Justification and approval: Mini MACC bridge extension in Bahrain

NAVFACUnited StatesAwarded

Outcome

This tender has been awarded. The award details are not published yet. Open tenders like this one are listed below.

Buyer
NAVFAC
Place
Juffair, Al ‘Āşimah, Bahrain
Submission deadline
Not available
Contract value
Not stated in the notice
Classification
service
Published
September 29, 2026
SAM.gov, U.S. General Services Administration

Overview

NAVFAC Europe Africa Central’s public justification notice describes a 12-month bridge extension of the Mini Multiple Award Construction Contract ordering period, from 2 September 2026 through 1 September 2027, for construction services at NSA Bahrain. It states that the extension does not increase the original USD 95 million contract ceiling and will use approximately USD 44 million of remaining capacity. Five incumbent contractors are named in the official notice. The justification cites unusual and compelling urgency under 10 U.S.C. § 3204(a)(2), citing the need to avoid a gap in emergency construction services while a full and open follow-on competition is completed. The SAM record is the latest published version of a Justification notice and records an action date of 2 September 2026. No new awardee or additional contract value is reported; the stated USD 44 million is remaining capacity under the existing ceiling, not an added amount. The available notice information says open, but has no submission deadline; this is not presented as a bidder solicitation.

Information based on the public notice

What the buyer needs

This is a public justification for a bridge extension of an existing multiple-award construction contract ordering period, not a new open solicitation. The notice says the extension is needed to avoid a gap in construction and emergency repair capability at NSA Bahrain while the follow-on competition is completed.

Tender details

Buyer
NAVFAC
Country
United States
Procedure
Justification
Classification
NAICS 561210 · PSC Z2JZ
Notice reference
4d2e01a21b794cd29f5ab0213d58ba93 · JandA2613
Action
12-month bridge extension of ordering period, 2 September 2026 through 1 September 2027.
Contract vehicle
Mini Multiple Award Construction Contract (Mini MACC), for construction services at NSA Bahrain.
Financial context
No increase to original USD 95 million ceiling; approximately USD 44 million remaining capacity to be used.
Incumbents
Liberal Construction, LLC; Consorzio Continental Socconsortile A R; RocKs GMBH; Kooheji Contractors; Macro Vantage Levant DMCC.
Justification
Unusual and compelling urgency under 10 U.S.C. § 3204(a)(2).
SAM action date
2 September 2026.

What to check in the tender documents

  • The notice does not identify a new awardee or a new ceiling; the approximate USD 44 million is remaining capacity under the original USD 95 million ceiling. No submission deadline or detailed project-level scope is stated.
Get started with Ziva

Original notice

Read the original description

Z--NOTICE OF JUSTIFICATION AND APPROVAL

The Naval Facilities Engineering Systems Command, Europe Africa Central (NAVFAC EURAFCENT) intends to extend the ordering period for the Mini Multiple Award Construction Contract (Mini MACC) for an additional 12 months, from September 2, 2026, to September 1, 2027. This is a bridge action and does not increase the original $95 million contract ceiling. The extension will utilize the remaining contract capacity of approximately $44 million. Incumbent Contractors: - Liberal Construction, LLC - Consorzio Continental Socconsortile A R - RocKs GMBH - Kooheji Contractors - Macro Vantage Levant DMCC Justification: The extension is required due to “unusual and compelling urgency” under the authority of 10 U.S.C. § 3204(a)(2). Critical Mission Impact: A lapse in construction services at NSA Bahrain, the forward headquarters of the U.S. Fifth Fleet, would result in an unacceptable inability to perform emergency repairs and would degrade U.S. national security during a period of heightened operational activity in the region. Procurement Delays: The procurement of a long-term, competitive follow-on contract has been severely impacted by unforeseen events and the reassignment of key personnel to support critical operational priorities (“Operation Epic Fury”). Impracticality of Alternatives: Awarding a new contract vehicle at this time would cause an unavoidable and mission-critical delay of several months due to security, legal, and logistical requirements in Bahrain. This bridge action is necessary to provide the time required to complete the full and open competition for the follow-on MACC without incurring a dangerous gap in critical construction services.

Official source: SAM.gov, U.S. General Services Administration ↗