBS) Die vielen Abhängigkeiten zwischen den einzelnen Disziplinen sind über die gesamte Auftragsdauer zu koordinieren und bei Bedarf zu kommunizieren. Entsprechend sind auch organisatorische und kommunikative Fähigkeiten erwartet (Kompetenz primär der Gesamtleitung des Generalplaners). Ein PDF elektronisch über SIMAP einreichen. Fragen auf Deutsch bis 29. Oktober 2026 im SIMAP-Forum. Arbeitsgemeinschaften und Subunternehmen sind zulässig; Varianten und Teilangebote nicht. Entwicklungsraum Thun, Marktgasse 17, 3600 Thun; +41 33 225 61 61; info@erthun.ch; https://entwicklungsraum-thun.ch Title [simap_api#project-info.title]: Verkehrszukunft Region Thun, Arbeitspaket 3: stadträumliche, verkehrliche, bautechnische und umweltplanerische Machbarkeitsstudie von zwei Tunnelvarianten Offer submission instructions [simap_api#project-info.offerSpecificNote]: siehe Ausschreibungsunterlagen Place of performance [simap_api#procurement.orderAddressDescription]: Die Mehrheit der Leistungen können am Ort der beauftragten Firmen erbracht werden. Physische Besprechungen finden in Thun statt, grundsätzlich beim ERT. Deadline and formal requirements [simap_api#dates.specificDeadlinesAndFormalRequirements]: Das Angebot in elektronischer Form als eine PDF-Datei unter www.simap.ch einzureichen. Consortium rules [simap_api#terms.consortiumNote]: Firmen einer Bietergemeinschaft dürfen sich nur einmal bewerben. Subcontractor rules [simap_api#terms.subContractorNote]: Subunternehmungen können sich nur bei einem Anbieter bewerben. Other requirements [simap_api#terms.otherRequirements]: Vorbefassung: Die Verfasser bisheriger Studien sind zur Teilnahme an der Ausschreibung zugelassen. Die durch die Verfasser massgeblichen erarbeiteten Projektunterlagen bzw. Ergebnisse werden der Ausschreibung beigefügt. EBP Schweiz AG, Zürich, Infras AG Bern, Bern und Naturaqua, Bern begleiten den Beschaffungsprozess. Sie sind für diese Beschaffung als Anbieterinnen ausgeschlossen. Review procedure [simap_api#terms.remediesNotice]: Diese Ausschreibung kann innert 20 Tagen seit ihrer Publikation auf www.simap.ch mit Beschwerde beim Regierungsstatthalteramt Thun, Scheibenstrasse 3, 3600 Thun, angefochten werden. Eine allfällige Beschwerde muss einen Antrag, die Angabe von Tatsachen und Beweismitteln, eine Begründung sowie eine Unterschrift enthalten. Die angefochtene Ausschreibung und greifbare Beweismittel sind beizulegen Qualification criterion [simap_api#criteria.qualificationCriteria[1].title]: EK 1 Fachliche Leistungsfähigkeit Qualification criterion description [simap_api#criteria.qualificationCriteria[1].description]: EK 1.1 Referenzprojekt 1 Stadtentwicklung/Stadtraum/Freiraum EK 1.2 Referenzprojekt 2 Verkehrsplanung-/modellierung EK 1.3 Referenzprojekt 3 Tunnelprojektierung EK 1.4 Referenzprojekt 4 Strassenprojektierung EK 1.5 Referenzprojekt 5 Umweltplanung/Nachhaltigkeitsbeurteilung Qualification criterion verification [simap_api#criteria.qualificationCriteria[1].verification]: Je ein vergleichbares Referenzprojekt im urbanen Raum aus dem genannten Fachbereich, mindestens über die SIA-Teilphase 2 Vorstudie, nicht länger als 10 Jahre abgeschlossen. Qualification criterion [simap_api#criteria.qualificationCriteria[2].title]: EK 2 Wirtschaftliche Leistungsfähigkeit Qualification criterion description [simap_api#criteria.qualificationCriteria[2].description]: Mittlerer Jahresumsatz der letzten drei Jahre in Summe der am Auftrag beteiligten Unternehmen beträgt mehr als 1.0 Mio. CHF/Jahr. Qualification criterion verification [simap_api#criteria.qualificationCriteria[2].verification]: Nachweis Jahresumsätze. Qualification criterion [simap_api#criteria.qualificationCriteria[3].title]: EK 3 Organisatorische Leistungsfähigkeit Qualification criterion description [simap_api#criteria.qualificationCriteria[3].description]: Die Kontinuität bzw. Verfügbarkeit der eingesetzten Schlüsselpersonen ist für die Dauer des Auftrags gewährleistet. Award criterion [simap_api#criteria.awardCriteria[1].title]: ZK 1 Angebotspreis Award criterion description [simap_api#criteria.awardCriteria[1].description]: Angebotspreis gemäss Honorarkalkulation. Der Aufwand wird in Form von Stunden von der Beschaffungsstelle vorgegeben (total 3'000 Std.). Award criterion [simap_api#criteria.awardCriteria[2].title]: ZK 2 Kompetenz Schlüsselpersonen Award criterion description [simap_api#criteria.awardCriteria[2].description]: ZK 2.1 Schlüsselperson 1 Gesamtleitung (15%) ZK 2.2 Schlüsselperson 2 Stadtentwicklung/Stadtraum/Freiraum (10%) ZK 2.3 Schlüsselperson 3 Verkehrsplanung/-modellierung (10%) ZK 2.4 Schlüsselperson 4 Tunnelprojektierung (10%) ZK 2.5 Schlüsselperson 5 Strassenprojektierung (10%) Award criterion [simap_api#criteria.awardCriteria[3].title]: ZK 3 Vorgehen und Organisation Award criterion description [simap_api#criteria.awardCriteria[3].description]: Erläuterung des Vorgehens (Vorschlag zum Ablauf) sowie Erläuterung des Aufbaus (Organigramm) und Ablaufs (Kommunikation und Koordination) des interdisziplinären Generalplanerteams Participation requirement description [simap_api#terms.termsCriteria[1].description]: Angebote, welche unvollständig oder nicht fristgerecht eingereicht wurden oder andere Mängel nach Art. 44 IVöB 2019 aufweisen und die Teilnahmebedingungen (Selbstdeklaration) verletzen, werden vom weiteren Verfahren ausgeschlossen. Participation requirement verification [simap_api#terms.termsCriteria[1].verification]: Selbstdeklaration Questions and answers [simap_api#dates.qnas[1]]: Question deadline: 2026-10-29. Fragen sind in deutscher Sprache unter www.simap.ch im "Forum" einzureichen.
https://www.simap.ch/de/project-detail/f66ef5bf-fe88-4c8b-ba8a-3cbc6542849d
Source retrieved: 2026-10-23T03:38:06.379217Z