Rehabilitation of the Çorum Alaca Dam Irrigation System
Outcome
Submissions closed on 2 November 2026. No award has been published yet.
- Place
- Çorum Alaca, Türkiye
- 2 November 2026 at 14:00 as stated; timezone not stated
- 02:00 PM · UTC
- Contract value
- Not stated in the notice
- Contract period
- 450 calendar days, excluding the Defects Liability Period
- Published
- September 22, 202
- World Bank Procurement Notices / Devlet Su İşleri Genel Müdürlüğü
Overview
The General Directorate of State Hydraulic Works invites bids for rehabilitation of the Çorum Alaca Dam irrigation system under the World Bank financed TULIP project. The work is intended to irrigate 1,887 hectares and includes supplying and laying 51,765 metres of HDPE, steel and GRP pipelines, constructing 29,850 metres of operation and maintenance roads, and building the associated valves, hydrants, drainage, crossings and concrete structures. The stated contract period is 450 calendar days, excluding the Defects Liability Period. Bids must be submitted in sealed form at the stated address; electronic bids are not accepted. The notice requires purchase of the bidding documents for TRY 10,000 and a bid security of TRY 8,000,000 or equivalent. The submission time is 2 November 2026 at 14:00; the notice does not state a timezone.
Information based on the public notice
Ask about this tender
What the buyer needs
Rehabilitation of the Çorum Alaca irrigation system to irrigate 1,887 hectares, including pipeline supply and installation, operation and maintenance roads, and associated network structures and appurtenances.
- Bidders must purchase the bidding documents for a non-refundable TRY 10,000 fee. A bid security of TRY 8,000,000 or equivalent from a bank accepted by the authority is required. Bids must be sealed and delivered physically; electronic bids are not accepted. Bid validity is 90 calendar days from the bid date.
Tender details
- Buyer
- General Directorate of State Hydraulic Works, Directorate of Irrigation
- Country
Türkiye
- Procedure
- Request for Bids
- Classification
- WORLD_BANK P172562
- Notice reference
- OP00468376
- Project
- World Bank financed Turkey Resilient Landscape Integration Project (TULIP), P172562
- Scope
- Rehabilitation of the Çorum Alaca irrigation system to irrigate 1,887 hectares, including pipeline supply and installation, operation and maintenance roads, and associated network structures and appurtenances.
- Duration
- 450 calendar days excluding Defects Liability Period
- Bid security
- TRY 8,000,000 or equivalent
- Offer deadline
- 2 November 2026, 14:00; timezone not stated
What to check in the tender documents
- The public notice does not state an estimated contract value. Detailed evaluation and qualification criteria are referenced on the authority’s linked page and were not reviewed. The submission time is stated without a timezone.
Original notice
Read the original description
Rehabilitation of the Çorum Alaca Dam Irrigation System
Official source: World Bank Procurement Notices / Devlet Su İşleri Genel Müdürlüğü ↗
https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00468376
Source retrieved: 2026-10-14T06:58:32.489746Z