title: "Modernisation of Rovaniemi Airport baggage handling system"
canonical: "https://zephior.com/tenders/e1a8cdcd-b2d5-4e80-bebe-01ac33758137/rovaniemi-airport-baggage-handling-modernisation"
last-updated: 2026-10-26T10:00:00+00:00
---

# Modernisation of Rovaniemi Airport baggage handling system

Finavia seeks design, supply and installation work to integrate one new standard 3 departure-baggage screening machine and associated conveyors, controls and safety equipment into the existing Rovaniemi Airport system. Site installation and commissioning are planned for October 2026 to November 2027. Offers are due 26 October 2026 at 10:00 UTC.

- Status: closed
- Country: FI
- Buyer: Finavia Oyj
- Submission deadline: 2026-10-26T10:00:00+00:00 (instant)
- Original notice: https://www.hankintailmoitukset.fi/en/public/procedure/38458/enotice/59104
- Source checked: 2026-10-14T19:44:44.795207Z

## Source-backed public facts

```json
{
  "id": "e1a8cdcd-b2d5-4e80-bebe-01ac33758137",
  "revision": 1,
  "modifiedAt": "2026-10-26T10:00:00+00:00",
  "sourceCheckedAt": "2026-10-14T19:44:44.795207Z",
  "stale": true,
  "url": "https://zephior.com/tenders/e1a8cdcd-b2d5-4e80-bebe-01ac33758137/rovaniemi-airport-baggage-handling-modernisation",
  "locale": "en",
  "title": "Modernisation of Rovaniemi Airport baggage handling system",
  "summary": "Finavia seeks design, supply and installation work to integrate one new standard 3 departure-baggage screening machine and associated conveyors, controls and safety equipment into the existing Rovaniemi Airport system. Site installation and commissioning are planned for October 2026 to November 2027. Offers are due 26 October 2026 at 10:00 UTC.",
  "status": "closed",
  "recordedStatus": "open",
  "sourceStatus": "open",
  "country": "FI",
  "buyer": {
    "id": "finavia-oyj",
    "name": "Finavia Oyj"
  },
  "category": {
    "de": "Gepäckfördersysteme an Flughäfen",
    "en": "Airport baggage handling systems",
    "fr": "Systèmes de traitement des bagages aéroportuaires",
    "id": "airport-baggage-handling"
  },
  "deadline": {
    "at": "2026-10-26T10:00:00+00:00",
    "date": null,
    "source_ref": "canonical_snapshot#deadline_at",
    "sourceRef": "canonical_snapshot#deadline_at",
    "collectorValue": "2026-10-26T10:00:00+00:00",
    "precision": "instant",
    "displayTimeZone": "visitor browser time zone for exact timestamps; date-only deadlines retain their calendar date",
    "semantics": "at or date is the reviewed deadline from the cited source. collectorValue is what the collector parsed; it can show a date-only deadline as local midnight, so prefer at or date when they differ."
  },
  "originalSource": {
    "url": "https://www.hankintailmoitukset.fi/en/public/procedure/38458/enotice/59104",
    "title": "Rovaniemi Airport Baggage Handling System Modernisation",
    "issuer": "Finavia Oyj",
    "status": "open",
    "language": "fi",
    "location": "Lentäjäntie 3 01530 Vantaa FIN",
    "deadline_at": "2026-10-26T10:00:00+00:00",
    "description": "Rovaniemi Airport Baggage Handling System Modernisation The procurement concerns modernizing the existing baggage handling system for departure baggage at Rovaniemi airport. The procurement consists of modifications to the existing baggage handling system to add and integrate one (1) new standard 3 screening machine for departure baggage with its own conveyor line. Modernization of the existing baggage handling system for departure baggage must meet required specifications for baggage flow and redundancy, steel works, structures and other related peripheral devices/systems. The delivery includes designing, manufacturing, shipment, installation, integration of standard 3 screening machine, training and start-up of the Baggage Handling Systems. The procurement contains also fire doors and/or security shutters, low level control system, including SCADA remote monitoring system, SAC (Sort Allocation Controller) and other relevant interfaces and functionalities. On-site installations as well as commissioning are planned to take pace in period between 10/2026 – 11/2027. The successful implementation of the procurement requires cooperation with the contractors executing the necessary changes to the space where the baggage handling system is located and with the contractor installing the new screening machine.,",
    "country_code": "FI",
    "published_at": "2026-10-11T07:05:02.443+00:00",
    "contract_type": "services",
    "deadline_date": null,
    "procedure_type": "neg-w-call",
    "reference_numbers": [
      "EF-59104"
    ],
    "classification_codes": [
      {
        "code": "51000000 34961000",
        "system": "CPV",
        "provenance": "source_declared"
      }
    ]
  },
  "sourceName": "Hilma public eNotice canonical record (official detail page shell provided no visible notice text)",
  "sources": [
    {
      "ref": "canonical_snapshot",
      "url": "https://www.hankintailmoitukset.fi/en/public/procedure/38458/enotice/59104",
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-14T19:44:44.795207Z"
    }
  ],
  "content": {
    "title": "Modernisation of Rovaniemi Airport baggage handling system",
    "summary": "Finavia seeks design, supply and installation work to integrate one new standard 3 departure-baggage screening machine and associated conveyors, controls and safety equipment into the existing Rovaniemi Airport system. Site installation and commissioning are planned for October 2026 to November 2027. Offers are due 26 October 2026 at 10:00 UTC.",
    "key_facts": [
      {
        "label": "Buyer",
        "value": "Finavia Oyj",
        "source_ref": "canonical_snapshot"
      },
      {
        "label": "Procurement reference",
        "value": "EF-59104",
        "source_ref": "canonical_snapshot"
      },
      {
        "label": "Scope",
        "value": "One new standard 3 screening machine with dedicated conveyor, integrated into the existing system.",
        "source_ref": "canonical_snapshot"
      },
      {
        "label": "Planned installation and commissioning",
        "value": "October 2026 to November 2027",
        "source_ref": "canonical_snapshot"
      },
      {
        "label": "Offer deadline",
        "value": "26 October 2026, 10:00 UTC",
        "source_ref": "canonical_snapshot#deadline_at"
      }
    ],
    "notice_analysis": {
      "scope": "Modernize the existing departure-baggage handling system at Rovaniemi Airport by modifying it to add and integrate one new standard 3 screening machine with a dedicated conveyor line. The stated delivery includes design, manufacture, shipment, installation, integration, training and system start-up; related equipment includes fire doors or security shutters, low-level controls, SCADA remote monitoring, SAC and interfaces. Installation and commissioning are planned between October 2026 and November 2027 and require coordination with contractors changing the space and installing the screening machine. Detailed technical specifications are referred to but not reproduced in the available notice description.",
      "missing_information": [
        "Detailed technical specifications are not included in the accessible notice description.",
        "Estimated value, award criteria, and exact contract duration were not available in the checked public page or notice description."
      ],
      "participation_requirements": [
        "Meet the procurement specifications for baggage flow, redundancy, structures and related peripheral systems.",
        "Coordinate implementation with the contractors responsible for the space changes and screening-machine installation."
      ]
    }
  },
  "facts": {
    "lots": [],
    "schedule": [
      {
        "event": "Planned onsite installation and commissioning",
        "value": "October 2026 to November 2027",
        "source_ref": "canonical_snapshot#description"
      }
    ],
    "requirements": [
      {
        "text": "Modernization must meet specifications for baggage flow and redundancy, steel works, structures and related peripheral devices/systems.",
        "source_ref": "canonical_snapshot#description"
      },
      {
        "text": "Coordinate with contractors carrying out required changes to the system space and installing the new screening machine.",
        "source_ref": "canonical_snapshot#description"
      }
    ],
    "award_criteria": [],
    "estimated_value": null
  },
  "award": null,
  "contractPeriod": null,
  "noticeText": {
    "text": "Rovaniemi Airport Baggage Handling System Modernisation The procurement concerns modernizing the existing baggage handling system for departure baggage at Rovaniemi airport. The procurement consists of modifications to the existing baggage handling system to add and integrate one (1) new standard 3 screening machine for departure baggage with its own conveyor line. Modernization of the existing baggage handling system for departure baggage must meet required specifications for baggage flow and redundancy, steel works, structures and other related peripheral devices/systems. The delivery includes designing, manufacturing, shipment, installation, integration of standard 3 screening machine, training and start-up of the Baggage Handling Systems. The procurement contains also fire doors and/or security shutters, low level control system, including SCADA remote monitoring system, SAC (Sort Allocation Controller) and other relevant interfaces and functionalities. On-site installations as well as commissioning are planned to take pace in period between 10/2026 – 11/2027. The successful implementation of the procurement requires cooperation with the contractors executing the necessary changes to the space where the baggage handling system is located and with the contractor installing the new screening machine.,",
    "language": "en",
    "source_ref": "canonical_snapshot#description"
  },
  "updates": [],
  "historyTotal": 1,
  "historyTruncated": false,
  "historyNextBefore": null,
  "related": [],
  "history": [
    {
      "revision": 1,
      "createdAt": "2026-10-14T19:44:50.138219+00:00",
      "changedFields": [
        "published"
      ],
      "source": {
        "url": "https://www.hankintailmoitukset.fi/en/public/procedure/38458/enotice/59104",
        "title": "Rovaniemi Airport Baggage Handling System Modernisation",
        "issuer": "Finavia Oyj",
        "status": "open",
        "language": "fi",
        "location": "Lentäjäntie 3 01530 Vantaa FIN",
        "deadline_at": "2026-10-26T10:00:00+00:00",
        "description": "Rovaniemi Airport Baggage Handling System Modernisation The procurement concerns modernizing the existing baggage handling system for departure baggage at Rovaniemi airport. The procurement consists of modifications to the existing baggage handling system to add and integrate one (1) new standard 3 screening machine for departure baggage with its own conveyor line. Modernization of the existing baggage handling system for departure baggage must meet required specifications for baggage flow and redundancy, steel works, structures and other related peripheral devices/systems. The delivery includes designing, manufacturing, shipment, installation, integration of standard 3 screening machine, training and start-up of the Baggage Handling Systems. The procurement contains also fire doors and/or security shutters, low level control system, including SCADA remote monitoring system, SAC (Sort Allocation Controller) and other relevant interfaces and functionalities. On-site installations as well as commissioning are planned to take pace in period between 10/2026 – 11/2027. The successful implementation of the procurement requires cooperation with the contractors executing the necessary changes to the space where the baggage handling system is located and with the contractor installing the new screening machine.,",
        "country_code": "FI",
        "published_at": "2026-10-11T07:05:02.443+00:00",
        "contract_type": "services",
        "deadline_date": null,
        "procedure_type": "neg-w-call",
        "reference_numbers": [
          "EF-59104"
        ],
        "classification_codes": [
          {
            "code": "51000000 34961000",
            "system": "CPV",
            "provenance": "source_declared"
          }
        ]
      },
      "noticeText": {
        "text": "Rovaniemi Airport Baggage Handling System Modernisation The procurement concerns modernizing the existing baggage handling system for departure baggage at Rovaniemi airport. The procurement consists of modifications to the existing baggage handling system to add and integrate one (1) new standard 3 screening machine for departure baggage with its own conveyor line. Modernization of the existing baggage handling system for departure baggage must meet required specifications for baggage flow and redundancy, steel works, structures and other related peripheral devices/systems. The delivery includes designing, manufacturing, shipment, installation, integration of standard 3 screening machine, training and start-up of the Baggage Handling Systems. The procurement contains also fire doors and/or security shutters, low level control system, including SCADA remote monitoring system, SAC (Sort Allocation Controller) and other relevant interfaces and functionalities. On-site installations as well as commissioning are planned to take pace in period between 10/2026 – 11/2027. The successful implementation of the procurement requires cooperation with the contractors executing the necessary changes to the space where the baggage handling system is located and with the contractor installing the new screening machine.,",
        "language": "en",
        "source_ref": "canonical_snapshot#description"
      }
    }
  ],