CHC electrolysis JadeWeser prequalification

Outcome

Submissions closed on 13 November 2026. No award has been published yet. Open tenders like this one are listed below.

Place
Austria
Submission deadline
09:00 AM · UTC
Contract value
Not stated in the notice
Classification
Hydrogen electrolysis plant
Published
Not stated in the notice
Canonical public notice snapshot; official detail unavailable

Overview

EWE HYDROGEN GmbH and VERBUND GREEN HYDROGEN GmbH intend to establish and operate a modular 200 MW electrolysis plant as a joint venture. The notice description states around 5,000 full-load hours and production of up to 17,600 tonnes of green hydrogen per year from renewable electricity under RED II, with supply to the H2Coastlink 5 pipeline. This notice concerns prequalification for a future EPC tender. The detail page returned a short response without an identity-matched notice block, so participation criteria, required prequalification evidence, lots, value and award method are unavailable. The snapshot gives a deadline of 13 November 2026 at 09:00 UTC.

Information based on the public notice

What the buyer needs

Prequalification for a future EPC tender for a planned joint-venture modular electrolysis plant. The description states 200 MW, around 5,000 full-load hours per year, and up to 17,600 tonnes of green hydrogen annually, connected to the H2Coastlink 5 pipeline.

Tender details

Buyer
VERBUND Business Solution GmbH
Country
Austria
Procedure
Auftragsbekanntmachung
Classification
Hydrogen electrolysis plant
Notice reference
256767
Planned plant capacity
200 MW modular electrolysis plant
Operating profile
Around 5,000 full-load hours
Production capacity
Up to 17,600 tonnes of green hydrogen per year
Power source and standard
Renewable electricity under RED II
Pipeline
H2Coastlink 5

What to check in the tender documents

  • No identity-matched official detail was retrieved. Prequalification criteria, required evidence, lots, contract value, future EPC timetable and award method are unavailable.
Get started with Ziva

Original notice

Read the original description

CHC Elektrolyse JadeWeser - PreQualification

CHC Elektrolyse JadeWeser - PreQualification EWE HYDROGEN GmbH and VERBUND GREEN HYDROGEN GmbH intend to establish and operate a modular 200 MW electrolysis plant as part of a joint venture. Operating at around 5.000 full-load hours, the plant can produce up to 17.600 t/a of green H2 from renewable electricity (RED II) and feed it into the H2Coastlink 5 pipeline. This tender covers the prequalification for the upcoming EPC-tender.

Official source: Canonical public notice snapshot; official detail unavailable ↗