Signalling and train-control installation framework for Rheinbahn

Rheinbahn AGGermanyClosed
3 November 2026 at 10:00 UTC, as stored in the canonical record.
10:00 AM · UTC
Contract value
Not stated in the notice
Contract period
1 December 2026–31 December 2029, with an optional one-year extension, as stated in the title.
Published
October 7, 2026

Oeffentliche Vergabe, German public procurement portal

Overview

Rheinbahn AG has published an open framework procurement for installation work on signalling and train-control technology. The title states an initial term from 1 December 2026 through 31 December 2029, with an optional one-year extension. The available description repeats the title and provides no work quantities, locations along the network, call-off rules, technical scope or framework ceiling. The linked official detail page timed out when opened. The available notice information stores a submission deadline of 3 November 2026 at 10:00 UTC.

Information based on the public notice

What the buyer needs

Installation work on signalling and train-control technology under a framework agreement. The title states a 1 December 2026–31 December 2029 term with an optional one-year extension.

Tender details

Buyer
Rheinbahn AG
Country
Germany
Procedure
de-open
Classification
Railway signalling and train-control installation · CPV 43 · CPV 44 · CPV 45 · CPV 71
Notice reference
ocds-mnwr74-25903168
Scope
Installation of signalling and train-control technology
Contract term
1 December 2026–31 December 2029; optional one-year extension
Submission deadline
3 November 2026, 10:00 UTC (available notice information)

What to check in the tender documents

  • The available notice text does not detail the installations, quantities, work locations, call-off terms, ceiling, participation rules or award criteria. The linked official detail page timed out.
Get started with Ziva

Original notice

Read the original description

Rahmenvertrag Montagearbeiten Signal- und Zugsicherungstechnik 01.12.2026 – 31.12.2029 + Optionale Verlängerung um 1 Jahr

Rahmenvertrag Montagearbeiten Signal- und Zugsicherungstechnik 01.12.2026 – 31.12.2029 + Optionale Verlängerung um 1 Jahr Rahmenvertrag Montagearbeiten Signal- und Zugsicherungstechnik 01.12.2026 – 31.12.2029 + Optionale Verlängerung um 1 Jahr Rahmenvertrag Montagearbeiten Signal- und Zugsicherungstechnik 01.12.2026 – 31.12.2029 + Optionale Verlängerung um 1 Jahr

Official source: Oeffentliche Vergabe, German public procurement portal ↗