Accessibility works for Budapest tram lines 56 and 56A
Outcome
Submissions closed on 22 October 2026. No award has been published yet. Open tenders like this one are listed below.
- Place
- Hungary
- Deadline for receipt of tenders
- 12:00 PM · UTC
- Contract value
- Not stated in the notice
- Lots
- 2 lots
- Contract period
- 250 days per lot
- Published
- October 4, 2026
- ted-europa
Overview
BKK is procuring construction to make tram stops on Budapest lines 56 and 56A accessible for low-floor trams. Two lots cover the Krisztina körút stops and the Hűvösvölgy line section. Work includes rebuilding platforms and associated track, road, utilities, lighting and traffic-signal infrastructure. Lot 1 covers six platforms and 240 metres of track, with two additional platforms at Krisztina tér as an option. Each lot has a 250-day completion period. The deadline is 22 October 2026 at 14:00 CEST. The notice requires Hungarian electronic submission, an electronic signature and bid security.
Information based on the public notice
Ask about this tender
What the buyer needs
Reconstruction of tram stops and supporting infrastructure to provide accessible boarding on Budapest tram lines 56 and 56A.
- Two lots, each with a 250-day performance period.
- The offer deadline is 22 October 2026 at 14:00 CEST.
- Electronic submission in Hungarian and an advanced or qualified electronic signature are required.
- Bid security is specified separately for the two lots.
Lots
LOT-0001 ·Krisztina körút platforms
LOT-0002 ·Hűvösvölgy line-section platforms and terminal
Tender details
- Buyer
- BKK Budapesti Közlekedési Központ Zártkörűen Működő Részvénytársaság
- Country
Hungary
- Procedure
- open
- Classification
- Tramway construction · CPV 45234128 · CPV 45233120 · CPV 45234126 · CPV 45234129 · CPV 45316200 · CPV 45316212 · CPV 45316213 · CPV 71500000 · CPV 45200000
- Notice reference
- 685396-2026
- Lots
- 1: Krisztina körút stops; 2: Hűvösvölgy line section and terminal.
- Lot 1 scope
- Six platforms and 240 metres of track, with an optional two further platforms at Krisztina tér.
- Duration
- 250 days per lot
- Bid security
- HUF 5,000,000 for lot 1; HUF 25,000,000 for lot 2.
What to check in the tender documents
- Detailed construction drawings and bill of quantities are in the procurement documents, which were not reviewed.
Original notice
Read the original description
56-56A villamosvonal peronok akadálymentesítése
Official source: ted-europa ↗
https://ted.europa.eu/en/notice/-/detail/685396-2026