title: "Notice of a contract modification: Lekkanaal/third Beatrix Lock chamber, relocation of New Dutch Waterline assets"
canonical: "https://zephior.com/tenders/abb18ad6-976d-464f-a5e9-eb68a275395e/notice-of-a-contract-modification-lekkanaal-third-beatrix-lock-chamber-relocation-of-new-dutch-waterline-assets"
last-updated: 2026-10-11T09:53:56.082775+00:00
---

# Notice of a contract modification: Lekkanaal/third Beatrix Lock chamber, relocation of New Dutch Waterline assets

Rijkswaterstaat’s notice concerns measures linked to relocation of New Dutch Waterline objects during the Lekkanaal and third Beatrix Lock chamber works. It says the competent authority’s late decision on an environmental permit, outside the deadlines set by the route-law coordinator, caused unforeseen and unwanted delay. The measures are described as inseparable from the contractor’s work and phasing and as intended to prevent the permit from becoming void. The retrieved TenderNed page exposed only a generic shell; value, parties, modification date and current contract status are unavailable.

- Status: unconfirmed
- Country: NL
- Buyer: Rijkswaterstaat Grote Projecten en Onderhoud
- Submission deadline: Not available (unavailable)
- Original notice: https://www.tenderned.nl/aankondigingen/overzicht/107066
- Source checked: 2026-10-11T09:36:00.588240Z

## Source-backed public facts

```json
{
  "id": "abb18ad6-976d-464f-a5e9-eb68a275395e",
  "revision": 2,
  "modifiedAt": "2026-10-11T09:53:56.082775+00:00",
  "sourceCheckedAt": "2026-10-11T09:36:00.588240Z",
  "stale": false,
  "url": "https://zephior.com/tenders/abb18ad6-976d-464f-a5e9-eb68a275395e/notice-of-a-contract-modification-lekkanaal-third-beatrix-lock-chamber-relocation-of-new-dutch-waterline-assets",
  "locale": "en",
  "title": "Notice of a contract modification: Lekkanaal/third Beatrix Lock chamber, relocation of New Dutch Waterline assets",
  "summary": "Rijkswaterstaat’s notice concerns measures linked to relocation of New Dutch Waterline objects during the Lekkanaal and third Beatrix Lock chamber works. It says the competent authority’s late decision on an environmental permit, outside the deadlines set by the route-law coordinator, caused unforeseen and unwanted delay. The measures are described as inseparable from the contractor’s work and phasing and as intended to prevent the permit from becoming void. The retrieved TenderNed page exposed only a generic shell; value, parties, modification date and current contract status are unavailable.",
  "status": "unconfirmed",
  "recordedStatus": "unconfirmed",
  "sourceStatus": "awarded",
  "country": "NL",
  "buyer": {
    "id": "rijkswaterstaat-grote-projecten-onderhoud",
    "name": "Rijkswaterstaat Grote Projecten en Onderhoud"
  },
  "category": {
    "de": "Änderung eines Infrastrukturvertrags",
    "en": "Infrastructure contract modification",
    "fr": "Modification d’un marché d’infrastructure",
    "id": "infrastructure-contract-modification"
  },
  "deadline": {
    "at": null,
    "date": null,
    "sourceRef": null,
    "precision": "unavailable",
    "displayTimeZone": "visitor browser time zone for exact timestamps; date-only deadlines retain their calendar date"
  },
  "originalSource": {
    "url": "https://www.tenderned.nl/aankondigingen/overzicht/107066",
    "title": "31089547: Aankondiging van een wijziging Lekkanaal/3e kolk Beatrixsluis maatregelen verplaatsing NHW-objecten",
    "issuer": "Rijkswaterstaat Grote Projecten en Onderhoud",
    "status": "awarded",
    "language": "nl",
    "location": "NEDERLAND",
    "deadline_at": null,
    "description": "Maatregelen in verband met het niet tijdig, conform de door de Tracéwetcoördinator vastgestelde termijnen, door het bevoegd gezag beslissen op de omgevingsvergunning inzake de verplaatsing van NHW objecten, hetgeen heeft geleid tot onvoorziene en ongewenste vertraging en maatregelen ter voorkoming van vernietiging van de omgevingsvergunning. \r\nDe maatregelen zijn onlosmakelijk verbonden met de werkzaamheden en de fasering van de opdrachtnemer.",
    "country_code": "NL",
    "published_at": "2017-04-19T11:00:04.402+00:00",
    "contract_type": "Werken",
    "deadline_date": null,
    "procedure_type": "Onderhandelingsprocedure zonder voorafgaande oproep tot mededinging",
    "reference_numbers": [
      "107066"
    ],
    "classification_codes": [
      {
        "code": "45262210-6",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "71325000-2",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "NL",
        "system": "NUTS",
        "provenance": "source_declared"
      }
    ]
  },
  "sourceName": "TenderNed",
  "sources": [
    {
      "ref": "canonical_snapshot",
      "url": null,
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-11T09:36:00.588240Z"
    },
    {
      "ref": "official_notice_html",
      "url": "https://www.tenderned.nl/aankondigingen/overzicht/107066",
      "kind": "official_notice_html",
      "retrieved_at": "2026-10-11T09:36:00.588240Z"
    }
  ],
  "content": {
    "title": "Notice of a contract modification: Lekkanaal/third Beatrix Lock chamber, relocation of New Dutch Waterline assets",
    "summary": "Rijkswaterstaat’s notice concerns measures linked to relocation of New Dutch Waterline objects during the Lekkanaal and third Beatrix Lock chamber works. It says the competent authority’s late decision on an environmental permit, outside the deadlines set by the route-law coordinator, caused unforeseen and unwanted delay. The measures are described as inseparable from the contractor’s work and phasing and as intended to prevent the permit from becoming void. The retrieved TenderNed page exposed only a generic shell; value, parties, modification date and current contract status are unavailable.",
    "key_facts": [
      {
        "label": "Buyer",
        "value": "Rijkswaterstaat Grote Projecten en Onderhoud",
        "source_ref": "canonical_snapshot#/issuer"
      },
      {
        "label": "Scope",
        "value": "Contract modification measures addressing delay caused by a late environmental-permit decision affecting relocation of New Dutch Waterline objects; described as inseparable from the contractor’s works and phasing.",
        "source_ref": "canonical_snapshot#/description"
      }
    ],
    "notice_analysis": {
      "scope": "Contract modification measures addressing delay caused by a late environmental-permit decision affecting relocation of New Dutch Waterline objects; described as inseparable from the contractor’s works and phasing.",
      "missing_information": [
        "TenderNed returned only a generic page shell. The change value, parties, date and current status are unavailable.",
        "TenderNed lieferte nur eine allgemeine Seitenhülle. Änderungswert, Parteien, Datum und aktueller Status sind nicht verfügbar.",
        "TenderNed ne renvoie qu’une coquille générique. La valeur, les parties, la date et le statut actuel ne sont pas disponibles."
      ],
      "participation_requirements": []
    }
  },
  "facts": {
    "lots": [],
    "schedule": [],
    "requirements": [],
    "award_criteria": [],
    "estimated_value": null
  },
  "award": null,
  "contractPeriod": null,
  "noticeText": {
    "text": "31089547: Aankondiging van een wijziging Lekkanaal/3e kolk Beatrixsluis maatregelen verplaatsing NHW-objecten\nMaatregelen in verband met het niet tijdig, conform de door de Tracéwetcoördinator vastgestelde termijnen, door het bevoegd gezag beslissen op de omgevingsvergunning inzake de verplaatsing van NHW objecten, hetgeen heeft geleid tot onvoorziene en ongewenste vertraging en maatregelen ter voorkoming van vernietiging van de omgevingsvergunning. \r\nDe maatregelen zijn onlosmakelijk verbonden met de werkzaamheden en de fasering van de opdrachtnemer.",
    "language": "nl",
    "source_ref": "canonical_snapshot"
  },
  "updates": [],
  "history": [],