B25 OU DKB BW 02 Bridge and Road Construction

Outcome

Submissions closed on 10 November 2026. No award has been published yet. Open tenders like this one are listed below.

Place
91550, Dinkelsbühl, DE256, DEU
Submission deadline
09:15 AM · UTC
Contract value
Not stated in the notice
Classification
works
Published
October 7, 2026
TED (Tenders Electronic Daily)

Overview

Bridge and road construction on the B25 bypass at Dinkelsbühl. The notice lists 70 m of DN120 bored piles, 10,200 m³ of excavation, 7,250 m³ of placed soil, 9,030 m² of soil improvement, 825 m³ of concrete, 120 tonnes of reinforcing steel, 10 tonnes of prestressing steel, 590 m of pipeline, 3,370 m³ of frost-protection layer, 3,600 m² of asphalt base and 4,300 m² of asphalt surface. The official TED result matches the exact title and buyer. Bids are due 10 November 2026 at 10:15 CET. No estimated value was returned.

Information based on the public notice

What the buyer needs

Bridge and road construction on the B25 bypass at Dinkelsbühl. The notice lists piling, excavation, earthworks, soil improvement, concrete and steel, a pipeline, and road layers, with quantities stated in the German public notice.

Tender details

Buyer
Staatliches Bauamt Ansbach
Country
Germany
Procedure
open
Classification
CPV 45221100
Notice reference
ocds-mnwr74-56b4558c-8fe5-498e-a070-db7b439dc687
TED publication number
699999-2026
Internal reference
26-096880
Offer deadline
10 November 2026, 10:15 CET
Status
Open

What to check in the tender documents

  • The retrieved API fields do not provide an estimated value, award facts, detailed eligibility criteria or contract duration.
Get started with Ziva

Original notice

Read the original description

B25 OU DKB BW 02 Bruecke u Strassenbau

B25 OU DKB BW 02 Bruecke u Strassenbau Bohrpfähle DN120: 70 m, Baugrube herstellen: 10.200 m3, Boden einbauen: 7.250 m3 qualifizierte Bodenverbesserung 9.030 m2 Beton: 825 m3, Betonstahl: 120 to, Spannstahl: 10 to, Huckepackleitung: 590 m, Frostschutzschicht: 3370 m3, Asphalttragschicht: 3.600 m2 Asphaltdeckschicht: 4.300 m2

Official source: TED (Tenders Electronic Daily) ↗