title: "Prequalification: Gelephu–Tareythang road and bridge packages"
canonical: "https://zephior.com/tenders/d908c8e2-f019-49d9-ba8f-c49f7122fefa/prequalification-gelephu-tareythang-road-and-bridge-packages"
last-updated: "2026-10-22T04:00:00+00:00"
language: "en"
---

[Tenders](https://zephior.com/tenders) › [Bhutan](https://zephior.com/tenders/countries/bt) › [Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan](https://zephior.com/tenders/buyers/department-of-surface-transport-ministry-of-infrastructure)

# Prequalification: Gelephu–Tareythang road and bridge packages

Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan · Bhutan · Closed

## Outcome

Submissions closed on 22 October 2026. No award has been published yet.

- **Buyer:** Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan
- **Place:** Bhutan
- **22 October 2026, 10:00 Bhutan time:** October 22, 2026 at 4:00 AM UTC
- **Contract value:** Not stated in the notice
- **Lots:** 3 lots
- **Published:** October 8, 202

## Overview

Bhutan’s Department of Surface Transport seeks prequalification applicants for three road-and-bridge packages on the Gelephu–Tareythang corridor, covering 12.6 km and five major bridges. Package I covers km 0.000–3.868; Package II km 3.868–8.453; Package III km 8.453–12.600. The notice describes carriageway, pavement, drainage, slope-protection, tunnel and bridge works. Applications close 22 October 2026 at 10:00 Bhutan time (04:00 UTC); opening is 10:30 local time.

Information based on the public notice

## What the buyer needs

The notice is an invitation for prequalification for ACCESS–Bhutan, reference ACCESS/DOST/WD-1, WD-2 and WD-3, issued by the Department of Surface Transport. It describes three packages of road and bridge works totaling 12,600 m, including five major bridges; Package I is four-lane and Packages II and III are two-lane. The specific bridge types and span configurations appear in the original notice text. The prequalification is open to eligible applicants. No estimated procurement value is stated, and the RFB was expected in October 2026.

## Lots

- Package I · Road and bridge works, km 0.000–3.868; four-lane carriageway
- Package II · Road and bridge works, km 3.868–8.453; two-lane carriageway
- Package III · Road, tunnel and bridge works, km 8.453–12.600; two-lane carriageway

## Tender details

- Buyer: Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan
- Country: Bhutan
- Procedure: Request for Bids
- Classification: Road and bridge construction · WORLD\_BANK P181278
- Notice reference: OP00457042
- Submission deadline: 22 October 2026, 10:00 Bhutan time (04:00 UTC)

## Original notice

**Construction of Gelephu - Tareythang roads and bridges on Southern East-West Highway Package-I; from Ch 0.0m to 3868.0m**

Specific Procurement Notice
                                           Invitation for Prequalification

Country: Kingdom of Bhutan

Name of Project: Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) – Bhutan Project

Contract Title: Construction of Gelephu-Tareythang Road and Bridges

Loan No./Credit No./Grant No: IDA 77560 (Credit)/IDAE4310 (grant)

Prequalification Reference No: ACCESS/DOST/WD-1, ACCESS/DOST/WD-2 and ACCESS/DOST/WD-3

1. The Royal Government of Bhutan has received financing from the World Bank toward the cost of the
proposed Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) – Bhutan Project, and
intends to apply part of the proceeds toward payments under the contracts for ACCESS/DOST/WD-1,
ACCESS/DOST/WD-2, and ACCESS/DOST/WD-3 for the Construction of Gelephu-Tareythang Road and
Bridges.

2. The Department of Surface Transport (DoST), Ministry of Infrastructure and Transport (MoIT), Royal
Government of Bhutan, intends to prequalify contractors for the following work packages under the Gelephu-
Tareythang Road Project involving the construction of 12,600 m of roadway and major bridge structures. The
project comprises five major bridges with bridge lengths varying from 320 m to 1020 m, including PSC I-Girder
and Cast-in-Situ Balanced Cantilever superstructures. The longest structure is the Mau River Bridge with a total
length of 1020 m. The project corridor starts from Gelephu Town and terminates at Tareythang.

The contract packages are described below:

    i.        Package I: Segment 1 to 5 (km 0.000 to km 3.868)



    Construction of a 4-lane carriageway including earthworks, pavement, drainage, slope protection works, and
    associated ancillary works. The package also includes construction of the following two major bridges:


    •     Gelephu Bridge – PSC I-Girder Bridge of span configuration (2 × 40) m; and
    •     Mau River Bridge – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration: (3 x 6) +
          [60 + (6 x 90) + 60] + (3 x 60) m

    ii.       Package II: Segment 5 to 8 (km 3.868 to km 8.453)

Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross-
drainage structures, culverts, slope stabilization, and protection work and associated ancillary works. The package
includes the following major bridges including pile foundations and associated structural works:


    •     Taklai & Jengkhurung Rivers Bridge – PSC I-Girder Bridge of span configuration 8 x (2 × 50) m ; and



                                                                                        Tele: 02 321434(PA) Ext: 139
                                         དཔལ་%ན་འ(ག་ག*ང་། གཞི་/ེན་མཁོ་ཆས་དང་ 6ེལ་འ7ེན་་8ན་ཁག
                                               འ"ོ་འ%ལ་'ེལ་འ)ེན་ལས་,ངས།
                                      ROYAL GOVERNMENT OF BHUTAN
                                MINISTRY OF INFRASTRUCTURE AND TRANSPORT
                                    DEPARTMENT OF SURFACE TRANSPORT

    •      Langer River Bridge – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 ×
           90 + 60 m).

    iii.       Package III: Segment 8 to 10 (km 8.453 to km 12.600)

Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross
drainage structures, culverts, Cuts and Cover tunnel (nearly 30 m below the ground level), slope stabilization,
anchor works, soil nailing. The package includes construction of the following bridge structures:


    •      Singye River Bridge – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 × 90
           + 60 ) m; and
    •      Tareythang Bridge at km 10.880 – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration:
           (60 + 90 + 60) m.

It is expected that the Request for Bids (RFB) will be issued in October 2026.

3. Prequalification will be conducted in accordance with the procedures specified in the World Bank’s Procurement
Regulations for IPF Borrowers, Fifth Edition, September 2023 (“Procurement Regulations”), and is open to all eligible
Applicants as defined in the Procurement Regulations.

4. Interested eligible Applicants may obtain further information from the Department of Surface Transport, Ministry
of Infrastructure and Transport, at the address provided below during office hours from 0900 to 1700 hours (Bhutan
Standard Time, GMT +6:00). The Prequalification Document may be downloaded free of charge from the official
website of the Department of Surface Transport, Ministry of Infrastructure and Transport, Royal Government of
Bhutan. The document can be downloaded from https://moit.gov.bt from July 20, 2026. Applicants are encouraged to
register their contact details to receive clarifications, addenda, and other updates, if any. The Employer shall not be
responsible for any failure or delay in downloading the document due to internet connectivity issues, browser
incompatibility, or other technical problems at the Applicant’s end.

5. Applications for prequalification should be submitted in clearly marked envelopes and delivered to the
address below by 1000 hours (Bhutan Time, GMT + 0600 hours) on: October 22, 2026 and will be opened on
the same date at 1030 hours (Bhutan Time, GMT + 0600 hours). Late applications may be rejected.

Chief Engineer
Construction Division
Department of Surface Transport (DoST)
Ministry of Infrastructure & Transport (MoIT)
City: Thimphu
ZIP/Postal Code: 11001
Country: Bhutan
Telephone: PABX No.: 975-2-322086
Email id and website: cmpradhan@moit.gov.bt and www.moit.gov.bt







                                                                                         Tele: 02 321434(PA) Ext: 139

- Official source: [World Bank procurement notice (canonical snapshot)](https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00457042)
- [Official notice PDF](https://moit.gov.bt/wp-content/uploads/2026/10/Revised-SPN-for-PQDdocx.pdf)

## Notice updates

### October 12, 2026 · Version 2 (Summary and analysis updated, Original notice updated, Deadline updated, Source references updated)

Construction of Gelephu - Tareythang roads and bridges on Southern East-West Highway Package-I; from Ch 0.0m to 3868.0m

Specific Procurement Notice
                                           Invitation for Prequalification

Country: Kingdom of Bhutan

Name of Project: Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) – Bhutan Project

Contract Title: Construction of Gelephu-Tareythang Road and Bridges

Loan No./Credit No./Grant No: IDA 77560 (Credit)/IDAE4310 (grant)

Prequalification Reference No: ACCESS/DOST/WD-1, ACCESS/DOST/WD-2 and ACCESS/DOST/WD-3

1. The Royal Government of Bhutan has received financing from the World Bank toward the cost of the
proposed Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) – Bhutan Project, and
intends to apply part of the proceeds toward payments under the contracts for ACCESS/DOST/WD-1,
ACCESS/DOST/WD-2, and ACCESS/DOST/WD-3 for the Construction of Gelephu-Tareythang Road and
Bridges.

2. The Department of Surface Transport (DoST), Ministry of Infrastructure and Transport (MoIT), Royal
Government of Bhutan, intends to prequalify contractors for the following work packages under the Gelephu-
Tareythang Road Project involving the construction of 12,600 m of roadway and major bridge structures. The
project comprises five major bridges with bridge lengths varying from 320 m to 1020 m, including PSC I-Girder
and Cast-in-Situ Balanced Cantilever superstructures. The longest structure is the Mau River Bridge with a total
length of 1020 m. The project corridor starts from Gelephu Town and terminates at Tareythang.

The contract packages are described below:

    i.        Package I: Segment 1 to 5 (km 0.000 to km 3.868)



    Construction of a 4-lane carriageway including earthworks, pavement, drainage, slope protection works, and
    associated ancillary works. The package also includes construction of the following two major bridges:


    •     Gelephu Bridge – PSC I-Girder Bridge of span configuration (2 × 40) m; and
    •     Mau River Bridge – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration: (3 x 6) +
          [60 + (6 x 90) + 60] + (3 x 60) m

    ii.       Package II: Segment 5 to 8 (km 3.868 to km 8.453)

Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross-
drainage structures, culverts, slope stabilization, and protection work and associated ancillary works. The package
includes the following major bridges including pile foundations and associated structural works:


    •     Taklai & Jengkhurung Rivers Bridge – PSC I-Girder Bridge of span configuration 8 x (2 × 50) m ; and



                                                                                        Tele: 02 321434(PA) Ext: 139
                                         དཔལ་%ན་འ(ག་ག*ང་། གཞི་/ེན་མཁོ་ཆས་དང་ 6ེལ་འ7ེན་་8ན་ཁག
                                               འ"ོ་འ%ལ་'ེལ་འ)ེན་ལས་,ངས།
                                      ROYAL GOVERNMENT OF BHUTAN
                                MINISTRY OF INFRASTRUCTURE AND TRANSPORT
                                    DEPARTMENT OF SURFACE TRANSPORT

    •      Langer River Bridge – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 ×
           90 + 60 m).

    iii.       Package III: Segment 8 to 10 (km 8.453 to km 12.600)

Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross
drainage structures, culverts, Cuts and Cover tunnel (nearly 30 m below the ground level), slope stabilization,
anchor works, soil nailing. The package includes construction of the following bridge structures:


    •      Singye River Bridge – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 × 90
           + 60 ) m; and
    •      Tareythang Bridge at km 10.880 – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration:
           (60 + 90 + 60) m.

It is expected that the Request for Bids (RFB) will be issued in October 2026.

3. Prequalification will be conducted in accordance with the procedures specified in the World Bank’s Procurement
Regulations for IPF Borrowers, Fifth Edition, September 2023 (“Procurement Regulations”), and is open to all eligible
Applicants as defined in the Procurement Regulations.

4. Interested eligible Applicants may obtain further information from the Department of Surface Transport, Ministry
of Infrastructure and Transport, at the address provided below during office hours from 0900 to 1700 hours (Bhutan
Standard Time, GMT +6:00). The Prequalification Document may be downloaded free of charge from the official
website of the Department of Surface Transport, Ministry of Infrastructure and Transport, Royal Government of
Bhutan. The document can be downloaded from https://moit.gov.bt from July 20, 2026. Applicants are encouraged to
register their contact details to receive clarifications, addenda, and other updates, if any. The Employer shall not be
responsible for any failure or delay in downloading the document due to internet connectivity issues, browser
incompatibility, or other technical problems at the Applicant’s end.

5. Applications for prequalification should be submitted in clearly marked envelopes and delivered to the
address below by 1000 hours (Bhutan Time, GMT + 0600 hours) on: October 22, 2026 and will be opened on
the same date at 1030 hours (Bhutan Time, GMT + 0600 hours). Late applications may be rejected.

Chief Engineer
Construction Division
Department of Surface Transport (DoST)
Ministry of Infrastructure & Transport (MoIT)
City: Thimphu
ZIP/Postal Code: 11001
Country: Bhutan
Telephone: PABX No.: 975-2-322086
Email id and website: cmpradhan@moit.gov.bt and www.moit.gov.bt







                                                                                         Tele: 02 321434(PA) Ext: 139

### October 12, 2026 · Version 1 (Published)

Construction of Gelephu - Tareythang roads and bridges on Southern East-West Highway Package-I; from Ch 0.0m to 3868.0m

Specific Procurement Notice Invitation for Prequalification Country: Kingdom of Bhutan Name of Project: Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) &ndash; Bhutan Project Contract Title: Construction of Gelephu-Tareythang Road and Bridges Loan No./Credit No./Grant No: IDA 77560 (Credit)/IDAE4310 (grant) Prequalification Reference No : ACCESS/DOST/WD-1, ACCESS/DOST/WD-2 and ACCESS/DOST/WD-3 1. The Royal Government of Bhutan has received financing from the World Bank toward the cost of the proposed Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) &ndash; Bhutan Project , and intends to apply part of the proceeds toward payments under the contracts for ACCESS/DOST/WD-1, ACCESS/DOST/WD-2, and ACCESS/DOST/WD-3 for the Construction of Gelephu-Tareythang Road and Bridges. 2. The Department of Surface Transport (DoST), Ministry of Infrastructure and Transport (MoIT), Royal Government of Bhutan, intends to prequalify contractors for the following work packages under the Gelephu-Tareythang Road Project involving the construction of 12,600 m of roadway and major bridge structures. The project comprises five major bridges with bridge lengths varying from 320 m to 1020 m, including PSC I-Girder and Cast-in-Situ Balanced Cantilever superstructures. The longest structure is the Mau River Bridge with a total length of 1020 m. The project corridor starts from Gelephu Town and terminates at Tareythang. The contract packages are described below: Package I: Segment 1 to 5 (km 0.000 to km 3.868) Construction of a 4-lane carriageway including earthworks, pavement, drainage, slope protection works, and associated ancillary works. The package also includes construction of the following two major bridges: Gelephu Bridge &ndash; PSC I-Girder Bridge of span configuration (2 &times; 40) m; and Mau River Bridge &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration: (3 x 6) + [60 + (6 x 90) + 60] + (3 x 60) m Package II: Segment 5 to 8 (km 3.868 to km 8.453) Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross-drainage structures, culverts, slope stabilization, and protection work and associated ancillary works. The package includes the following major bridges including pile foundations and associated structural works: Taklai & Jengkhurung Rivers Bridge &ndash; PSC I-Girder Bridge of span configuration 8 x (2 &times; 50) m ; and Langer River Bridge &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 &times; 90 + 60 m). Package III: Segment 8 to 10 (km 8.453 to km 12.600) Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross drainage structures, culverts, Cuts and Cover tunnel (nearly 30 m below the ground level), slope stabilization, anchor works, soil nailing. The package includes construction of the following bridge structures: Singye River Bridge &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 &times; 90 + 60 ) m; and Tareythang Bridge at km 10.880 &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration: (60 + 90 + 60) m. It is expected that the Request for Bids (RFB) will be issued in October 2026. 3. Prequalification will be conducted in accordance with the procedures specified in the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, Fifth Edition, September 2023 (&ldquo;Procurement Regulations&rdquo;), and is open to all eligible Applicants as defined in the Procurement Regulations. 4. Interested eligible Applicants may obtain further information from the Department of Surface Transport, Ministry of Infrastructure and Transport, at the address provided below during office hours from 0900 to 1700 hours (Bhutan Standard Time, GMT +6:00). The Prequalification Document may be downloaded free of charge from the official website of the Department of Surface Transport, Ministry of Infrastructure and Transport, Royal Government of Bhutan. The document can be downloaded from https://moit.gov.bt/specific-procurement-notice-for-pre-qualification-of-contractors-for-construction-of-gelephu-tareythang-road-and-bridges/ from July 20, 2026. Applicants are encouraged to register their contact details to receive clarifications, addenda, and other updates, if any. The Employer shall not be responsible for any failure or delay in downloading the document due to internet connectivity issues, browser incompatibility, or other technical problems at the Applicant&rsquo;s end. 5. Applications for prequalification should be submitted in clearly marked envelopes and delivered to the address below by 1000 hours (Bhutan Time, GMT + 0600 hours) on: October 22, 2026 and will be opened on the same date at 1030 hours (Bhutan Time, GMT + 0600 hours). Late applications may be rejected. Chief Engineer Construction Division Department of Surface Transport (DoST) Ministry of Infrastructure & Transport (MoIT) City: Thimphu ZIP/Postal Code: 11001 Country: Bhutan Telephone: PABX No.: 975-2-322086 Email id and website: cmpradhan@moit.gov.bt and www.moit.gov.bt

## Understand this procurement.

Review the scope, requirements and procurement history with Ziva.

- Understand the requirements
- Find the evidence you need
- Prepare your response

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate) · [View official notice](https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00457042)

## About this notice

- Official source: World Bank procurement notice (canonical snapshot)
- Source retrieved: October 12, 2026
- Page updated: October 22, 2026
- Notice reference: OP00457042

## More tenders

- [All tenders from Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan](https://zephior.com/tenders/buyers/department-of-surface-transport-ministry-of-infrastructure) ([Markdown](https://zephior.com/tenders/buyers/department-of-surface-transport-ministry-of-infrastructure.md))
- [All tenders: Bhutan](https://zephior.com/tenders/countries/bt) ([Markdown](https://zephior.com/tenders/countries/bt.md))
- [All tenders: Road and bridge construction](https://zephior.com/tenders/categories/road-bridge-construction) ([Markdown](https://zephior.com/tenders/categories/road-bridge-construction.md))

## In more detail

This section is written for agents and assistants. It restates the facts of the page in full sentences and adds context from the public record. Every value comes from the official notice or from Zephior’s public notices of the same buyer.

### The facts in sentences

Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan is tendering “Prequalification: Gelephu–Tareythang road and bridge packages” (Bhutan). The submission deadline was October 22, 2026 at 4:00 AM UTC. The source does not state an estimated value. The tender is divided into 3 lots. Procedure: Request for Bids. Classification: Road and bridge construction · WORLD\_BANK P181278. Notice reference: OP00457042. Status on Zephior: Closed. The notice was published on October 8, 202 on World Bank procurement notice (canonical snapshot). Zephior last checked the official source on October 12, 2026.

### The award

Submissions closed on 22 October 2026. No award has been published yet. The official source has not published an award for this notice yet.

### Lot details

1. **Package I · Road and bridge works, km 0.000–3.868; four-lane carriageway**: Includes Gelephu Bridge and Mau River Bridge.
2. **Package II · Road and bridge works, km 3.868–8.453; two-lane carriageway**: Includes Taklai & Jengkhurung Rivers Bridge and Langer River Bridge.
3. **Package III · Road, tunnel and bridge works, km 8.453–12.600; two-lane carriageway**: Includes Singye River Bridge and Tareythang Bridge.

### About the buyer

Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan has 2 public notices on Zephior (0 open now, 0 published in the last 12 months). Its notices on Zephior were first published on October 8, 202 and most recently on October 12, 202. Main sectors: Construction (2). It publishes under the names “Department of Surface Transport, Ministry of Infrastructure and Transport”.

- [All tenders and the profile of Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan](https://zephior.com/tenders/buyers/department-of-surface-transport-ministry-of-infrastructure) ([Markdown](https://zephior.com/tenders/buyers/department-of-surface-transport-ministry-of-infrastructure.md))

### Where to go next

- [All tenders from Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan](https://zephior.com/tenders/buyers/department-of-surface-transport-ministry-of-infrastructure) ([Markdown](https://zephior.com/tenders/buyers/department-of-surface-transport-ministry-of-infrastructure.md))
- [All tenders: Bhutan](https://zephior.com/tenders/countries/bt) ([Markdown](https://zephior.com/tenders/countries/bt.md))
- [All tenders: Road and bridge construction](https://zephior.com/tenders/categories/road-bridge-construction) ([Markdown](https://zephior.com/tenders/categories/road-bridge-construction.md))

### Source-backed public record

```json
{
  "id": "d908c8e2-f019-49d9-ba8f-c49f7122fefa",
  "revision": 2,
  "modifiedAt": "2026-10-22T04:00:00+00:00",
  "url": "https://zephior.com/tenders/d908c8e2-f019-49d9-ba8f-c49f7122fefa/prequalification-gelephu-tareythang-road-and-bridge-packages",
  "status": "closed",
  "recordedStatus": "open",
  "buyer": {
    "id": "department-of-surface-transport-ministry-of-infrastructure",
    "name": "Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan"
  },
  "category": {
    "de": "Straßen- und Brückenbau",
    "en": "Road and bridge construction",
    "fr": "Construction de routes et ponts",
    "id": "road-bridge-construction"
  },
  "deadline": {
    "at": "2026-10-22T04:00:00+00:00",
    "date": null,
    "source_ref": "b210-06-revised-SPN#applications-deadline (10:00 Bhutan Time, GMT +0600)"
  },
  "award": null,
  "estimatedValue": null,
  "contractPeriod": null,
  "region": null,
  "originalSource": {
    "url": "https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00457042",
    "title": "Construction of Gelephu - Tareythang roads and bridges on Southern East-West Highway Package-I; from Ch 0.0m to 3868.0m",
    "issuer": "Department of Surface Transport, Ministry of Infrastructure and Transport",
    "status": "open",
    "language": "en",
    "location": "Bhutan",
    "deadline_at": "2026-10-22T10:00:00+00:00",
    "description": "Specific Procurement Notice Invitation for Prequalification Country: Kingdom of Bhutan Name of Project: Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) &ndash; Bhutan Project Contract Title: Construction of Gelephu-Tareythang Road and Bridges Loan No./Credit No./Grant No: IDA 77560 (Credit)/IDAE4310 (grant) Prequalification Reference No : ACCESS/DOST/WD-1, ACCESS/DOST/WD-2 and ACCESS/DOST/WD-3 1. The Royal Government of Bhutan has received financing from the World Bank toward the cost of the proposed Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) &ndash; Bhutan Project , and intends to apply part of the proceeds toward payments under the contracts for ACCESS/DOST/WD-1, ACCESS/DOST/WD-2, and ACCESS/DOST/WD-3 for the Construction of Gelephu-Tareythang Road and Bridges. 2. The Department of Surface Transport (DoST), Ministry of Infrastructure and Transport (MoIT), Royal Government of Bhutan, intends to prequalify contractors for the following work packages under the Gelephu-Tareythang Road Project involving the construction of 12,600 m of roadway and major bridge structures. The project comprises five major bridges with bridge lengths varying from 320 m to 1020 m, including PSC I-Girder and Cast-in-Situ Balanced Cantilever superstructures. The longest structure is the Mau River Bridge with a total length of 1020 m. The project corridor starts from Gelephu Town and terminates at Tareythang. The contract packages are described below: Package I: Segment 1 to 5 (km 0.000 to km 3.868) Construction of a 4-lane carriageway including earthworks, pavement, drainage, slope protection works, and associated ancillary works. The package also includes construction of the following two major bridges: Gelephu Bridge &ndash; PSC I-Girder Bridge of span configuration (2 &times; 40) m; and Mau River Bridge &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration: (3 x 6) + [60 + (6 x 90) + 60] + (3 x 60) m Package II: Segment 5 to 8 (km 3.868 to km 8.453) Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross-drainage structures, culverts, slope stabilization, and protection work and associated ancillary works. The package includes the following major bridges including pile foundations and associated structural works: Taklai & Jengkhurung Rivers Bridge &ndash; PSC I-Girder Bridge of span configuration 8 x (2 &times; 50) m ; and Langer River Bridge &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 &times; 90 + 60 m). Package III: Segment 8 to 10 (km 8.453 to km 12.600) Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross drainage structures, culverts, Cuts and Cover tunnel (nearly 30 m below the ground level), slope stabilization, anchor works, soil nailing. The package includes construction of the following bridge structures: Singye River Bridge &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 &times; 90 + 60 ) m; and Tareythang Bridge at km 10.880 &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration: (60 + 90 + 60) m. It is expected that the Request for Bids (RFB) will be issued in October 2026. 3. Prequalification will be conducted in accordance with the procedures specified in the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, Fifth Edition, September 2023 (&ldquo;Procurement Regulations&rdquo;), and is open to all eligible Applicants as defined in the Procurement Regulations. 4. Interested eligible Applicants may obtain further information from the Department of Surface Transport, Ministry of Infrastructure and Transport, at the address provided below during office hours from 0900 to 1700 hours (Bhutan Standard Time, GMT +6:00). The Prequalification Document may be downloaded free of charge from the official website of the Department of Surface Transport, Ministry of Infrastructure and Transport, Royal Government of Bhutan. The document can be downloaded from https://moit.gov.bt/specific-procurement-notice-for-pre-qualification-of-contractors-for-construction-of-gelephu-tareythang-road-and-bridges/ from July 20, 2026. Applicants are encouraged to register their contact details to receive clarifications, addenda, and other updates, if any. The Employer shall not be responsible for any failure or delay in downloading the document due to internet connectivity issues, browser incompatibility, or other technical problems at the Applicant&rsquo;s end. 5. Applications for prequalification should be submitted in clearly marked envelopes and delivered to the address below by 1000 hours (Bhutan Time, GMT + 0600 hours) on: October 22, 2026 and will be opened on the same date at 1030 hours (Bhutan Time, GMT + 0600 hours). Late applications may be rejected. Chief Engineer Construction Division Department of Surface Transport (DoST) Ministry of Infrastructure & Transport (MoIT) City: Thimphu ZIP/Postal Code: 11001 Country: Bhutan Telephone: PABX No.: 975-2-322086 Email id and website: cmpradhan@moit.gov.bt and www.moit.gov.bt",
    "country_code": "BT",
    "published_at": "0202-10-08T00:00:00+00:00",
    "contract_type": "CW",
    "deadline_date": null,
    "procedure_type": "Request for Bids",
    "reference_numbers": [
      "OP00457042"
    ],
    "classification_codes": [
      {
        "code": "P181278",
        "system": "WORLD_BANK",
        "provenance": "source_declared"
      }
    ]
  },
  "sources": [
    {
      "ref": "b210-06-canonical_snapshot",
      "url": "https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00457042",
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-12T16:39:18.359186Z"
    },
    {
      "ref": "canonical_snapshot",
      "url": "https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00457042",
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-12T16:38:50.600713Z"
    },
    {
      "ref": "b210-06-revised-SPN",
      "url": "https://moit.gov.bt/wp-content/uploads/2026/10/Revised-SPN-for-PQDdocx.pdf",
      "kind": "official_notice_pdf",
      "retrieved_at": "2026-10-12T16:44:54.423791Z"
    }
  ],
  "keyFacts": [
    {
      "label": "Notice reference",
      "value": "OP00457042",
      "source_ref": "canonical_snapshot#/reference_numbers"
    },
    {
      "label": "Submission deadline",
      "value": "22 October 2026, 10:00 Bhutan time (04:00 UTC)",
      "source_ref": "b210-06-revised-SPN#applications-deadline"
    }
  ],
  "noticeFacts": {
    "lots": [
      {
        "id": "Package I",
        "title": "Road and bridge works, km 0.000–3.868; four-lane carriageway",
        "source_ref": "canonical_snapshot#/description",
        "description": "Includes Gelephu Bridge and Mau River Bridge."
      },
      {
        "id": "Package II",
        "title": "Road and bridge works, km 3.868–8.453; two-lane carriageway",
        "source_ref": "canonical_snapshot#/description",
        "description": "Includes Taklai & Jengkhurung Rivers Bridge and Langer River Bridge."
      },
      {
        "id": "Package III",
        "title": "Road, tunnel and bridge works, km 8.453–12.600; two-lane carriageway",
        "source_ref": "canonical_snapshot#/description",
        "description": "Includes Singye River Bridge and Tareythang Bridge."
      }
    ],
    "schedule": [],
    "requirements": [],
    "award_criteria": [],
    "estimated_value": null
  },
  "historyTotal": 2
}
```