Electrical installations at the Horn raw water pumping station

The English source description is an automatic translation. The original SIMAP description is in German and is reproduced in German above.

Place
Zürich, canton of Zurich
Offer deadline: 11 January 2027 at 10:00 Central European Time
09:00 AM · UTC
Contract value
Not stated in the notice
Contract period
15 March 2027 to 25 February 2028. The notice says the final construction programme dates govern.
Published
November 20, 2026
SIMAP

Overview

Stadt Zürich Wasserversorgung invites bids to renew the electrical installations at the Horn raw water pumping station, part of the SWW Moos project. The station must remain in operation through its existing temporary system during construction, with raw water supply maintained at all times. Works include replacing the installations to current standards and fire safety requirements, followed by a switch to new plant and control systems during the planned autumn 2027 shutdown, commissioning and functional tests. The stated execution period is 15 March 2027 to 25 February 2028, but dates in the final construction programme govern. Electronic submission is not permitted. German language bids are due 11 January 2027 at 10:00 Central European Time. A valid NIV general installation authorization is required.

Information based on the public notice

What the buyer needs

Renewal of all electrical installations at the Horn raw water pumping station, including continuity of water supply, a planned system changeover, commissioning and functional tests.

  • A valid general installation authorization under the NIV rules from the Swiss Federal Inspectorate for Heavy Current Installations is required.
  • Offers must be in German. Electronic submission is not permitted. The notice directs bidders to A03 Submission Provisions, Article 6.20, for detailed submission instructions.
  • Consortium bids, variants and partial offers are not permitted. Subcontracting is permitted, but the same subcontractor may not participate in multiple applications.

Tender details

Buyer
Stadt Zürich Wasserversorgung
Country
Switzerland
Procedure
open
Classification
Electrical installation work · CPV 45310000
Notice reference
47985 · 47985-01
Submission
Electronic submission is not permitted. The notice refers bidders to A03 Submission Provisions, Article 6.20, for the exact method. Listed offer address: Stadt Zürich Wasserversorgung, Hardhof 9, 8064 Zürich
Required authorization
A valid general installation authorization under the NIV rules from the Swiss Federal Inspectorate for Heavy Current Installations
Offer deadline
11 January 2027 at 10:00 Central European Time
Question date
18 December 2026; no time is specified
Execution period
15 March 2027 to 25 February 2028; final construction programme dates govern
Location
Zürich, Switzerland

What to check in the tender documents

  • The public notice states no estimated contract value. Detailed qualification and award criteria are in the tender documents. The notice points to A03 Submission Provisions, Article 6.20, for the exact method and formalities where electronic submission is not permitted.
Get started with Ziva

Original notice

Read the original description

SWW Moos Überbrückungsmassnahmen, PW Horn, Elektroinstallationen

Das Rohwasser-Pumpwerk Horn wird derzeit über eine provisorische elektrische Infrastruktur betrieben. Im Anschluss an die Schadstoffsanierung sowie die Umsetzung der erforderlichen statischen Massnahmen werden sämtliche elektrischen Installationen vollständig erneuert und gemäss den aktuell geltenden Normen sowie den Anforderungen des Brandschutzes neu erstellt. Während der gesamten Bauzeit bleibt das Pumpwerk über das bestehende Provisorium in Betrieb, wodurch die Rohwasserversorgung jederzeit sichergestellt werden muss. Dies stellt hohe Anforderungen an die Planung, Koordination und Ausführung der Arbeiten. Die für Herbst 2027 vorgesehene Werksabstellung wird genutzt, um den provisorischen Betrieb auf die neu erstellten Anlagen und Steuerungssysteme umzuschalten. In diesem Zeitraum erfolgen die Inbetriebnahme der neuen Infrastruktur, die erforderlichen Umschaltungen sowie die abschliessenden Funktionstests als Grundlage für den zukünftigen Regelbetrieb.

Official source: SIMAP ↗