# General planning services for the Regensdorf substation expansion

Swissgrid AG - Engineering & Construction · Switzerland · Closed

## Outcome

Submissions closed on 6 November 2026. No award has been published yet.

> The offer deadline of 6 November 2026 at 23:59 CET has passed. The available notice does not state an award. Detailed execution dates and the detailed award and qualification criteria are in the referenced tender documents and are not stated in the public notice.

- **Buyer:** Swissgrid AG - Engineering & Construction
- **Place:** Regensdorf, canton of Zurich
- **Offer deadline: 6 November 2026 at 23:59 CET.:** November 6, 2026 at 10:59 PM UTC
- **Contract value:** Not stated in the notice
- **Published:** September 24, 2026

## Overview

Swissgrid seeks a general planner for SIA service phases 32 to 53 for a two-bay expansion of the 220-kV Regensdorf substation. The assignment covers coordination and engineering across primary systems, auxiliary power and civil works; phases 51 to 53 are an option.

Information based on the public notice

## What the buyer needs

General planning and overall coordination for adding transformer and reserve bays to the existing GIS substation, including primary technology and high-voltage cable, auxiliary systems and cable routes, civil/building engineering, and construction supervision as an option.

- Offers must be submitted completely and electronically through SAP Ariba; email, post and personal delivery are not accepted. German is preferred. Consortia and subcontractors are permitted; no site visit is planned.

## Tender details

- Buyer: Swissgrid AG - Engineering & Construction
- Country: Switzerland
- Procedure: open
- Classification: Electrical substation engineering · CPV 71000000
- Notice reference: 44015 · 44015-01
- Offer deadline: 6 November 2026 at 23:59 CET
- Question deadline: 9 October 2026; questions via SAP Ariba form
- Planning phases: SIA 32 to 53; phases 51 to 53 optional
- Offer validity: 180 days

## What to check in the tender documents

- The public notice gives no contract value or project dates; exact execution dates are in a contract draft that was not accessed. Award criteria are in tender documents.

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate)

## Original notice

**Generalplaner SIA 32-53 für UW Regensdorf**

Generalplaner SIA 32-53 für UW Regensdorf

Das 220-kV-Unterwerk Regensdorf befindet sich in der Gemeinde Regensdorf im Kanton Zürich.

Die gasisolierte 220-kV-Schaltanlage im Unterwerk Regensdorf wurde 2021 in Betrieb genommen. Trotz des jungen Alters der GIS (5-jährig) ist diese gemäss Hersteller nicht mit demselben Anlagentyp erweiterbar. Es wird eine Eigenanfertigung für das Adapterstück benötigt, um die Erweiterung zu einem aktuellen Anlagetyp durchführen zu können. Dies kommt mit einem höhere Platzbedarf einher, weshalb die Swissgrid entschieden hat, die Anlage direkt um zwei Felder zu erweitern. Hierzu soll die GIS-Anlage mit zwei Feldern (Trafo- und Reservefeld), sowie mit den notwendigen Kabelanschlüssen erweitert werden. 

Mit dieser Ausschreibung soll nun zur Planung und Koordination dieses Projektes, der Generalplaner für die SIA-Phasen SIA 32 bis 53 beschafft werden, wobei die SIA-Phasen 51-53 als Option vergeben werden. Nebst dem fachspezifischen Leistungsumfang in seinem Zuständigkeitsbereich, übernimmt der Generalplaner auch die übergeordnete Aufsicht und Koordination aller involvierten Fachbereiche inkl. zugehöriger Schnittstellen als Gesamtleiter im Sinne der SIA 103 war. 

Die nachfolgenden Teilbereiche sind vom Generalplaner selbst zu organisieren:

Führung und Koordination aller involvierten Fachbereiche inkl. SchnittstellenEngineering und Planung im Teilprojekt - Primärtechnik (inkl. Hochspannungskabel)Engineering und Planung im Teilprojekt - Eigebedarf inkl. KabelführungenEngineering und Planung im Teilprojekt - Hoch- und TiefbauBauleitung (optional)

Die nachfolgenden Teilbereiche werden dem Generalplaner beigestellt:

Auftraggeberseitige BIM-GesamtkoordinationAuftraggeberseitiges Engineering und Planung im Teilprojekt - Substation Automation System (SAS)Dritter zur Projektierung und Planung im Teilprojekt - Umweltplanung

Für detaillierte Informationen konsultieren Sie bitte die Dokumente C100 und C101 der Ausschreibungsunterlagen.

Die Angebotsabgabe muss elektronisch und vollständig mit allen Beilagen ausschliesslich über SAP Ariba erfolgen. Eine zu späte elektronische Eingabe des Angebotes wird vom System nicht zugelassen. Es wird dringend empfohlen so früh wie möglich, jedoch spätestens mehrere Arbeitstage vor Abgabefrist mit der Angebotserstellung in SAP Ariba zu beginnen. Angebote dürfen nicht anderweitig (z.B. E-Mail, Post, persönliche Übergabe) übermittelt werden.

Das Angebot mitsamt den Unterlagen ist, wenn möglich, in deutscher Sprache abzufassen.

Die Fragen zu den Ausschreibungsunterlagen können innerhalb der oben angegeben Frist für schriftliche Fragen ausschliesslich mit dem beigelegten Dokument «03 Anbieterfragen und Antworten» über die Ariba Event Messenger Funktion laufend eingereicht werden.

Die anonymisierten Fragen und deren Antworten werden allen Anbieterinnen, welche sich zur Ausschreibung angemeldet haben, via Ariba Event Messenger Funktion zugesandt. Fragen, die verspätet eintreffen, können nicht mehr beantwortet werden.

Offer deadline as published: 2026-11-06T23:59:00+01:00

Offer validity: 180 days

- Official source: [SIMAP](https://www.simap.ch/de/project-detail/4c6fa6a5-5ba0-44a5-ab6c-8deabfea6b3b)

## Notice updates

### November 7, 2026 · Version 2 (Summary and analysis updated, Source notice details updated, Source references updated, Status changed, Notice update added)

Generalplaner SIA 32-53 für UW Regensdorf

Generalplaner SIA 32-53 für UW Regensdorf

Das 220-kV-Unterwerk Regensdorf befindet sich in der Gemeinde Regensdorf im Kanton Zürich.

Die gasisolierte 220-kV-Schaltanlage im Unterwerk Regensdorf wurde 2021 in Betrieb genommen. Trotz des jungen Alters der GIS (5-jährig) ist diese gemäss Hersteller nicht mit demselben Anlagentyp erweiterbar. Es wird eine Eigenanfertigung für das Adapterstück benötigt, um die Erweiterung zu einem aktuellen Anlagetyp durchführen zu können. Dies kommt mit einem höhere Platzbedarf einher, weshalb die Swissgrid entschieden hat, die Anlage direkt um zwei Felder zu erweitern. Hierzu soll die GIS-Anlage mit zwei Feldern (Trafo- und Reservefeld), sowie mit den notwendigen Kabelanschlüssen erweitert werden. 

Mit dieser Ausschreibung soll nun zur Planung und Koordination dieses Projektes, der Generalplaner für die SIA-Phasen SIA 32 bis 53 beschafft werden, wobei die SIA-Phasen 51-53 als Option vergeben werden. Nebst dem fachspezifischen Leistungsumfang in seinem Zuständigkeitsbereich, übernimmt der Generalplaner auch die übergeordnete Aufsicht und Koordination aller involvierten Fachbereiche inkl. zugehöriger Schnittstellen als Gesamtleiter im Sinne der SIA 103 war. 

Die nachfolgenden Teilbereiche sind vom Generalplaner selbst zu organisieren:

Führung und Koordination aller involvierten Fachbereiche inkl. SchnittstellenEngineering und Planung im Teilprojekt - Primärtechnik (inkl. Hochspannungskabel)Engineering und Planung im Teilprojekt - Eigebedarf inkl. KabelführungenEngineering und Planung im Teilprojekt - Hoch- und TiefbauBauleitung (optional)

Die nachfolgenden Teilbereiche werden dem Generalplaner beigestellt:

Auftraggeberseitige BIM-GesamtkoordinationAuftraggeberseitiges Engineering und Planung im Teilprojekt - Substation Automation System (SAS)Dritter zur Projektierung und Planung im Teilprojekt - Umweltplanung

Für detaillierte Informationen konsultieren Sie bitte die Dokumente C100 und C101 der Ausschreibungsunterlagen.

Die Angebotsabgabe muss elektronisch und vollständig mit allen Beilagen ausschliesslich über SAP Ariba erfolgen. Eine zu späte elektronische Eingabe des Angebotes wird vom System nicht zugelassen. Es wird dringend empfohlen so früh wie möglich, jedoch spätestens mehrere Arbeitstage vor Abgabefrist mit der Angebotserstellung in SAP Ariba zu beginnen. Angebote dürfen nicht anderweitig (z.B. E-Mail, Post, persönliche Übergabe) übermittelt werden.

Das Angebot mitsamt den Unterlagen ist, wenn möglich, in deutscher Sprache abzufassen.

Die Fragen zu den Ausschreibungsunterlagen können innerhalb der oben angegeben Frist für schriftliche Fragen ausschliesslich mit dem beigelegten Dokument «03 Anbieterfragen und Antworten» über die Ariba Event Messenger Funktion laufend eingereicht werden.

Die anonymisierten Fragen und deren Antworten werden allen Anbieterinnen, welche sich zur Ausschreibung angemeldet haben, via Ariba Event Messenger Funktion zugesandt. Fragen, die verspätet eintreffen, können nicht mehr beantwortet werden.

Offer deadline as published: 2026-11-06T23:59:00+01:00

Offer validity: 180 days

### October 11, 2026 · Version 1 (Published)

Generalplaner SIA 32-53 für UW Regensdorf

Generalplaner SIA 32-53 für UW Regensdorf

Das 220-kV-Unterwerk Regensdorf befindet sich in der Gemeinde Regensdorf im Kanton Zürich.

Die gasisolierte 220-kV-Schaltanlage im Unterwerk Regensdorf wurde 2021 in Betrieb genommen. Trotz des jungen Alters der GIS (5-jährig) ist diese gemäss Hersteller nicht mit demselben Anlagentyp erweiterbar. Es wird eine Eigenanfertigung für das Adapterstück benötigt, um die Erweiterung zu einem aktuellen Anlagetyp durchführen zu können. Dies kommt mit einem höhere Platzbedarf einher, weshalb die Swissgrid entschieden hat, die Anlage direkt um zwei Felder zu erweitern. Hierzu soll die GIS-Anlage mit zwei Feldern (Trafo- und Reservefeld), sowie mit den notwendigen Kabelanschlüssen erweitert werden. 

Mit dieser Ausschreibung soll nun zur Planung und Koordination dieses Projektes, der Generalplaner für die SIA-Phasen SIA 32 bis 53 beschafft werden, wobei die SIA-Phasen 51-53 als Option vergeben werden. Nebst dem fachspezifischen Leistungsumfang in seinem Zuständigkeitsbereich, übernimmt der Generalplaner auch die übergeordnete Aufsicht und Koordination aller involvierten Fachbereiche inkl. zugehöriger Schnittstellen als Gesamtleiter im Sinne der SIA 103 war. 

Die nachfolgenden Teilbereiche sind vom Generalplaner selbst zu organisieren:

Führung und Koordination aller involvierten Fachbereiche inkl. SchnittstellenEngineering und Planung im Teilprojekt - Primärtechnik (inkl. Hochspannungskabel)Engineering und Planung im Teilprojekt - Eigebedarf inkl. KabelführungenEngineering und Planung im Teilprojekt - Hoch- und TiefbauBauleitung (optional)

Die nachfolgenden Teilbereiche werden dem Generalplaner beigestellt:

Auftraggeberseitige BIM-GesamtkoordinationAuftraggeberseitiges Engineering und Planung im Teilprojekt - Substation Automation System (SAS)Dritter zur Projektierung und Planung im Teilprojekt - Umweltplanung

Für detaillierte Informationen konsultieren Sie bitte die Dokumente C100 und C101 der Ausschreibungsunterlagen.

Die Angebotsabgabe muss elektronisch und vollständig mit allen Beilagen ausschliesslich über SAP Ariba erfolgen. Eine zu späte elektronische Eingabe des Angebotes wird vom System nicht zugelassen. Es wird dringend empfohlen so früh wie möglich, jedoch spätestens mehrere Arbeitstage vor Abgabefrist mit der Angebotserstellung in SAP Ariba zu beginnen. Angebote dürfen nicht anderweitig (z.B. E-Mail, Post, persönliche Übergabe) übermittelt werden.

Das Angebot mitsamt den Unterlagen ist, wenn möglich, in deutscher Sprache abzufassen.

Die Fragen zu den Ausschreibungsunterlagen können innerhalb der oben angegeben Frist für schriftliche Fragen ausschliesslich mit dem beigelegten Dokument «03 Anbieterfragen und Antworten» über die Ariba Event Messenger Funktion laufend eingereicht werden.

Die anonymisierten Fragen und deren Antworten werden allen Anbieterinnen, welche sich zur Ausschreibung angemeldet haben, via Ariba Event Messenger Funktion zugesandt. Fragen, die verspätet eintreffen, können nicht mehr beantwortet werden.

Offer deadline as published: 2026-11-06T23:59:00+01:00

Offer validity: 180 days

## Understand this procurement.

Review the scope, requirements and procurement history with Ziva.

- Understand the requirements
- Find the evidence you need
- Prepare your response

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate) · [View official notice](https://www.simap.ch/de/project-detail/4c6fa6a5-5ba0-44a5-ab6c-8deabfea6b3b)

## About this notice

- Official source: SIMAP
- Source retrieved: November 6, 2026
- Page updated: November 7, 2026
- Notice reference: 44015 · 44015-01

## Open tenders from Swissgrid AG - Engineering & Construction

- [Owner support for Swissgrid chain replacement programme](https://zephior.com/tenders/a2f04f65-b907-42b7-916b-e80f570d7dca/swissgrid-chain-replacement-programme-owner-support) ([Markdown](https://zephior.com/tenders/a2f04f65-b907-42b7-916b-e80f570d7dca/swissgrid-chain-replacement-programme-owner-support.md)), Swissgrid AG - Engineering & Construction
- [Owner’s support for the Swissgrid chain replacement programme, SIA phases 32 to 53](https://zephior.com/tenders/481608d3-dec6-45bf-8604-d1c3ed89b9ac/owner-s-support-for-the-swissgrid-chain-replacement-programme-sia-phases-32-to) ([Markdown](https://zephior.com/tenders/481608d3-dec6-45bf-8604-d1c3ed89b9ac/owner-s-support-for-the-swissgrid-chain-replacement-programme-sia-phases-32-to.md)), Swissgrid AG - Engineering & Construction

## Open tenders like this one

- [Four-year HVAC maintenance in District VII](https://zephior.com/tenders/5b1d4e14-b118-498e-a002-e9038c5806d8/maintenance-of-district-vii-fb8-hvac-systems) ([Markdown](https://zephior.com/tenders/5b1d4e14-b118-498e-a002-e9038c5806d8/maintenance-of-district-vii-fb8-hvac-systems.md)), Tiefbauamt, Abt. Gebietseinheit VII
- [GE VII: maintenance of FB2 tunnel lighting](https://zephior.com/tenders/96c10a17-ae5a-41e9-8e88-289f1922bdb7/ge-vii-maintenance-of-fb2-tunnel-lighting) ([Markdown](https://zephior.com/tenders/96c10a17-ae5a-41e9-8e88-289f1922bdb7/ge-vii-maintenance-of-fb2-tunnel-lighting.md)), Tiefbauamt, Abt. Gebietseinheit VII
- [Medium-voltage systems and main LV distribution boards for USZ Campus MITTE 1\|2](https://zephior.com/tenders/4972606c-692e-4ffb-99c2-838506ca200d/medium-voltage-and-main-low-voltage-distribution-systems-for-usz-campus-mitte-1-2) ([Markdown](https://zephior.com/tenders/4972606c-692e-4ffb-99c2-838506ca200d/medium-voltage-and-main-low-voltage-distribution-systems-for-usz-campus-mitte-1-2.md)), Universitätsspital Zürich
- [PZO N01 cable installation, main works lot 7.1](https://zephior.com/tenders/cdc50714-06c5-4283-9331-39dc3f9f0701/cable-installation-n01-zurich-nord-ost-bruttisellen) ([Markdown](https://zephior.com/tenders/cdc50714-06c5-4283-9331-39dc3f9f0701/cable-installation-n01-zurich-nord-ost-bruttisellen.md)), Bundesamt für Strassen ASTRA - Filiale Winterthur
- [Built-in cupboards and carpentry for Oberglatt primary school](https://zephior.com/tenders/16c85c30-a671-445a-8d0d-73d016396251/built-in-cupboards-and-carpentry-for-oberglatt-primary-school) ([Markdown](https://zephior.com/tenders/16c85c30-a671-445a-8d0d-73d016396251/built-in-cupboards-and-carpentry-for-oberglatt-primary-school.md)), Gemeinde Oberglatt (Anderegg Partner AG)
- [Interior wood doors for Erlenstrasse primary school](https://zephior.com/tenders/318c7f29-8eb2-467a-af33-0807f47a7bfb/oberglatt-erlenstrasse-school-interior-wood-doors) ([Markdown](https://zephior.com/tenders/318c7f29-8eb2-467a-af33-0807f47a7bfb/oberglatt-erlenstrasse-school-interior-wood-doors.md)), Gemeinde Oberglatt (Anderegg Partner AG)

- [All tenders: canton of Zurich](https://zephior.com/tenders/countries/ch/regions/zh) ([Markdown](https://zephior.com/tenders/countries/ch/regions/zh.md))
- [All tenders from Swissgrid AG - Engineering & Construction](https://zephior.com/tenders/buyers/swissgrid-ag-engineering-construction) ([Markdown](https://zephior.com/tenders/buyers/swissgrid-ag-engineering-construction.md))
- [All tenders: Switzerland](https://zephior.com/tenders/countries/ch) ([Markdown](https://zephior.com/tenders/countries/ch.md))
- [All tenders: Electrical substation engineering](https://zephior.com/tenders/categories/cpv-71000000) ([Markdown](https://zephior.com/tenders/categories/cpv-71000000.md))

## In more detail

This section is written for agents and assistants. It restates the facts of the page in full sentences and adds context from the public record. Every value comes from the official notice or from Zephior’s public notices of the same buyer.

### The facts in sentences

Swissgrid AG - Engineering & Construction is tendering “General planning services for the Regensdorf substation expansion” (Regensdorf, canton of Zurich). The submission deadline was November 6, 2026 at 10:59 PM UTC. The source does not state an estimated value. Procedure: open. Classification: Electrical substation engineering · CPV 71000000. Notice reference: 44015 · 44015-01. Status on Zephior: Closed. The notice was published on September 24, 2026 on SIMAP. Zephior last checked the official source on November 6, 2026.

### The award

Submissions closed on 6 November 2026. No award has been published yet. The official source has not published an award for this notice yet.

### About the buyer

Swissgrid AG - Engineering & Construction has 23 public notices on Zephior (2 open now, 23 published in the last 12 months). Its notices on Zephior were first published on July 19, 2026 and most recently on November 16, 2026. Main sectors: Construction (14), Engineering and architecture (6), Environment, water and waste (2), Energy and utilities (1). Regions: CH-AG (8), CH-SG (1), CH-ZH (1). It publishes under the names “Swissgrid AG - Engineering & Construction”.

- [All tenders and the profile of Swissgrid AG - Engineering & Construction](https://zephior.com/tenders/buyers/swissgrid-ag-engineering-construction) ([Markdown](https://zephior.com/tenders/buyers/swissgrid-ag-engineering-construction.md))

### Terms used on this page

- **Open procedure:** Any interested supplier may submit a tender; there is no preselection.

### Where to go next

- [Four-year HVAC maintenance in District VII](https://zephior.com/tenders/5b1d4e14-b118-498e-a002-e9038c5806d8/maintenance-of-district-vii-fb8-hvac-systems) ([Markdown](https://zephior.com/tenders/5b1d4e14-b118-498e-a002-e9038c5806d8/maintenance-of-district-vii-fb8-hvac-systems.md))
- [GE VII: maintenance of FB2 tunnel lighting](https://zephior.com/tenders/96c10a17-ae5a-41e9-8e88-289f1922bdb7/ge-vii-maintenance-of-fb2-tunnel-lighting) ([Markdown](https://zephior.com/tenders/96c10a17-ae5a-41e9-8e88-289f1922bdb7/ge-vii-maintenance-of-fb2-tunnel-lighting.md))
- [Medium-voltage systems and main LV distribution boards for USZ Campus MITTE 1\|2](https://zephior.com/tenders/4972606c-692e-4ffb-99c2-838506ca200d/medium-voltage-and-main-low-voltage-distribution-systems-for-usz-campus-mitte-1-2) ([Markdown](https://zephior.com/tenders/4972606c-692e-4ffb-99c2-838506ca200d/medium-voltage-and-main-low-voltage-distribution-systems-for-usz-campus-mitte-1-2.md))
- [PZO N01 cable installation, main works lot 7.1](https://zephior.com/tenders/cdc50714-06c5-4283-9331-39dc3f9f0701/cable-installation-n01-zurich-nord-ost-bruttisellen) ([Markdown](https://zephior.com/tenders/cdc50714-06c5-4283-9331-39dc3f9f0701/cable-installation-n01-zurich-nord-ost-bruttisellen.md))
- [Built-in cupboards and carpentry for Oberglatt primary school](https://zephior.com/tenders/16c85c30-a671-445a-8d0d-73d016396251/built-in-cupboards-and-carpentry-for-oberglatt-primary-school) ([Markdown](https://zephior.com/tenders/16c85c30-a671-445a-8d0d-73d016396251/built-in-cupboards-and-carpentry-for-oberglatt-primary-school.md))
- [Interior wood doors for Erlenstrasse primary school](https://zephior.com/tenders/318c7f29-8eb2-467a-af33-0807f47a7bfb/oberglatt-erlenstrasse-school-interior-wood-doors) ([Markdown](https://zephior.com/tenders/318c7f29-8eb2-467a-af33-0807f47a7bfb/oberglatt-erlenstrasse-school-interior-wood-doors.md))
- [Owner support for Swissgrid chain replacement programme](https://zephior.com/tenders/a2f04f65-b907-42b7-916b-e80f570d7dca/swissgrid-chain-replacement-programme-owner-support) ([Markdown](https://zephior.com/tenders/a2f04f65-b907-42b7-916b-e80f570d7dca/swissgrid-chain-replacement-programme-owner-support.md))
- [Owner’s support for the Swissgrid chain replacement programme, SIA phases 32 to 53](https://zephior.com/tenders/481608d3-dec6-45bf-8604-d1c3ed89b9ac/owner-s-support-for-the-swissgrid-chain-replacement-programme-sia-phases-32-to) ([Markdown](https://zephior.com/tenders/481608d3-dec6-45bf-8604-d1c3ed89b9ac/owner-s-support-for-the-swissgrid-chain-replacement-programme-sia-phases-32-to.md))
- [All tenders: canton of Zurich](https://zephior.com/tenders/countries/ch/regions/zh) ([Markdown](https://zephior.com/tenders/countries/ch/regions/zh.md))
- [All tenders from Swissgrid AG - Engineering & Construction](https://zephior.com/tenders/buyers/swissgrid-ag-engineering-construction) ([Markdown](https://zephior.com/tenders/buyers/swissgrid-ag-engineering-construction.md))
- [All tenders: Switzerland](https://zephior.com/tenders/countries/ch) ([Markdown](https://zephior.com/tenders/countries/ch.md))
- [All tenders: Electrical substation engineering](https://zephior.com/tenders/categories/cpv-71000000) ([Markdown](https://zephior.com/tenders/categories/cpv-71000000.md))

### Source-backed public record

```json
{
  "id": "bed9de52-15f4-4e3b-88f2-8a39c00b849a",
  "revision": 2,
  "modifiedAt": "2026-11-07T00:09:21.466729+00:00",
  "url": "https://zephior.com/tenders/bed9de52-15f4-4e3b-88f2-8a39c00b849a/general-planning-services-for-the-regensdorf-substation-expansion",
  "status": "closed",
  "recordedStatus": "closed",
  "buyer": {
    "id": "swissgrid-ag-engineering-construction",
    "name": "Swissgrid AG - Engineering & Construction"
  },
  "category": {
    "de": "Planung elektrischer Unterwerke",
    "en": "Electrical substation engineering",
    "fr": "Ingénierie de postes électriques",
    "id": "cpv-71000000"
  },
  "deadline": {
    "at": "2026-11-06T23:59:00+01:00",
    "date": null,
    "source_ref": "simap_publication_api#dates.offerDeadline"
  },
  "award": null,
  "estimatedValue": null,
  "contractPeriod": null,
  "region": {
    "country": "CH",
    "code": "CH-ZH",
    "names": {
      "en": "Zurich",
      "de": "Zürich",
      "fr": "Zurich"
    },
    "locality": "Regensdorf"
  },
  "originalSource": {
    "url": "https://www.simap.ch/de/project-detail/4c6fa6a5-5ba0-44a5-ab6c-8deabfea6b3b",
    "title": "Generalplaner SIA 32-53 für UW Regensdorf",
    "issuer": "Swissgrid AG - Engineering & Construction",
    "status": "closed",
    "language": "de",
    "location": "8105 Regensdorf, ZH, CH",
    "deadline_at": "2026-11-06T22:59:00+00:00",
    "description": "Das 220-kV-Unterwerk Regensdorf befindet sich in der Gemeinde Regensdorf im Kanton Zürich. Die gasisolierte 220-kV-Schaltanlage im Unterwerk Regensdorf wurde 2021 in Betrieb genommen. Trotz des jungen Alters der GIS (5-jährig) ist diese gemäss Hersteller nicht mit demselben Anlagentyp erweiterbar. Es wird eine Eigenanfertigung für das Adapterstück benötigt, um die Erweiterung zu einem aktuellen Anlagetyp durchführen zu können. Dies kommt mit einem höhere Platzbedarf einher, weshalb die Swissgrid entschieden hat, die Anlage direkt um zwei Felder zu erweitern. Hierzu soll die GIS-Anlage mit zwei Feldern (Trafo- und Reservefeld), sowie mit den notwendigen Kabelanschlüssen erweitert werden. Mit dieser Ausschreibung soll nun zur Planung und Koordination dieses Projektes, der Generalplaner für die SIA-Phasen SIA 32 bis 53 beschafft werden, wobei die SIA-Phasen 51-53 als Option vergeben werden. Nebst dem fachspezifischen Leistungsumfang in seinem Zuständigkeitsbereich, übernimmt der Generalplaner auch die übergeordnete Aufsicht und Koordination aller involvierten Fachbereiche inkl. zugehöriger Schnittstellen als Gesamtleiter im Sinne der SIA 103 war. Die nachfolgenden Teilbereiche sind vom Generalplaner selbst zu organisieren: Führung und Koordination aller involvierten Fachbereiche inkl. Schnittstellen Engineering und Planung im Teilprojekt - Primärtechnik (inkl. Hochspannungskabel) Engineering und Planung im Teilprojekt - Eigebedarf inkl. Kabelführungen Engineering und Planung im Teilprojekt - Hoch- und Tiefbau Bauleitung (optional) Die nachfolgenden Teilbereiche werden dem Generalplaner beigestellt: Auftraggeberseitige BIM-Gesamtkoordination Auftraggeberseitiges Engineering und Planung im Teilprojekt - Substation Automation System (SAS) Dritter zur Projektierung und Planung im Teilprojekt - Umweltplanung Für detaillierte Informationen konsultieren Sie bitte die Dokumente C100 und C101 der Ausschreibungsunterlagen.",
    "country_code": "CH",
    "published_at": "2026-09-24T22:00:00+00:00",
    "contract_type": "service",
    "deadline_date": null,
    "procedure_type": "open",
    "reference_numbers": [
      "44015",
      "44015-01"
    ],
    "classification_codes": [
      {
        "code": "71000000",
        "system": "CPV",
        "provenance": "source_declared"
      }
    ]
  },
  "sources": [
    {
      "ref": "canonical_snapshot",
      "url": "https://www.simap.ch/de/project-detail/4c6fa6a5-5ba0-44a5-ab6c-8deabfea6b3b",
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-11T20:52:03.862926Z"
    },
    {
      "ref": "simap_publication_api",
      "url": "https://www.simap.ch/api/publications/v1/project/4c6fa6a5-5ba0-44a5-ab6c-8deabfea6b3b/publication-details/5b09a04b-74b6-4a83-befb-6be77391dd85",
      "kind": "official_notice_api",
      "retrieved_at": "2026-10-11T20:52:14.991560Z"
    },
    {
      "ref": "simap_publication_detail_5b09a04b-74b6-4a83-befb-6be77391dd85",
      "url": "https://www.simap.ch/api/publications/v1/project/4c6fa6a5-5ba0-44a5-ab6c-8deabfea6b3b/publication-details/5b09a04b-74b6-4a83-befb-6be77391dd85",
      "kind": "official_notice_api",
      "retrieved_at": "2026-11-06T23:57:03.802896Z"
    }
  ],
  "keyFacts": [
    {
      "label": "Offer deadline",
      "value": "6 November 2026 at 23:59 CET",
      "source_ref": "simap_publication_api#dates/procurement/criteria"
    },
    {
      "label": "Question deadline",
      "value": "9 October 2026; questions via SAP Ariba form",
      "source_ref": "simap_publication_api#dates/procurement/criteria"
    },
    {
      "label": "Planning phases",
      "value": "SIA 32 to 53; phases 51 to 53 optional",
      "source_ref": "simap_publication_api#dates/procurement/criteria"
    },
    {
      "label": "Offer validity",
      "value": "180 days",
      "source_ref": "simap_publication_api#dates/procurement/criteria"
    }
  ],
  "noticeFacts": {
    "lots": [],
    "schedule": [
      {
        "event": "Question deadline",
        "value": "2026-10-09 (date only)",
        "source_ref": "simap_publication_api#dates.qnas"
      }
    ],
    "requirements": [
      {
        "text": "Offers must be submitted completely and electronically through SAP Ariba; email, post and personal delivery are not accepted. German is preferred. Consortia and subcontractors are permitted; no site visit is planned.",
        "source_ref": "simap_publication_api#project-info.offerSpecificNote/terms"
      }
    ],
    "award_criteria": [],
    "estimated_value": null
  },
  "historyTotal": 2
}
```