Hydraulic improvement of the SSD water supply system
The official API shows a correction publication (P02), but the supplied published notice record does not provide sufficient dated correction chronology to summarize changes separately.
eNaročanje
Overview
The five municipalities Polzela, Braslovče, Tabor, Vransko and Prebold are jointly procuring hydraulic improvements to the SSD water supply system. The published notice divides the works into four sections, “Odsek 1” through “Odsek 4”; bidders may offer for one or more sections, but must cover all services within each section they bid for. Selection is made separately by section. The notice describes EU cohesion-policy co-financing and requires the works to be completed by 31 December 2028. It also expects the construction manager to be present daily. The public API gives a submission time of 10:00 without a timezone; the available notice information gives 08:00 UTC on the same date, so their time relationship is not established.
Information based on the public notice
Ask about this tender
What the buyer needs
Hydraulic improvement works for the SSD water supply system, divided into four independently awardable sections. The notice refers technical detail to a separate project design, which was not accessed.
- An offer may cover one, several or all four sections. For each section offered, the bidder must enter its price in the OBR-6 summary and submit the corresponding Excel price schedule, and must offer all services in that section.
- For each section, the notice requires absence of the exclusion grounds in section 8.1 and fulfillment of the participation conditions in section 8.2 and other conditions in section 9 of the instructions.
Lots
1 ·Odsek 1
2 ·Odsek 2
3 ·Odsek 3
4 ·Odsek 4
Tender details
- Buyer
- OBČINA POLZELA and the municipalities of Braslovče, Tabor, Vransko and Prebold
- Country
Slovenia
- Procedure
- Obvestilo o javnem naročilu – splošno področje
- Classification
- CPV_INTERNAL 6647
- Notice reference
- JN007381/2026-EUe16/01-P02
- Sections
- 4: Odsek 1, Odsek 2, Odsek 3, Odsek 4
- Bid deadline
- 19 October 2026, 10:00; timezone not stated by the API; available notice information says 08:00 UTC and the relationship is unverified
- Works completion
- By 31 December 2028
What to check in the tender documents
- The estimated procurement value is not stated in the public notice API.
- The relationship between the API submission time 10:00 without timezone and canonical 08:00 UTC is unverified.
- Technical specifications in the separately referenced project design were not accessed.
Original notice
Read the original description
Hidravlična izboljšava vodovodnega sistema SSD
Official source: eNaročanje ↗
https://www.enarocanje.si/#/pregled-objav/1200312
Source retrieved: 2026-10-12T23:31:00.857449Z