Repair and replacement of the Torgauer Straße bridge in Leipzig
Outcome
Submissions closed on 17 November 2026. No award has been published yet. Open tenders like this one are listed below.
- Buyer
- Stadt Leipzig
- Place
- Leipzig, Germany.
- 16 November 2026 at 24:00 CET (UTC+01:00), equivalent to 17 November at 00:00.
- 11:00 PM · UTC
- Contract value
- Not stated in the notice
- Lots
- 1 lot
- Contract period
- Construction is scheduled from 22 February 2027 through 29 October 2027.
- Published
- October 5, 2026
- service.bund.de / Stadt Leipzig Mobilitäts- und Tiefbauamt
Overview
The City of Leipzig’s Mobility and Civil Engineering Office is procuring the repair and replacement construction of the bridge over Torgauer Straße for a pedestrian and cycle crossing. The works include excavation, concrete and steel removal and construction, shotcrete concrete repair, and a new aluminium structure with a 27 m span and 6.8 m width. Construction is scheduled from 22 February to 29 October 2027. The offer deadline is printed as 16 November 2026 at 24:00 CET (UTC+01:00), equivalent to midnight at the start of 17 November. Price is weighted at 100%.
Information based on the public notice
Ask about this tender
What the buyer needs
Repair and replacement of a bridge on Torgauer Straße in Leipzig to provide a pedestrian and cycle crossing.
- Electronic submission through eVergabe is permitted; the notice specifies text form and advanced or qualified electronic signatures/seals.
- Alternative offers and multiple main offers are not permitted.
Lots
LOT-0001 ·Instandsetzung und Ersatzneubau Brücke über die Torgauer Straße
Tender details
- Buyer
- Stadt Leipzig
- Country
Germany
- Procedure
- public procurement notice
- Classification
- Construction and civil works
- Notice reference
- evergabede/2026/10/7062285
- Project
- Repair and replacement construction of the bridge over Torgauer Straße for a pedestrian and cycle crossing.
- Main quantities
- 1,400 m³ excavation and backfill; 130 m³ concrete demolition and construction; 250 t steel removal; 350 m² shotcrete concrete repair; design and construction of an aluminium structure with a 27 m span and 6.8 m bridge width.
- Construction period
- 22 February to 29 October 2027.
- Offer deadline
- 16 November 2026 at 24:00 CET (UTC+01:00), equivalent to 17 November at 00:00.
- Award criterion
- Price, weighted at 100%.
What to check in the tender documents
- The notice does not state an estimated contract value. It says no separate opening appointment will take place.
Original notice
Read the original description
ENB Brücke über die Torgauer Straße
Official source: service.bund.de / Stadt Leipzig Mobilitäts- und Tiefbauamt ↗
https://www.service.bund.de/IMPORTE/Ausschreibungen/evergabede/2026/10/7062285.html
Source retrieved: 2026-10-24T10:37:07.753073Z