Zagorje solar power plant and battery storage
Outcome
Submissions closed on 6 November 2026. No award has been published yet. Open tenders like this one are listed below.
- Place
- Kamnolom Zagorje, Zagorje ob Savi, Slovenia
- 6 Nov 2026, 10:00:00 UTC+02:00
- 08:00 AM · UTC
- Contract value
- Not stated in the notice
- Lots
- 1 lot
- Contract period
- 10 months
- Published
- October 7, 2026
- Official Journal of the European Union, TED
Overview
Holding Slovenske Elektrarne seeks design, supply, construction, testing and commissioning of a 1.38 MWp solar plant with a 1.25 MW, 5 MWh battery system at the Kamnolom Zagorje closed landfill. The open turnkey works contract lasts 10 months; the published notice gives no value.
Information based on the public notice
Ask about this tender
What the buyer needs
The turnkey project includes PV modules, inverters, foundations and structures, cabling, grounding and lightning protection, the battery system, a 1.6 MVA transformer station, civil works, drainage, landfill remediation measures, maintenance roads and fencing, grid connection and telecommunications. The contractor must prepare design and as-built documents, operating and maintenance instructions, testing, commissioning and staff training, supporting technical inspection and use-permit issuance. The buyer seeks EU Just Transition Fund co-financing; the notice does not confirm that funding.
- The procurement requires obtaining the restricted part of the tender documents and attending a site visit as conditions for submitting an offer. The published notice states a 10-month term and a turnkey FIDIC Yellow Book 1999 basis.
Lots
LOT-0000 ·Izgradnja sončne elektrarne Zagorje ob Savi z baterijskim hranilnikom električne energije
Tender details
- Buyer
- HOLDING SLOVENSKE ELEKTRARNE d.o.o.
- Country
Slovenia
- Procedure
- open
- Classification
- Solar energy construction · CPV 45000000
- Notice reference
- 693365-2026
- Deadline
- 6 Nov 2026, 10:00:00 UTC+02:00
- Contract period
- 10 months
- CPV classification codes
- 45000000
- Tender validity
- 180 days
What to check in the tender documents
- No estimated value, awardee or award amount is stated. Technical specifications are in the restricted tender-document section and were not accessed. EU co-financing is described only as sought, not confirmed.
Original notice
Read the original description
Izgradnja sončne elektrarne Zagorje ob Savi z baterijskim hranilnikom električne energije
Official source: Official Journal of the European Union, TED ↗
https://ted.europa.eu/en/notice/-/detail/693365-2026
Source retrieved: 2026-10-13T07:19:37.186569Z