Shade structure installation at Dargaville High School

Deadline: 2026-11-10T04:00:00+00:00
04:00 AM · UTC
Contract value
Not stated in the notice
Classification
School canopy construction
Published
October 12, 2026

new-zealand-gets

Overview

The New Zealand Ministry of Education seeks a turnkey design-and-build contractor for a standalone, open-ended tensile-membrane canopy over the existing asphalt multisport courts at Dargaville High School. The stated work includes structural engineering and drawings, consent and producer-statement documentation, a galvanized steel frame, a PVC membrane, indicative bored-pier foundations, surface reinstatement, stormwater connection, any needed geotechnical work and service locating, and handover documentation and warranties. Work will occur at an operating school and is planned in one stage. The canonical notice is open; deadline 10 November 2026 at 04:00 UTC. The exact-origin robots file is valid text/plain and permits this target, but the detailed page was not fetched because the available notice information already supplies the substantive scope. Value, award criteria and eligibility remain unavailable.

Information based on the public notice

What the buyer needs

Turnkey design and construction of a standalone tensile-membrane shade canopy over existing multisport courts at an operating school, including listed engineering, consent, construction, reinstatement, drainage and handover work.

Tender details

Buyer
Ministry of Education - School Infrastructure
Country
New Zealand
Procedure
Not stated in the notice
Classification
School canopy construction · UNSPSC 72000000
Notice reference
35135703
Requirements
Turnkey design-and-build of a standalone, open-ended canopy over existing asphalt multisport courts. · Structural engineering, 3D modelling, working and shop drawings are included. · Building-consent documentation and producer statements PS1, PS3 and PS4 are included for the Code Compliance Certificate. · The NZ-fabricated hot-dip galvanised steel frame has a minimum 50-year design life and must comply with the NZ Building Code, AS/NZS 5131 and AC1828. · The PVC tensile membrane (SKY W9400 or equivalent) has maximum 13% light transmission, low glare and a minimum 25-year pro rata warranty. · The indicative concept uses about 14 bored piers, each 900 mm in diameter and 3.0 to 3.5 m deep. · Concrete and asphalt cutting, spoil disposal, and court-surface reinstatement around posts are included. · Rainwater collection must connect to the existing stormwater system; any needed geotechnical investigation and underground-service locating are included. · As-built drawings, operation and maintenance manuals, and warranties are required at handover. · Work is at an operating school site and is planned as one stage with one handover at Practical Completion.

What to check in the tender documents

  • Estimated value, evaluation and award criteria, eligibility conditions, and final detailed design quantities are unavailable in the canonical notice.
Get started with Ziva

Original notice

Read the original description

Dargaville High School – Shade Structure Installation

Dargaville High School – Shade Structure Installation The work required is the turn-key design and build of a standalone, open-ended tensile membrane canopy over the existing asphalt multi-sport courts at Dargaville High School. The Contract Works include: - Structural engineering, 3D modelling, and working and shop drawings - Building consent, including all documentation and producer statements (PS1, PS3 and PS4) needed for the Code Compliance Certificate - A NZ-fabricated, hot-dip galvanised steel frame with a minimum 50-year design life, compliant with the NZ Building Code, AS/NZS 5131 and AC1828 - A PVC tensile membrane (SKY W9400 or equivalent) with a maximum of 13% light transmission, low glare and a minimum 25-year pro rata warranty - Bored pier foundations, independent of existing buildings. The indicative concept uses about 14 piers, each 900mm in diameter and 3.0 to 3.5m deep - Concrete and asphalt cutting, spoil disposal, and reinstating the court surface around each post - Rainwater collection connected to the existing stormwater system - Any geotechnical investigation needed, and locating underground services - As-built drawings, operation and maintenance manuals, and warranties at handover The works are on an operating school site. They will be delivered in a single stage with one handover at Practical Completion.

Official source: new-zealand-gets ↗