Joule substation retrofit with SF6 free medium voltage cells
- Place
- Switzerland
- Offer submission deadline
- 10:30 AM · UTC
- Contract value
- Not stated in the notice
- Contract period
- 2027-03-01 to 2028-08-31
- Published
- November 4, 2026
- TED and SIMAP
Overview
SIE is replacing the 6.4 kV medium voltage installation at its Joule substation in Ecublens. The project includes 32 new 24 kV cells without SF6, removal and recycling of existing equipment, auxiliary AC and DC systems, batteries, controls, protection and communications, integration of retained equipment, civil works, testing and commissioning. The cells must first operate at 6.4 kV and later support 21 kV without structural changes to the main equipment. The tender requires the proposed cell manufacturer to act as general contractor. A mandatory site visit and advance registration apply.
Information based on the public notice
Ask about this tender
What the buyer needs
- The bidder must manufacture the Lot 1 medium voltage cells and assume the general contractor role.
- A mandatory site visit is required; registration is required in advance.
- Offer documents must arrive by the stated deadline; the dispatch date does not count.
Tender details
- Buyer
- SIE S.A., Service intercommunal des Energies
- Country
Switzerland
- Procedure
- open
- Classification
- Electrical equipment · CPV 45311000 · CPV 31210000 · CPV 31682300
- Notice reference
- 768056-2026
- Scope
- Replace the Joule 6.4 kV installation and supply 32 SF6 free 24 kV cells, with removal, auxiliary systems, controls, testing and commissioning.
- Deadline
- Offers are due 27 January 2027 at 11:30 CET.
- Mandatory visit
- A mandatory site visit is scheduled for 29 October 2026 at 14:00 in Ecublens. Registration was due 23 October 2026.
- Contract period
- 1 March 2027 to 31 August 2028.
- Eligibility
- The bidder must be the manufacturer of the proposed Lot 1 cells and act as general contractor. Integrators and representatives without their own design and manufacturing control are not admitted.
What to check in the tender documents
- Detailed technical specifications and evaluation methodology are in the procurement documents and were not reviewed.
Original notice
Read the original description
Suisse – Travaux de câblage et d'installations électriques – RETROFIT DES CELLULES 6.4 kV DE JOULE PAR DE NOUVELLES CELLULES 24 KV SANS SF6
Official source: TED and SIMAP ↗
Notice updates
November 22, 2026 · Version 2
Buyer updated · Contract period updated · Deadline information updated · Original notice updated · Deadline updated · Location updated · Source updated · Source notice details updated · Source references updated
Suisse – Travaux de câblage et d'installations électriques – RETROFIT DES CELLULES 6.4 kV DE JOULE PAR DE NOUVELLES CELLULES 24 KV SANS SF6
Official title: RETROFIT DES CELLULES 6.4 kV DE JOULE PAR DE NOUVELLES CELLULES 24 KV SANS SF6 Submission note: Les dossiers sous plis fermés et portant la mention « Projet de renouvellement des cellules MT (6.4) kV à Joule » avec l’inscription « Ne pas ouvrir ». Envoyés par colis inscrits à l’adresse de correspondance du représentant du Maître de l’ouvrage. Seules la date et l’heure d’arrivée des documents feront foi. La date d’envoi ne sera pas prise en compte. Il est de la responsabilité des candidats de prendre les mesures adéquates pour que l’acheminement de leur dossier se fasse dans le délai imparti, soit le mercredi 27 janvier 2027 à 11h30 au plus tard. Procurement scope: Le présent appel d'offres porte sur le renouvellement complet de l’installation moyenne tension (6,4 kV) du poste de Joule, situé au chemin du Bochet 5 ,1024 Ecublens et la fourniture de 32 nouvelles cellules MT conçues selon une technologie sans SF₆ . Le projet s'inscrit dans la stratégie de modernisation du réseau de distribution de SIE SA et constitue une étape majeure de la migration progressive du réseau de distribution de 6,4 kV vers 21 kV. Le projet comprend notamment : Le démontage, le recyclage et l'évacuation des cellules et matériel MT existantes ; La démolition et l’évacuation des niches existantes ; L’évacuation d’une bonbonne d’Azote présente dans le poste ; L’élimination de 2 barils d’huile (416 l au total) ; Le remplacement complet des cellules moyenne tension existantes ; Le renouvellement des services auxiliaires AC et DC et des batteries ainsi que l’amélioration complète des installations CVSE ; Le renouvellement des équipements de contrôle-commande, de protection et de communication ; L'intégration des équipements existants conservés ; Les travaux de génie civil nécessaires ; Les adaptations des liaisons câblées moyenne tension existantes (optionnelle); Le transport et montage de l’ensemble des équipements fournis ; Les essais en usine (FAT), les essais sur site (SAT), les essais fonctionnels ainsi que la mise en service complète des installations ; La remise de l'ensemble de la documentation conforme à l'exécution. Les nouvelles cellules devront permettre une exploitation dans une première phase sous une tension de 6,4 kV puis, sans modification structurelle des équipements principaux, sous une tension de 21 kV. En conséquent, les transformateurs de tension devront être dimensionnés pour permettre ce changement de tension modifications. Les cellules devront être conçues selon une technologie sans SF₆ et de préférence isolée à l’air et compatible avec les exigences environnementales actuelles et conformes aux prescriptions techniques du présent cahier des charges et des normes en vigueurs. Les équipements haute tension (50kV) existants ainsi que les transformateurs de puissance sont conservés. Le présent marché comprend uniquement les interfaces nécessaires à leur maintien en exploitation. Execution notes: Le contrat pourra être signé après le délai de recours, mais la commande et l'exécution du marché n'auront lieu qu'après l'obtention de l'approbation des plans par l'ESTI. Contract period: 2027-03-01 to 2028-08-31 Options: Le génie civil et l'adaptation des câbles. Le soumissionnaire doit se référer aux spécifications techniques des différents lots du marché. Site visit: Une visite du poste HT/MT de Joule est prévue le jeudi 29 octobre 2026 à 14h00. L'inscription à la visite devra être effectuée avant le vendredi 23 octobre 2026 à 17h00. Participation terms: Le soumissionnaire doit obligatoirement être le fabricant des cellules MT 24 kV proposées au Lot 1 et assumer la fonction d’Entrepreneur Général. Les intégrateurs ou représentants ne disposant pas de la maîtrise propre de la conception et de la fabrication des cellules proposées ne sont pas admis. Consortium: Selon les conditions spécifiées dans le cahier 1 "conditions générales et particulières" Subcontracting: Selon les conditions spécifiées dans le cahier 1 "conditions générales et particulières" Legal remedies: Le présent appel d’offres peut faire l’objet d’un recours à la Cour de droit administratif et public du Tribunal cantonal, Route du Signal 8 (Palais de Justice de l’Hermitage), 1014 Lausanne, dans les vingt jours dès sa notification par publication ; le recours doit être signé et indiquer les conclusions et ses motifs. La décision attaquée est jointe au recours. Offer deadline: 2027-01-27T11:30:00+01:00 Documents available: 2026-10-09 to 2026-10-23 Questions and answers: Les questions relatives au projet seront posées sur le forum du site SIMAP (www.simap.ch) jusqu’au : - Vendredi 6 novembre 2026 à 17h00 pour le premier tour de questions - Vendredi 4 décembre 2026 à 17h00 pour le second tour de questions Les questions soumises après cette date ne seront plus prises en considération. Les réponses aux questions seront disponibles sur SIMAP pour tous les soumissionnaires inscrits pour ce projet. Au cours de l’analyse des offres, l’adjudicateur pourra être amené à demander des informations complémentaires pour la rectification et l’évaluation des offres, selon l’OMP, Art.25. Ces demandes, ainsi que les réponses écrites, feront partie intégrante de l’offre. Appointment date: 2026-10-23 Appointment date: 2026-10-29 Appointment details: Visite à 14h sur site. EPI obligatoires : Casque, gilet et chaussures de sécurité. Adresse : Chemin du Brochet 5, 1024, Ecublens (VD) - CH. Appointment date: 2026-11-17 Appointment date: 2026-11-24 Appointment details: Visite à 14h sur site. EPI obligatoires : Casque, gilet et chaussures de sécurité. Adresse : Chemin du Brochet 5, 1024, Ecublens (VD) - CH. Procurement office: {'de': None, 'en': None, 'fr': 'SIE S.A., Service intercommunal des Energies', 'it': None} Office address: {'de': None, 'en': None, 'fr': 'Chemin de la Gottrause 11', 'it': None} Office address: 1023 Office address: {'de': None, 'en': None, 'fr': 'Crissier', 'it': None} Office telephone: +41216315000
November 5, 2026 · Version 1
Published
Швейцария – Работи по изтегляне на кабели за електрически инсталации и по свързване на електрически инсталации – RETROFIT DES CELLULES 6.4 kV DE JOULE PAR DE NOUVELLES CELLULES 24 KV SANS SF6
Official title: RETROFIT DES CELLULES 6.4 kV DE JOULE PAR DE NOUVELLES CELLULES 24 KV SANS SF6 Submission note: Les dossiers sous plis fermés et portant la mention « Projet de renouvellement des cellules MT (6.4) kV à Joule » avec l’inscription « Ne pas ouvrir ». Envoyés par colis inscrits à l’adresse de correspondance du représentant du Maître de l’ouvrage. Seules la date et l’heure d’arrivée des documents feront foi. La date d’envoi ne sera pas prise en compte. Il est de la responsabilité des candidats de prendre les mesures adéquates pour que l’acheminement de leur dossier se fasse dans le délai imparti, soit le mercredi 27 janvier 2027 à 11h30 au plus tard. Document access: Les dossiers d’appels d’offres seront mis à disposition des soumissionnaires sur un site ftp dont les modalités d’accès seront transmises aux soumissionnaires inscrits sur SIMAP. Mettre en copie thomas.feusier@gruner.ch Procurement scope: Le présent appel d'offres porte sur le renouvellement complet de l’installation moyenne tension (6,4 kV) du poste de Joule, situé au chemin du Bochet 5 ,1024 Ecublens et la fourniture de 32 nouvelles cellules MT conçues selon une technologie sans SF₆ . Le projet s'inscrit dans la stratégie de modernisation du réseau de distribution de SIE SA et constitue une étape majeure de la migration progressive du réseau de distribution de 6,4 kV vers 21 kV. Le projet comprend notamment : Le démontage, le recyclage et l'évacuation des cellules et matériel MT existantes ; La démolition et l’évacuation des niches existantes ; L’évacuation d’une bonbonne d’Azote présente dans le poste ; L’élimination de 2 barils d’huile (416 l au total) ; Le remplacement complet des cellules moyenne tension existantes ; Le renouvellement des services auxiliaires AC et DC et des batteries ainsi que l’amélioration complète des installations CVSE ; Le renouvellement des équipements de contrôle-commande, de protection et de communication ; L'intégration des équipements existants conservés ; Les travaux de génie civil nécessaires ; Les adaptations des liaisons câblées moyenne tension existantes (optionnelle); Le transport et montage de l’ensemble des équipements fournis ; Les essais en usine (FAT), les essais sur site (SAT), les essais fonctionnels ainsi que la mise en service complète des installations ; La remise de l'ensemble de la documentation conforme à l'exécution. Les nouvelles cellules devront permettre une exploitation dans une première phase sous une tension de 6,4 kV puis, sans modification structurelle des équipements principaux, sous une tension de 21 kV. En conséquent, les transformateurs de tension devront être dimensionnés pour permettre ce changement de tension modifications. Les cellules devront être conçues selon une technologie sans SF₆ et de préférence isolée à l’air et compatible avec les exigences environnementales actuelles et conformes aux prescriptions techniques du présent cahier des charges et des normes en vigueurs. Les équipements haute tension (50kV) existants ainsi que les transformateurs de puissance sont conservés. Le présent marché comprend uniquement les interfaces nécessaires à leur maintien en exploitation. Execution notes: Le contrat pourra être signé après le délai de recours, mais la commande et l'exécution du marché n'auront lieu qu'après l'obtention de l'approbation des plans par l'ESTI. Contract period: 2027-03-01 to 2028-08-31 Options: Le génie civil et l'adaptation des câbles. Le soumissionnaire doit se référer aux spécifications techniques des différents lots du marché. Site visit: Une visite du poste HT/MT de Joule est prévue le jeudi 29 octobre 2026 à 14h00. L'inscription à la visite devra être effectuée avant le vendredi 23 octobre 2026 à 17h00. Participation terms: Le soumissionnaire doit obligatoirement être le fabricant des cellules MT 24 kV proposées au Lot 1 et assumer la fonction d’Entrepreneur Général. Les intégrateurs ou représentants ne disposant pas de la maîtrise propre de la conception et de la fabrication des cellules proposées ne sont pas admis. Consortium: Selon les conditions spécifiées dans le cahier 1 "conditions générales et particulières" Subcontracting: Selon les conditions spécifiées dans le cahier 1 "conditions générales et particulières" Legal remedies: Le présent appel d’offres peut faire l’objet d’un recours à la Cour de droit administratif et public du Tribunal cantonal, Route du Signal 8 (Palais de Justice de l’Hermitage), 1014 Lausanne, dans les vingt jours dès sa notification par publication ; le recours doit être signé et indiquer les conclusions et ses motifs. La décision attaquée est jointe au recours. Offer deadline: 2027-01-27T11:30:00+01:00 Documents available: 2026-10-09 to 2026-10-23 Questions and answers: Les questions relatives au projet seront posées sur le forum du site SIMAP (www.simap.ch) jusqu’au : - Vendredi 6 novembre 2026 à 17h00 pour le premier tour de questions - Vendredi 4 décembre 2026 à 17h00 pour le second tour de questions Les questions soumises après cette date ne seront plus prises en considération. Les réponses aux questions seront disponibles sur SIMAP pour tous les soumissionnaires inscrits pour ce projet. Au cours de l’analyse des offres, l’adjudicateur pourra être amené à demander des informations complémentaires pour la rectification et l’évaluation des offres, selon l’OMP, Art.25. Ces demandes, ainsi que les réponses écrites, feront partie intégrante de l’offre. Appointment date: 2026-10-23 Appointment date: 2026-10-29 Appointment details: Visite à 14h sur site. EPI obligatoires : Casque, gilet et chaussures de sécurité. Adresse : Chemin du Brochet 5, 1024, Ecublens (VD) - CH. Appointment date: 2026-11-17 Appointment date: 2026-11-24 Appointment details: Visite à 14h sur site. EPI obligatoires : Casque, gilet et chaussures de sécurité. Adresse : Chemin du Brochet 5, 1024, Ecublens (VD) - CH. Procurement office: {'de': None, 'en': None, 'fr': 'SIE S.A., Service intercommunal des Energies', 'it': None} Office address: {'de': None, 'en': None, 'fr': 'Chemin de la Gottrause 11', 'it': None} Office address: 1023 Office address: {'de': None, 'en': None, 'fr': 'Crissier', 'it': None} Office telephone: +41216315000 Functional procurement mailbox: info@sie.ch
https://ted.europa.eu/en/notice/-/detail/768056-2026
Source retrieved: 2026-11-22T03:23:55.537991Z