# Overhead line and switchyard maintenance at Agus 7

National Power Corporation – Mindanao Generation · Philippines · Closed

## Outcome

Submissions closed on 14 October 2026. No award has been published yet.

- **Buyer:** National Power Corporation – Mindanao Generation
- **Place:** Agus 7 switchyard and overhead line, Lanao del Norte, Philippines
- **Closed 14 October 2026 at 09:00 as displayed; time zone not stated.:** October 14, 2026
- **Contract value:** ₱412,000
- **Lots:** 1 lot
- **Contract period:** 12 days
- **Published:** October 9, 2026

## Overview

National Power Corporation’s Mindanao Generation unit sought overhead tie-line and switchyard maintenance at Agus 7. Work includes correcting conductor sag, cleaning tower and switchyard insulators, retightening connectors and removing HVIC compound; Units 1 and 2 must be shut down. The PHP 412,000 small-value procurement allows 12 days for the work. The notice requires relevant experience, site-inspection and cost documentation, safety qualifications and equipment. It closed on 14 October 2026 at 09:00 as displayed; no time zone is stated.

Information based on the public notice

## What the buyer needs

Maintenance of overhead tie-line and switchyard equipment at Agus 7, including a planned shutdown, insulator cleaning or replacement, conductor work and connector maintenance.

- Prepare materials and equipment on site, correct conductor sag, clean suspension tower posts and insulators, and retighten tower connectors.
- Clean the porcelain suspension insulators at Agus 7 switchyard, including take-off transformers; remove the existing HVIC compound and tighten connectors if thermal scanning identifies hot spots.
- Agus 7 Units 1 and 2 must be shut down during the work. The contractor supplies safety harnesses and other transmission-line safety equipment and must provide qualified safety staff, PPE and worker training.
- Provide at least three years of transmission-line maintenance experience, site-inspection evidence, cost estimate and bill of materials, and HVIC technical data.
- Complete six days of insulator replacement and six days of semi-annual preventive maintenance within 12 days; provide dated work photographs and an accomplishment report.

## Lots

- 1 · Overhead tie-line and Agus 7 switchyard maintenance

## Tender details

- Buyer: National Power Corporation – Mindanao Generation
- Country: Philippines
- Procedure: Not stated in the notice
- Classification: Electrical transmission-line maintenance
- Notice reference: 13280877
- Procurement mode: Negotiated Procurement, Small Value Procurement (Sec. 34)
- Approved budget: PHP 412,000
- Work period: 12 days
- Experience requirement: At least 3 years in transmission-line maintenance
- Closing time: 14 October 2026 at 09:00; time zone not stated

## What to check in the tender documents

- The public notice does not state a time zone for the closing clock. Detailed site and material conditions require the site inspection and tender documents.

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate)

## Original notice

**TIE LINE & SWITCHYARD OVERHEAD MAINTENANCE (A7)**

Bid Notice Abstract
Invitation to Bid (ITB)
Reference Number
13280877
Procuring Entity
NATIONAL POWER CORPORATION - MINDANAO GENERATION
Title
TIE LINE & SWITCHYARD OVERHEAD MAINTENANCE (A7)
Area of Delivery
Lanao Del Norte
Solicitation Number:
MG-A7M26-141
Trade Agreement:
Implementing Rules and Regulations
Procurement Mode:
Negotiated Procurement - Small Value Procurement (Sec. 34)
Classification:
Goods
Category:
General Engineering Services
Approved Budget for the Contract:
PHP
412,000.00
Delivery Period:
12 Day/s
Client Agency:
Contact Person:
Rey R. Fausto
Materials Management Specialist
Maria Cristina,
Iligan City
Lanao Del Norte
Philippines 9200
63-63-2219033
63-63-2213988
reyfausto2013@gmail.com
Status
Closed
Associated Components
1
Bid Supplements
0
Document Request List
2
Date Published
10/10/2026
Last Updated / Time
10/10/2026 00:00 AM
Closing Date / Time
14/10/2026 09:00 AM
Description
TIE LINE & SWITCHYARD OVERHEAD MAINTENANCE
SCOPE OF WORKS:
ACTIVITY 1:
1. PREPARATION FO MATERIALS AND EQUIPMENT ON SITE.
2.CORRECTION OF SAG CONDUCTOR
3. CLEANING OF SUSPENSION TOWER POSTS AND SUSPENSION INSULATORS,
PHOTOGRAPHS SHALL BE TAKEN BEFORE AND AFTER CLEANING
4. RETIGHTHENING OF TOWER CONNECTORS
5. AGUS 7 UNITS 1 AND 2 SHALL BE SHUT DOWN DURING THE ACTIVITIES
6. SAFETY HARNESS AND OTHER EQUIPMENT FOR TRANSMISSION LINE
ACTIVITIES SHOULD BE PROVIDED BY THE CONTRACTOR.
ACTIVITY 2:
1. PREPARATION OF MATERIALS/RESOURCES ON SITE AND SITE EVALUATION.
2. CLEANING OF PORCELAIN SUSPENSION INSULATORS ON THE AGUS 7 SWYD,
INCLUDING TAKE-OFF TRANSFORMERS, REMOVE THE EXISTING HVIC COMPOUND
3. CONDUCT TIGHTHENING OF CONNECTORS IF HOTSPOTS ARE IDENTIFIED
DURING THERMAL SCANNING FROM AGUS 7 SWYD UP TO THE LAST TOWER.
4. AGUS 7 UNITS 1 AND 2 SHALL BE SHUT DOWN TO CONDUCT THE ACTIVITIES.
5. SAFETY HARNESS AND OTHER EQUIPMENT FOR TRANSMISSION LINE
ACTIVITIES SHOULD BE PROVIDED BY THE CONTRACTOR.
TERMS AND CONDITIONS:
1. All line works must be completed within TWELVE (12) DAYS, consisting of SIX (6) DAYS for insulator replacement and days (6) days for semi-annual PMS. The
line works shall be conducted during the shutdown of Agus 7 Units 1 and 2.
2. The interested bidder shall comply the following:
a. Eligibility Requirements
* Mayor's Permit (Valid Product line)
* Philgeps (Platinum/Red/Blue) Certificate
* Omnibus Sworn Statement
* Latest Audited Annual Financial Sworn Statement
b. Techincal Requirements
* Certificate of Site Inspection/Notarized Affidavit of Site Inspection
* Cost Estimate and Bill of Materials
* Brochure/Technical Data sheet: HVIC Compound
* Must have three years experience in T/L maintenance
3. The winning bidder shall comply with the following:
a. Technical Requirements:
* BOSH and COSH Training Certificate for the designated Safety Officer/s
* Certificate of Mandatory 8-hour OSH Seminar for workers
* Job Hazard Analysis/ Risk Assessment
* Company OSH Program/Emergency Plan
* Lineman should have a certificate of lineman's training certificate from a reputable training center such as TESDA & NGCP.
b. Administrative Requirements:
*  Sworn Statement that his/ her worker conforms with the following requirements:
- At least 18 years old above
- Has not involved from any liability, case, crime or no record covered by PNP/NBI and its affiliates.
* Safety and Environmental Orientation to be conducted by the Plant Safety Officer and PCO;
* Briefing and Security Check by the Plant Security Officer.
* Complete and appropriate PPE's shall be provided and used.
* Coordinate first with the End-User for further details of the Job
* All materials as stipulated in the submitted bill of materials shall be delivered first to Agus 6&7 Warehouse for inspection prior to start of any work activities. Excess
materials after the completion of work activities shall be returned to the said warehouse;
* Photographs shall be taken before, during, and after completion of the project, with corresponding dates.
* All solid and hazardous wastes shall be properly segregated and disposed
* All scrap/waste/junk materials shall be turned-over to Agus 6&7 HPPC Warehouse for documentation purposes;
* NPC shall not be held liable to any untoward incident that may happen during the course of the job.
* The company's work permitting and HSE procedures and policies shall be strictly observed during the conduct of work.
4. The following shall be provided the following prior to acceptance:
*  Accomplishment report - 2 copies for warehouse and QA/Safety
5. All works shall be subject for final inspection by End-User and Plant QA prior to issuance of Certificate of Acceptance and Completion.
6. Other requirements may be determined by the End-User but still subject for TWG Evaluation.
7. The number of manpower & corresponding rates reflected in the cost estimate/ bill materials for the labor are fixed. Interested bidders are instructed to follow the
said number of manpower and corresponding rates. Offer of bidders below the minimum daily rate will be declared non-complying. However, daily rates above the NPC
minimum rates are acceptable.
Other Information
SITE INSPECTION AND AFFIDAVIT OF SITE INSPECTION
COST ESTIMATE AND BILL OF MATERIALS
BROCHURE/TECHNICAL DATA SHEET FOR HVIC COMPOUND
MUST HAVE AT LEAST THREE(3) YEARS EXPERIENCE IN TRANSMISSION LINE MAINTENANCE
Created by
Rey R. Fausto
Date Created
09/10/2026

- Official source: [PhilGEPS](https://notices.philgeps.gov.ph/GEPSNONPILOT/Tender/SplashBidNoticeAbstractUI.aspx?menuIndex=3&refID=13280877&DirectFrom=OpenOpp&Type=category&BusCatID=79)

## Notice updates

### October 16, 2026 · Version 3 (Buyer updated, Classification updated, Contract period updated, Deadline information updated, Summary and analysis updated, Tender facts updated, Original notice updated, Location updated, Source notice details updated, Source references updated, Status changed, Notice update added)

TIE LINE & SWITCHYARD OVERHEAD MAINTENANCE (A7)

Bid Notice Abstract
Invitation to Bid (ITB)
Reference Number
13280877
Procuring Entity
NATIONAL POWER CORPORATION - MINDANAO GENERATION
Title
TIE LINE & SWITCHYARD OVERHEAD MAINTENANCE (A7)
Area of Delivery
Lanao Del Norte
Solicitation Number:
MG-A7M26-141
Trade Agreement:
Implementing Rules and Regulations
Procurement Mode:
Negotiated Procurement - Small Value Procurement (Sec. 34)
Classification:
Goods
Category:
General Engineering Services
Approved Budget for the Contract:
PHP
412,000.00
Delivery Period:
12 Day/s
Client Agency:
Contact Person:
Rey R. Fausto
Materials Management Specialist
Maria Cristina,
Iligan City
Lanao Del Norte
Philippines 9200
63-63-2219033
63-63-2213988
reyfausto2013@gmail.com
Status
Closed
Associated Components
1
Bid Supplements
0
Document Request List
2
Date Published
10/10/2026
Last Updated / Time
10/10/2026 00:00 AM
Closing Date / Time
14/10/2026 09:00 AM
Description
TIE LINE & SWITCHYARD OVERHEAD MAINTENANCE
SCOPE OF WORKS:
ACTIVITY 1:
1. PREPARATION FO MATERIALS AND EQUIPMENT ON SITE.
2.CORRECTION OF SAG CONDUCTOR
3. CLEANING OF SUSPENSION TOWER POSTS AND SUSPENSION INSULATORS,
PHOTOGRAPHS SHALL BE TAKEN BEFORE AND AFTER CLEANING
4. RETIGHTHENING OF TOWER CONNECTORS
5. AGUS 7 UNITS 1 AND 2 SHALL BE SHUT DOWN DURING THE ACTIVITIES
6. SAFETY HARNESS AND OTHER EQUIPMENT FOR TRANSMISSION LINE
ACTIVITIES SHOULD BE PROVIDED BY THE CONTRACTOR.
ACTIVITY 2:
1. PREPARATION OF MATERIALS/RESOURCES ON SITE AND SITE EVALUATION.
2. CLEANING OF PORCELAIN SUSPENSION INSULATORS ON THE AGUS 7 SWYD,
INCLUDING TAKE-OFF TRANSFORMERS, REMOVE THE EXISTING HVIC COMPOUND
3. CONDUCT TIGHTHENING OF CONNECTORS IF HOTSPOTS ARE IDENTIFIED
DURING THERMAL SCANNING FROM AGUS 7 SWYD UP TO THE LAST TOWER.
4. AGUS 7 UNITS 1 AND 2 SHALL BE SHUT DOWN TO CONDUCT THE ACTIVITIES.
5. SAFETY HARNESS AND OTHER EQUIPMENT FOR TRANSMISSION LINE
ACTIVITIES SHOULD BE PROVIDED BY THE CONTRACTOR.
TERMS AND CONDITIONS:
1. All line works must be completed within TWELVE (12) DAYS, consisting of SIX (6) DAYS for insulator replacement and days (6) days for semi-annual PMS. The
line works shall be conducted during the shutdown of Agus 7 Units 1 and 2.
2. The interested bidder shall comply the following:
a. Eligibility Requirements
* Mayor's Permit (Valid Product line)
* Philgeps (Platinum/Red/Blue) Certificate
* Omnibus Sworn Statement
* Latest Audited Annual Financial Sworn Statement
b. Techincal Requirements
* Certificate of Site Inspection/Notarized Affidavit of Site Inspection
* Cost Estimate and Bill of Materials
* Brochure/Technical Data sheet: HVIC Compound
* Must have three years experience in T/L maintenance
3. The winning bidder shall comply with the following:
a. Technical Requirements:
* BOSH and COSH Training Certificate for the designated Safety Officer/s
* Certificate of Mandatory 8-hour OSH Seminar for workers
* Job Hazard Analysis/ Risk Assessment
* Company OSH Program/Emergency Plan
* Lineman should have a certificate of lineman's training certificate from a reputable training center such as TESDA & NGCP.
b. Administrative Requirements:
*  Sworn Statement that his/ her worker conforms with the following requirements:
- At least 18 years old above
- Has not involved from any liability, case, crime or no record covered by PNP/NBI and its affiliates.
* Safety and Environmental Orientation to be conducted by the Plant Safety Officer and PCO;
* Briefing and Security Check by the Plant Security Officer.
* Complete and appropriate PPE's shall be provided and used.
* Coordinate first with the End-User for further details of the Job
* All materials as stipulated in the submitted bill of materials shall be delivered first to Agus 6&7 Warehouse for inspection prior to start of any work activities. Excess
materials after the completion of work activities shall be returned to the said warehouse;
* Photographs shall be taken before, during, and after completion of the project, with corresponding dates.
* All solid and hazardous wastes shall be properly segregated and disposed
* All scrap/waste/junk materials shall be turned-over to Agus 6&7 HPPC Warehouse for documentation purposes;
* NPC shall not be held liable to any untoward incident that may happen during the course of the job.
* The company's work permitting and HSE procedures and policies shall be strictly observed during the conduct of work.
4. The following shall be provided the following prior to acceptance:
*  Accomplishment report - 2 copies for warehouse and QA/Safety
5. All works shall be subject for final inspection by End-User and Plant QA prior to issuance of Certificate of Acceptance and Completion.
6. Other requirements may be determined by the End-User but still subject for TWG Evaluation.
7. The number of manpower & corresponding rates reflected in the cost estimate/ bill materials for the labor are fixed. Interested bidders are instructed to follow the
said number of manpower and corresponding rates. Offer of bidders below the minimum daily rate will be declared non-complying. However, daily rates above the NPC
minimum rates are acceptable.
Other Information
SITE INSPECTION AND AFFIDAVIT OF SITE INSPECTION
COST ESTIMATE AND BILL OF MATERIALS
BROCHURE/TECHNICAL DATA SHEET FOR HVIC COMPOUND
MUST HAVE AT LEAST THREE(3) YEARS EXPERIENCE IN TRANSMISSION LINE MAINTENANCE
Created by
Rey R. Fausto
Date Created
09/10/2026

### October 12, 2026 · Version 2 (Summary and analysis updated)

TIE LINE & SWITCHYARD OVERHEAD MAINTENANCE (A7)

Bid Notice Abstract
Invitation to Bid (ITB)
Reference Number
13280877
Procuring Entity
NATIONAL POWER CORPORATION - MINDANAO GENERATION
Title
TIE LINE & SWITCHYARD OVERHEAD MAINTENANCE (A7)
Area of Delivery
Lanao Del Norte
Printable 
										Version
Solicitation Number:
MG-A7M26-141
Trade Agreement:
Implementing Rules and Regulations
Procurement Mode:
Negotiated Procurement - Small Value Procurement (Sec. 34)
Classification:
Goods
Category:
General Engineering Services
Approved Budget for the Contract:
PHP
412,000.00
Delivery Period:
12 Day/s
Client Agency:
Contact Person:
Rey R. Fausto
Materials Management Specialist
Maria Cristina,
Iligan City
Lanao Del Norte
Philippines 9200
63-63-2219033
63-63-2213988
reyfausto2013@gmail.com
Status
Active
Associated Components
Order
Bid Supplements
0
Document Request List
0
Date Published
10/10/2026
Last Updated / Time
10/10/2026 12:00 AM
Closing Date / Time
14/10/2026 9:00 AM
Description
TIE LINE & SWITCHYARD OVERHEAD MAINTENANCE
SCOPE OF WORKS:
ACTIVITY 1:
1. PREPARATION FO MATERIALS AND EQUIPMENT ON SITE.
2.CORRECTION OF SAG CONDUCTOR
3. CLEANING OF SUSPENSION TOWER POSTS AND SUSPENSION INSULATORS,
PHOTOGRAPHS SHALL BE TAKEN BEFORE AND AFTER CLEANING
4. RETIGHTHENING OF TOWER CONNECTORS
5. AGUS 7 UNITS 1 AND 2 SHALL BE SHUT DOWN DURING THE ACTIVITIES
6. SAFETY HARNESS AND OTHER EQUIPMENT FOR TRANSMISSION LINE
ACTIVITIES SHOULD BE PROVIDED BY THE CONTRACTOR.
ACTIVITY 2:
1. PREPARATION OF MATERIALS/RESOURCES ON SITE AND SITE EVALUATION.
2. CLEANING OF PORCELAIN SUSPENSION INSULATORS ON THE AGUS 7 SWYD,
INCLUDING TAKE-OFF TRANSFORMERS, REMOVE THE EXISTING HVIC COMPOUND
3. CONDUCT TIGHTHENING OF CONNECTORS IF HOTSPOTS ARE IDENTIFIED
DURING THERMAL SCANNING FROM AGUS 7 SWYD UP TO THE LAST TOWER.
4. AGUS 7 UNITS 1 AND 2 SHALL BE SHUT DOWN TO CONDUCT THE ACTIVITIES.
5. SAFETY HARNESS AND OTHER EQUIPMENT FOR TRANSMISSION LINE
ACTIVITIES SHOULD BE PROVIDED BY THE CONTRACTOR.
TERMS AND CONDITIONS:
1. All line works must be completed within TWELVE (12) DAYS, consisting of SIX (6) DAYS for insulator replacement and days (6) days for semi-annual PMS. The
line works shall be conducted during the shutdown of Agus 7 Units 1 and 2.
2. The interested bidder shall comply the following:
a. Eligibility Requirements
* Mayor's Permit (Valid Product line)
* Philgeps (Platinum/Red/Blue) Certificate
* Omnibus Sworn Statement
* Latest Audited Annual Financial Sworn Statement
b. Techincal Requirements
* Certificate of Site Inspection/Notarized Affidavit of Site Inspection
* Cost Estimate and Bill of Materials
* Brochure/Technical Data sheet: HVIC Compound
* Must have three years experience in T/L maintenance
3. The winning bidder shall comply with the following:
a. Technical Requirements:
* BOSH and COSH Training Certificate for the designated Safety Officer/s
* Certificate of Mandatory 8-hour OSH Seminar for workers
* Job Hazard Analysis/ Risk Assessment
* Company OSH Program/Emergency Plan
* Lineman should have a certificate of lineman's training certificate from a reputable training center such as TESDA & NGCP.
b. Administrative Requirements:
*  Sworn Statement that his/ her worker conforms with the following requirements:
- At least 18 years old above
- Has not involved from any liability, case, crime or no record covered by PNP/NBI and its affiliates.
* Safety and Environmental Orientation to be conducted by the Plant Safety Officer and PCO;
* Briefing and Security Check by the Plant Security Officer.
* Complete and appropriate PPE's shall be provided and used.
* Coordinate first with the End-User for further details of the Job
* All materials as stipulated in the submitted bill of materials shall be delivered first to Agus 6&7 Warehouse for inspection prior to start of any work activities. Excess
materials after the completion of work activities shall be returned to the said warehouse;
* Photographs shall be taken before, during, and after completion of the project, with corresponding dates.
* All solid and hazardous wastes shall be properly segregated and disposed
* All scrap/waste/junk materials shall be turned-over to Agus 6&7 HPPC Warehouse for documentation purposes;
* NPC shall not be held liable to any untoward incident that may happen during the course of the job.
* The company's work permitting and HSE procedures and policies shall be strictly observed during the conduct of work.
4. The following shall be provided the following prior to acceptance:
*  Accomplishment report - 2 copies for warehouse and QA/Safety
5. All works shall be subject for final inspection by End-User and Plant QA prior to issuance of Certificate of Acceptance and Completion.
6. Other requirements may be determined by the End-User but still subject for TWG Evaluation.
7. The number of manpower & corresponding rates reflected in the cost estimate/ bill materials for the labor are fixed. Interested bidders are instructed to follow the
said number of manpower and corresponding rates. Offer of bidders below the minimum daily rate will be declared non-complying. However, daily rates above the NPC
minimum rates are acceptable.
Other Information
SITE INSPECTION AND AFFIDAVIT OF SITE INSPECTION
COST ESTIMATE AND BILL OF MATERIALS
BROCHURE/TECHNICAL DATA SHEET FOR HVIC COMPOUND
MUST HAVE AT LEAST THREE(3) YEARS EXPERIENCE IN TRANSMISSION LINE MAINTENANCE

### October 12, 2026 · Version 1 (Published)

TIE LINE & SWITCHYARD OVERHEAD MAINTENANCE (A7)

Bid Notice Abstract
Invitation to Bid (ITB)
Reference Number
13280877
Procuring Entity
NATIONAL POWER CORPORATION - MINDANAO GENERATION
Title
TIE LINE & SWITCHYARD OVERHEAD MAINTENANCE (A7)
Area of Delivery
Lanao Del Norte
Printable 
										Version
Solicitation Number:
MG-A7M26-141
Trade Agreement:
Implementing Rules and Regulations
Procurement Mode:
Negotiated Procurement - Small Value Procurement (Sec. 34)
Classification:
Goods
Category:
General Engineering Services
Approved Budget for the Contract:
PHP
412,000.00
Delivery Period:
12 Day/s
Client Agency:
Contact Person:
Rey R. Fausto
Materials Management Specialist
Maria Cristina,
Iligan City
Lanao Del Norte
Philippines 9200
63-63-2219033
63-63-2213988
reyfausto2013@gmail.com
Status
Active
Associated Components
Order
Bid Supplements
0
Document Request List
0
Date Published
10/10/2026
Last Updated / Time
10/10/2026 12:00 AM
Closing Date / Time
14/10/2026 9:00 AM
Description
TIE LINE & SWITCHYARD OVERHEAD MAINTENANCE
SCOPE OF WORKS:
ACTIVITY 1:
1. PREPARATION FO MATERIALS AND EQUIPMENT ON SITE.
2.CORRECTION OF SAG CONDUCTOR
3. CLEANING OF SUSPENSION TOWER POSTS AND SUSPENSION INSULATORS,
PHOTOGRAPHS SHALL BE TAKEN BEFORE AND AFTER CLEANING
4. RETIGHTHENING OF TOWER CONNECTORS
5. AGUS 7 UNITS 1 AND 2 SHALL BE SHUT DOWN DURING THE ACTIVITIES
6. SAFETY HARNESS AND OTHER EQUIPMENT FOR TRANSMISSION LINE
ACTIVITIES SHOULD BE PROVIDED BY THE CONTRACTOR.
ACTIVITY 2:
1. PREPARATION OF MATERIALS/RESOURCES ON SITE AND SITE EVALUATION.
2. CLEANING OF PORCELAIN SUSPENSION INSULATORS ON THE AGUS 7 SWYD,
INCLUDING TAKE-OFF TRANSFORMERS, REMOVE THE EXISTING HVIC COMPOUND
3. CONDUCT TIGHTHENING OF CONNECTORS IF HOTSPOTS ARE IDENTIFIED
DURING THERMAL SCANNING FROM AGUS 7 SWYD UP TO THE LAST TOWER.
4. AGUS 7 UNITS 1 AND 2 SHALL BE SHUT DOWN TO CONDUCT THE ACTIVITIES.
5. SAFETY HARNESS AND OTHER EQUIPMENT FOR TRANSMISSION LINE
ACTIVITIES SHOULD BE PROVIDED BY THE CONTRACTOR.
TERMS AND CONDITIONS:
1. All line works must be completed within TWELVE (12) DAYS, consisting of SIX (6) DAYS for insulator replacement and days (6) days for semi-annual PMS. The
line works shall be conducted during the shutdown of Agus 7 Units 1 and 2.
2. The interested bidder shall comply the following:
a. Eligibility Requirements
* Mayor's Permit (Valid Product line)
* Philgeps (Platinum/Red/Blue) Certificate
* Omnibus Sworn Statement
* Latest Audited Annual Financial Sworn Statement
b. Techincal Requirements
* Certificate of Site Inspection/Notarized Affidavit of Site Inspection
* Cost Estimate and Bill of Materials
* Brochure/Technical Data sheet: HVIC Compound
* Must have three years experience in T/L maintenance
3. The winning bidder shall comply with the following:
a. Technical Requirements:
* BOSH and COSH Training Certificate for the designated Safety Officer/s
* Certificate of Mandatory 8-hour OSH Seminar for workers
* Job Hazard Analysis/ Risk Assessment
* Company OSH Program/Emergency Plan
* Lineman should have a certificate of lineman's training certificate from a reputable training center such as TESDA & NGCP.
b. Administrative Requirements:
*  Sworn Statement that his/ her worker conforms with the following requirements:
- At least 18 years old above
- Has not involved from any liability, case, crime or no record covered by PNP/NBI and its affiliates.
* Safety and Environmental Orientation to be conducted by the Plant Safety Officer and PCO;
* Briefing and Security Check by the Plant Security Officer.
* Complete and appropriate PPE's shall be provided and used.
* Coordinate first with the End-User for further details of the Job
* All materials as stipulated in the submitted bill of materials shall be delivered first to Agus 6&7 Warehouse for inspection prior to start of any work activities. Excess
materials after the completion of work activities shall be returned to the said warehouse;
* Photographs shall be taken before, during, and after completion of the project, with corresponding dates.
* All solid and hazardous wastes shall be properly segregated and disposed
* All scrap/waste/junk materials shall be turned-over to Agus 6&7 HPPC Warehouse for documentation purposes;
* NPC shall not be held liable to any untoward incident that may happen during the course of the job.
* The company's work permitting and HSE procedures and policies shall be strictly observed during the conduct of work.
4. The following shall be provided the following prior to acceptance:
*  Accomplishment report - 2 copies for warehouse and QA/Safety
5. All works shall be subject for final inspection by End-User and Plant QA prior to issuance of Certificate of Acceptance and Completion.
6. Other requirements may be determined by the End-User but still subject for TWG Evaluation.
7. The number of manpower & corresponding rates reflected in the cost estimate/ bill materials for the labor are fixed. Interested bidders are instructed to follow the
said number of manpower and corresponding rates. Offer of bidders below the minimum daily rate will be declared non-complying. However, daily rates above the NPC
minimum rates are acceptable.
Other Information
SITE INSPECTION AND AFFIDAVIT OF SITE INSPECTION
COST ESTIMATE AND BILL OF MATERIALS
BROCHURE/TECHNICAL DATA SHEET FOR HVIC COMPOUND
MUST HAVE AT LEAST THREE(3) YEARS EXPERIENCE IN TRANSMISSION LINE MAINTENANCE

## Understand this procurement.

Review the scope, requirements and procurement history with Ziva.

- Understand the requirements
- Find the evidence you need
- Prepare your response

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate) · [View official notice](https://notices.philgeps.gov.ph/GEPSNONPILOT/Tender/SplashBidNoticeAbstractUI.aspx?menuIndex=3&refID=13280877&DirectFrom=OpenOpp&Type=category&BusCatID=79)

## About this notice

- Official source: PhilGEPS
- Source retrieved: October 16, 2026
- Page updated: October 16, 2026
- Notice reference: 13280877

## Open tenders like this one

- [Repairs and maintenance at two General Trias public schools](https://zephior.com/tenders/1ad78e08-bd9f-4882-95bc-90d5bb949714/repairs-and-maintenance-at-two-general-trias-public-schools-1ad78e08) ([Markdown](https://zephior.com/tenders/1ad78e08-bd9f-4882-95bc-90d5bb949714/repairs-and-maintenance-at-two-general-trias-public-schools-1ad78e08.md)), GENERAL TRIAS CITY CAVITE
- [Catering services for the Municipality of Hamtic](https://zephior.com/tenders/c97f80be-45ff-42c4-9ab4-d81218541255/catering-services-for-the-municipality-of-hamtic-c97f80be) ([Markdown](https://zephior.com/tenders/c97f80be-45ff-42c4-9ab4-d81218541255/catering-services-for-the-municipality-of-hamtic-c97f80be.md)), Municipality of Hamtic, Antique
- [Food supplies for Lake Wood supplemental feeding programme](https://zephior.com/tenders/09749ea8-6e0b-42da-9e92-1ac24928e568/food-supplies-for-lake-wood-supplemental-feeding-programme) ([Markdown](https://zephior.com/tenders/09749ea8-6e0b-42da-9e92-1ac24928e568/food-supplies-for-lake-wood-supplemental-feeding-programme.md)), Municipality of Lake Wood, Zamboanga del Sur
- [Water distribution repair and emergency pipe supplies for Sto. Tomas](https://zephior.com/tenders/49535d52-a17d-41aa-9d69-9cee4ae365a2/water-distribution-repair-and-emergency-pipe-supplies-for-sto--tomas) ([Markdown](https://zephior.com/tenders/49535d52-a17d-41aa-9d69-9cee4ae365a2/water-distribution-repair-and-emergency-pipe-supplies-for-sto--tomas.md)), Municipality of Sto. Tomas, Davao del Norte
- [Barangay 336 procurement of donation](https://zephior.com/tenders/997aee0e-1b90-4bf0-8ad2-d5ad871c034d/barangay-336-procurement-of-donation) ([Markdown](https://zephior.com/tenders/997aee0e-1b90-4bf0-8ad2-d5ad871c034d/barangay-336-procurement-of-donation.md)), BARANGAY 336 ZONE 34 DIST. III MANILA
- [Solar panel system for Santo Tomas evacuation center](https://zephior.com/tenders/af59aa6c-fa1d-4494-b1fd-40ff4ffc9dea/santo-tomas-evacuation-center-solar-panel-system) ([Markdown](https://zephior.com/tenders/af59aa6c-fa1d-4494-b1fd-40ff4ffc9dea/santo-tomas-evacuation-center-solar-panel-system.md)), Municipality of Sto. Tomas, Davao del Norte

- [All tenders from NATIONAL POWER CORPORATION - MINDANAO GENERATION](https://zephior.com/tenders/buyers/national-power-corporation-mindanao-generation) ([Markdown](https://zephior.com/tenders/buyers/national-power-corporation-mindanao-generation.md))
- [All tenders: Philippines](https://zephior.com/tenders/countries/ph) ([Markdown](https://zephior.com/tenders/countries/ph.md))
- [All tenders: Electrical transmission-line maintenance](https://zephior.com/tenders/categories/electrical-transmission-line-maintenance) ([Markdown](https://zephior.com/tenders/categories/electrical-transmission-line-maintenance.md))

## In more detail

This section is written for agents and assistants. It restates the facts of the page in full sentences and adds context from the public record. Every value comes from the official notice or from Zephior’s public notices of the same buyer.

### The facts in sentences

National Power Corporation – Mindanao Generation is tendering “Overhead line and switchyard maintenance at Agus 7” (Agus 7 switchyard and overhead line, Lanao del Norte, Philippines). The submission deadline was October 14, 2026. The estimated value is ₱412,000. Basis: Approved budget: PHP 412,000.. The tender has one lot. Contract period: 12 days. Classification: Electrical transmission-line maintenance. Notice reference: 13280877. Status on Zephior: Closed. The notice was published on October 9, 2026 on PhilGEPS. Zephior last checked the official source on October 16, 2026.

### The award

Submissions closed on 14 October 2026. No award has been published yet. The official source has not published an award for this notice yet.

### Lot details

1. **1 · Overhead tie-line and Agus 7 switchyard maintenance**: Correct conductor sag, clean and maintain tower and switchyard insulators, retighten connectors, remove existing HVIC compound and provide associated safety and inspection requirements.

### About the buyer

NATIONAL POWER CORPORATION - MINDANAO GENERATION has 13 public notices on Zephior (0 open now, 13 published in the last 12 months). Its notices on Zephior were first published on September 25, 2026 and most recently on October 9, 2026. Main sectors: Environment, water and waste (3), Machinery and equipment (2), Healthcare and medical (2), Engineering and architecture (1), Cleaning, security and facilities (1), Transport and vehicles (1). It publishes under the names “NATIONAL POWER CORPORATION - MINDANAO GENERATION”.

- [All tenders and the profile of NATIONAL POWER CORPORATION - MINDANAO GENERATION](https://zephior.com/tenders/buyers/national-power-corporation-mindanao-generation) ([Markdown](https://zephior.com/tenders/buyers/national-power-corporation-mindanao-generation.md))

### Terms used on this page

- **Negotiated procedure:** The buyer negotiates the terms with one or more suppliers it has chosen, with or without a prior call for competition.

### Where to go next

- [Repairs and maintenance at two General Trias public schools](https://zephior.com/tenders/1ad78e08-bd9f-4882-95bc-90d5bb949714/repairs-and-maintenance-at-two-general-trias-public-schools-1ad78e08) ([Markdown](https://zephior.com/tenders/1ad78e08-bd9f-4882-95bc-90d5bb949714/repairs-and-maintenance-at-two-general-trias-public-schools-1ad78e08.md))
- [Catering services for the Municipality of Hamtic](https://zephior.com/tenders/c97f80be-45ff-42c4-9ab4-d81218541255/catering-services-for-the-municipality-of-hamtic-c97f80be) ([Markdown](https://zephior.com/tenders/c97f80be-45ff-42c4-9ab4-d81218541255/catering-services-for-the-municipality-of-hamtic-c97f80be.md))
- [Food supplies for Lake Wood supplemental feeding programme](https://zephior.com/tenders/09749ea8-6e0b-42da-9e92-1ac24928e568/food-supplies-for-lake-wood-supplemental-feeding-programme) ([Markdown](https://zephior.com/tenders/09749ea8-6e0b-42da-9e92-1ac24928e568/food-supplies-for-lake-wood-supplemental-feeding-programme.md))
- [Water distribution repair and emergency pipe supplies for Sto. Tomas](https://zephior.com/tenders/49535d52-a17d-41aa-9d69-9cee4ae365a2/water-distribution-repair-and-emergency-pipe-supplies-for-sto--tomas) ([Markdown](https://zephior.com/tenders/49535d52-a17d-41aa-9d69-9cee4ae365a2/water-distribution-repair-and-emergency-pipe-supplies-for-sto--tomas.md))
- [Barangay 336 procurement of donation](https://zephior.com/tenders/997aee0e-1b90-4bf0-8ad2-d5ad871c034d/barangay-336-procurement-of-donation) ([Markdown](https://zephior.com/tenders/997aee0e-1b90-4bf0-8ad2-d5ad871c034d/barangay-336-procurement-of-donation.md))
- [Solar panel system for Santo Tomas evacuation center](https://zephior.com/tenders/af59aa6c-fa1d-4494-b1fd-40ff4ffc9dea/santo-tomas-evacuation-center-solar-panel-system) ([Markdown](https://zephior.com/tenders/af59aa6c-fa1d-4494-b1fd-40ff4ffc9dea/santo-tomas-evacuation-center-solar-panel-system.md))
- [All tenders from NATIONAL POWER CORPORATION - MINDANAO GENERATION](https://zephior.com/tenders/buyers/national-power-corporation-mindanao-generation) ([Markdown](https://zephior.com/tenders/buyers/national-power-corporation-mindanao-generation.md))
- [All tenders: Philippines](https://zephior.com/tenders/countries/ph) ([Markdown](https://zephior.com/tenders/countries/ph.md))
- [All tenders: Electrical transmission-line maintenance](https://zephior.com/tenders/categories/electrical-transmission-line-maintenance) ([Markdown](https://zephior.com/tenders/categories/electrical-transmission-line-maintenance.md))

### Source-backed public record

```json
{
  "id": "c8176a7f-de48-45b5-b424-f2f78790fe31",
  "revision": 3,
  "modifiedAt": "2026-10-16T08:00:13.997764+00:00",
  "url": "https://zephior.com/tenders/c8176a7f-de48-45b5-b424-f2f78790fe31/agus-7-tie-line-and-switchyard-overhead-maintenance",
  "status": "closed",
  "recordedStatus": "closed",
  "buyer": {
    "id": "national-power-corporation-mindanao-generation",
    "name": "NATIONAL POWER CORPORATION - MINDANAO GENERATION"
  },
  "category": {
    "de": "Wartung von Stromübertragungsleitungen",
    "en": "Electrical transmission-line maintenance",
    "fr": "Maintenance de lignes électriques",
    "id": "electrical-transmission-line-maintenance"
  },
  "deadline": {
    "at": null,
    "date": "2026-10-14",
    "source_ref": "official_notice_html#Closing Date / Time"
  },
  "award": null,
  "estimatedValue": {
    "basis": "Approved Budget for the Contract in the official PhilGEPS abstract.",
    "amount": 412000,
    "currency": "PHP",
    "source_ref": "official_notice_html#Approved Budget for the Contract",
    "localized_basis": {
      "de": "Genehmigtes Budget: 412.000 PHP.",
      "en": "Approved budget: PHP 412,000.",
      "fr": "Budget approuvé : 412 000 PHP."
    }
  },
  "contractPeriod": "12 days",
  "region": null,
  "originalSource": {
    "url": "https://notices.philgeps.gov.ph/GEPSNONPILOT/Tender/SplashBidNoticeAbstractUI.aspx?menuIndex=3&refID=13280877&DirectFrom=OpenOpp&Type=category&BusCatID=79",
    "title": "TIE LINE & SWITCHYARD OVERHEAD MAINTENANCE (A7)",
    "issuer": "NATIONAL POWER CORPORATION - MINDANAO GENERATION",
    "status": "closed",
    "language": "en",
    "location": null,
    "deadline_at": "2026-10-14T01:00:00+00:00",
    "description": null,
    "country_code": "PH",
    "published_at": "2026-10-09T16:00:00+00:00",
    "contract_type": "General Engineering Services",
    "deadline_date": null,
    "procedure_type": null,
    "reference_numbers": [
      "13280877"
    ],
    "classification_codes": []
  },
  "sources": [
    {
      "ref": "canonical_snapshot",
      "url": "https://notices.philgeps.gov.ph/GEPSNONPILOT/Tender/SplashBidNoticeAbstractUI.aspx?menuIndex=3&refID=13280877&DirectFrom=OpenOpp&Type=category&BusCatID=79",
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-16T07:51:10.274488Z"
    },
    {
      "ref": "official_notice_html",
      "url": "https://notices.philgeps.gov.ph/GEPSNONPILOT/Tender/PrintableBidNoticeAbstractUI.aspx?refID=13280877",
      "kind": "official_notice_html",
      "retrieved_at": "2026-10-16T07:56:38.755762Z"
    }
  ],
  "keyFacts": [
    {
      "label": "Buyer",
      "value": "National Power Corporation – Mindanao Generation",
      "source_ref": "official_notice_html#Procuring Entity"
    },
    {
      "label": "Procurement mode",
      "value": "Negotiated Procurement, Small Value Procurement (Sec. 34)",
      "source_ref": "official_notice_html#Procurement Mode"
    },
    {
      "label": "Approved budget",
      "value": "PHP 412,000",
      "source_ref": "official_notice_html#Approved Budget for the Contract"
    },
    {
      "label": "Work period",
      "value": "12 days",
      "source_ref": "official_notice_html#Delivery Period"
    },
    {
      "label": "Experience requirement",
      "value": "At least 3 years in transmission-line maintenance",
      "source_ref": "official_notice_html#Description"
    },
    {
      "label": "Closing time",
      "value": "14 October 2026 at 09:00; time zone not stated",
      "source_ref": "official_notice_html#Closing Date / Time"
    }
  ],
  "noticeFacts": {
    "lots": [
      {
        "id": "1",
        "title": "Overhead tie-line and Agus 7 switchyard maintenance",
        "source_ref": "official_notice_html#Description",
        "description": "Correct conductor sag, clean and maintain tower and switchyard insulators, retighten connectors, remove existing HVIC compound and provide associated safety and inspection requirements."
      }
    ],
    "schedule": [
      {
        "event": "Published",
        "value": "10 October 2026",
        "source_ref": "official_notice_html#Date Published"
      },
      {
        "event": "Closing date",
        "value": "14 October 2026 at 09:00; time zone not stated",
        "source_ref": "official_notice_html#Closing Date / Time"
      },
      {
        "event": "Work period",
        "value": "12 days: six days for insulator replacement and six days for semi-annual preventive maintenance",
        "source_ref": "official_notice_html#TERMS AND CONDITIONS"
      }
    ],
    "requirements": [
      {
        "text": "Prepare materials and equipment on site, correct conductor sag, clean suspension tower posts and insulators, and retighten tower connectors.",
        "source_ref": "official_notice_html#Description"
      },
      {
        "text": "Clean the porcelain suspension insulators at Agus 7 switchyard, including take-off transformers; remove the existing HVIC compound and tighten connectors if thermal scanning identifies hot spots.",
        "source_ref": "official_notice_html#Description"
      },
      {
        "text": "Agus 7 Units 1 and 2 must be shut down during the work. The contractor supplies safety harnesses and other transmission-line safety equipment and must provide qualified safety staff, PPE and worker training.",
        "source_ref": "official_notice_html#Description"
      },
      {
        "text": "Provide at least three years of transmission-line maintenance experience, site-inspection evidence, cost estimate and bill of materials, and HVIC technical data.",
        "source_ref": "official_notice_html#Description"
      },
      {
        "text": "Complete six days of insulator replacement and six days of semi-annual preventive maintenance within 12 days; provide dated work photographs and an accomplishment report.",
        "source_ref": "official_notice_html#Description"
      }
    ],
    "award_criteria": [],
    "estimated_value": {
      "basis": "Approved Budget for the Contract in the official PhilGEPS abstract.",
      "amount": 412000,
      "currency": "PHP",
      "source_ref": "official_notice_html#Approved Budget for the Contract",
      "localized_basis": {
        "de": "Genehmigtes Budget: 412.000 PHP.",
        "en": "Approved budget: PHP 412,000.",