Fire protection works at Halle prison buildings 2.0, 3.1 and 3.4

Outcome

Submissions closed on 3 November 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Halle, Germany
3 November 2026 at 10:30 UTC
10:30 AM · UTC
Contract value
Not stated in the notice
Contract period
Building 2.0: 11 January 2026 to 25 August 2027, by floor; kitchen building 3.1: 15 February to 19 March 2027, with work restricted to 13:00–16:00; building 3.4: 5–30 April 2027, with the same restricted hours.
Published
October 2, 2026
Public procurement notice for fire-protection works

Overview

The notice covers fire-protection construction works in three buildings at Halle prison: the detention building 2.0, the kitchen building 3.1, and the storeroom and laundry building 3.4. Listed tasks include protecting finishes and fixtures, temporary barriers and scaffolding, masonry and plaster repairs, closing chases and openings, and upgrading ceilings and enclosures to specified fire-resistance classes. The notice gives approximate quantities for each building and separate work periods. The submission deadline is 3 November 2026 at 10:30 UTC. The listed start date for building 2.0 precedes the notice publication date, and the source does not explain this.

Information based on the public notice

What the buyer needs

Fire-protection construction and finishing works in three named buildings at Halle prison, with building-specific quantities and work periods.

Tender details

Buyer
Amt für Immobilien- und Baumanagement Magdeburg, Zentraleinheit ZE112 - Vergabe
Country
Germany
Procedure
de-open
Classification
Fire-protection construction works · CPV 43000000 · CPV 44000000 · CPV 45000000 · CPV 71000000
Notice reference
ocds-mnwr74-9e4499fd-8518-4603-85df-7b50378ccd90
Work location
Halle prison, buildings 2.0, 3.1 and 3.4
Scope
Fire-protection construction works
Work schedule
Building 2.0: 11 January 2026 to 25 August 2027, by floor; kitchen building 3.1: 15 February to 19 March 2027, with work restricted to 13:00–16:00; building 3.4: 5–30 April 2027, with the same restricted hours.
Submission deadline
3 November 2026 at 10:30 UTC

What to check in the tender documents

  • The available description does not state the estimated value, lot structure, award criteria or contract end date. It lists a 11 January 2026 start for building 2.0, before the notice publication date of 2 October 2026; the source does not explain the timing.
Get started with Ziva

Original notice

Read the original description

Bauleistungen - Brandschutzmaßnahmen, Justizvollzugsanstalt Halle Geb. 2.0 + 3.1 + 3.4 (SLB-2026-0394)

Bauleistungen - Brandschutzmaßnahmen, Justizvollzugsanstalt Halle Geb. 2.0 + 3.1 + 3.4 (SLB-2026-0394) Gebäude 2.0 Hafthaus ca.350+195m² Schutz Böden + Fenster-Türen-Einrichtungsgegenstände, ca. 50m² Folienschutzwände; ca. 51m³ Arbeits-/Raumgerüste; ca. 12mTüröffnungen Maurer-bzw. Betonanschläge herstellen mit Sturzeinbau, ca.20m² Innenwandputze inkl. Untergrundvorbereitung, ca.60m Schlitze schließen, ca.61mStahlzargen verputzen, ca.28Stück Wanddurchbrüche nachträglich verputzen; ca.122+30m² Deckenertüchtigung F30 und F90, ca.26m F30-Verkofferungen Rückbau und Erneuerung, ca. 17m F90-Stahlträgerflanschbekleidung, ca. 55m² F30-Trockenbauwände, ca. 4,5m F30-Entrauchungskanal; Gebäude 3.1 Küche ca.180+410m² Schutz Böden + Fenster-Türen-Einrichtungsgegenstände, ca.9+35m² Staubschutz-+Folienwände, ca. 260m3 Arbeits-/Raumgerüste; ca.4m²Mauerwerkswand; ca.45Stück Wanddurchbrüche verschließen, ca.10m² Innenwandputze inkl. Untergrundvorbereitung, ca.35m Schlitze schließen, ca.32m Stahlzargen verputzen, ca.21Stück Wanddurchbrüche nachträglich verputzen; ca.11m² F30-Trockenbauwand, ca.11m² RC2-Trockenbauwand, ca.81m Stahlträgerflanschbekleidung unterschiedliche Breiten, ca.3m² F30-Decke Gebäude 3.4 Kammer+ Wäscherei ca.125+65m² Schutz Böden + Fenster-Türen-Einrichtungsgegenstände, ca.30+25m² Staubschutz-+Folienwände, ca.50m² Arbeits-Roll- bzw. Raumgerüste;ca.2,5m Tür Anschlag mauern, ca. 1,25 m² Deckenstahlbetonstreifen en, ca.2,0m² Innenwandputze inkl. Untergrundvorbereitung, ca.35m Schlitze schließen, ca.68mStahlzargen verputzen, ca.18Stück Wanddurchbrüche nachträglich verputzen; ca.7m² F90-Trockenbauwände, ca.4m² F90-Trockenb.decke ca.45m F90-Verkofferungen Geb. 2.0 Hafthaus Realisierungszeitraum 11.01.26 bis 25.08.27 geschossweise siehe Fbl. 214 Geb. 3.1 Küche Realisierrungszeitraum 15.02.27 bis 19.03.27 (nur zeitlich eingeschränkters Arbeiten 13-16 Uhr) Geb. 3.4 Kammer + Wäscherei Realisierungszeitraum 05.04.27 bis 30.04.27 (Arbeitszeit wie vor)

Official source: Public procurement notice for fire-protection works ↗