ET01 power supply for combustion line 2

INGE CSD / I.C.E. / IBGSwitzerlandClosed

Outcome

Submissions closed on 14 October 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Winterthur, canton of Zurich
Submission deadline
12:00 PM · UTC
Contract value
Not stated in the notice
Contract period
2027-04-01 to 2032-01-01
Published
September 17, 2026
SIMAP

Overview

For the ErVeL2 project in Winterthur, subcontract ET01 covers delivery, installation and commissioning of the central energy supply, including transformers, medium-voltage switchgear and cabling, grid control systems, and turbine-generator synchronisation. The tender is a single, un-lotted construction procurement. The mandatory site visit was 30 July 2026. Offers were due 14 October 2026 at 14:00 CEST; this deadline has passed. The notice gives a 365-day offer-validity period and refers bidders to the procurement documents for qualification and award criteria.

Information based on the public notice

What the buyer needs

  • No variants or partial offers are permitted.
  • Attendance at the site visit on 30 July 2026 was mandatory.
  • Qualification and award criteria are specified in the procurement documents.

Tender details

Buyer
INGE CSD / I.C.E. / IBG
Country
Switzerland
Procedure
Open procedure
Classification
Energy infrastructure and electrical works · CPV 45252300
Notice reference
40191 · 40191-03
Submission deadline
2026-10-14T14:00:00+02:00

What to check in the tender documents

  • No estimated contract value is published.
Get started with Ziva

Original notice

Read the original description

Replacement for Combustion Line 2 - ET01 Energy supply (PS)

ET01 Energieversorgung (EV) Der Teilauftrag ET01 umfasst die Lieferung, Montage und Inbetriebnahme der zentralen Energieversorgungsanlagen für das Projekt ErVeL2. Dazu gehören die wesentlichen Komponenten der Mittelspannungsversorgung sowie deren Anbindung an die übergeordneten Systeme. Dies beinhaltet unter anderem: - Transformatoren (Trafos) - Mittelspannungsschaltanlagen - Mittelspannungs-/Niederpannungsverkabelung - Netzleittechnik - Einrichtungen zur Synchronisation der Turbogruppen (Generatoren) Bestätigung der Teilnahmebedingungen (Dokument B01.02- Allgemeine Submissionsbedienungen) No variants or partial offers are permitted. Attendance at the site visit on 30 July 2026 was mandatory. Qualification and award criteria are specified in the procurement documents.

Official source: SIMAP ↗

Notice updates

October 19, 2026 · Version 3

Summary and analysis updated

Replacement for Combustion Line 2 - ET01 Energy supply (PS)

ET01 Energieversorgung (EV) Der Teilauftrag ET01 umfasst die Lieferung, Montage und Inbetriebnahme der zentralen Energieversorgungsanlagen für das Projekt ErVeL2. Dazu gehören die wesentlichen Komponenten der Mittelspannungsversorgung sowie deren Anbindung an die übergeordneten Systeme. Dies beinhaltet unter anderem: - Transformatoren (Trafos) - Mittelspannungsschaltanlagen - Mittelspannungs-/Niederpannungsverkabelung - Netzleittechnik - Einrichtungen zur Synchronisation der Turbogruppen (Generatoren) Bestätigung der Teilnahmebedingungen (Dokument B01.02- Allgemeine Submissionsbedienungen) No variants or partial offers are permitted. Attendance at the site visit on 30 July 2026 was mandatory. Qualification and award criteria are specified in the procurement documents.

October 14, 2026 · Version 2

Buyer updated · Classification updated · Contract period updated · Deadline information updated · Summary and analysis updated · Tender facts updated · Original notice updated · Deadline updated · Location updated · Source updated · Source notice details updated · Source references updated · Status changed

Replacement for Combustion Line 2 - ET01 Energy supply (PS)

ET01 Energieversorgung (EV) Der Teilauftrag ET01 umfasst die Lieferung, Montage und Inbetriebnahme der zentralen Energieversorgungsanlagen für das Projekt ErVeL2. Dazu gehören die wesentlichen Komponenten der Mittelspannungsversorgung sowie deren Anbindung an die übergeordneten Systeme. Dies beinhaltet unter anderem: - Transformatoren (Trafos) - Mittelspannungsschaltanlagen - Mittelspannungs-/Niederpannungsverkabelung - Netzleittechnik - Einrichtungen zur Synchronisation der Turbogruppen (Generatoren) Bestätigung der Teilnahmebedingungen (Dokument B01.02- Allgemeine Submissionsbedienungen) No variants or partial offers are permitted. Attendance at the site visit on 30 July 2026 was mandatory. Qualification and award criteria are specified in the procurement documents.

October 11, 2026 · Version 1

Published

Replacement for Combustion Line 2 - ET01 Energy supply (PS)

ET01 Power Supply (PS) Subcontract ET01 covers the delivery, installation, and commissioning of the central power supply systems for the ErVeL2 project. This includes the key components of the medium-voltage power supply as well as their connection to the higher-level systems. This includes, among other things: - Transformers - Medium-voltage switchgear - Medium-voltage/low-voltage cabling - Grid control technology - Equipment for synchronizing the turbine sets (generators)