Supply of 32 tonnes of machined marble blocks
- Buyer
- CERN
- Place
- CERN, Esplanade des Particules 1, 1211 Geneva 23, Switzerland
- No response deadline stated in the announcement.
- Not available
- Contract value
- Not stated in the notice
- Contract period
- Delivery by March 2027
- Published
- March 27, 2025
- CERN
Overview
CERN announced a planned purchase of 32 tonnes of marble, delivered as 30 blocks in three dimensions. Each block must be machined from a single piece, without gluing, to ISO 2768-cL overall tolerances. Delivery is expected by March 2027. Interested firms should have conventional machining experience and provide documented material certificates, metrology and a detailed manufacturing and inspection plan with monthly progress reports. The estimated cost range is CHF 200,000–400,000; no response deadline is stated.
Information based on the public notice
Ask about this tender
What the buyer needs
Supply of machined marble blocks for CERN, with dimensional variants, single-piece production and specified conventional-machining documentation and reporting.
- Interested firms should have experience in conventional machining and provide documented material certificates and metrology, as well as a detailed manufacturing and inspection plan with monthly manufacturing status reports.
Tender details
- Buyer
- CERN
- Country
Switzerland
- Procedure
- Price Enquiry
- Classification
- Materials, fuels and chemicals
- Notice reference
- DO-34598/BE
- Stage
- Announcement; price enquiry was estimated for February 2027
- Quantity
- 32 tonnes in 30 blocks across three dimensions
- Specification
- Single-piece machining, no gluing; ISO 2768-cL tolerances
- Delivery
- By March 2027
- Estimated cost range
- CHF 200,000–400,000
- Supplier experience
- Conventional machining, documented material certificates and metrology, and a detailed manufacturing and inspection plan with monthly reports.
Original notice
Read the original description
Supply of 32 tons of marble, delivered in 30 blocks of three different dimensions.
Official source: CERN ↗
Notice updates
October 22, 2026 · Version 3
Notice update added
Supply of 32 tons of marble, delivered in 30 blocks of three different dimensions.
CERN intends to place a contract for the supply of 32 tons of marble, delivered in 30 blocks of three different dimensions. Marble blocks shall be machined from a single piece (without gluing), with overall tolerances according to ISO2768 - cL. The Supply will be delivered by March 2027. Interested firms shall have a proven experience and competence in conventional machining, very well documented material certificates and metrology and detailed manufacturing and inspection plan (schedule) with monthly manufacturing status report. Estimated cost range: 200k - 400k CHF Procedure stage: Announcement; next step (estimated): Price Enquiry 02/2027
October 22, 2026 · Version 2
Contract period updated · Summary and analysis updated · Tender facts updated · Original notice updated · Source notice details updated · Source references updated
Supply of 32 tons of marble, delivered in 30 blocks of three different dimensions.
CERN intends to place a contract for the supply of 32 tons of marble, delivered in 30 blocks of three different dimensions. Marble blocks shall be machined from a single piece (without gluing), with overall tolerances according to ISO2768 - cL. The Supply will be delivered by March 2027. Interested firms shall have a proven experience and competence in conventional machining, very well documented material certificates and metrology and detailed manufacturing and inspection plan (schedule) with monthly manufacturing status report. Estimated cost range: 200k - 400k CHF Procedure stage: Announcement; next step (estimated): Price Enquiry 02/2027
October 17, 2026 · Version 1
Published
Supply of 32 tons of marble, delivered in 30 blocks of three different dimensions.
CERN intends to place a contract for the supply of 32 tons of marble, delivered in 30 blocks of three different dimensions. Marble blocks shall be machined from a single piece (without gluing), with overall tolerances according to ISO2768 - cL. The Supply will be delivered by March 2027. Interested firms shall have a proven experience and competence in conventional machining, very well documented material certificates and metrology and detailed manufacturing and inspection plan (schedule) with monthly manufacturing status report. Estimated cost range: 200k - 400k CHF Procedure stage: Announcement; next step (estimated): Price Enquiry 09/2026
https://forthcoming-ms.app.cern.ch/?id=DO-34598/BE/#!/
Source retrieved: 2026-10-22T17:14:38Z