# Wieniawa energy-cluster infrastructure

Gmina Wieniawa · Poland · Closed

## Outcome

Submissions closed on 14 October 2026. No award has been published yet.

- **Buyer:** Gmina Wieniawa
- **Place:** Poland
- **Submission deadline:** October 14, 2026 at 7:00 AM UTC
- **Contract value:** Not stated in the notice
- **Lots:** 3 lots
- **Published:** September 29, 2026

## Overview

Gmina Wieniawa’s works-and-supply procurement has three lots: a biomass, heat-network and cogeneration energy cluster in Wieniawa; related infrastructure in Sokolniki Mokre; and photovoltaic installations with energy storage on public buildings. The main notice describes design, permitting, construction and energy-management obligations. A site visit is recommended but not mandatory. Tenders are due 14 October 2026 at 09:00 UTC+02 and must remain valid for 90 days. No estimated contract value or award outcome is stated in the main notice.

Information based on the public notice

## What the buyer needs

Design and construction of energy infrastructure across three lots.

- A site visit is recommended but is not a condition for submitting an offer.

## Lots

- LOT-0001 · Utworzenie magazynu na zrębki drzewne, utworzenie kotłowni biomasowej i montaż kotła, utworzenie sieci i węzłów ciepłowniczych, instalację kogeneracji wraz z systemem przygotowania paliwa, utworzenie magazynu ciepła o pojemności 3,5 MWh oraz wdrożenie systemu zarządzania energią w miejscowości Wieniawa
- LOT-0002 · Utworzenie magazynu na zrębki drzewne wraz z budynkiem kotłowni, dostawę i montaż kotła, utworzenie kogeneracji wraz z systemem przygotowania paliwa, utworzenie sieci i węzłów ciepłowniczych oraz utworzenie magazynu ciepła o pojemności 3,5 MWh w miejscowości Sokolniki Mokre
- LOT-0003 · Budowa instalacji fotowoltaicznych oraz magazynów energii na Budynkach Użyteczności Publicznej

## Tender details

- Buyer: Gmina Wieniawa
- Country: Poland
- Procedure: open
- Classification: CPV 45000000 · CPV 45331000 · CPV 45331110 · CPV 45453000 · CPV 71321200 · CPV 71300000 · CPV 45331100 · CPV 45300000 · CPV 45400000 · CPV 45450000 · CPV 45330000 · CPV 09300000 · CPV 45311100 · CPV 45311200 · CPV 45315100 · CPV 45315300 · CPV 71320000 · CPV 71323100
- Notice reference: 674195-2026
- Scope: Three lots: energy-cluster infrastructure in Wieniawa, analogous heat/biomass/cogeneration infrastructure in Sokolniki Mokre, and photovoltaic installations with energy storage at public buildings.
- Delivery of works: The notice requires design documentation, permits or notifications, construction/installation and an energy-management system; detailed functional programmes are referenced separately.
- Submission: Tender deadline: 14 October 2026, 09:00 UTC+02. The tender must remain valid for 90 days.

## What to check in the tender documents

- Estimated value, detailed functional programmes, technical specifications and award outcome are not stated in the main notice; separately referenced materials were not opened.

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate)

## Original notice

**Innowacyjne rozwiązania dotyczące energii cieplnej i elektrycznej Wieniawskiego Klastra Energii**

See the notice on TED website

   674195-2026 - Competition
   Poland – Construction work – Innowacyjne rozwiązania dotyczące energii cieplnej i elektrycznej
   Wieniawskiego Klastra Energii
   OJ S 189/2026 30/09/2026
   Contract or concession notice – standard regime - Change notice
   Works


   1. Buyer

      1.1. Buyer
           Official name: Gmina Wieniawa
           Email: sekretariat@gminawieniawa.pl
           Legal type of the buyer: Local authority
           Activity of the contracting authority: General public services

   2. Procedure

      2.1. Procedure
           Title: Innowacyjne rozwiązania dotyczące energii cieplnej i elektrycznej Wieniawskiego Klastra
           Energii
           Description: 1. Przedmiotem zamówienia są roboty budowlane i dostawa wraz z montażem w
           ramach zadania inwestycyjnego pod nazwą: „Innowacyjne rozwiązania dotyczące energii
           cieplnej i elektrycznej Wieniawskiego Klastra Energii”. 2. Zamówienie podzielone zostało na
           trzy następujących części: 1) Część zamówienia nr 1 – „Utworzenie magazynu na zrębki
           drzewne, utworzenie kotłowni biomasowej i montaż kotła, utworzenie sieci i węzłów
           ciepłowniczych, instalację kogeneracji wraz z systemem przygotowania paliwa, utworzenie
           magazynu ciepła o pojemności 3,5 MWh oraz wdrożenie systemu zarządzania energią w
           miejscowości Wieniawa”; 2) Część zamówienia nr 2 – „Utworzenie magazynu na zrębki
           drzewne wraz z budynkiem kotłowni, dostawę i montaż kotła, utworzenie kogeneracji wraz z
           systemem przygotowania paliwa, utworzenie sieci i węzłów ciepłowniczych oraz utworzenie
           magazynu ciepła o pojemności 3,5 MWh w miejscowości Sokolniki Mokre”; 3) Część
           zamówienia nr 3 – „Budowa instalacji fotowoltaicznych oraz magazynów energii na Budynkach
           Użyteczności Publicznej”. 3. W ramach części zamówienia nr 1 – Wykonawca zobowiązany
           będzie: 1) wykonać dokumentację(e) projektową(e), w tym Projekt(y) Budowalny(e), Projekt(y)
           Techniczny(e) i Projekt(y) Wykonawczy(e), kosztorys(y) wraz z przedmiarem(ami) robót,
           specyfikację techniczną wykonania i odbioru robót wraz z uzyskaniem prawomocnej(ych)
           decyzji o pozwoleniu na budowę albo zgłoszenia(eń) robót – dla całego zakresu opisanego w
           Programie Funkcjonalno–Użytkowym, a także przygotować do zatwierdzenia przez
           Zamawiającego Harmonogram budowy; 2) wykonać roboty budowlane, w oparciu o
           opracowaną(e) i zaakceptowaną(e) przez Zamawiającego dokumentację(e) projektowo-
           kosztorysową(e), o której(ych) mowa w pkt 1) powyżej, i uzyskaną(e) prawomocną(e) decyzję
           (e) o pozwoleniu na budowę albo zgłoszenie(a) robót oraz uzyskać prawomocne pozwolenie
           (a) na użytkowania albo zgłoszenie(a) zakończenia robót (o ile dotyczy); 3) wykonać
           wdrożenie systemu zarządzania energią, monitorowania, zarządzania produkcją i dystrybucją
           energii, optymalizacji, integracji systemów pomiarowych, raportowania i analizy danych. 4. W
           ramach części zamówienia nr 2 – Wykonawca zobowiązany będzie: 1) wykonać dokumentację
           (e) projektową(e), w tym Projekt(y) Budowalny(e), Projekt(y) Techniczny(e) i Projekt(y)
           Wykonawczy(e), kosztorys(y) wraz z przedmiarem(ami) robót, specyfikację techniczną

674195-2026                                                                                           Page 1/27
              wykonania i odbioru robót wraz z uzyskaniem prawomocnej(ych) decyzji o pozwoleniu na
              budowę albo zgłoszenia(eń) robót – dla całego zakresu opisanego w Programie Funkcjonalno–
              Użytkowym, a także przygotować do zatwierdzenia przez Zamawiającego Harmonogram
              budowy; 2) wykonać roboty budowlane, w oparciu o opracowaną(e) i zaakceptowaną(e) przez
              Zamawiającego dokumentację(e) projektowo-kosztorysową(e), o której(ych) mowa w pkt 1)
              powyżej, i uzyskaną(e) prawomocną(e) decyzję(e) o pozwoleniu na budowę albo zgłoszenie
              (a) robót oraz uzyskać prawomocne pozwolenie(a) na użytkowania albo zgłoszenie(a)
              zakończenia robót (o ile dotyczy); 3) wykonać wdrożenie systemu zarządzania energią,
              monitorowania, zarządzania produkcją i dystrybucją energii, optymalizacji, integracji systemów
              pomiarowych, raportowania i analizy danych. 5. W ramach części zamówienia nr 3
              Wykonawca zobowiązany będzie do: 1) zaprojektowania i budowy instalacji fotowoltaicznych
              oraz magazynów energii na Budynkach Użyteczności Publicznej; 2) opracowania
              dokumentacji wykonawczej; 3) dostawy i montażu kompletnych instalacji układów
              fotowoltaicznych wraz magazynami energii oraz podłączenie ich do istniejących już systemów
              energetycznych; 4) wdrożenia systemu zarządzania energią, monitorowania, zarządzania
              produkcją i dystrybucją energii, optymalizacji, integracji systemów pomiarowych, raportowania
              i analizy danych; - w zakresie opisanym w Programie Funkcjonalno–Użytkowym. 6. Szczegóły
              zakres przedmiotu niniejszego zamówienia precyzują: 1) dla części zamówienia nr 1 i 2 –
              załącznik nr 8 do SWZ – Program Funkcjonalno-Użytkowy, właściwy dla tych części
              zamówienia, zaś wymogi dotyczące realizacji zamówienia załącznik nr 9a do SWZ – Projekt
              umowy; 2) dla części zamówienia nr 3 – załącznik nr 8 do SWZ – Program Funkcjonalno-
              Użytkowy, właściwy dla tej części zamówienia, zaś wymogi dotyczące realizacji zamówienia
              załącznik nr 9b do SWZ – Projekt umowy. 7. Pożądane jest, aby przed złożeniem Oferty
              Wykonawca przeprowadził wizję lokalną terenów, na których zlokalizowane będą roboty objęte
              przedmiotem niniejszego zamówienia. Przeprowadzenie wizji nie jest warunkiem dla złożenia
              oferty w niniejszym postępowaniu. Koszty dokonania wizji lokalnej terenu budowy poniesie
              Wykonawca. 8. Roboty budowlane stanowiące przedmiot niniejszego zamówienia należy
              wykonać zgodnie z niniejszą SWZ, Opisem Przedmiotu Zamówienia (OPZ), Projektem Umowy
              oraz zgodnie z zasadami sztuki budowlanej, wiedzy technicznej, obowiązującymi przepisami i
              normami. Zobowiązanie wykonania robót zgodnie z powyższymi dokumentami nie zwalnia
              Wykonawcy m. in. od obowiązku weryfikacji tej dokumentacji w trakcie trwania umowy i
              zgłaszania Zamawiającemu wykrytych w niej wad czy uchybień skutkujących możliwością
              niedochowania warunków umowy lub naruszeniem przepisów prawa. 9. Od dnia odbioru placu
              budowy Wykonawca odpowiada za wszystkie zdarzenia, które zaistnieją podczas
              wykonywania umowy. Za wszystkie wyrządzone komukolwiek szkody podczas budowy lub w
              związku z budową odpowiada Wykonawca, chyba, że nie zachodzi związek przyczynowy
              pomiędzy prowadzeniem robót a wyrządzoną szkodą. Wykonawca przyjmie odpowiedzialność
              w szczególności za: 1) szkody i następstwa nieszczęśliwych wypadków dotyczących
              pracowników Wykonawcy oraz osób trzecich przebywających w rejonie prowadzonych robót;
              2) szkody wynikające ze zniszczeń oraz innych zdarzeń w odniesieniu do robót, materiałów
              sprzętu i innego mienia ruchomego związanego z prowadzeniem robót podczas realizacji
              przedmiotu niniejszej umowy; Dalsze zapisy w SWZ.
              Procedure identifier: d6aa223d-cc53-4ce8-be69-ef59ea6282d3
              Internal identifier: ZP.2710.15.2026
              Type of procedure: Open
              The procedure is accelerated: no

     2.1.1. Purpose
            Main nature of the contract: Works
            Main classification (cpv): 45000000 Construction work

674195-2026                                                                                          Page 2/27
              Additional classification (cpv): 45331000 Heating, ventilation and air-conditioning installation
              work, 45331110 Boiler installation work, 45453000 Overhaul and refurbishment work,
              71321200 Heating-system design services, 71300000 Engineering services, 45331100
              Central-heating installation work, 45331000 Heating, ventilation and air-conditioning
              installation work, 45300000 Building installation work, 45400000 Building completion work,
              45450000 Other building completion work, 45330000 Plumbing and sanitary works, 45330000
              Plumbing and sanitary works, 09300000 Electricity, heating, solar and nuclear energy,
              45311100 Electrical wiring work, 45311200 Electrical fitting work, 45315100 Electrical
              engineering installation works, 45315300 Electricity supply installations, 71320000
              Engineering design services, 71323100 Electrical power systems design services

     2.1.2. Place of performance
            Country subdivision (NUTS): Radomski (PL921)
            Country: Poland

     2.1.4. General information
            Additional information: Zamawiający skorzysta z uprawnienia wynikającego z art. 139 ust. 1
            ustawy Pzp. Zamawiający najpierw dokona badania i oceny ofert a następnie zbada czy
            Wykonawca, którego oferta została najwyżej oceniona, nie podlega wykluczeniu oraz spełnia
            warunki udziału w postępowaniu. Nie ujawnia się informacji stanowiących tajemnicę
            przedsiębiorstwa w rozumieniu przepisów ustawy z dnia 16 kwietnia 1993 r. o zwalczaniu
            nieuczciwej konkurencji (t.j. Dz. U. z 2026 r. poz. 85), jeżeli Wykonawca, wraz z przekazaniem
            takich informacji, zastrzegł, że nie mogą być one udostępniane oraz wykazał, że zastrzeżone
            informacje stanowią tajemnicę przedsiębiorstwa. Wykonawca nie może zastrzec informacji, o
            których mowa w art. 222 ust. 5 ustawy Pzp. 1. Zamawiający przed wyborem oferty
            najkorzystniejszej, wezwie Wykonawcę, którego oferta została najwyżej oceniona, do złożenia
            w wyznaczonym terminie, nie krótszym niż 10 dni, aktualnych na dzień złożenia podmiotowych
            środków dowodowych, a w przypadku polegania przez Wykonawcę na zdolnościach lub
            sytuacji podmiotów udostępniających zasoby – do złożenia podmiotowych środków
            dowodowych w zakresie pkt 2 i 3 poniżej, dotyczących tych podmiotów (w zakresie, w jakim
            nie zostały one zastąpione ważnym certyfikatem i wskazane w oświadczeniu JEDZ). 2.
            Dokumenty i oświadczenia wymagane od Wykonawcy na potwierdzenie braku podstaw
            wykluczenia Wykonawcy z postępowania: 1) informacja z Krajowego Rejestru Karnego w
            zakresie określonym w art. 108 ust. 1 pkt 4 ustawy Pzp (tj. dotycząca orzeczenia zakazu
            ubiegania się o zamówienie publiczne tytułem środka karnego), sporządzona nie wcześniej niż
            6 miesięcy przed jej złożeniem; 2) informacja z Krajowego Rejestru Karnego w zakresie
            określonym w art. 108 ust. 1 pkt 2 ustawy Pzp oraz w zakresie określonym w art. 109 ust. 1
            pkt 3 ustawy Pzp (dotycząca skazania za przestępstwo lub ukarania za wykroczenie, za które
            wymierzono karę aresztu), sporządzona nie wcześniej niż 6 miesięcy przed jej złożeniem; 3)
            informacja z Krajowego Rejestru Karnego w zakresie określonym w art. 108 ust. 1 pkt 1
            ustawy Pzp, w zakresie określonym w art. 109 ust. 1 pkt 2 lit. a) ustawy Pzp i w zakresie art.
            109 ust. 1 pkt 2 lit. b ustawy Pzp (dotycząca ukarania za wykroczenie, za które wymierzono
            karę aresztu), sporządzona nie wcześniej niż 6 przed jej złożeniem; 4) odpis lub informacja z
            Krajowego Rejestru Sądowego lub z Centralnej Ewidencji i Informacji o Działalności
            Gospodarczej, jeżeli odrębne przepisy wymagają wpisu do rejestru lub ewidencji, w celu
            wykazania braku podstaw wykluczenia na podstawie art. 109 ust. 1 pkt 4 ustawy Pzp,
            sporządzona nie wcześniej niż 3 miesiące przed jej złożeniem; 5) oświadczenie Wykonawcy o
            aktualności informacji zawartych w oświadczeniu, o którym mowa w art. 125 ust. 1 ustawy
            Pzp, w zakresie podstaw wykluczenia z postępowania wskazanych przez Zamawiającego, o
            których mowa w art. 109 ust. 1 pkt 2 lit. b ustawy Pzp (w zakresie dotyczącym ukarania za


674195-2026                                                                                             Page 3/27
              wykroczenie, za które wymierzono karę ograniczenia wolności lub karę grzywny), art. 109 ust.
              1 pkt 2 lit. c ustawy Pzp oraz art. 109 ust. 1 pkt 3 ustawy Pzp (w zakresie ukarania za
              wykroczenie, za które wymierzono karę ograniczenia wolności lub karę grzywny) –
              sporządzone zgodnie ze wzorem zawartym w Załączniku nr 3 do SWZ); 6) oświadczenie
              Wykonawcy o aktualności informacji zawartych w oświadczeniu, o których mowa w art. 125
              ust. 1 ustawy Pzp w zakresie podstaw wykluczenia z postępowania, o których mowa w: a) art.
              108 ust. 1 pkt 3 i pkt 6 ustawy Pzp, b) art. 108 ust. 1 pkt 4 ustawy Pzp, dotyczących
              orzeczenia zakazu ubiegania się o zamówienie publiczne tytułem środka zapobiegawczego, c)
              art. 108 ust. 1 pkt 5 ustawy Pzp, dotyczących zawarcia z innymi wykonawcami porozumienia
              mającego na celu zakłócenie konkurencji, d) art. 109 ust. 1 pkt 7 - 10 ustawy Pzp, e) rozdziale
              IV pkt 1 ppkt 1) SWZ, – sporządzone zgodnie ze wzorem zawartym w Załączniku nr 3 do
              SWZ; 7) oświadczenie Wykonawcy, w zakresie art. 108 ust. 1 pkt 6 ustawy Pzp, o braku
              przynależności do tej samej grupy kapitałowej w rozumieniu ustawy z dnia 16 lutego 2007 r. o
              ochronie konkurencji i konsumentów z innym wykonawcą, który złożył odrębną ofertę albo
              oświadczenie o przynależności do tej samej grupy kapitałowej wraz z dokumentami lub
              informacjami potwierdzającymi przygotowanie oferty niezależnie od innego wykonawcy
              należącego do tej samej grupy kapitałowej – sporządzone zgodnie ze wzorem zawartym w
              Załączniku nr 4 do SWZ. 3. Jeżeli Wykonawca ma siedzibę lub miejsce zamieszkania poza
              granicami Rzeczypospolitej Polskiej, zamiast dokumentów wymienionych w 2 ppkt 1) – 4)
              powyżej, składa dokumenty określone w § 4 rozporządzenia Ministra Rozwoju, Pracy i
              Technologii z dnia 23 grudnia 2020 r. w sprawie podmiotowych środków dowodowych oraz
              innych dokumentów lub oświadczeń, jakich może żądać zamawiający od wykonawcy (Dz. U.
              2020 poz. 2415 ze zm.), tj.: 1) informacja z odpowiedniego rejestru, takiego jak rejestr sądowy
              albo w przypadku braku takiego rejestru, inny równoważny dokument wydany przez właściwy
              organ sądowy lub administracyjny kraju, w którym Wykonawca ma siedzibę lub miejsce
              zamieszkania lub miejsce zamieszkania ma osoba, której dotyczy informacja albo dokument,
              w zakresie określonym w art. 108 ust. 1 pkt 1, 2 i 4 oraz art. 109 ust. 1 pkt 2 lit. a i b oraz pkt 3
              ustawy Pzp; 2) dokument lub dokumenty wystawione w kraju, w którym Wykonawca ma
              siedzibę lub miejsce zamieszkania, potwierdzające odpowiednio, że nie otwarto jego likwidacji
              ani nie ogłoszono upadłości, jego aktywami nie zarządza likwidator lub sąd, nie zawarł układu
              z wierzycielami, jego działalność gospodarcza nie jest zawieszona ani nie znajduje się on w
              innej tego rodzaju sytuacji wynikającej z podobnej procedury przewidzianej w przepisach
              miejsca wszczęcia tej procedury; 3) inne dokumenty i oświadczenia, o których mowa w pkt 2
              ppkt 5) – 7) SWZ. 4. Dokumenty, o których mowa w pkt 3 ppkt 1) powyżej, powinny być
              wystawione nie wcześniej niż 6 miesięcy przed ich złożeniem, natomiast dokumenty, o których
              mowa w pkt 3 ppkt 2) powyżej, powinny być wystawione nie wcześniej niż 3 miesiące przed
              ich złożeniem. 5. Jeżeli w kraju, w którym wykonawca ma siedzibę lub miejsce zamieszkania
              lub miejsce zamieszkania ma osoba, której dokument dotyczy, nie wydaje się dokumentów o
              których mowa w pkt 3 ppkt 1) i 2) powyżej, lub gdy dokumenty te nie odnoszą się do
              wszystkich przypadków, o których mowa w art. 108 ust. 1 pkt 1, 2 i 4, art. 109 ust. 1 pkt 2 lit. a
              i b oraz pkt 3 ustawy Pzp, zastępuje się je odpowiednio w całości lub w części dokumentem
              zawierającym odpowiednio oświadczenie Wykonawcy, ze wskazaniem osoby albo osób
              uprawnionych do jego reprezentacji, lub oświadczenie osoby, której dokument miał dotyczyć,
              złożone pod przysięgą, lub, jeżeli w kraju, w którym Wykonawca ma siedzibę lub miejsce
              zamieszkania lub miejsce zamieszkania ma osoba, której dokument miał dotyczyć, nie ma
              przepisów o oświadczeniu pod przysięgą, złożone przed organem sądowym lub
              administracyjnym, notariuszem, organem samorządu zawodowego lub gospodarczego,
              właściwym ze względu na siedzibę lub miejsce zamieszkania Wykonawcy lub miejsce
              zamieszkania osoby, której dokument miał dotyczyć. Terminy zawarte w pkt 4 powyżej,
              stosuje się odpowiednio. 6. Zamawiający stosuje ustawę z dnia 5 sierpnia 2025 r. o certyfikacji

674195-2026                                                                                                 Page 4/27
              wykonawców zamówień publicznych (Dz. U. poz. 1235 z późn. zm.). 7. Wykonawcy
              zainteresowani certyfikatem znajdą szczegóły w Rozporządzeniu Ministra Finansów i
              Gospodarki z dnia 22 maja 2026 r. w sprawie sposobu składania wniosku o certyfikację
              wykonawców zamówień publicznych i postępowania z tym wnioskiem, szczegółowego
              sposobu przeprowadzania procedury certyfikacji, sposobu prowadzenia stałego nadzoru nad
              aktualnością ważności udzielonej certyfikacji i sposobu przeprowadzania jej aktualizacji oraz
              sposobu ustalania wynagrodzenia podmiotu certyfikującego związanego z certyfikacją (Dz. U.
              poz. 709). 8. Szczegółowe informacje dotyczące certyfikatów dostępne są na stronach:
              Urzędu Zamówień Publicznych https://www.gov.pl/web/uzp, Ministerstwa Rozwoju i
              Technologii https://www.gov.pl/web/rozwoj-technologia. 9. Dokumenty wymagane od
              Wykonawcy na potwierdzenie zgodności oferowanych robót budowlanych z wymaganiami
              (przedmiotowe środki dowodowe): Dla części zamówienia nr 1 i 2: 1) karty katalogowe
              oferowanego(ych) kotła(ów), podpisane przez producenta lub podmiot uprawniony do
              reprezentowania producenta lub dystrybutora urządzeń na rynku polskim, obejmujące
              informacje potwierdzające spełnianie przez te urządzenia parametrów; Dla części zamówienia
              nr 3: 2) karty katalogowe oferowanych modułów fotowoltaicznych, falowników oraz
              magazynów energii, podpisane przez producenta lub podmiot uprawniony do reprezentowania
              producenta lub dystrybutora urządzeń na rynku polskim, obejmujące informacje
              potwierdzające spełnianie przez te urządzenia parametrów. 10. Zamawiający będzie stosował
              procedurę uzupełnienia przedmiotowych środków dowodowych. Zamawiający wyznaczy w
              wezwaniu termin uzupełnienia wymaganego przedmiotowego środka dowodowego
              odpowiednio do sytuacji, jaka wystąpiła w postępowaniu, rodzaju uzupełnianego
              przedmiotowego środka dowodowego oraz z poszanowaniem równego traktowania
              wykonawców. 11. Zamawiający może żądać od wykonawców wyjaśnień dotyczących treści
              przedmiotowych środków dowodowych. Dalsze zapisy w SWZ.
              Legal basis:
              Directive 2014/24/EU
              Art. 132 ustawy z 11 września 2019 r. Prawo zamówień publicznych (t.j. Dz. U. z 2026 r. poz.
              793 z późn. zm.) -

     2.1.5. Terms of procurement
            Terms of submission:
            Maximum number of lots for which one tenderer can submit tenders: 3
            Terms of contract:
            Maximum number of lots for which contracts can be awarded to one tenderer: 3

     2.1.6. Grounds for exclusion
            Sources of grounds for exclusion: Notice
            Assets being administered by liquidator:
            Direct or indirect involvement in the preparation of this procurement procedure:
            Business activities are suspended:
            Analogous situation like bankruptcy, insolvency or arrangement with creditors under national
            law:
            Corruption:
            Fraud:
            Breaching of obligations in the fields of environmental law:
            Breaching of obligations in the fields of labour law:
            Breaching of obligations in the fields of social law:
            Breaching obligation relating to payment of social security contributions:
            Breaching obligation relating to payment of taxes:


674195-2026                                                                                          Page 5/27
              Insolvency:
              Agreements with other economic operators aimed at distorting competition:
              Child labour and including other forms of trafficking in human beings:
              Money laundering or terrorist financing:
              Terrorist offences or offences linked to terrorist activities:
              Early termination, damages, or other comparable sanctions:
              Participation in a criminal organisation:
              Arrangement with creditors:
              Bankruptcy:
              Misrepresentation, withheld information, unable to provide required documents or obtained
              confidential information of this procedure:
              Purely national exclusion grounds: Z postępowania o udzielenie zamówienia wyklucza się
              Wykonawców, którzy podlegają wykluczeniu na podstawie przepisów, o których mowa w art.
              108 ust. 1 pkt 1) – 6) ustawy Pzp (podstawy wykluczenia obligatoryjne) oraz art. 109 ust. 1 pkt
              2, 3, 4, 7, 8, 9, 10 ustawy Pzp (podstawy wykluczenia fakultatywne), z zastrzeżeniem
              wyjątków przewidzianych w ustawie Pzp. Zgodnie z art. 7 ust. 1 ustawy z dnia 13 kwietnia
              2022 r. o szczególnych rozwiązaniach w zakresie przeciwdziałania wspieraniu agresji na
              Ukrainę oraz służących ochronie bezpieczeństwa narodowego (t.j. Dz. U. z 2025 r. poz. 514),
              Z postępowania o udzielenie zamówienia wyklucza się: 1) wykonawcę oraz uczestnika
              konkursu wymienionego w wykazach określonych w rozporządzeniu 765/2006 i
              rozporządzeniu 269/2014 albo wpisanego na listę na podstawie decyzji w sprawie wpisu na
              listę rozstrzygającej o zastosowaniu środka, o którym mowa w art. 1 pkt 3 tej ustawy; 2)
              wykonawcę oraz uczestnika konkursu, którego beneficjentem rzeczywistym w rozumieniu
              ustawy z dnia 1 marca 2018 r. o przeciwdziałaniu praniu pieniędzy oraz finansowaniu
              terroryzmu (Dz. U. z 2022 r. poz. 593 i 655) jest osoba wymieniona w wykazach określonych
              w rozporządzeniu 765/2006 i rozporządzeniu 269/2014 albo wpisana na listę lub będąca takim
              beneficjentem rzeczywistym od dnia 24 lutego 2022 r., o ile została wpisana na listę na
              podstawie decyzji w sprawie wpisu na listę rozstrzygającej o zastosowaniu środka, o którym
              mowa w art. 1 pkt 3 tej ustawy; 3) wykonawcę oraz uczestnika konkursu, którego jednostką
              dominującą w rozumieniu art. 3 ust. 1 pkt 37 ustawy z dnia 29 września 1994 r. o
              rachunkowości (Dz. U. z 2021 r. poz. 217, 2105 i 2106) jest podmiot wymieniony w wykazach
              określonych w rozporządzeniu 765/2006 i rozporządzeniu 269/2014 albo wpisany na listę lub
              będący taką jednostką dominującą od dnia 24 lutego 2022 r., o ile został wpisany na listę na
              podstawie decyzji w sprawie wpisu na listę rozstrzygającej o zastosowaniu środka, o którym
              mowa w art. 1 pkt 3 tej ustawy; oraz, na podstawie art. 5k rozporządzenia Rady (UE) nr 833
              /2014 z dnia 31 lipca 2014 r. dotyczącego środków ograniczających w związku z działaniami
              Rosji destabilizującymi sytuację na Ukrainie (Dz.Urz. UE L 229 z 31.7.2014, s. 1), w brzmieniu
              nadanym m.in. rozporządzeniem Rady (UE) nr 2025/2033 z dnia 23 października 2025 r. (Dz.
              U. UE L 2025.2033) oraz rozporządzeniem Rady (UE) nr 2025/395 z dnia 24 lutego 2025 r.
              (Dz.U. UE L 2025.395).

   5. Lot

      5.1. Lot: LOT-0001
           Title: Utworzenie magazynu na zrębki drzewne, utworzenie kotłowni biomasowej i montaż
           kotła, utworzenie sieci i węzłów ciepłowniczych, instalację kogeneracji wraz z systemem
           przygotowania paliwa, utworzenie magazynu ciepła o pojemności 3,5 MWh oraz wdrożenie
           systemu zarządzania energią w miejscowości Wieniawa
           Description: 1. W ramach części zamówienia nr 1 – Wykonawca zobowiązany będzie: 1)
           wykonać dokumentację(e) projektową(e), w tym Projekt(y) Budowalny(e), Projekt(y)

674195-2026                                                                                            Page 6/27
              Techniczny(e) i Projekt(y) Wykonawczy(e), kosztorys(y) wraz z przedmiarem(ami) robót,
              specyfikację techniczną wykonania i odbioru robót wraz z uzyskaniem prawomocnej(ych)
              decyzji o pozwoleniu na budowę albo zgłoszenia(eń) robót – dla całego zakresu opisanego w
              Programie Funkcjonalno–Użytkowym, a także przygotować do zatwierdzenia przez
              Zamawiającego Harmonogram budowy; 2) wykonać roboty budowlane, w oparciu o
              opracowaną(e) i zaakceptowaną(e) przez Zamawiającego dokumentację(e) projektowo-
              kosztorysową(e), o której(ych) mowa w pkt 1) powyżej, i uzyskaną(e) prawomocną(e) decyzję
              (e) o pozwoleniu na budowę albo zgłoszenie(a) robót oraz uzyskać prawomocne pozwolenie
              (a) na użytkowania albo zgłoszenie(a) zakończenia robót (o ile dotyczy); 3) wykonać
              wdrożenie systemu zarządzania energią, monitorowania, zarządzania produkcją i dystrybucją
              energii, optymalizacji, integracji systemów pomiarowych, raportowania i analizy danych. 2.
              Szczegóły zakres przedmiotu niniejszego zamówienia precyzują dla części zamówienia nr 1 –
              załącznik nr 8 do SWZ – Program Funkcjonalno-Użytkowy, właściwy dla tych części
              zamówienia, zaś wymogi dotyczące realizacji zamówienia załącznik nr 9a do SWZ – Projekt
              umowy. 3. Pożądane jest, aby przed złożeniem Oferty Wykonawca przeprowadził wizję
              lokalną terenów, na których zlokalizowane będą roboty objęte przedmiotem niniejszego
              zamówienia. Przeprowadzenie wizji nie jest warunkiem dla złożenia oferty w niniejszym
              postępowaniu. Koszty dokonania wizji lokalnej terenu budowy poniesie Wykonawca. 4. Roboty
              budowlane stanowiące przedmiot niniejszego zamówienia należy wykonać zgodnie z niniejszą
              SWZ, Opisem Przedmiotu Zamówienia (OPZ), Projektem Umowy oraz zgodnie z zasadami
              sztuki budowlanej, wiedzy technicznej, obowiązującymi przepisami i normami. Zobowiązanie
              wykonania robót zgodnie z powyższymi dokumentami nie zwalnia Wykonawcy m. in. od
              obowiązku weryfikacji tej dokumentacji w trakcie trwania umowy i zgłaszania Zamawiającemu
              wykrytych w niej wad czy uchybień skutkujących możliwością niedochowania warunków
              umowy lub naruszeniem przepisów prawa. 5. Od dnia odbioru placu budowy Wykonawca
              odpowiada za wszystkie zdarzenia, które zaistnieją podczas wykonywania umowy. Za
              wszystkie wyrządzone komukolwiek szkody podczas budowy lub w związku z budową
              odpowiada Wykonawca, chyba, że nie zachodzi związek przyczynowy pomiędzy
              prowadzeniem robót a wyrządzoną szkodą. Wykonawca przyjmie odpowiedzialność w
              szczególności za: 1) szkody i następstwa nieszczęśliwych wypadków dotyczących
              pracowników Wykonawcy oraz osób trzecich przebywających w rejonie prowadzonych robót;
              2) szkody wynikające ze zniszczeń oraz innych zdarzeń w odniesieniu do robót, materiałów
              sprzętu i innego mienia ruchomego związanego z prowadzeniem robót podczas realizacji
              przedmiotu niniejszej umowy; 3) szkody w robotach spowodowane przez niego przy usuwaniu
              wad w okresie gwarancji i rękojmi; 4) niewłaściwe zabezpieczenie terenu budowy oraz
              dopuszczenie na teren budowy osób nieupoważnionych. 6. Zamawiający, zgodnie z zapisami
              art. 99 ust. 5 i art. 101 ust. 4 ustawy Pzp, dopuszcza rozwiązania równoważne dla robót,
              materiałów, systemów spełniające obowiązujące standardy i wymagania. Zamawiający
              zastrzega, że wszędzie tam, gdzie w treści opisu przedmiotu zamówienia, stanowiącego opis
              przedmiotu zamówienia, zostały w opisie tego przedmiotu wskazane znaki towarowe, patenty
              lub pochodzenie urządzeń lub materiałów należy je traktować wyłącznie jako propozycje
              projektanta. Zamawiający dopuszcza metody, materiały, urządzenia, systemy, technologie itp.
              równoważne do przedstawionych w opisie przedmiotu zamówienia. Dopuszcza się więc
              zaproponowanie w ofercie wszelkich równoważnych odpowiedników rynkowych o
              właściwościach nie gorszych niż wskazane przez Zamawiającego. Parametry wskazanego
              standardu określają minimalne warunki techniczne, eksploatacyjne, użytkowe, jakościowe i
              funkcjonalne, jakie ma spełniać przedmiot zamówienia. W ofercie można przyjąć metody,
              materiały, urządzenia, systemy, technologie itp. innych marek i producentów, jednak o
              parametrach technicznych, jakościowych i właściwościach użytkowych oraz funkcjonalnych
              odpowiadających metodom, materiałom, urządzeniom, systemom, technologiom itp. opisanym

674195-2026                                                                                        Page 7/27
              w SWZ. Ponadto zamienne urządzenia przyjęte do wyceny: winny spełniać funkcję, jakiej mają
              służyć, winny być kompatybilne z pozostałymi urządzeniami, aby zespół urządzeń dawał
              zamierzony efekt, nie mogą wpływać na zmianę rodzaju i zakresu robót budowlanych. Na
              żądanie Zamawiającego, Wykonawca ma obowiązek udowodnienia, iż zastosowane
              rozwiązania równoważne pozwolą osiągnąć wszystkie założenia techniczne dla
              przedmiotowego zadania inwestycyjnego, biorąc pod uwagę całość inwestycji, a nie wybrany
              fragment całości. Ciężar udowodnienia, że materiał lub urządzenie jest równoważne w
              stosunku do wymogu określonego przez Zamawiającego spoczywa na Wykonawcy. Jeżeli
              materiały lub/i urządzenia zaoferowane przez Wykonawcę jako równoważne nie będą
              równoważne w świetle przedłożonych przez Wykonawcę dokumentów, oferta tego
              Wykonawcy zostanie odrzucona jako nieodpowiadająca treści SWZ. W przypadku zaś
              opisania przedmiotu zamówienia przez odniesienie do norm, europejskich ocen technicznych,
              aprobat, specyfikacji technicznych i systemów referencji technicznych, Zamawiający
              dopuszcza wykonanie zamówienia z zastosowaniem rozwiązań równoważnych opisywanym.
              W takim wypadku, procedurę opisaną na wstępie niniejszego punktu stosuje się odpowiednio.
              7. Dalsze zapisy w SWZ.
              Internal identifier: Część zamówienia nr 1

     5.1.1. Purpose
            Main nature of the contract: Works
            Main classification (cpv): 45000000 Construction work
            Additional classification (cpv): 45331110 Boiler installation work, 45453000 Overhaul and
            refurbishment work, 71321200 Heating-system design services, 71300000 Engineering
            services, 45331100 Central-heating installation work, 45331000 Heating, ventilation and air-
            conditioning installation work, 45300000 Building installation work, 45400000 Building
            completion work, 45450000 Other building completion work, 45330000 Plumbing and sanitary
            works, 45331000 Heating, ventilation and air-conditioning installation work

     5.1.2. Place of performance
            Country subdivision (NUTS): Radomski (PL921)
            Country: Poland

     5.1.3. Estimated duration
            Start date: 01/12/2026
            Duration end date: 30/06/2027

     5.1.6. General information
            Reserved participation:
            Participation is not reserved.
            Procurement Project fully or partially financed with EU Funds.
            Information about European Union funds:
            Identifier of EU funds: Przedmiotowe zamówienie jest realizowane jest w ramach projektu pn.:
            „Innowacyjne rozwiązania dotyczące Energii elektrycznej i cieplnej Wieniawskiego Klastra
            Energii”, dofinansowanego z Inwestycji B2.2.2 Krajowego Planu Odbudowy i Zwiększania
            Odporności (KPO).
            The procurement is covered by the Government Procurement Agreement (GPA): no
            Additional information: Zamawiający wskazuje datę początkową terminu realizacji zamówienia
            wyłącznie z przyczyn technicznych, bowiem formularz ogłoszenia o zamówieniu nie daje
            możliwości wskazania jedynie daty końcowej terminu realizacji zamówienia.

     5.1.9. Selection criteria
            Sources of selection criteria: Notice

674195-2026                                                                                        Page 8/27
              Criterion: References on specified works
              Description of selection criterion: Warunek dotyczący zdolności zawodowej zostanie
              spełniony, jeżeli Wykonawca wykaże, że w okresie ostatnich pięciu lat przed upływem terminu
              składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, wykonał
              co najmniej: a) 2 (dwa) zadania polegające na budowie, rozbudowie, przebudowie lub
              modernizacji kotłowni zasilanych biomasą, przy czym każde z tych zadań musi obejmować
              swoim zakresem budowę dedykowanego magazynu paliwa (biomasy), a co najmniej jedno z
              tych zadań obejmować kotłownię o mocy nie mniejszej niż 300 kW. i b) 1 (jedna) zadanie
              polegające na budowie, rozbudowie, przebudowie lub modernizacji sieci cieplnej wraz z
              przyłączami o długości co najmniej 1000 m.b., i c) 2 (dwa) zadania polegające na opracowaniu
              dokumentacji projektowej dla instalacji grzewczych wytwarzających energię z biomasy, przy
              czym każda z tych usług (umów) musiała obejmować projektowanie źródeł ciepła o łącznej
              mocy grzewczej nie mniejszej niż 0,5 MW, i d) dostawę i montaż co najmniej 90 węzłów
              cieplnych, realizowanych w jednym lub kilku zadaniach w okresie ostatnich 5 lat, przy czym co
              najmniej jedno zadanie musi obejmować dostawę i montaż minimum 30 węzłów, i e) 1 (jedna)
              zadanie polegające na uruchomieniu zdalnego systemu monitoringu i telemetrii dla co
              najmniej 26 węzłów cieplnych, i f) 1 (jedno) zadanie obejmujące zaprojektowanie, dostawę i
              uruchomienie jednego zintegrowanego systemu zarządzania i monitorowania energią (EMS
              /BMS), nadzorującego w czasie rzeczywistym współpracę rozproszonych instalacji zasilanych
              z OZE, z zastrzeżeniem, że system musi obejmować monitoring dla łącznie co najmniej 200
              instalacji zasilanych z OZE. Zamawiający wymaga, aby w/w roboty budowlane zostały
              wykonane należycie. Dokumenty i oświadczenia wymagane od Wykonawcy na potwierdzenie
              spełniania warunków udziału w postępowaniu (dla wszystkich części zamówienia): 1) wykaz
              robót budowlanych wykonanych nie wcześniej niż w okresie ostatnich pięciu lat przed
              upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym
              okresie, wraz z podaniem ich wartości, przedmiotu, dat wykonania i podmiotów, na rzecz
              których roboty te zostały wykonane – załącznik nr 5 do SWZ, oraz załączenie dowodów
              określających, czy te roboty budowlane zostały wykonane należycie, przy czym dowodami, o
              których mowa, są referencje bądź inne dokumenty sporządzone przez podmiot, na rzecz
              którego roboty budowlane zostały wykonane, a jeżeli wykonawca z przyczyn niezależnych od
              niego nie jest w stanie uzyskać tych dokumentów - inne odpowiednie dokumenty.

              Criterion: Number of managerial staff
              Description of selection criterion: Warunek dotyczący zdolności zawodowej zostanie
              spełniony, jeżeli wykonawca wykaże, iż dysponuje osobą zdolną do wykonania zamówienia,
              tj.: a) Projektant branży instalacyjnej - kwalifikacje i umiejętności: uprawnienia do
              projektowania w specjalności instalacyjnej w zakresie sieci, instalacji i urządzeń cieplnych,
              wentylacyjnych, gazowych, wodociągowych i kanalizacyjnych bez ograniczeń, uprawniającymi
              do projektowania obiektu budowlanego związanego z obiektem budowlanym stanowiącym
              przedmiot zamówienia* oraz przynależność do Okręgowej Izby Budownictwa, b) Kierownik
              Budowy: - kwalifikacje i umiejętności: uprawnienia do kierowania robotami budowlanymi w
              specjalności sieci, instalacji i urządzeń cieplnych, wentylacyjnych, gazowych, wodociągowych i
              kanalizacyjnych bez ograniczeń, uprawniającymi do kierowania robotami budowlanymi
              związanymi z obiektem budowlanym stanowiącym przedmiot zamówienia* oraz przynależność
              do Okręgowej Izby Budownictwa, - Doświadczenie zawodowe: doświadczenie zawodowe
              obejmujące pełnienie funkcji kierownika budowy lub kierownika robót przy realizacji co
              najmniej 2 (dwóch) odrębnych zadań polegających na budowie, rozbudowie lub modernizacji
              kotłowni zasilanych biomasą o mocy nie mniejszej niż 300 kW każda, przy czym każde z tych
              zadań musi obejmować równoczesną budowę sieci cieplnej o długości nie mniejszej niż 200
              metrów. * dopuszcza się odpowiadające tym uprawnieniom uprawnienia budowlane, które

674195-2026                                                                                           Page 9/27
              zostały wydane na podstawie wcześniej obowiązujących przepisów oraz odpowiadające im
              uprawnienia wydane obywatelom państw Europejskiego Porozumienia o Wolnym Handlu
              (EFTA) – stron umowy o Europejskim Obszarze Gospodarczym oraz Konfederacji
              Szwajcarskiej, z zastrzeżeniem art. 12a oraz innych przepisów ustawy Prawo budowlane oraz
              ustawy z dnia 22 grudnia 2015 r. o zasadach uznawania kwalifikacji zawodowych nabytych w
              państwach członkowskich Unii Europejskiej (t.j. Dz. U. z 2026 r. poz. 166). Zamawiający
              dopuszcza możliwości łączenia funkcji specjalistów przez jedną osobę, pod warunkiem, że
              osoba ta spełnia warunki dla wszystkich łączonych funkcji. Dokumenty i oświadczenia
              wymagane od Wykonawcy na potwierdzenie spełniania warunków udziału w postępowaniu
              (dla wszystkich części zamówienia): 1) wykaz osób, skierowanych przez wykonawcę do
              realizacji zamówienia publicznego, w szczególności odpowiedzialnych za świadczenie usług,
              kontrolę jakości lub kierowanie robotami budowlanymi, wraz z informacjami na temat ich
              kwalifikacji zawodowych, uprawnień, doświadczenia niezbędnych do wykonania Zamówienia,
              a także zakresu wykonywanych przez te osoby czynności oraz informacją o podstawie do
              dysponowania tymi osobami – załącznik nr 6 do SWZ.

   5.1.10. Award criteria
           Criterion:
           Type: Price
           Description: Najniższa Cena
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 50
           Criterion:
           Type: Quality
           Description: Sprawność kotła
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 5
           Criterion:
           Type: Quality
           Description: Emisja pyłu
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 2,5
           Criterion:
           Type: Quality
           Description: Emisja OGC
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 2,5
           Criterion:
           Type: Quality
           Description: Gwarancja producenta dotycząca dobrego wykonania, uruchomienia i przeglądu
           od producenta
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 5
           Criterion:
           Type: Quality
           Description: Posiadanie certyfikatów przez producenta
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 3
           Criterion:
           Type: Quality

674195-2026                                                                                     Page 10/27
              Description: Analiza ryzyka TÜV
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 5
              Criterion:
              Type: Quality
              Description: Przystosowanie do pracy pod nadciśnieniem
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2
              Criterion:
              Type: Quality
              Description: Wyposażenie w system wykorzystania energii reaktywnej (biernej)
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Wyposażenie w system suchej puryfikacji (oczyszczania) gazu
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Systemy Zarządzania producenta rur preizolowanych
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 7,5
              Criterion:
              Type: Quality
              Description: Systemy Zarządzania producenta węzłów cieplnych
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 12,5

   5.1.11. Procurement documents
           Address of the procurement documents: https://ezamowienia.gov.pl/mp-client/search/list/ocds-
           148610-2c2a0486-4d87-4dcf-90af-910e50d175a1

   5.1.12. Terms of procurement
           Terms of submission:
           Electronic submission: Required
           Address for submission: https://ezamowienia.gov.pl/mp-client/search/list/ocds-148610-
           2c2a0486-4d87-4dcf-90af-910e50d175a1
           Languages in which tenders or requests to participate may be submitted: Polish
           Electronic catalogue: Not allowed
           Description of the financial guarantee: 1. Zamawiający przewiduje obowiązek wniesienia
           wadium przed upływem terminu składania ofert, w wysokości dla części zamówienia nr 1 –
           150 000,00 PLN (słownie: sto pięćdziesiąt tysięcy złotych 00/100). 2. Wadium może być
           wniesione w jednej lub kilku następujących formach: 1) pieniądzu (w tytule przelewu należy
           podać nr sprawy: ZP.2710.15.2026 oraz numer części zamówienia); 2) gwarancjach
           bankowych; 3) gwarancjach ubezpieczeniowych; 4) poręczeniach udzielanych przez podmioty,
           o których mowa w art. 6b ust. 5 pkt 2 ustawy z dnia 9 listopada 2000 r. o utworzeniu polskiej
           Agencji Rozwoju Przedsiębiorczości (t.j. Dz. U. z 2025 r. poz. 98). 3. Wadium wnoszone w
           pieniądzu należy wpłacać przelewem na rachunek bankowy Zamawiającego w Banku
           Spółdzielczym w Przysusze O/Wieniawa, nr rachunku: 05 9145 1040 2000 0055 2000 0032. 4.


674195-2026                                                                                     Page 11/27
              Terminowe wniesienie wadium w formie pieniężnej oznacza, że żądana przez Zamawiającego
              kwota została wpłacona w pełnej wysokości przelewem na wskazany przez niego rachunek
              bankowy. Oznacza to, że wniesienie wadium w tej postaci jest skuteczne dopiero z chwilą
              uznania rachunku Zamawiającego kwotą wadium przed upływem terminu składania ofert. 5. W
              przypadku wniesienia wadium w formie gwarancji lub poręczenia, o których mowa w ust. 3,
              Wykonawca przekazuje Zamawiającemu oryginał gwarancji lub poręczenia w postaci
              elektronicznej, do upływu terminu składania ofert. Zaleca się gwarancję lub poręczenie, o
              których mowa powyżej, dołączyć do dokumentów składanych wraz z ofertą. 6. Wadium
              wniesione w formie poręczeń lub gwarancji będzie akceptowane przez Zamawiającego, jeżeli
              będzie zawierać wszystkie określone ustawą Pzp przypadki utraty wadium przez Wykonawcę,
              klauzulę o nieodwołalności oraz zapewnienie bezwarunkowej wypłaty przez gwaranta na
              pierwsze pisemne żądanie Zamawiającego, pełnej kwoty wadium w przypadkach
              wymienionych w art. 98 ust. 6 ustawy Pzp. 7. Oferta niezabezpieczona wadium zostanie
              odrzucona. Dalsze zapisy w SWZ.
              Deadline for receipt of tenders: 14/10/2026 09:00:00 (UTC+02:00) Eastern European Time,
              Central European Summer Time
              Duration during which the tender must remain valid: 90 Days
              Information about public opening:
              Opening date: 14/10/2026 11:00:00 (UTC+02:00) Eastern European Time, Central European
              Summer Time
              Terms of contract:
              The execution of the contract must be performed within the framework of sheltered
              employment programmes: No
              Electronic invoicing: Required
              Electronic ordering will be used: no
              Electronic payment will be used: yes

   5.1.15. Techniques
           Framework agreement:
           No framework agreement
           Information about the dynamic purchasing system:
           No dynamic purchase system

   5.1.16. Further information, mediation and review
           Mediation organisation: Krajowa Izba Odwoławcza
           Review organisation: Krajowa Izba Odwoławcza
           Information about review deadlines: 1. Wykonawcom, a także innemu podmiotowi, jeżeli ma
           lub miał interes w uzyskaniu zamówienia oraz poniósł lub może ponieść szkodę w wyniku
           naruszenia przez Zamawiającego przepisów ustawy Pzp, przysługują środki ochrony prawnej
           przewidziane w art. 505 i następnych ustawy Pzp. Środki ochrony prawnej wobec ogłoszenia
           wszczynającego postępowanie o udzielenie zamówienia oraz dokumentów zamówienia
           przysługują również organizacjom wpisanym na listę, o której mowa w art. 469 pkt 15 ustawy
           Pzp oraz Rzecznikowi Małych i Średnich Przedsiębiorców. 2. Wobec niezgodnej z przepisami
           ustawy Pzp czynności Zamawiającego podjętej w postępowaniu, w tym na projektowane
           postanowienie umowy, lub w przypadku zaniechania przez Zamawiającego dokonania
           czynności, do których podjęcia zobowiązany jest Zamawiający przepisami ustawy Pzp lub w
           przypadku zaniechania przeprowadzenia postępowania o udzielenie zamówienia na
           podstawie ustawy Pzp, mimo że Zamawiający był do tego obowiązany, Wykonawca może
           wnieść odwołanie. 3. Odwołanie wnosi się do Prezesa Izby w formie pisemnej, w formie
           elektronicznej albo w postaci elektronicznej z tym, że odwołanie i przystąpienie do


674195-2026                                                                                     Page 12/27
              postępowania odwoławczego, wniesione w postaci elektronicznej, wymagają opatrzenia
              podpisem zaufanym. 4. Odwołujący przekazuje Zamawiającemu odwołanie wniesione w
              formie elektronicznej albo postaci elektronicznej albo kopię tego odwołania, jeżeli zostało ono
              wniesione w formie pisemnej, przed upływem terminu do wniesienia odwołania w taki sposób,
              aby mógł on zapoznać się z jego treścią przed upływem tego terminu. 5. Odwołanie wnosi się
              w terminie: 1) 10 dni od dnia przekazania informacji o czynności Zamawiającego stanowiącej
              podstawę jego wniesienia, jeżeli informacja została przekazana przy użyciu środków
              komunikacji elektronicznej; 2) 15 dni od dnia przekazania informacji o czynności
              Zamawiającego stanowiącej podstawę jego wniesienia, jeżeli informacja została przekazana w
              sposób inny niż określony w ppkt 1). 6. Odwołanie wobec treści ogłoszenia o zamówieniu lub
              wobec treści dokumentów zamówienia wnosi się w terminie 10 dni od dnia publikacji
              ogłoszenia w Dzienniku Urzędowym Unii Europejskiej lub zamieszczenia dokumentów
              zamówienia na stronie internetowej Zamawiającego. 7. Odwołanie w przypadkach innych niż
              określone w pkt 5 i 6 wnosi się w terminie 10 dni od dnia, w którym powzięto lub przy
              zachowaniu należytej staranności można było powziąć wiadomość o okolicznościach
              stanowiących podstawę jego wniesienia. 8. Jeżeli Zamawiający nie opublikował ogłoszenia o
              zamiarze zawarcia umowy lub mimo takiego obowiązku nie przesłał Wykonawcy
              zawiadomienia o wyborze najkorzystniejszej oferty, odwołanie wnosi się nie później niż w
              terminie: 1) 30 dni od dnia publikacji w Dzienniku Urzędowym Unii Europejskiej ogłoszenia o
              udzieleniu zamówienia, 2) 6 miesięcy od dnia zawarcia umowy, jeżeli Zamawiający nie
              opublikował w Dzienniku Urzędowym Unii Europejskiej ogłoszenia o udzieleniu zamówienia. 9.
              Na orzeczenie Krajowej Izby Odwoławczej oraz postanowienie Prezesa Izby, stronom oraz
              uczestnikom postępowania odwoławczego przysługuje skarga do sądu. Szczegółowo kwestie
              dotyczące skargi do sądu uregulowane zostały w art. 579-590 ustawy Pzp.
              Organisation providing more information on the review procedures: Krajowa Izba Odwoławcza

      5.1. Lot: LOT-0002
           Title: Utworzenie magazynu na zrębki drzewne wraz z budynkiem kotłowni, dostawę i montaż
           kotła, utworzenie kogeneracji wraz z systemem przygotowania paliwa, utworzenie sieci i
           węzłów ciepłowniczych oraz utworzenie magazynu ciepła o pojemności 3,5 MWh w
           miejscowości Sokolniki Mokre
           Description: 1. W ramach części zamówienia nr 2 – Wykonawca zobowiązany będzie: 1)
           wykonać dokumentację(e) projektową(e), w tym Projekt(y) Budowalny(e), Projekt(y)
           Techniczny(e) i Projekt(y) Wykonawczy(e), kosztorys(y) wraz z przedmiarem(ami) robót,
           specyfikację techniczną wykonania i odbioru robót wraz z uzyskaniem prawomocnej(ych)
           decyzji o pozwoleniu na budowę albo zgłoszenia(eń) robót – dla całego zakresu opisanego w
           Programie Funkcjonalno–Użytkowym, a także przygotować do zatwierdzenia przez
           Zamawiającego Harmonogram budowy; 2) wykonać roboty budowlane, w oparciu o
           opracowaną(e) i zaakceptowaną(e) przez Zamawiającego dokumentację(e) projektowo-
           kosztorysową(e), o której(ych) mowa w pkt 1) powyżej, i uzyskaną(e) prawomocną(e) decyzję
           (e) o pozwoleniu na budowę albo zgłoszenie(a) robót oraz uzyskać prawomocne pozwolenie
           (a) na użytkowania albo zgłoszenie(a) zakończenia robót (o ile dotyczy); 3) wykonać
           wdrożenie systemu zarządzania energią, monitorowania, zarządzania produkcją i dystrybucją
           energii, optymalizacji, integracji systemów pomiarowych, raportowania i analizy danych. 2.
           Szczegóły zakres przedmiotu niniejszego zamówienia precyzują dla części zamówienia nr 2 –
           załącznik nr 8 do SWZ – Program Funkcjonalno-Użytkowy, właściwy dla tych części
           zamówienia, zaś wymogi dotyczące realizacji zamówienia załącznik nr 9a do SWZ – Projekt
           umowy. 3. Pożądane jest, aby przed złożeniem Oferty Wykonawca przeprowadził wizję
           lokalną terenów, na których zlokalizowane będą roboty objęte przedmiotem niniejszego
           zamówienia. Przeprowadzenie wizji nie jest warunkiem dla złożenia oferty w niniejszym

674195-2026                                                                                          Page 13/27
              postępowaniu. Koszty dokonania wizji lokalnej terenu budowy poniesie Wykonawca. 4. Roboty
              budowlane stanowiące przedmiot niniejszego zamówienia należy wykonać zgodnie z niniejszą
              SWZ, Opisem Przedmiotu Zamówienia (OPZ), Projektem Umowy oraz zgodnie z zasadami
              sztuki budowlanej, wiedzy technicznej, obowiązującymi przepisami i normami. Zobowiązanie
              wykonania robót zgodnie z powyższymi dokumentami nie zwalnia Wykonawcy m. in. od
              obowiązku weryfikacji tej dokumentacji w trakcie trwania umowy i zgłaszania Zamawiającemu
              wykrytych w niej wad czy uchybień skutkujących możliwością niedochowania warunków
              umowy lub naruszeniem przepisów prawa. 5. Od dnia odbioru placu budowy Wykonawca
              odpowiada za wszystkie zdarzenia, które zaistnieją podczas wykonywania umowy. Za
              wszystkie wyrządzone komukolwiek szkody podczas budowy lub w związku z budową
              odpowiada Wykonawca, chyba, że nie zachodzi związek przyczynowy pomiędzy
              prowadzeniem robót a wyrządzoną szkodą. Wykonawca przyjmie odpowiedzialność w
              szczególności za: 1) szkody i następstwa nieszczęśliwych wypadków dotyczących
              pracowników Wykonawcy oraz osób trzecich przebywających w rejonie prowadzonych robót;
              2) szkody wynikające ze zniszczeń oraz innych zdarzeń w odniesieniu do robót, materiałów
              sprzętu i innego mienia ruchomego związanego z prowadzeniem robót podczas realizacji
              przedmiotu niniejszej umowy; 3) szkody w robotach spowodowane przez niego przy usuwaniu
              wad w okresie gwarancji i rękojmi; 4) niewłaściwe zabezpieczenie terenu budowy oraz
              dopuszczenie na teren budowy osób nieupoważnionych. 6. Zamawiający, zgodnie z zapisami
              art. 99 ust. 5 i art. 101 ust. 4 ustawy Pzp, dopuszcza rozwiązania równoważne dla robót,
              materiałów, systemów spełniające obowiązujące standardy i wymagania. Zamawiający
              zastrzega, że wszędzie tam, gdzie w treści opisu przedmiotu zamówienia, stanowiącego opis
              przedmiotu zamówienia, zostały w opisie tego przedmiotu wskazane znaki towarowe, patenty
              lub pochodzenie urządzeń lub materiałów należy je traktować wyłącznie jako propozycje
              projektanta. Zamawiający dopuszcza metody, materiały, urządzenia, systemy, technologie itp.
              równoważne do przedstawionych w opisie przedmiotu zamówienia. Dopuszcza się więc
              zaproponowanie w ofercie wszelkich równoważnych odpowiedników rynkowych o
              właściwościach nie gorszych niż wskazane przez Zamawiającego. Parametry wskazanego
              standardu określają minimalne warunki techniczne, eksploatacyjne, użytkowe, jakościowe i
              funkcjonalne, jakie ma spełniać przedmiot zamówienia. W ofercie można przyjąć metody,
              materiały, urządzenia, systemy, technologie itp. innych marek i producentów, jednak o
              parametrach technicznych, jakościowych i właściwościach użytkowych oraz funkcjonalnych
              odpowiadających metodom, materiałom, urządzeniom, systemom, technologiom itp. opisanym
              w SWZ. Ponadto zamienne urządzenia przyjęte do wyceny: winny spełniać funkcję, jakiej mają
              służyć, winny być kompatybilne z pozostałymi urządzeniami, aby zespół urządzeń dawał
              zamierzony efekt, nie mogą wpływać na zmianę rodzaju i zakresu robót budowlanych. Na
              żądanie Zamawiającego, Wykonawca ma obowiązek udowodnienia, iż zastosowane
              rozwiązania równoważne pozwolą osiągnąć wszystkie założenia techniczne dla
              przedmiotowego zadania inwestycyjnego, biorąc pod uwagę całość inwestycji, a nie wybrany
              fragment całości. Ciężar udowodnienia, że materiał lub urządzenie jest równoważne w
              stosunku do wymogu określonego przez Zamawiającego spoczywa na Wykonawcy. Jeżeli
              materiały lub/i urządzenia zaoferowane przez Wykonawcę jako równoważne nie będą
              równoważne w świetle przedłożonych przez Wykonawcę dokumentów, oferta tego
              Wykonawcy zostanie odrzucona jako nieodpowiadająca treści SWZ. W przypadku zaś
              opisania przedmiotu zamówienia przez odniesienie do norm, europejskich ocen technicznych,
              aprobat, specyfikacji technicznych i systemów referencji technicznych, Zamawiający
              dopuszcza wykonanie zamówienia z zastosowaniem rozwiązań równoważnych opisywanym.
              W takim wypadku, procedurę opisaną na wstępie niniejszego punktu stosuje się odpowiednio.
              7. Dalsze zapisy w SWZ.
              Internal identifier: Część zamówienia nr 2

674195-2026                                                                                      Page 14/27
     5.1.1. Purpose
            Main nature of the contract: Works
            Main classification (cpv): 45000000 Construction work
            Additional classification (cpv): 45331110 Boiler installation work, 45453000 Overhaul and
            refurbishment work, 71321200 Heating-system design services, 71300000 Engineering
            services, 45331100 Central-heating installation work, 45331000 Heating, ventilation and air-
            conditioning installation work, 45300000 Building installation work, 45400000 Building
            completion work, 45450000 Other building completion work, 45330000 Plumbing and sanitary
            works, 45331000 Heating, ventilation and air-conditioning installation work

     5.1.2. Place of performance
            Country subdivision (NUTS): Radomski (PL921)
            Country: Poland

     5.1.3. Estimated duration
            Start date: 01/12/2026
            Duration end date: 30/06/2027

     5.1.6. General information
            Reserved participation:
            Participation is not reserved.
            Procurement Project fully or partially financed with EU Funds.
            Information about European Union funds:
            Identifier of EU funds: Przedmiotowe zamówienie jest realizowane jest w ramach projektu pn.:
            „Innowacyjne rozwiązania dotyczące Energii elektrycznej i cieplnej Wieniawskiego Klastra
            Energii”, dofinansowanego z Inwestycji B2.2.2 Krajowego Planu Odbudowy i Zwiększania
            Odporności (KPO).
            The procurement is covered by the Government Procurement Agreement (GPA): no
            Additional information: Zamawiający wskazuje datę początkową terminu realizacji zamówienia
            wyłącznie z przyczyn technicznych, bowiem formularz ogłoszenia o zamówieniu nie daje
            możliwości wskazania jedynie daty końcowej terminu realizacji zamówienia.

     5.1.9. Selection criteria
            Sources of selection criteria: Notice
            Criterion: References on specified works
            Description of selection criterion: Warunek dotyczący zdolności zawodowej zostanie
            spełniony, jeżeli Wykonawca wykaże, że w okresie ostatnich pięciu lat przed upływem terminu
            składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, wykonał
            co najmniej: a) 2 (dwa) zadania polegające na budowie, rozbudowie, przebudowie lub
            modernizacji kotłowni zasilanych biomasą, przy czym każde z tych zadań musi obejmować
            swoim zakresem budowę dedykowanego magazynu paliwa (biomasy), a co najmniej jedno z
            tych zadań obejmować kotłownię o mocy nie mniejszej niż 300 kW. i b) 1 (jedna) zadanie
            polegające na budowie, rozbudowie, przebudowie lub modernizacji sieci cieplnej wraz z
            przyłączami o długości co najmniej 1000 m.b., i c) 2 (dwa) zadania polegające na opracowaniu
            dokumentacji projektowej dla instalacji grzewczych wytwarzających energię z biomasy, przy
            czym każda z tych usług (umów) musiała obejmować projektowanie źródeł ciepła o łącznej
            mocy grzewczej nie mniejszej niż 0,5 MW, i d) dostawę i montaż co najmniej 25 węzłów
            cieplnych, realizowanych w jednym zadaniu, i e) 1 (jedna) zadanie polegające na
            uruchomieniu zdalnego systemu monitoringu i telemetrii dla co najmniej 15 węzłów cieplnych.
            Zamawiający wymaga, aby w/w roboty budowlane zostały wykonane należycie. Dokumenty i
            oświadczenia wymagane od Wykonawcy na potwierdzenie spełniania warunków udziału w

674195-2026                                                                                       Page 15/27
              postępowaniu (dla wszystkich części zamówienia): 1) wykaz robót budowlanych wykonanych
              nie wcześniej niż w okresie ostatnich pięciu lat przed upływem terminu składania ofert, a jeżeli
              okres prowadzenia działalności jest krótszy – w tym okresie, wraz z podaniem ich wartości,
              przedmiotu, dat wykonania i podmiotów, na rzecz których roboty te zostały wykonane –
              załącznik nr 5 do SWZ, oraz załączenie dowodów określających, czy te roboty budowlane
              zostały wykonane należycie, przy czym dowodami, o których mowa, są referencje bądź inne
              dokumenty sporządzone przez podmiot, na rzecz którego roboty budowlane zostały
              wykonane, a jeżeli wykonawca z przyczyn niezależnych od niego nie jest w stanie uzyskać
              tych dokumentów - inne odpowiednie dokumenty.

              Criterion: Number of managerial staff
              Description of selection criterion: Warunek dotyczący zdolności zawodowej zostanie
              spełniony, jeżeli wykonawca wykaże, iż dysponuje osobą zdolną do wykonania zamówienia,
              tj.: a) Projektant branży instalacyjnej - kwalifikacje i umiejętności: uprawnienia do
              projektowania w specjalności instalacyjnej w zakresie sieci, instalacji i urządzeń cieplnych,
              wentylacyjnych, gazowych, wodociągowych i kanalizacyjnych bez ograniczeń, uprawniającymi
              do projektowania obiektu budowlanego związanego z obiektem budowlanym stanowiącym
              przedmiot zamówienia* oraz przynależność do Okręgowej Izby Budownictwa, b) Kierownik
              Budowy: - kwalifikacje i umiejętności: uprawnienia do kierowania robotami budowlanymi w
              specjalności sieci, instalacji i urządzeń cieplnych, wentylacyjnych, gazowych, wodociągowych i
              kanalizacyjnych bez ograniczeń, uprawniającymi do kierowania robotami budowlanymi
              związanymi z obiektem budowlanym stanowiącym przedmiot zamówienia* oraz przynależność
              do Okręgowej Izby Budownictwa, - Doświadczenie zawodowe: doświadczenie zawodowe
              obejmujące pełnienie funkcji kierownika budowy lub kierownika robót przy realizacji co
              najmniej 2 (dwóch) odrębnych zadań polegających na budowie, rozbudowie lub modernizacji
              kotłowni zasilanych biomasą o mocy nie mniejszej niż 300 kW każda, przy czym każde z tych
              zadań musi obejmować równoczesną budowę sieci cieplnej o długości nie mniejszej niż 200
              metrów. * dopuszcza się odpowiadające tym uprawnieniom uprawnienia budowlane, które
              zostały wydane na podstawie wcześniej obowiązujących przepisów oraz odpowiadające im
              uprawnienia wydane obywatelom państw Europejskiego Porozumienia o Wolnym Handlu
              (EFTA) – stron umowy o Europejskim Obszarze Gospodarczym oraz Konfederacji
              Szwajcarskiej, z zastrzeżeniem art. 12a oraz innych przepisów ustawy Prawo budowlane oraz
              ustawy z dnia 22 grudnia 2015 r. o zasadach uznawania kwalifikacji zawodowych nabytych w
              państwach członkowskich Unii Europejskiej (t.j. Dz. U. z 2026 r. poz. 166). Zamawiający
              dopuszcza możliwości łączenia funkcji specjalistów przez jedną osobę, pod warunkiem, że
              osoba ta spełnia warunki dla wszystkich łączonych funkcji. Dokumenty i oświadczenia
              wymagane od Wykonawcy na potwierdzenie spełniania warunków udziału w postępowaniu
              (dla wszystkich części zamówienia): 1) wykaz osób, skierowanych przez wykonawcę do
              realizacji zamówienia publicznego, w szczególności odpowiedzialnych za świadczenie usług,
              kontrolę jakości lub kierowanie robotami budowlanymi, wraz z informacjami na temat ich
              kwalifikacji zawodowych, uprawnień, doświadczenia niezbędnych do wykonania Zamówienia,
              a także zakresu wykonywanych przez te osoby czynności oraz informacją o podstawie do
              dysponowania tymi osobami – załącznik nr 6 do SWZ.

   5.1.10. Award criteria
           Criterion:
           Type: Price
           Description: Najniższa Cena
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 50

674195-2026                                                                                            Page 16/27
              Criterion:
              Type: Quality
              Description: Sprawność kotła
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 5
              Criterion:
              Type: Quality
              Description: Emisja pyłu
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Emisja OGC
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Gwarancja producenta dotycząca dobrego wykonania, uruchomienia i przeglądu
              od producenta
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 5
              Criterion:
              Type: Quality
              Description: Posiadanie certyfikatów przez producenta
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 3
              Criterion:
              Type: Quality
              Description: Analiza ryzyka TÜV
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 5
              Criterion:
              Type: Quality
              Description: Przystosowanie do pracy pod nadciśnieniem
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2
              Criterion:
              Type: Quality
              Description: Wyposażenie w system wykorzystania energii reaktywnej (biernej)
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Wyposażenie w system suchej puryfikacji (oczyszczania) gazu
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Systemy Zarządzania producenta rur preizolowanych
              Category of award weight criterion: Weight (percentage, exact)

674195-2026                                                                                    Page 17/27
              Award criterion number: 7,5
              Criterion:
              Type: Quality
              Description: Systemy Zarządzania producenta węzłów cieplnych
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 12,5

   5.1.11. Procurement documents
           Address of the procurement documents: https://ezamowienia.gov.pl/mp-client/search/list/ocds-
           148610-2c2a0486-4d87-4dcf-90af-910e50d175a1

   5.1.12. Terms of procurement
           Terms of submission:
           Electronic submission: Required
           Address for submission: https://ezamowienia.gov.pl/mp-client/search/list/ocds-148610-
           2c2a0486-4d87-4dcf-90af-910e50d175a1
           Languages in which tenders or requests to participate may be submitted: Polish
           Electronic catalogue: Not allowed
           Description of the financial guarantee: 1. Zamawiający przewiduje obowiązek wniesienia
           wadium przed upływem terminu składania ofert, w wysokości dla części zamówienia nr 2 –
           120 000,00 PLN (słownie: sto dwadzieścia tysięcy złotych 00/100). 2. Wadium może być
           wniesione w jednej lub kilku następujących formach: 1) pieniądzu (w tytule przelewu należy
           podać nr sprawy: ZP.2710.15.2026 oraz numer części zamówienia); 2) gwarancjach
           bankowych; 3) gwarancjach ubezpieczeniowych; 4) poręczeniach udzielanych przez podmioty,
           o których mowa w art. 6b ust. 5 pkt 2 ustawy z dnia 9 listopada 2000 r. o utworzeniu polskiej
           Agencji Rozwoju Przedsiębiorczości (t.j. Dz. U. z 2025 r. poz. 98). 3. Wadium wnoszone w
           pieniądzu należy wpłacać przelewem na rachunek bankowy Zamawiającego w Banku
           Spółdzielczym w Przysusze O/Wieniawa, nr rachunku: 05 9145 1040 2000 0055 2000 0032. 4.
           Terminowe wniesienie wadium w formie pieniężnej oznacza, że żądana przez Zamawiającego
           kwota została wpłacona w pełnej wysokości przelewem na wskazany przez niego rachunek
           bankowy. Oznacza to, że wniesienie wadium w tej postaci jest skuteczne dopiero z chwilą
           uznania rachunku Zamawiającego kwotą wadium przed upływem terminu składania ofert. 5. W
           przypadku wniesienia wadium w formie gwarancji lub poręczenia, o których mowa w ust. 3,
           Wykonawca przekazuje Zamawiającemu oryginał gwarancji lub poręczenia w postaci
           elektronicznej, do upływu terminu składania ofert. Zaleca się gwarancję lub poręczenie, o
           których mowa powyżej, dołączyć do dokumentów składanych wraz z ofertą. 6. Wadium
           wniesione w formie poręczeń lub gwarancji będzie akceptowane przez Zamawiającego, jeżeli
           będzie zawierać wszystkie określone ustawą Pzp przypadki utraty wadium przez Wykonawcę,
           klauzulę o nieodwołalności oraz zapewnienie bezwarunkowej wypłaty przez gwaranta na
           pierwsze pisemne żądanie Zamawiającego, pełnej kwoty wadium w przypadkach
           wymienionych w art. 98 ust. 6 ustawy Pzp. 7. Oferta niezabezpieczona wadium zostanie
           odrzucona. Dalsze zapisy w SWZ.
           Deadline for receipt of tenders: 14/10/2026 09:00:00 (UTC+02:00) Eastern European Time,
           Central European Summer Time
           Duration during which the tender must remain valid: 90 Days
           Information about public opening:
           Opening date: 14/10/2026 11:00:00 (UTC+02:00) Eastern European Time, Central European
           Summer Time
           Terms of contract:



674195-2026                                                                                     Page 18/27
              The execution of the contract must be performed within the framework of sheltered
              employment programmes: No
              Electronic invoicing: Required
              Electronic ordering will be used: no
              Electronic payment will be used: yes

   5.1.15. Techniques
           Framework agreement:
           No framework agreement
           Information about the dynamic purchasing system:
           No dynamic purchase system

   5.1.16. Further information, mediation and review
           Mediation organisation: Krajowa Izba Odwoławcza
           Review organisation: Krajowa Izba Odwoławcza
           Information about review deadlines: 1. Wykonawcom, a także innemu podmiotowi, jeżeli ma
           lub miał interes w uzyskaniu zamówienia oraz poniósł lub może ponieść szkodę w wyniku
           naruszenia przez Zamawiającego przepisów ustawy Pzp, przysługują środki ochrony prawnej
           przewidziane w art. 505 i następnych ustawy Pzp. Środki ochrony prawnej wobec ogłoszenia
           wszczynającego postępowanie o udzielenie zamówienia oraz dokumentów zamówienia
           przysługują również organizacjom wpisanym na listę, o której mowa w art. 469 pkt 15 ustawy
           Pzp oraz Rzecznikowi Małych i Średnich Przedsiębiorców. 2. Wobec niezgodnej z przepisami
           ustawy Pzp czynności Zamawiającego podjętej w postępowaniu, w tym na projektowane
           postanowienie umowy, lub w przypadku zaniechania przez Zamawiającego dokonania
           czynności, do których podjęcia zobowiązany jest Zamawiający przepisami ustawy Pzp lub w
           przypadku zaniechania przeprowadzenia postępowania o udzielenie zamówienia na
           podstawie ustawy Pzp, mimo że Zamawiający był do tego obowiązany, Wykonawca może
           wnieść odwołanie. 3. Odwołanie wnosi się do Prezesa Izby w formie pisemnej, w formie
           elektronicznej albo w postaci elektronicznej z tym, że odwołanie i przystąpienie do
           postępowania odwoławczego, wniesione w postaci elektronicznej, wymagają opatrzenia
           podpisem zaufanym. 4. Odwołujący przekazuje Zamawiającemu odwołanie wniesione w
           formie elektronicznej albo postaci elektronicznej albo kopię tego odwołania, jeżeli zostało ono
           wniesione w formie pisemnej, przed upływem terminu do wniesienia odwołania w taki sposób,
           aby mógł on zapoznać się z jego treścią przed upływem tego terminu. 5. Odwołanie wnosi się
           w terminie: 1) 10 dni od dnia przekazania informacji o czynności Zamawiającego stanowiącej
           podstawę jego wniesienia, jeżeli informacja została przekazana przy użyciu środków
           komunikacji elektronicznej; 2) 15 dni od dnia przekazania informacji o czynności
           Zamawiającego stanowiącej podstawę jego wniesienia, jeżeli informacja została przekazana w
           sposób inny niż określony w ppkt 1). 6. Odwołanie wobec treści ogłoszenia o zamówieniu lub
           wobec treści dokumentów zamówienia wnosi się w terminie 10 dni od dnia publikacji
           ogłoszenia w Dzienniku Urzędowym Unii Europejskiej lub zamieszczenia dokumentów
           zamówienia na stronie internetowej Zamawiającego. 7. Odwołanie w przypadkach innych niż
           określone w pkt 5 i 6 wnosi się w terminie 10 dni od dnia, w którym powzięto lub przy
           zachowaniu należytej staranności można było powziąć wiadomość o okolicznościach
           stanowiących podstawę jego wniesienia. 8. Jeżeli Zamawiający nie opublikował ogłoszenia o
           zamiarze zawarcia umowy lub mimo takiego obowiązku nie przesłał Wykonawcy
           zawiadomienia o wyborze najkorzystniejszej oferty, odwołanie wnosi się nie później niż w
           terminie: 1) 30 dni od dnia publikacji w Dzienniku Urzędowym Unii Europejskiej ogłoszenia o
           udzieleniu zamówienia, 2) 6 miesięcy od dnia zawarcia umowy, jeżeli Zamawiający nie
           opublikował w Dzienniku Urzędowym Unii Europejskiej ogłoszenia o udzieleniu zamówienia. 9.


674195-2026                                                                                       Page 19/27
              Na orzeczenie Krajowej Izby Odwoławczej oraz postanowienie Prezesa Izby, stronom oraz
              uczestnikom postępowania odwoławczego przysługuje skarga do sądu. Szczegółowo kwestie
              dotyczące skargi do sądu uregulowane zostały w art. 579-590 ustawy Pzp.
              Organisation providing more information on the review procedures: Krajowa Izba Odwoławcza

      5.1. Lot: LOT-0003
           Title: Budowa instalacji fotowoltaicznych oraz magazynów energii na Budynkach Użyteczności
           Publicznej
           Description: 1. W ramach części zamówienia nr 3 Wykonawca zobowiązany będzie do: 1)
           zaprojektowania i budowy instalacji fotowoltaicznych oraz magazynów energii na Budynkach
           Użyteczności Publicznej; 2) opracowania dokumentacji wykonawczej; 3) dostawy i montażu
           kompletnych instalacji układów fotowoltaicznych wraz magazynami energii oraz podłączenie
           ich do istniejących już systemów energetycznych; 4) wdrożenia systemu zarządzania energią,
           monitorowania, zarządzania produkcją i dystrybucją energii, optymalizacji, integracji systemów
           pomiarowych, raportowania i analizy danych; - w zakresie opisanym w Programie
           Funkcjonalno–Użytkowym 2. Szczegóły zakres przedmiotu niniejszego zamówienia precyzują
           dla części zamówienia nr 3 – załącznik nr 8 do SWZ – Program Funkcjonalno-Użytkowy,
           właściwy dla tych części zamówienia, zaś wymogi dotyczące realizacji zamówienia załącznik
           nr 9b do SWZ – Projekt umowy. 3. Pożądane jest, aby przed złożeniem Oferty Wykonawca
           przeprowadził wizję lokalną terenów, na których zlokalizowane będą roboty objęte
           przedmiotem niniejszego zamówienia. Przeprowadzenie wizji nie jest warunkiem dla złożenia
           oferty w niniejszym postępowaniu. Koszty dokonania wizji lokalnej terenu budowy poniesie
           Wykonawca. 4. Roboty budowlane stanowiące przedmiot niniejszego zamówienia należy
           wykonać zgodnie z niniejszą SWZ, Opisem Przedmiotu Zamówienia (OPZ), Projektem Umowy
           oraz zgodnie z zasadami sztuki budowlanej, wiedzy technicznej, obowiązującymi przepisami i
           normami. Zobowiązanie wykonania robót zgodnie z powyższymi dokumentami nie zwalnia
           Wykonawcy m. in. od obowiązku weryfikacji tej dokumentacji w trakcie trwania umowy i
           zgłaszania Zamawiającemu wykrytych w niej wad czy uchybień skutkujących możliwością
           niedochowania warunków umowy lub naruszeniem przepisów prawa. 5. Od dnia odbioru placu
           budowy Wykonawca odpowiada za wszystkie zdarzenia, które zaistnieją podczas
           wykonywania umowy. Za wszystkie wyrządzone komukolwiek szkody podczas budowy lub w
           związku z budową odpowiada Wykonawca, chyba, że nie zachodzi związek przyczynowy
           pomiędzy prowadzeniem robót a wyrządzoną szkodą. Wykonawca przyjmie odpowiedzialność
           w szczególności za: 1) szkody i następstwa nieszczęśliwych wypadków dotyczących
           pracowników Wykonawcy oraz osób trzecich przebywających w rejonie prowadzonych robót;
           2) szkody wynikające ze zniszczeń oraz innych zdarzeń w odniesieniu do robót, materiałów
           sprzętu i innego mienia ruchomego związanego z prowadzeniem robót podczas realizacji
           przedmiotu niniejszej umowy; 3) szkody w robotach spowodowane przez niego przy usuwaniu
           wad w okresie gwarancji i rękojmi; 4) niewłaściwe zabezpieczenie terenu budowy oraz
           dopuszczenie na teren budowy osób nieupoważnionych. 6. Zamawiający, zgodnie z zapisami
           art. 99 ust. 5 i art. 101 ust. 4 ustawy Pzp, dopuszcza rozwiązania równoważne dla robót,
           materiałów, systemów spełniające obowiązujące standardy i wymagania. Zamawiający
           zastrzega, że wszędzie tam, gdzie w treści opisu przedmiotu zamówienia, stanowiącego opis
           przedmiotu zamówienia, zostały w opisie tego przedmiotu wskazane znaki towarowe, patenty
           lub pochodzenie urządzeń lub materiałów należy je traktować wyłącznie jako propozycje
           projektanta. Zamawiający dopuszcza metody, materiały, urządzenia, systemy, technologie itp.
           równoważne do przedstawionych w opisie przedmiotu zamówienia. Dopuszcza się więc
           zaproponowanie w ofercie wszelkich równoważnych odpowiedników rynkowych o
           właściwościach nie gorszych niż wskazane przez Zamawiającego. Parametry wskazanego
           standardu określają minimalne warunki techniczne, eksploatacyjne, użytkowe, jakościowe i

674195-2026                                                                                      Page 20/27
              funkcjonalne, jakie ma spełniać przedmiot zamówienia. W ofercie można przyjąć metody,
              materiały, urządzenia, systemy, technologie itp. innych marek i producentów, jednak o
              parametrach technicznych, jakościowych i właściwościach użytkowych oraz funkcjonalnych
              odpowiadających metodom, materiałom, urządzeniom, systemom, technologiom itp. opisanym
              w SWZ. Ponadto zamienne urządzenia przyjęte do wyceny: winny spełniać funkcję, jakiej mają
              służyć, winny być kompatybilne z pozostałymi urządzeniami, aby zespół urządzeń dawał
              zamierzony efekt, nie mogą wpływać na zmianę rodzaju i zakresu robót budowlanych. Na
              żądanie Zamawiającego, Wykonawca ma obowiązek udowodnienia, iż zastosowane
              rozwiązania równoważne pozwolą osiągnąć wszystkie założenia techniczne dla
              przedmiotowego zadania inwestycyjnego, biorąc pod uwagę całość inwestycji, a nie wybrany
              fragment całości. Ciężar udowodnienia, że materiał lub urządzenie jest równoważne w
              stosunku do wymogu określonego przez Zamawiającego spoczywa na Wykonawcy. Jeżeli
              materiały lub/i urządzenia zaoferowane przez Wykonawcę jako równoważne nie będą
              równoważne w świetle przedłożonych przez Wykonawcę dokumentów, oferta tego
              Wykonawcy zostanie odrzucona jako nieodpowiadająca treści SWZ. W przypadku zaś
              opisania przedmiotu zamówienia przez odniesienie do norm, europejskich ocen technicznych,
              aprobat, specyfikacji technicznych i systemów referencji technicznych, Zamawiający
              dopuszcza wykonanie zamówienia z zastosowaniem rozwiązań równoważnych opisywanym.
              W takim wypadku, procedurę opisaną na wstępie niniejszego punktu stosuje się odpowiednio.
              7. Dalsze zapisy w SWZ.
              Internal identifier: Część zamówienia nr 3

     5.1.1. Purpose
            Main nature of the contract: Works
            Main classification (cpv): 45000000 Construction work
            Additional classification (cpv): 09300000 Electricity, heating, solar and nuclear energy,
            45300000 Building installation work, 71321200 Heating-system design services, 45311100
            Electrical wiring work, 45311200 Electrical fitting work, 45315100 Electrical engineering
            installation works, 45315300 Electricity supply installations, 71320000 Engineering design
            services, 71323100 Electrical power systems design services

     5.1.2. Place of performance
            Country subdivision (NUTS): Radomski (PL921)
            Country: Poland

     5.1.3. Estimated duration
            Start date: 01/12/2026
            Duration end date: 30/06/2027

     5.1.6. General information
            Reserved participation:
            Participation is not reserved.
            Procurement Project fully or partially financed with EU Funds.
            Information about European Union funds:
            Identifier of EU funds: Przedmiotowe zamówienie jest realizowane jest w ramach projektu pn.:
            „Innowacyjne rozwiązania dotyczące Energii elektrycznej i cieplnej Wieniawskiego Klastra
            Energii”, dofinansowanego z Inwestycji B2.2.2 Krajowego Planu Odbudowy i Zwiększania
            Odporności (KPO).
            The procurement is covered by the Government Procurement Agreement (GPA): no




674195-2026                                                                                       Page 21/27
              Additional information: Zamawiający wskazuje datę początkową terminu realizacji zamówienia
              wyłącznie z przyczyn technicznych, bowiem formularz ogłoszenia o zamówieniu nie daje
              możliwości wskazania jedynie daty końcowej terminu realizacji zamówienia.

     5.1.9. Selection criteria
            Sources of selection criteria: Notice
            Criterion: References on specified works
            Description of selection criterion: Warunek dotyczący zdolności zawodowej zostanie
            spełniony, jeżeli Wykonawca wykaże, że w okresie ostatnich pięciu lat przed upływem terminu
            składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, wykonał
            co najmniej 1 (jedno) zadanie obejmujące: dostawę i montaż instalacji fotowoltaicznych w co
            najmniej 2 budynkach użyteczności publicznej, przy czym moc każdej instalacji wynosiła nie
            mniej niż 25 kW, oraz dostawę i montaż co najmniej 2 magazynów energii, przy czym moc
            każdego magazynu energii wynosiła nie mniej niż 10 kW lub pojemność każdego magazynu
            energii wynosiła nie mniej niż 10 kWh. Zamawiający wymaga, aby w/w dostawy zostały
            wykonane należycie. Dokumenty i oświadczenia wymagane od Wykonawcy na potwierdzenie
            spełniania warunków udziału w postępowaniu (dla wszystkich części zamówienia): 1) wykaz
            dostaw wykonanych nie wcześniej niż w okresie ostatnich pięciu lat przed upływem terminu
            składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, wraz z
            podaniem ich wartości, przedmiotu, dat wykonania i podmiotów, na rzecz których dostawy te
            zostały wykonane – załącznik nr 5 do SWZ, oraz załączenie dowodów określających czy
            dostawy te zostały wykonane należycie, przy czym dowodami, o których mowa, są referencje
            bądź inne dokumenty wystawione przez podmiot, na rzecz którego dostawy były wykonywane,
            a jeżeli Wykonawca z przyczyn niezależnych od niego nie jest w stanie uzyskać tych
            dokumentów – oświadczenie Wykonawcy.

              Criterion: Number of managerial staff
              Description of selection criterion: Warunek dotyczący zdolności technicznej zostanie
              spełniony, jeżeli wykonawca wykaże, iż dysponuje osobami zdolnymi do wykonania
              zamówienia, tj.: a) Projektant branży elektrycznej - kwalifikacje i umiejętności: uprawnienia do
              projektowania w specjalności instalacji i urządzeń elektrycznych i elektroenergetycznych,
              uprawniającymi do projektowania obiektu budowlanego związanego z obiektem budowlanym
              stanowiącym przedmiot zamówienia* oraz przynależność do Okręgowej Izby Budownictwa, b)
              Kierownik Budowy: - kwalifikacje i umiejętności: uprawnienia do kierowania robotami
              budowlanymi w specjalności instalacji i urządzeń elektrycznych i elektroenergetycznych,
              uprawniającymi do kierowania robotami budowlanymi związanymi z obiektem budowlanym
              stanowiącym przedmiot zamówienia* oraz przynależność do Okręgowej Izby Budownictwa, *
              dopuszcza się odpowiadające tym uprawnieniom uprawnienia budowlane, które zostały
              wydane na podstawie wcześniej obowiązujących przepisów oraz odpowiadające im
              uprawnienia wydane obywatelom państw Europejskiego Porozumienia o Wolnym Handlu
              (EFTA) – stron umowy o Europejskim Obszarze Gospodarczym oraz Konfederacji
              Szwajcarskiej, z zastrzeżeniem art. 12a oraz innych przepisów ustawy Prawo budowlane oraz
              ustawy z dnia 22 grudnia 2015 r. o zasadach uznawania kwalifikacji zawodowych nabytych w
              państwach członkowskich Unii Europejskiej (t.j. Dz. U. z 2023 r. poz. 334 z późn. zm.).
              Zamawiający dopuszcza możliwości łączenia funkcji specjalistów przez jedną osobę (również
              w ramach części zamówienia), pod warunkiem, że osoba ta spełnia warunki dla wszystkich
              łączonych funkcji. Dokumenty i oświadczenia wymagane od Wykonawcy na potwierdzenie
              spełniania warunków udziału w postępowaniu (dla wszystkich części zamówienia): 1) wykaz
              osób, skierowanych przez wykonawcę do realizacji zamówienia publicznego, w szczególności
              odpowiedzialnych za świadczenie usług, kontrolę jakości lub kierowanie robotami

674195-2026                                                                                            Page 22/27
              budowlanymi, wraz z informacjami na temat ich kwalifikacji zawodowych, uprawnień,
              doświadczenia niezbędnych do wykonania Zamówienia, a także zakresu wykonywanych przez
              te osoby czynności oraz informacją o podstawie do dysponowania tymi osobami – załącznik nr
              6 do SWZ.

   5.1.10. Award criteria
           Criterion:
           Type: Price
           Description: Najniższa Cena
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 50
           Criterion:
           Type: Quality
           Description: Technologia Back-Contact lub zero BusBar
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 5
           Criterion:
           Type: Quality
           Description: Kula gradowa 55 mm
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 15
           Criterion:
           Type: Quality
           Description: Gwarancja spadku efektywności w ciągu 30 lat do maksymalnie 88%
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 5
           Criterion:
           Type: Quality
           Description: Przedłużenie gwarancji producenta falownika
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 5
           Criterion:
           Type: Quality
           Description: Przedłużenie gwarancji producenta magazynu energii
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 10
           Criterion:
           Type: Quality
           Description: Moduł przeciwpożarowy
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 2,5
           Criterion:
           Type: Quality
           Description: Maty grzewcze
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 2,5
           Criterion:
           Type: Quality
           Description: Metalowa obudowa
           Category of award weight criterion: Weight (percentage, exact)

674195-2026                                                                                      Page 23/27
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Wbudowany BMS na poziomie każdego modułu
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5

   5.1.11. Procurement documents
           Address of the procurement documents: https://ezamowienia.gov.pl/mp-client/search/list/ocds-
           148610-2c2a0486-4d87-4dcf-90af-910e50d175a1

   5.1.12. Terms of procurement
           Terms of submission:
           Electronic submission: Required
           Address for submission: https://ezamowienia.gov.pl/mp-client/search/list/ocds-148610-
           2c2a0486-4d87-4dcf-90af-910e50d175a1
           Languages in which tenders or requests to participate may be submitted: Polish
           Electronic catalogue: Not allowed
           Description of the financial guarantee: 1. Zamawiający przewiduje obowiązek wniesienia
           wadium przed upływem terminu składania ofert, w wysokości dla części zamówienia nr 3 – 10
           000,00 PLN (słownie: dziesięć tysięcy złotych 00/100). 2. Wadium może być wniesione w
           jednej lub kilku następujących formach: 1) pieniądzu (w tytule przelewu należy podać nr
           sprawy: ZP.2710.15.2026 oraz numer części zamówienia); 2) gwarancjach bankowych; 3)
           gwarancjach ubezpieczeniowych; 4) poręczeniach udzielanych przez podmioty, o których
           mowa w art. 6b ust. 5 pkt 2 ustawy z dnia 9 listopada 2000 r. o utworzeniu polskiej Agencji
           Rozwoju Przedsiębiorczości (t.j. Dz. U. z 2025 r. poz. 98). 3. Wadium wnoszone w pieniądzu
           należy wpłacać przelewem na rachunek bankowy Zamawiającego w Banku Spółdzielczym w
           Przysusze O/Wieniawa, nr rachunku: 05 9145 1040 2000 0055 2000 0032. 4. Terminowe
           wniesienie wadium w formie pieniężnej oznacza, że żądana przez Zamawiającego kwota
           została wpłacona w pełnej wysokości przelewem na wskazany przez niego rachunek
           bankowy. Oznacza to, że wniesienie wadium w tej postaci jest skuteczne dopiero z chwilą
           uznania rachunku Zamawiającego kwotą wadium przed upływem terminu składania ofert. 5. W
           przypadku wniesienia wadium w formie gwarancji lub poręczenia, o których mowa w ust. 3,
           Wykonawca przekazuje Zamawiającemu oryginał gwarancji lub poręczenia w postaci
           elektronicznej, do upływu terminu składania ofert. Zaleca się gwarancję lub poręczenie, o
           których mowa powyżej, dołączyć do dokumentów składanych wraz z ofertą. 6. Wadium
           wniesione w formie poręczeń lub gwarancji będzie akceptowane przez Zamawiającego, jeżeli
           będzie zawierać wszystkie określone ustawą Pzp przypadki utraty wadium przez Wykonawcę,
           klauzulę o nieodwołalności oraz zapewnienie bezwarunkowej wypłaty przez gwaranta na
           pierwsze pisemne żądanie Zamawiającego, pełnej kwoty wadium w przypadkach
           wymienionych w art. 98 ust. 6 ustawy Pzp. 7. Oferta niezabezpieczona wadium zostanie
           odrzucona. Dalsze zapisy w SWZ.
           Deadline for receipt of tenders: 14/10/2026 09:00:00 (UTC+02:00) Eastern European Time,
           Central European Summer Time
           Duration during which the tender must remain valid: 90 Days
           Information about public opening:
           Opening date: 14/10/2026 11:00:00 (UTC+02:00) Eastern European Time, Central European
           Summer Time
           Terms of contract:



674195-2026                                                                                     Page 24/27
              The execution of the contract must be performed within the framework of sheltered
              employment programmes: No
              Electronic invoicing: Required
              Electronic ordering will be used: no
              Electronic payment will be used: yes

   5.1.15. Techniques
           Framework agreement:
           No framework agreement
           Information about the dynamic purchasing system:
           No dynamic purchase system

   5.1.16. Further information, mediation and review
           Mediation organisation: Krajowa Izba Odwoławcza
           Review organisation: Krajowa Izba Odwoławcza
           Information about review deadlines: 1. Wykonawcom, a także innemu podmiotowi, jeżeli ma
           lub miał interes w uzyskaniu zamówienia oraz poniósł lub może ponieść szkodę w wyniku
           naruszenia przez Zamawiającego przepisów ustawy Pzp, przysługują środki ochrony prawnej
           przewidziane w art. 505 i następnych ustawy Pzp. Środki ochrony prawnej wobec ogłoszenia
           wszczynającego postępowanie o udzielenie zamówienia oraz dokumentów zamówienia
           przysługują również organizacjom wpisanym na listę, o której mowa w art. 469 pkt 15 ustawy
           Pzp oraz Rzecznikowi Małych i Średnich Przedsiębiorców. 2. Wobec niezgodnej z przepisami
           ustawy Pzp czynności Zamawiającego podjętej w postępowaniu, w tym na projektowane
           postanowienie umowy, lub w przypadku zaniechania przez Zamawiającego dokonania
           czynności, do których podjęcia zobowiązany jest Zamawiający przepisami ustawy Pzp lub w
           przypadku zaniechania przeprowadzenia postępowania o udzielenie zamówienia na
           podstawie ustawy Pzp, mimo że Zamawiający był do tego obowiązany, Wykonawca może
           wnieść odwołanie. 3. Odwołanie wnosi się do Prezesa Izby w formie pisemnej, w formie
           elektronicznej albo w postaci elektronicznej z tym, że odwołanie i przystąpienie do
           postępowania odwoławczego, wniesione w postaci elektronicznej, wymagają opatrzenia
           podpisem zaufanym. 4. Odwołujący przekazuje Zamawiającemu odwołanie wniesione w
           formie elektronicznej albo postaci elektronicznej albo kopię tego odwołania, jeżeli zostało ono
           wniesione w formie pisemnej, przed upływem terminu do wniesienia odwołania w taki sposób,
           aby mógł on zapoznać się z jego treścią przed upływem tego terminu. 5. Odwołanie wnosi się
           w terminie: 1) 10 dni od dnia przekazania informacji o czynności Zamawiającego stanowiącej
           podstawę jego wniesienia, jeżeli informacja została przekazana przy użyciu środków
           komunikacji elektronicznej; 2) 15 dni od dnia przekazania informacji o czynności
           Zamawiającego stanowiącej podstawę jego wniesienia, jeżeli informacja została przekazana w
           sposób inny niż określony w ppkt 1). 6. Odwołanie wobec treści ogłoszenia o zamówieniu lub
           wobec treści dokumentów zamówienia wnosi się w terminie 10 dni od dnia publikacji
           ogłoszenia w Dzienniku Urzędowym Unii Europejskiej lub zamieszczenia dokumentów
           zamówienia na stronie internetowej Zamawiającego. 7. Odwołanie w przypadkach innych niż
           określone w pkt 5 i 6 wnosi się w terminie 10 dni od dnia, w którym powzięto lub przy
           zachowaniu należytej staranności można było powziąć wiadomość o okolicznościach
           stanowiących podstawę jego wniesienia. 8. Jeżeli Zamawiający nie opublikował ogłoszenia o
           zamiarze zawarcia umowy lub mimo takiego obowiązku nie przesłał Wykonawcy
           zawiadomienia o wyborze najkorzystniejszej oferty, odwołanie wnosi się nie później niż w
           terminie: 1) 30 dni od dnia publikacji w Dzienniku Urzędowym Unii Europejskiej ogłoszenia o
           udzieleniu zamówienia, 2) 6 miesięcy od dnia zawarcia umowy, jeżeli Zamawiający nie
           opublikował w Dzienniku Urzędowym Unii Europejskiej ogłoszenia o udzieleniu zamówienia. 9.


674195-2026                                                                                       Page 25/27
              Na orzeczenie Krajowej Izby Odwoławczej oraz postanowienie Prezesa Izby, stronom oraz
              uczestnikom postępowania odwoławczego przysługuje skarga do sądu. Szczegółowo kwestie
              dotyczące skargi do sądu uregulowane zostały w art. 579-590 ustawy Pzp.
              Organisation providing more information on the review procedures: Krajowa Izba Odwoławcza

   8. Organisations

      8.1. ORG-0002
           Official name: Krajowa Izba Odwoławcza
           Registration number: 5262239325
           Postal address: ul. Postępu 17A
           Town: Warszawa
           Postcode: 02-676
           Country subdivision (NUTS): Miasto Warszawa (PL911)
           Country: Poland
           Email: odwolania@uzp.gov.pl
           Telephone: (22) 458 78 01
           Internet address: https://www.gov.pl/web/uzp/krajowa-izba-odwolawcza
           Roles of this organisation:
           Review organisation
           Organisation providing more information on the review procedures
           Mediation organisation

      8.1. ORG-0003
           Official name: Gmina Wieniawa
           Registration number: 6010081434
           Postal address: ul. Kochanowskiego 88
           Town: Wieniawa
           Postcode: 26-432
           Country subdivision (NUTS): Radomski (PL921)
           Country: Poland
           Email: sekretariat@gminawieniawa.pl
           Telephone: +48 48 673 00 01
           Fax: +48 48 377 73 07
           Internet address: https://samorzad.gov.pl/web/gmina-wieniawa
           Roles of this organisation:
           Buyer

      8.1. ORG-0000
           Official name: Publications Office of the European Union
           Registration number: PUBL
           Town: Luxembourg
           Postcode: 2417
           Country subdivision (NUTS): Luxembourg (LU000)
           Country: Luxembourg
           Email: ted@publications.europa.eu
           Telephone: +352 29291
           Internet address: https://op.europa.eu
           Roles of this organisation:
           TED eSender


674195-2026                                                                                     Page 26/27
   10. Change

              Version of the previous notice to be changed: 609531-2026
              Main reason for change: Information updated

   Notice information

              Notice identifier/version: 4e23ba81-d80d-4889-a855-2f9f6ad07d2e - 01
              Form type: Competition
              Notice type: Contract or concession notice – standard regime
              Notice subtype: 16
              Notice dispatch date: 29/09/2026 11:04:48 (UTC+00:00) Western European Time, GMT
              Languages in which this notice is officially available: Polish
              Notice publication number: 674195-2026
              OJ S issue number: 189/2026
              Publication date: 30/09/2026




674195-2026                                                                                  Page 27/27

- Official source: [TED](https://ted.europa.eu/en/notice/-/detail/674195-2026)
- [Official notice PDF](https://ted.europa.eu/en/notice/685583-2026/pdf)

## Notice updates

### October 15, 2026 · Version 2 (Buyer updated, Classification updated, Contract period updated, Deadline information updated, Summary and analysis updated, Tender facts updated, Original notice updated, Deadline updated, Location updated, Source updated, Source notice details updated, Source references updated, Status changed, Notice update added)

Полша – Строителни и монтажни работи – Innowacyjne rozwiązania dotyczące energii cieplnej i elektrycznej Wieniawskiego Klastra Energii

See the notice on TED website

   674195-2026 - Competition
   Poland – Construction work – Innowacyjne rozwiązania dotyczące energii cieplnej i elektrycznej
   Wieniawskiego Klastra Energii
   OJ S 189/2026 30/09/2026
   Contract or concession notice – standard regime - Change notice
   Works


   1. Buyer

      1.1. Buyer
           Official name: Gmina Wieniawa
           Email: sekretariat@gminawieniawa.pl
           Legal type of the buyer: Local authority
           Activity of the contracting authority: General public services

   2. Procedure

      2.1. Procedure
           Title: Innowacyjne rozwiązania dotyczące energii cieplnej i elektrycznej Wieniawskiego Klastra
           Energii
           Description: 1. Przedmiotem zamówienia są roboty budowlane i dostawa wraz z montażem w
           ramach zadania inwestycyjnego pod nazwą: „Innowacyjne rozwiązania dotyczące energii
           cieplnej i elektrycznej Wieniawskiego Klastra Energii”. 2. Zamówienie podzielone zostało na
           trzy następujących części: 1) Część zamówienia nr 1 – „Utworzenie magazynu na zrębki
           drzewne, utworzenie kotłowni biomasowej i montaż kotła, utworzenie sieci i węzłów
           ciepłowniczych, instalację kogeneracji wraz z systemem przygotowania paliwa, utworzenie
           magazynu ciepła o pojemności 3,5 MWh oraz wdrożenie systemu zarządzania energią w
           miejscowości Wieniawa”; 2) Część zamówienia nr 2 – „Utworzenie magazynu na zrębki
           drzewne wraz z budynkiem kotłowni, dostawę i montaż kotła, utworzenie kogeneracji wraz z
           systemem przygotowania paliwa, utworzenie sieci i węzłów ciepłowniczych oraz utworzenie
           magazynu ciepła o pojemności 3,5 MWh w miejscowości Sokolniki Mokre”; 3) Część
           zamówienia nr 3 – „Budowa instalacji fotowoltaicznych oraz magazynów energii na Budynkach
           Użyteczności Publicznej”. 3. W ramach części zamówienia nr 1 – Wykonawca zobowiązany
           będzie: 1) wykonać dokumentację(e) projektową(e), w tym Projekt(y) Budowalny(e), Projekt(y)
           Techniczny(e) i Projekt(y) Wykonawczy(e), kosztorys(y) wraz z przedmiarem(ami) robót,
           specyfikację techniczną wykonania i odbioru robót wraz z uzyskaniem prawomocnej(ych)
           decyzji o pozwoleniu na budowę albo zgłoszenia(eń) robót – dla całego zakresu opisanego w
           Programie Funkcjonalno–Użytkowym, a także przygotować do zatwierdzenia przez
           Zamawiającego Harmonogram budowy; 2) wykonać roboty budowlane, w oparciu o
           opracowaną(e) i zaakceptowaną(e) przez Zamawiającego dokumentację(e) projektowo-
           kosztorysową(e), o której(ych) mowa w pkt 1) powyżej, i uzyskaną(e) prawomocną(e) decyzję
           (e) o pozwoleniu na budowę albo zgłoszenie(a) robót oraz uzyskać prawomocne pozwolenie
           (a) na użytkowania albo zgłoszenie(a) zakończenia robót (o ile dotyczy); 3) wykonać
           wdrożenie systemu zarządzania energią, monitorowania, zarządzania produkcją i dystrybucją
           energii, optymalizacji, integracji systemów pomiarowych, raportowania i analizy danych. 4. W
           ramach części zamówienia nr 2 – Wykonawca zobowiązany będzie: 1) wykonać dokumentację
           (e) projektową(e), w tym Projekt(y) Budowalny(e), Projekt(y) Techniczny(e) i Projekt(y)
           Wykonawczy(e), kosztorys(y) wraz z przedmiarem(ami) robót, specyfikację techniczną

674195-2026                                                                                           Page 1/27
              wykonania i odbioru robót wraz z uzyskaniem prawomocnej(ych) decyzji o pozwoleniu na
              budowę albo zgłoszenia(eń) robót – dla całego zakresu opisanego w Programie Funkcjonalno–
              Użytkowym, a także przygotować do zatwierdzenia przez Zamawiającego Harmonogram
              budowy; 2) wykonać roboty budowlane, w oparciu o opracowaną(e) i zaakceptowaną(e) przez
              Zamawiającego dokumentację(e) projektowo-kosztorysową(e), o której(ych) mowa w pkt 1)
              powyżej, i uzyskaną(e) prawomocną(e) decyzję(e) o pozwoleniu na budowę albo zgłoszenie
              (a) robót oraz uzyskać prawomocne pozwolenie(a) na użytkowania albo zgłoszenie(a)
              zakończenia robót (o ile dotyczy); 3) wykonać wdrożenie systemu zarządzania energią,
              monitorowania, zarządzania produkcją i dystrybucją energii, optymalizacji, integracji systemów
              pomiarowych, raportowania i analizy danych. 5. W ramach części zamówienia nr 3
              Wykonawca zobowiązany będzie do: 1) zaprojektowania i budowy instalacji fotowoltaicznych
              oraz magazynów energii na Budynkach Użyteczności Publicznej; 2) opracowania
              dokumentacji wykonawczej; 3) dostawy i montażu kompletnych instalacji układów
              fotowoltaicznych wraz magazynami energii oraz podłączenie ich do istniejących już systemów
              energetycznych; 4) wdrożenia systemu zarządzania energią, monitorowania, zarządzania
              produkcją i dystrybucją energii, optymalizacji, integracji systemów pomiarowych, raportowania
              i analizy danych; - w zakresie opisanym w Programie Funkcjonalno–Użytkowym. 6. Szczegóły
              zakres przedmiotu niniejszego zamówienia precyzują: 1) dla części zamówienia nr 1 i 2 –
              załącznik nr 8 do SWZ – Program Funkcjonalno-Użytkowy, właściwy dla tych części
              zamówienia, zaś wymogi dotyczące realizacji zamówienia załącznik nr 9a do SWZ – Projekt
              umowy; 2) dla części zamówienia nr 3 – załącznik nr 8 do SWZ – Program Funkcjonalno-
              Użytkowy, właściwy dla tej części zamówienia, zaś wymogi dotyczące realizacji zamówienia
              załącznik nr 9b do SWZ – Projekt umowy. 7. Pożądane jest, aby przed złożeniem Oferty
              Wykonawca przeprowadził wizję lokalną terenów, na których zlokalizowane będą roboty objęte
              przedmiotem niniejszego zamówienia. Przeprowadzenie wizji nie jest warunkiem dla złożenia
              oferty w niniejszym postępowaniu. Koszty dokonania wizji lokalnej terenu budowy poniesie
              Wykonawca. 8. Roboty budowlane stanowiące przedmiot niniejszego zamówienia należy
              wykonać zgodnie z niniejszą SWZ, Opisem Przedmiotu Zamówienia (OPZ), Projektem Umowy
              oraz zgodnie z zasadami sztuki budowlanej, wiedzy technicznej, obowiązującymi przepisami i
              normami. Zobowiązanie wykonania robót zgodnie z powyższymi dokumentami nie zwalnia
              Wykonawcy m. in. od obowiązku weryfikacji tej dokumentacji w trakcie trwania umowy i
              zgłaszania Zamawiającemu wykrytych w niej wad czy uchybień skutkujących możliwością
              niedochowania warunków umowy lub naruszeniem przepisów prawa. 9. Od dnia odbioru placu
              budowy Wykonawca odpowiada za wszystkie zdarzenia, które zaistnieją podczas
              wykonywania umowy. Za wszystkie wyrządzone komukolwiek szkody podczas budowy lub w
              związku z budową odpowiada Wykonawca, chyba, że nie zachodzi związek przyczynowy
              pomiędzy prowadzeniem robót a wyrządzoną szkodą. Wykonawca przyjmie odpowiedzialność
              w szczególności za: 1) szkody i następstwa nieszczęśliwych wypadków dotyczących
              pracowników Wykonawcy oraz osób trzecich przebywających w rejonie prowadzonych robót;
              2) szkody wynikające ze zniszczeń oraz innych zdarzeń w odniesieniu do robót, materiałów
              sprzętu i innego mienia ruchomego związanego z prowadzeniem robót podczas realizacji
              przedmiotu niniejszej umowy; Dalsze zapisy w SWZ.
              Procedure identifier: d6aa223d-cc53-4ce8-be69-ef59ea6282d3
              Internal identifier: ZP.2710.15.2026
              Type of procedure: Open
              The procedure is accelerated: no

     2.1.1. Purpose
            Main nature of the contract: Works
            Main classification (cpv): 45000000 Construction work

674195-2026                                                                                          Page 2/27
              Additional classification (cpv): 45331000 Heating, ventilation and air-conditioning installation
              work, 45331110 Boiler installation work, 45453000 Overhaul and refurbishment work,
              71321200 Heating-system design services, 71300000 Engineering services, 45331100
              Central-heating installation work, 45331000 Heating, ventilation and air-conditioning
              installation work, 45300000 Building installation work, 45400000 Building completion work,
              45450000 Other building completion work, 45330000 Plumbing and sanitary works, 45330000
              Plumbing and sanitary works, 09300000 Electricity, heating, solar and nuclear energy,
              45311100 Electrical wiring work, 45311200 Electrical fitting work, 45315100 Electrical
              engineering installation works, 45315300 Electricity supply installations, 71320000
              Engineering design services, 71323100 Electrical power systems design services

     2.1.2. Place of performance
            Country subdivision (NUTS): Radomski (PL921)
            Country: Poland

     2.1.4. General information
            Additional information: Zamawiający skorzysta z uprawnienia wynikającego z art. 139 ust. 1
            ustawy Pzp. Zamawiający najpierw dokona badania i oceny ofert a następnie zbada czy
            Wykonawca, którego oferta została najwyżej oceniona, nie podlega wykluczeniu oraz spełnia
            warunki udziału w postępowaniu. Nie ujawnia się informacji stanowiących tajemnicę
            przedsiębiorstwa w rozumieniu przepisów ustawy z dnia 16 kwietnia 1993 r. o zwalczaniu
            nieuczciwej konkurencji (t.j. Dz. U. z 2026 r. poz. 85), jeżeli Wykonawca, wraz z przekazaniem
            takich informacji, zastrzegł, że nie mogą być one udostępniane oraz wykazał, że zastrzeżone
            informacje stanowią tajemnicę przedsiębiorstwa. Wykonawca nie może zastrzec informacji, o
            których mowa w art. 222 ust. 5 ustawy Pzp. 1. Zamawiający przed wyborem oferty
            najkorzystniejszej, wezwie Wykonawcę, którego oferta została najwyżej oceniona, do złożenia
            w wyznaczonym terminie, nie krótszym niż 10 dni, aktualnych na dzień złożenia podmiotowych
            środków dowodowych, a w przypadku polegania przez Wykonawcę na zdolnościach lub
            sytuacji podmiotów udostępniających zasoby – do złożenia podmiotowych środków
            dowodowych w zakresie pkt 2 i 3 poniżej, dotyczących tych podmiotów (w zakresie, w jakim
            nie zostały one zastąpione ważnym certyfikatem i wskazane w oświadczeniu JEDZ). 2.
            Dokumenty i oświadczenia wymagane od Wykonawcy na potwierdzenie braku podstaw
            wykluczenia Wykonawcy z postępowania: 1) informacja z Krajowego Rejestru Karnego w
            zakresie określonym w art. 108 ust. 1 pkt 4 ustawy Pzp (tj. dotycząca orzeczenia zakazu
            ubiegania się o zamówienie publiczne tytułem środka karnego), sporządzona nie wcześniej niż
            6 miesięcy przed jej złożeniem; 2) informacja z Krajowego Rejestru Karnego w zakresie
            określonym w art. 108 ust. 1 pkt 2 ustawy Pzp oraz w zakresie określonym w art. 109 ust. 1
            pkt 3 ustawy Pzp (dotycząca skazania za przestępstwo lub ukarania za wykroczenie, za które
            wymierzono karę aresztu), sporządzona nie wcześniej niż 6 miesięcy przed jej złożeniem; 3)
            informacja z Krajowego Rejestru Karnego w zakresie określonym w art. 108 ust. 1 pkt 1
            ustawy Pzp, w zakresie określonym w art. 109 ust. 1 pkt 2 lit. a) ustawy Pzp i w zakresie art.
            109 ust. 1 pkt 2 lit. b ustawy Pzp (dotycząca ukarania za wykroczenie, za które wymierzono
            karę aresztu), sporządzona nie wcześniej niż 6 przed jej złożeniem; 4) odpis lub informacja z
            Krajowego Rejestru Sądowego lub z Centralnej Ewidencji i Informacji o Działalności
            Gospodarczej, jeżeli odrębne przepisy wymagają wpisu do rejestru lub ewidencji, w celu
            wykazania braku podstaw wykluczenia na podstawie art. 109 ust. 1 pkt 4 ustawy Pzp,
            sporządzona nie wcześniej niż 3 miesiące przed jej złożeniem; 5) oświadczenie Wykonawcy o
            aktualności informacji zawartych w oświadczeniu, o którym mowa w art. 125 ust. 1 ustawy
            Pzp, w zakresie podstaw wykluczenia z postępowania wskazanych przez Zamawiającego, o
            których mowa w art. 109 ust. 1 pkt 2 lit. b ustawy Pzp (w zakresie dotyczącym ukarania za


674195-2026                                                                                             Page 3/27
              wykroczenie, za które wymierzono karę ograniczenia wolności lub karę grzywny), art. 109 ust.
              1 pkt 2 lit. c ustawy Pzp oraz art. 109 ust. 1 pkt 3 ustawy Pzp (w zakresie ukarania za
              wykroczenie, za które wymierzono karę ograniczenia wolności lub karę grzywny) –
              sporządzone zgodnie ze wzorem zawartym w Załączniku nr 3 do SWZ); 6) oświadczenie
              Wykonawcy o aktualności informacji zawartych w oświadczeniu, o których mowa w art. 125
              ust. 1 ustawy Pzp w zakresie podstaw wykluczenia z postępowania, o których mowa w: a) art.
              108 ust. 1 pkt 3 i pkt 6 ustawy Pzp, b) art. 108 ust. 1 pkt 4 ustawy Pzp, dotyczących
              orzeczenia zakazu ubiegania się o zamówienie publiczne tytułem środka zapobiegawczego, c)
              art. 108 ust. 1 pkt 5 ustawy Pzp, dotyczących zawarcia z innymi wykonawcami porozumienia
              mającego na celu zakłócenie konkurencji, d) art. 109 ust. 1 pkt 7 - 10 ustawy Pzp, e) rozdziale
              IV pkt 1 ppkt 1) SWZ, – sporządzone zgodnie ze wzorem zawartym w Załączniku nr 3 do
              SWZ; 7) oświadczenie Wykonawcy, w zakresie art. 108 ust. 1 pkt 6 ustawy Pzp, o braku
              przynależności do tej samej grupy kapitałowej w rozumieniu ustawy z dnia 16 lutego 2007 r. o
              ochronie konkurencji i konsumentów z innym wykonawcą, który złożył odrębną ofertę albo
              oświadczenie o przynależności do tej samej grupy kapitałowej wraz z dokumentami lub
              informacjami potwierdzającymi przygotowanie oferty niezależnie od innego wykonawcy
              należącego do tej samej grupy kapitałowej – sporządzone zgodnie ze wzorem zawartym w
              Załączniku nr 4 do SWZ. 3. Jeżeli Wykonawca ma siedzibę lub miejsce zamieszkania poza
              granicami Rzeczypospolitej Polskiej, zamiast dokumentów wymienionych w 2 ppkt 1) – 4)
              powyżej, składa dokumenty określone w § 4 rozporządzenia Ministra Rozwoju, Pracy i
              Technologii z dnia 23 grudnia 2020 r. w sprawie podmiotowych środków dowodowych oraz
              innych dokumentów lub oświadczeń, jakich może żądać zamawiający od wykonawcy (Dz. U.
              2020 poz. 2415 ze zm.), tj.: 1) informacja z odpowiedniego rejestru, takiego jak rejestr sądowy
              albo w przypadku braku takiego rejestru, inny równoważny dokument wydany przez właściwy
              organ sądowy lub administracyjny kraju, w którym Wykonawca ma siedzibę lub miejsce
              zamieszkania lub miejsce zamieszkania ma osoba, której dotyczy informacja albo dokument,
              w zakresie określonym w art. 108 ust. 1 pkt 1, 2 i 4 oraz art. 109 ust. 1 pkt 2 lit. a i b oraz pkt 3
              ustawy Pzp; 2) dokument lub dokumenty wystawione w kraju, w którym Wykonawca ma
              siedzibę lub miejsce zamieszkania, potwierdzające odpowiednio, że nie otwarto jego likwidacji
              ani nie ogłoszono upadłości, jego aktywami nie zarządza likwidator lub sąd, nie zawarł układu
              z wierzycielami, jego działalność gospodarcza nie jest zawieszona ani nie znajduje się on w
              innej tego rodzaju sytuacji wynikającej z podobnej procedury przewidzianej w przepisach
              miejsca wszczęcia tej procedury; 3) inne dokumenty i oświadczenia, o których mowa w pkt 2
              ppkt 5) – 7) SWZ. 4. Dokumenty, o których mowa w pkt 3 ppkt 1) powyżej, powinny być
              wystawione nie wcześniej niż 6 miesięcy przed ich złożeniem, natomiast dokumenty, o których
              mowa w pkt 3 ppkt 2) powyżej, powinny być wystawione nie wcześniej niż 3 miesiące przed
              ich złożeniem. 5. Jeżeli w kraju, w którym wykonawca ma siedzibę lub miejsce zamieszkania
              lub miejsce zamieszkania ma osoba, której dokument dotyczy, nie wydaje się dokumentów o
              których mowa w pkt 3 ppkt 1) i 2) powyżej, lub gdy dokumenty te nie odnoszą się do
              wszystkich przypadków, o których mowa w art. 108 ust. 1 pkt 1, 2 i 4, art. 109 ust. 1 pkt 2 lit. a
              i b oraz pkt 3 ustawy Pzp, zastępuje się je odpowiednio w całości lub w części dokumentem
              zawierającym odpowiednio oświadczenie Wykonawcy, ze wskazaniem osoby albo osób
              uprawnionych do jego reprezentacji, lub oświadczenie osoby, której dokument miał dotyczyć,
              złożone pod przysięgą, lub, jeżeli w kraju, w którym Wykonawca ma siedzibę lub miejsce
              zamieszkania lub miejsce zamieszkania ma osoba, której dokument miał dotyczyć, nie ma
              przepisów o oświadczeniu pod przysięgą, złożone przed organem sądowym lub
              administracyjnym, notariuszem, organem samorządu zawodowego lub gospodarczego,
              właściwym ze względu na siedzibę lub miejsce zamieszkania Wykonawcy lub miejsce
              zamieszkania osoby, której dokument miał dotyczyć. Terminy zawarte w pkt 4 powyżej,
              stosuje się odpowiednio. 6. Zamawiający stosuje ustawę z dnia 5 sierpnia 2025 r. o certyfikacji

674195-2026                                                                                                 Page 4/27
              wykonawców zamówień publicznych (Dz. U. poz. 1235 z późn. zm.). 7. Wykonawcy
              zainteresowani certyfikatem znajdą szczegóły w Rozporządzeniu Ministra Finansów i
              Gospodarki z dnia 22 maja 2026 r. w sprawie sposobu składania wniosku o certyfikację
              wykonawców zamówień publicznych i postępowania z tym wnioskiem, szczegółowego
              sposobu przeprowadzania procedury certyfikacji, sposobu prowadzenia stałego nadzoru nad
              aktualnością ważności udzielonej certyfikacji i sposobu przeprowadzania jej aktualizacji oraz
              sposobu ustalania wynagrodzenia podmiotu certyfikującego związanego z certyfikacją (Dz. U.
              poz. 709). 8. Szczegółowe informacje dotyczące certyfikatów dostępne są na stronach:
              Urzędu Zamówień Publicznych https://www.gov.pl/web/uzp, Ministerstwa Rozwoju i
              Technologii https://www.gov.pl/web/rozwoj-technologia. 9. Dokumenty wymagane od
              Wykonawcy na potwierdzenie zgodności oferowanych robót budowlanych z wymaganiami
              (przedmiotowe środki dowodowe): Dla części zamówienia nr 1 i 2: 1) karty katalogowe
              oferowanego(ych) kotła(ów), podpisane przez producenta lub podmiot uprawniony do
              reprezentowania producenta lub dystrybutora urządzeń na rynku polskim, obejmujące
              informacje potwierdzające spełnianie przez te urządzenia parametrów; Dla części zamówienia
              nr 3: 2) karty katalogowe oferowanych modułów fotowoltaicznych, falowników oraz
              magazynów energii, podpisane przez producenta lub podmiot uprawniony do reprezentowania
              producenta lub dystrybutora urządzeń na rynku polskim, obejmujące informacje
              potwierdzające spełnianie przez te urządzenia parametrów. 10. Zamawiający będzie stosował
              procedurę uzupełnienia przedmiotowych środków dowodowych. Zamawiający wyznaczy w
              wezwaniu termin uzupełnienia wymaganego przedmiotowego środka dowodowego
              odpowiednio do sytuacji, jaka wystąpiła w postępowaniu, rodzaju uzupełnianego
              przedmiotowego środka dowodowego oraz z poszanowaniem równego traktowania
              wykonawców. 11. Zamawiający może żądać od wykonawców wyjaśnień dotyczących treści
              przedmiotowych środków dowodowych. Dalsze zapisy w SWZ.
              Legal basis:
              Directive 2014/24/EU
              Art. 132 ustawy z 11 września 2019 r. Prawo zamówień publicznych (t.j. Dz. U. z 2026 r. poz.
              793 z późn. zm.) -

     2.1.5. Terms of procurement
            Terms of submission:
            Maximum number of lots for which one tenderer can submit tenders: 3
            Terms of contract:
            Maximum number of lots for which contracts can be awarded to one tenderer: 3

     2.1.6. Grounds for exclusion
            Sources of grounds for exclusion: Notice
            Assets being administered by liquidator:
            Direct or indirect involvement in the preparation of this procurement procedure:
            Business activities are suspended:
            Analogous situation like bankruptcy, insolvency or arrangement with creditors under national
            law:
            Corruption:
            Fraud:
            Breaching of obligations in the fields of environmental law:
            Breaching of obligations in the fields of labour law:
            Breaching of obligations in the fields of social law:
            Breaching obligation relating to payment of social security contributions:
            Breaching obligation relating to payment of taxes:


674195-2026                                                                                          Page 5/27
              Insolvency:
              Agreements with other economic operators aimed at distorting competition:
              Child labour and including other forms of trafficking in human beings:
              Money laundering or terrorist financing:
              Terrorist offences or offences linked to terrorist activities:
              Early termination, damages, or other comparable sanctions:
              Participation in a criminal organisation:
              Arrangement with creditors:
              Bankruptcy:
              Misrepresentation, withheld information, unable to provide required documents or obtained
              confidential information of this procedure:
              Purely national exclusion grounds: Z postępowania o udzielenie zamówienia wyklucza się
              Wykonawców, którzy podlegają wykluczeniu na podstawie przepisów, o których mowa w art.
              108 ust. 1 pkt 1) – 6) ustawy Pzp (podstawy wykluczenia obligatoryjne) oraz art. 109 ust. 1 pkt
              2, 3, 4, 7, 8, 9, 10 ustawy Pzp (podstawy wykluczenia fakultatywne), z zastrzeżeniem
              wyjątków przewidzianych w ustawie Pzp. Zgodnie z art. 7 ust. 1 ustawy z dnia 13 kwietnia
              2022 r. o szczególnych rozwiązaniach w zakresie przeciwdziałania wspieraniu agresji na
              Ukrainę oraz służących ochronie bezpieczeństwa narodowego (t.j. Dz. U. z 2025 r. poz. 514),
              Z postępowania o udzielenie zamówienia wyklucza się: 1) wykonawcę oraz uczestnika
              konkursu wymienionego w wykazach określonych w rozporządzeniu 765/2006 i
              rozporządzeniu 269/2014 albo wpisanego na listę na podstawie decyzji w sprawie wpisu na
              listę rozstrzygającej o zastosowaniu środka, o którym mowa w art. 1 pkt 3 tej ustawy; 2)
              wykonawcę oraz uczestnika konkursu, którego beneficjentem rzeczywistym w rozumieniu
              ustawy z dnia 1 marca 2018 r. o przeciwdziałaniu praniu pieniędzy oraz finansowaniu
              terroryzmu (Dz. U. z 2022 r. poz. 593 i 655) jest osoba wymieniona w wykazach określonych
              w rozporządzeniu 765/2006 i rozporządzeniu 269/2014 albo wpisana na listę lub będąca takim
              beneficjentem rzeczywistym od dnia 24 lutego 2022 r., o ile została wpisana na listę na
              podstawie decyzji w sprawie wpisu na listę rozstrzygającej o zastosowaniu środka, o którym
              mowa w art. 1 pkt 3 tej ustawy; 3) wykonawcę oraz uczestnika konkursu, którego jednostką
              dominującą w rozumieniu art. 3 ust. 1 pkt 37 ustawy z dnia 29 września 1994 r. o
              rachunkowości (Dz. U. z 2021 r. poz. 217, 2105 i 2106) jest podmiot wymieniony w wykazach
              określonych w rozporządzeniu 765/2006 i rozporządzeniu 269/2014 albo wpisany na listę lub
              będący taką jednostką dominującą od dnia 24 lutego 2022 r., o ile został wpisany na listę na
              podstawie decyzji w sprawie wpisu na listę rozstrzygającej o zastosowaniu środka, o którym
              mowa w art. 1 pkt 3 tej ustawy; oraz, na podstawie art. 5k rozporządzenia Rady (UE) nr 833
              /2014 z dnia 31 lipca 2014 r. dotyczącego środków ograniczających w związku z działaniami
              Rosji destabilizującymi sytuację na Ukrainie (Dz.Urz. UE L 229 z 31.7.2014, s. 1), w brzmieniu
              nadanym m.in. rozporządzeniem Rady (UE) nr 2025/2033 z dnia 23 października 2025 r. (Dz.
              U. UE L 2025.2033) oraz rozporządzeniem Rady (UE) nr 2025/395 z dnia 24 lutego 2025 r.
              (Dz.U. UE L 2025.395).

   5. Lot

      5.1. Lot: LOT-0001
           Title: Utworzenie magazynu na zrębki drzewne, utworzenie kotłowni biomasowej i montaż
           kotła, utworzenie sieci i węzłów ciepłowniczych, instalację kogeneracji wraz z systemem
           przygotowania paliwa, utworzenie magazynu ciepła o pojemności 3,5 MWh oraz wdrożenie
           systemu zarządzania energią w miejscowości Wieniawa
           Description: 1. W ramach części zamówienia nr 1 – Wykonawca zobowiązany będzie: 1)
           wykonać dokumentację(e) projektową(e), w tym Projekt(y) Budowalny(e), Projekt(y)

674195-2026                                                                                            Page 6/27
              Techniczny(e) i Projekt(y) Wykonawczy(e), kosztorys(y) wraz z przedmiarem(ami) robót,
              specyfikację techniczną wykonania i odbioru robót wraz z uzyskaniem prawomocnej(ych)
              decyzji o pozwoleniu na budowę albo zgłoszenia(eń) robót – dla całego zakresu opisanego w
              Programie Funkcjonalno–Użytkowym, a także przygotować do zatwierdzenia przez
              Zamawiającego Harmonogram budowy; 2) wykonać roboty budowlane, w oparciu o
              opracowaną(e) i zaakceptowaną(e) przez Zamawiającego dokumentację(e) projektowo-
              kosztorysową(e), o której(ych) mowa w pkt 1) powyżej, i uzyskaną(e) prawomocną(e) decyzję
              (e) o pozwoleniu na budowę albo zgłoszenie(a) robót oraz uzyskać prawomocne pozwolenie
              (a) na użytkowania albo zgłoszenie(a) zakończenia robót (o ile dotyczy); 3) wykonać
              wdrożenie systemu zarządzania energią, monitorowania, zarządzania produkcją i dystrybucją
              energii, optymalizacji, integracji systemów pomiarowych, raportowania i analizy danych. 2.
              Szczegóły zakres przedmiotu niniejszego zamówienia precyzują dla części zamówienia nr 1 –
              załącznik nr 8 do SWZ – Program Funkcjonalno-Użytkowy, właściwy dla tych części
              zamówienia, zaś wymogi dotyczące realizacji zamówienia załącznik nr 9a do SWZ – Projekt
              umowy. 3. Pożądane jest, aby przed złożeniem Oferty Wykonawca przeprowadził wizję
              lokalną terenów, na których zlokalizowane będą roboty objęte przedmiotem niniejszego
              zamówienia. Przeprowadzenie wizji nie jest warunkiem dla złożenia oferty w niniejszym
              postępowaniu. Koszty dokonania wizji lokalnej terenu budowy poniesie Wykonawca. 4. Roboty
              budowlane stanowiące przedmiot niniejszego zamówienia należy wykonać zgodnie z niniejszą
              SWZ, Opisem Przedmiotu Zamówienia (OPZ), Projektem Umowy oraz zgodnie z zasadami
              sztuki budowlanej, wiedzy technicznej, obowiązującymi przepisami i normami. Zobowiązanie
              wykonania robót zgodnie z powyższymi dokumentami nie zwalnia Wykonawcy m. in. od
              obowiązku weryfikacji tej dokumentacji w trakcie trwania umowy i zgłaszania Zamawiającemu
              wykrytych w niej wad czy uchybień skutkujących możliwością niedochowania warunków
              umowy lub naruszeniem przepisów prawa. 5. Od dnia odbioru placu budowy Wykonawca
              odpowiada za wszystkie zdarzenia, które zaistnieją podczas wykonywania umowy. Za
              wszystkie wyrządzone komukolwiek szkody podczas budowy lub w związku z budową
              odpowiada Wykonawca, chyba, że nie zachodzi związek przyczynowy pomiędzy
              prowadzeniem robót a wyrządzoną szkodą. Wykonawca przyjmie odpowiedzialność w
              szczególności za: 1) szkody i następstwa nieszczęśliwych wypadków dotyczących
              pracowników Wykonawcy oraz osób trzecich przebywających w rejonie prowadzonych robót;
              2) szkody wynikające ze zniszczeń oraz innych zdarzeń w odniesieniu do robót, materiałów
              sprzętu i innego mienia ruchomego związanego z prowadzeniem robót podczas realizacji
              przedmiotu niniejszej umowy; 3) szkody w robotach spowodowane przez niego przy usuwaniu
              wad w okresie gwarancji i rękojmi; 4) niewłaściwe zabezpieczenie terenu budowy oraz
              dopuszczenie na teren budowy osób nieupoważnionych. 6. Zamawiający, zgodnie z zapisami
              art. 99 ust. 5 i art. 101 ust. 4 ustawy Pzp, dopuszcza rozwiązania równoważne dla robót,
              materiałów, systemów spełniające obowiązujące standardy i wymagania. Zamawiający
              zastrzega, że wszędzie tam, gdzie w treści opisu przedmiotu zamówienia, stanowiącego opis
              przedmiotu zamówienia, zostały w opisie tego przedmiotu wskazane znaki towarowe, patenty
              lub pochodzenie urządzeń lub materiałów należy je traktować wyłącznie jako propozycje
              projektanta. Zamawiający dopuszcza metody, materiały, urządzenia, systemy, technologie itp.
              równoważne do przedstawionych w opisie przedmiotu zamówienia. Dopuszcza się więc
              zaproponowanie w ofercie wszelkich równoważnych odpowiedników rynkowych o
              właściwościach nie gorszych niż wskazane przez Zamawiającego. Parametry wskazanego
              standardu określają minimalne warunki techniczne, eksploatacyjne, użytkowe, jakościowe i
              funkcjonalne, jakie ma spełniać przedmiot zamówienia. W ofercie można przyjąć metody,
              materiały, urządzenia, systemy, technologie itp. innych marek i producentów, jednak o
              parametrach technicznych, jakościowych i właściwościach użytkowych oraz funkcjonalnych
              odpowiadających metodom, materiałom, urządzeniom, systemom, technologiom itp. opisanym

674195-2026                                                                                        Page 7/27
              w SWZ. Ponadto zamienne urządzenia przyjęte do wyceny: winny spełniać funkcję, jakiej mają
              służyć, winny być kompatybilne z pozostałymi urządzeniami, aby zespół urządzeń dawał
              zamierzony efekt, nie mogą wpływać na zmianę rodzaju i zakresu robót budowlanych. Na
              żądanie Zamawiającego, Wykonawca ma obowiązek udowodnienia, iż zastosowane
              rozwiązania równoważne pozwolą osiągnąć wszystkie założenia techniczne dla
              przedmiotowego zadania inwestycyjnego, biorąc pod uwagę całość inwestycji, a nie wybrany
              fragment całości. Ciężar udowodnienia, że materiał lub urządzenie jest równoważne w
              stosunku do wymogu określonego przez Zamawiającego spoczywa na Wykonawcy. Jeżeli
              materiały lub/i urządzenia zaoferowane przez Wykonawcę jako równoważne nie będą
              równoważne w świetle przedłożonych przez Wykonawcę dokumentów, oferta tego
              Wykonawcy zostanie odrzucona jako nieodpowiadająca treści SWZ. W przypadku zaś
              opisania przedmiotu zamówienia przez odniesienie do norm, europejskich ocen technicznych,
              aprobat, specyfikacji technicznych i systemów referencji technicznych, Zamawiający
              dopuszcza wykonanie zamówienia z zastosowaniem rozwiązań równoważnych opisywanym.
              W takim wypadku, procedurę opisaną na wstępie niniejszego punktu stosuje się odpowiednio.
              7. Dalsze zapisy w SWZ.
              Internal identifier: Część zamówienia nr 1

     5.1.1. Purpose
            Main nature of the contract: Works
            Main classification (cpv): 45000000 Construction work
            Additional classification (cpv): 45331110 Boiler installation work, 45453000 Overhaul and
            refurbishment work, 71321200 Heating-system design services, 71300000 Engineering
            services, 45331100 Central-heating installation work, 45331000 Heating, ventilation and air-
            conditioning installation work, 45300000 Building installation work, 45400000 Building
            completion work, 45450000 Other building completion work, 45330000 Plumbing and sanitary
            works, 45331000 Heating, ventilation and air-conditioning installation work

     5.1.2. Place of performance
            Country subdivision (NUTS): Radomski (PL921)
            Country: Poland

     5.1.3. Estimated duration
            Start date: 01/12/2026
            Duration end date: 30/06/2027

     5.1.6. General information
            Reserved participation:
            Participation is not reserved.
            Procurement Project fully or partially financed with EU Funds.
            Information about European Union funds:
            Identifier of EU funds: Przedmiotowe zamówienie jest realizowane jest w ramach projektu pn.:
            „Innowacyjne rozwiązania dotyczące Energii elektrycznej i cieplnej Wieniawskiego Klastra
            Energii”, dofinansowanego z Inwestycji B2.2.2 Krajowego Planu Odbudowy i Zwiększania
            Odporności (KPO).
            The procurement is covered by the Government Procurement Agreement (GPA): no
            Additional information: Zamawiający wskazuje datę początkową terminu realizacji zamówienia
            wyłącznie z przyczyn technicznych, bowiem formularz ogłoszenia o zamówieniu nie daje
            możliwości wskazania jedynie daty końcowej terminu realizacji zamówienia.

     5.1.9. Selection criteria
            Sources of selection criteria: Notice

674195-2026                                                                                        Page 8/27
              Criterion: References on specified works
              Description of selection criterion: Warunek dotyczący zdolności zawodowej zostanie
              spełniony, jeżeli Wykonawca wykaże, że w okresie ostatnich pięciu lat przed upływem terminu
              składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, wykonał
              co najmniej: a) 2 (dwa) zadania polegające na budowie, rozbudowie, przebudowie lub
              modernizacji kotłowni zasilanych biomasą, przy czym każde z tych zadań musi obejmować
              swoim zakresem budowę dedykowanego magazynu paliwa (biomasy), a co najmniej jedno z
              tych zadań obejmować kotłownię o mocy nie mniejszej niż 300 kW. i b) 1 (jedna) zadanie
              polegające na budowie, rozbudowie, przebudowie lub modernizacji sieci cieplnej wraz z
              przyłączami o długości co najmniej 1000 m.b., i c) 2 (dwa) zadania polegające na opracowaniu
              dokumentacji projektowej dla instalacji grzewczych wytwarzających energię z biomasy, przy
              czym każda z tych usług (umów) musiała obejmować projektowanie źródeł ciepła o łącznej
              mocy grzewczej nie mniejszej niż 0,5 MW, i d) dostawę i montaż co najmniej 90 węzłów
              cieplnych, realizowanych w jednym lub kilku zadaniach w okresie ostatnich 5 lat, przy czym co
              najmniej jedno zadanie musi obejmować dostawę i montaż minimum 30 węzłów, i e) 1 (jedna)
              zadanie polegające na uruchomieniu zdalnego systemu monitoringu i telemetrii dla co
              najmniej 26 węzłów cieplnych, i f) 1 (jedno) zadanie obejmujące zaprojektowanie, dostawę i
              uruchomienie jednego zintegrowanego systemu zarządzania i monitorowania energią (EMS
              /BMS), nadzorującego w czasie rzeczywistym współpracę rozproszonych instalacji zasilanych
              z OZE, z zastrzeżeniem, że system musi obejmować monitoring dla łącznie co najmniej 200
              instalacji zasilanych z OZE. Zamawiający wymaga, aby w/w roboty budowlane zostały
              wykonane należycie. Dokumenty i oświadczenia wymagane od Wykonawcy na potwierdzenie
              spełniania warunków udziału w postępowaniu (dla wszystkich części zamówienia): 1) wykaz
              robót budowlanych wykonanych nie wcześniej niż w okresie ostatnich pięciu lat przed
              upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym
              okresie, wraz z podaniem ich wartości, przedmiotu, dat wykonania i podmiotów, na rzecz
              których roboty te zostały wykonane – załącznik nr 5 do SWZ, oraz załączenie dowodów
              określających, czy te roboty budowlane zostały wykonane należycie, przy czym dowodami, o
              których mowa, są referencje bądź inne dokumenty sporządzone przez podmiot, na rzecz
              którego roboty budowlane zostały wykonane, a jeżeli wykonawca z przyczyn niezależnych od
              niego nie jest w stanie uzyskać tych dokumentów - inne odpowiednie dokumenty.

              Criterion: Number of managerial staff
              Description of selection criterion: Warunek dotyczący zdolności zawodowej zostanie
              spełniony, jeżeli wykonawca wykaże, iż dysponuje osobą zdolną do wykonania zamówienia,
              tj.: a) Projektant branży instalacyjnej - kwalifikacje i umiejętności: uprawnienia do
              projektowania w specjalności instalacyjnej w zakresie sieci, instalacji i urządzeń cieplnych,
              wentylacyjnych, gazowych, wodociągowych i kanalizacyjnych bez ograniczeń, uprawniającymi
              do projektowania obiektu budowlanego związanego z obiektem budowlanym stanowiącym
              przedmiot zamówienia* oraz przynależność do Okręgowej Izby Budownictwa, b) Kierownik
              Budowy: - kwalifikacje i umiejętności: uprawnienia do kierowania robotami budowlanymi w
              specjalności sieci, instalacji i urządzeń cieplnych, wentylacyjnych, gazowych, wodociągowych i
              kanalizacyjnych bez ograniczeń, uprawniającymi do kierowania robotami budowlanymi
              związanymi z obiektem budowlanym stanowiącym przedmiot zamówienia* oraz przynależność
              do Okręgowej Izby Budownictwa, - Doświadczenie zawodowe: doświadczenie zawodowe
              obejmujące pełnienie funkcji kierownika budowy lub kierownika robót przy realizacji co
              najmniej 2 (dwóch) odrębnych zadań polegających na budowie, rozbudowie lub modernizacji
              kotłowni zasilanych biomasą o mocy nie mniejszej niż 300 kW każda, przy czym każde z tych
              zadań musi obejmować równoczesną budowę sieci cieplnej o długości nie mniejszej niż 200
              metrów. * dopuszcza się odpowiadające tym uprawnieniom uprawnienia budowlane, które

674195-2026                                                                                           Page 9/27
              zostały wydane na podstawie wcześniej obowiązujących przepisów oraz odpowiadające im
              uprawnienia wydane obywatelom państw Europejskiego Porozumienia o Wolnym Handlu
              (EFTA) – stron umowy o Europejskim Obszarze Gospodarczym oraz Konfederacji
              Szwajcarskiej, z zastrzeżeniem art. 12a oraz innych przepisów ustawy Prawo budowlane oraz
              ustawy z dnia 22 grudnia 2015 r. o zasadach uznawania kwalifikacji zawodowych nabytych w
              państwach członkowskich Unii Europejskiej (t.j. Dz. U. z 2026 r. poz. 166). Zamawiający
              dopuszcza możliwości łączenia funkcji specjalistów przez jedną osobę, pod warunkiem, że
              osoba ta spełnia warunki dla wszystkich łączonych funkcji. Dokumenty i oświadczenia
              wymagane od Wykonawcy na potwierdzenie spełniania warunków udziału w postępowaniu
              (dla wszystkich części zamówienia): 1) wykaz osób, skierowanych przez wykonawcę do
              realizacji zamówienia publicznego, w szczególności odpowiedzialnych za świadczenie usług,
              kontrolę jakości lub kierowanie robotami budowlanymi, wraz z informacjami na temat ich
              kwalifikacji zawodowych, uprawnień, doświadczenia niezbędnych do wykonania Zamówienia,
              a także zakresu wykonywanych przez te osoby czynności oraz informacją o podstawie do
              dysponowania tymi osobami – załącznik nr 6 do SWZ.

   5.1.10. Award criteria
           Criterion:
           Type: Price
           Description: Najniższa Cena
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 50
           Criterion:
           Type: Quality
           Description: Sprawność kotła
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 5
           Criterion:
           Type: Quality
           Description: Emisja pyłu
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 2,5
           Criterion:
           Type: Quality
           Description: Emisja OGC
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 2,5
           Criterion:
           Type: Quality
           Description: Gwarancja producenta dotycząca dobrego wykonania, uruchomienia i przeglądu
           od producenta
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 5
           Criterion:
           Type: Quality
           Description: Posiadanie certyfikatów przez producenta
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 3
           Criterion:
           Type: Quality

674195-2026                                                                                     Page 10/27
              Description: Analiza ryzyka TÜV
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 5
              Criterion:
              Type: Quality
              Description: Przystosowanie do pracy pod nadciśnieniem
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2
              Criterion:
              Type: Quality
              Description: Wyposażenie w system wykorzystania energii reaktywnej (biernej)
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Wyposażenie w system suchej puryfikacji (oczyszczania) gazu
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Systemy Zarządzania producenta rur preizolowanych
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 7,5
              Criterion:
              Type: Quality
              Description: Systemy Zarządzania producenta węzłów cieplnych
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 12,5

   5.1.11. Procurement documents
           Address of the procurement documents: https://ezamowienia.gov.pl/mp-client/search/list/ocds-
           148610-2c2a0486-4d87-4dcf-90af-910e50d175a1

   5.1.12. Terms of procurement
           Terms of submission:
           Electronic submission: Required
           Address for submission: https://ezamowienia.gov.pl/mp-client/search/list/ocds-148610-
           2c2a0486-4d87-4dcf-90af-910e50d175a1
           Languages in which tenders or requests to participate may be submitted: Polish
           Electronic catalogue: Not allowed
           Description of the financial guarantee: 1. Zamawiający przewiduje obowiązek wniesienia
           wadium przed upływem terminu składania ofert, w wysokości dla części zamówienia nr 1 –
           150 000,00 PLN (słownie: sto pięćdziesiąt tysięcy złotych 00/100). 2. Wadium może być
           wniesione w jednej lub kilku następujących formach: 1) pieniądzu (w tytule przelewu należy
           podać nr sprawy: ZP.2710.15.2026 oraz numer części zamówienia); 2) gwarancjach
           bankowych; 3) gwarancjach ubezpieczeniowych; 4) poręczeniach udzielanych przez podmioty,
           o których mowa w art. 6b ust. 5 pkt 2 ustawy z dnia 9 listopada 2000 r. o utworzeniu polskiej
           Agencji Rozwoju Przedsiębiorczości (t.j. Dz. U. z 2025 r. poz. 98). 3. Wadium wnoszone w
           pieniądzu należy wpłacać przelewem na rachunek bankowy Zamawiającego w Banku
           Spółdzielczym w Przysusze O/Wieniawa, nr rachunku: 05 9145 1040 2000 0055 2000 0032. 4.


674195-2026                                                                                     Page 11/27
              Terminowe wniesienie wadium w formie pieniężnej oznacza, że żądana przez Zamawiającego
              kwota została wpłacona w pełnej wysokości przelewem na wskazany przez niego rachunek
              bankowy. Oznacza to, że wniesienie wadium w tej postaci jest skuteczne dopiero z chwilą
              uznania rachunku Zamawiającego kwotą wadium przed upływem terminu składania ofert. 5. W
              przypadku wniesienia wadium w formie gwarancji lub poręczenia, o których mowa w ust. 3,
              Wykonawca przekazuje Zamawiającemu oryginał gwarancji lub poręczenia w postaci
              elektronicznej, do upływu terminu składania ofert. Zaleca się gwarancję lub poręczenie, o
              których mowa powyżej, dołączyć do dokumentów składanych wraz z ofertą. 6. Wadium
              wniesione w formie poręczeń lub gwarancji będzie akceptowane przez Zamawiającego, jeżeli
              będzie zawierać wszystkie określone ustawą Pzp przypadki utraty wadium przez Wykonawcę,
              klauzulę o nieodwołalności oraz zapewnienie bezwarunkowej wypłaty przez gwaranta na
              pierwsze pisemne żądanie Zamawiającego, pełnej kwoty wadium w przypadkach
              wymienionych w art. 98 ust. 6 ustawy Pzp. 7. Oferta niezabezpieczona wadium zostanie
              odrzucona. Dalsze zapisy w SWZ.
              Deadline for receipt of tenders: 14/10/2026 09:00:00 (UTC+02:00) Eastern European Time,
              Central European Summer Time
              Duration during which the tender must remain valid: 90 Days
              Information about public opening:
              Opening date: 14/10/2026 11:00:00 (UTC+02:00) Eastern European Time, Central European
              Summer Time
              Terms of contract:
              The execution of the contract must be performed within the framework of sheltered
              employment programmes: No
              Electronic invoicing: Required
              Electronic ordering will be used: no
              Electronic payment will be used: yes

   5.1.15. Techniques
           Framework agreement:
           No framework agreement
           Information about the dynamic purchasing system:
           No dynamic purchase system

   5.1.16. Further information, mediation and review
           Mediation organisation: Krajowa Izba Odwoławcza
           Review organisation: Krajowa Izba Odwoławcza
           Information about review deadlines: 1. Wykonawcom, a także innemu podmiotowi, jeżeli ma
           lub miał interes w uzyskaniu zamówienia oraz poniósł lub może ponieść szkodę w wyniku
           naruszenia przez Zamawiającego przepisów ustawy Pzp, przysługują środki ochrony prawnej
           przewidziane w art. 505 i następnych ustawy Pzp. Środki ochrony prawnej wobec ogłoszenia
           wszczynającego postępowanie o udzielenie zamówienia oraz dokumentów zamówienia
           przysługują również organizacjom wpisanym na listę, o której mowa w art. 469 pkt 15 ustawy
           Pzp oraz Rzecznikowi Małych i Średnich Przedsiębiorców. 2. Wobec niezgodnej z przepisami
           ustawy Pzp czynności Zamawiającego podjętej w postępowaniu, w tym na projektowane
           postanowienie umowy, lub w przypadku zaniechania przez Zamawiającego dokonania
           czynności, do których podjęcia zobowiązany jest Zamawiający przepisami ustawy Pzp lub w
           przypadku zaniechania przeprowadzenia postępowania o udzielenie zamówienia na
           podstawie ustawy Pzp, mimo że Zamawiający był do tego obowiązany, Wykonawca może
           wnieść odwołanie. 3. Odwołanie wnosi się do Prezesa Izby w formie pisemnej, w formie
           elektronicznej albo w postaci elektronicznej z tym, że odwołanie i przystąpienie do


674195-2026                                                                                     Page 12/27
              postępowania odwoławczego, wniesione w postaci elektronicznej, wymagają opatrzenia
              podpisem zaufanym. 4. Odwołujący przekazuje Zamawiającemu odwołanie wniesione w
              formie elektronicznej albo postaci elektronicznej albo kopię tego odwołania, jeżeli zostało ono
              wniesione w formie pisemnej, przed upływem terminu do wniesienia odwołania w taki sposób,
              aby mógł on zapoznać się z jego treścią przed upływem tego terminu. 5. Odwołanie wnosi się
              w terminie: 1) 10 dni od dnia przekazania informacji o czynności Zamawiającego stanowiącej
              podstawę jego wniesienia, jeżeli informacja została przekazana przy użyciu środków
              komunikacji elektronicznej; 2) 15 dni od dnia przekazania informacji o czynności
              Zamawiającego stanowiącej podstawę jego wniesienia, jeżeli informacja została przekazana w
              sposób inny niż określony w ppkt 1). 6. Odwołanie wobec treści ogłoszenia o zamówieniu lub
              wobec treści dokumentów zamówienia wnosi się w terminie 10 dni od dnia publikacji
              ogłoszenia w Dzienniku Urzędowym Unii Europejskiej lub zamieszczenia dokumentów
              zamówienia na stronie internetowej Zamawiającego. 7. Odwołanie w przypadkach innych niż
              określone w pkt 5 i 6 wnosi się w terminie 10 dni od dnia, w którym powzięto lub przy
              zachowaniu należytej staranności można było powziąć wiadomość o okolicznościach
              stanowiących podstawę jego wniesienia. 8. Jeżeli Zamawiający nie opublikował ogłoszenia o
              zamiarze zawarcia umowy lub mimo takiego obowiązku nie przesłał Wykonawcy
              zawiadomienia o wyborze najkorzystniejszej oferty, odwołanie wnosi się nie później niż w
              terminie: 1) 30 dni od dnia publikacji w Dzienniku Urzędowym Unii Europejskiej ogłoszenia o
              udzieleniu zamówienia, 2) 6 miesięcy od dnia zawarcia umowy, jeżeli Zamawiający nie
              opublikował w Dzienniku Urzędowym Unii Europejskiej ogłoszenia o udzieleniu zamówienia. 9.
              Na orzeczenie Krajowej Izby Odwoławczej oraz postanowienie Prezesa Izby, stronom oraz
              uczestnikom postępowania odwoławczego przysługuje skarga do sądu. Szczegółowo kwestie
              dotyczące skargi do sądu uregulowane zostały w art. 579-590 ustawy Pzp.
              Organisation providing more information on the review procedures: Krajowa Izba Odwoławcza

      5.1. Lot: LOT-0002
           Title: Utworzenie magazynu na zrębki drzewne wraz z budynkiem kotłowni, dostawę i montaż
           kotła, utworzenie kogeneracji wraz z systemem przygotowania paliwa, utworzenie sieci i
           węzłów ciepłowniczych oraz utworzenie magazynu ciepła o pojemności 3,5 MWh w
           miejscowości Sokolniki Mokre
           Description: 1. W ramach części zamówienia nr 2 – Wykonawca zobowiązany będzie: 1)
           wykonać dokumentację(e) projektową(e), w tym Projekt(y) Budowalny(e), Projekt(y)
           Techniczny(e) i Projekt(y) Wykonawczy(e), kosztorys(y) wraz z przedmiarem(ami) robót,
           specyfikację techniczną wykonania i odbioru robót wraz z uzyskaniem prawomocnej(ych)
           decyzji o pozwoleniu na budowę albo zgłoszenia(eń) robót – dla całego zakresu opisanego w
           Programie Funkcjonalno–Użytkowym, a także przygotować do zatwierdzenia przez
           Zamawiającego Harmonogram budowy; 2) wykonać roboty budowlane, w oparciu o
           opracowaną(e) i zaakceptowaną(e) przez Zamawiającego dokumentację(e) projektowo-
           kosztorysową(e), o której(ych) mowa w pkt 1) powyżej, i uzyskaną(e) prawomocną(e) decyzję
           (e) o pozwoleniu na budowę albo zgłoszenie(a) robót oraz uzyskać prawomocne pozwolenie
           (a) na użytkowania albo zgłoszenie(a) zakończenia robót (o ile dotyczy); 3) wykonać
           wdrożenie systemu zarządzania energią, monitorowania, zarządzania produkcją i dystrybucją
           energii, optymalizacji, integracji systemów pomiarowych, raportowania i analizy danych. 2.
           Szczegóły zakres przedmiotu niniejszego zamówienia precyzują dla części zamówienia nr 2 –
           załącznik nr 8 do SWZ – Program Funkcjonalno-Użytkowy, właściwy dla tych części
           zamówienia, zaś wymogi dotyczące realizacji zamówienia załącznik nr 9a do SWZ – Projekt
           umowy. 3. Pożądane jest, aby przed złożeniem Oferty Wykonawca przeprowadził wizję
           lokalną terenów, na których zlokalizowane będą roboty objęte przedmiotem niniejszego
           zamówienia. Przeprowadzenie wizji nie jest warunkiem dla złożenia oferty w niniejszym

674195-2026                                                                                          Page 13/27
              postępowaniu. Koszty dokonania wizji lokalnej terenu budowy poniesie Wykonawca. 4. Roboty
              budowlane stanowiące przedmiot niniejszego zamówienia należy wykonać zgodnie z niniejszą
              SWZ, Opisem Przedmiotu Zamówienia (OPZ), Projektem Umowy oraz zgodnie z zasadami
              sztuki budowlanej, wiedzy technicznej, obowiązującymi przepisami i normami. Zobowiązanie
              wykonania robót zgodnie z powyższymi dokumentami nie zwalnia Wykonawcy m. in. od
              obowiązku weryfikacji tej dokumentacji w trakcie trwania umowy i zgłaszania Zamawiającemu
              wykrytych w niej wad czy uchybień skutkujących możliwością niedochowania warunków
              umowy lub naruszeniem przepisów prawa. 5. Od dnia odbioru placu budowy Wykonawca
              odpowiada za wszystkie zdarzenia, które zaistnieją podczas wykonywania umowy. Za
              wszystkie wyrządzone komukolwiek szkody podczas budowy lub w związku z budową
              odpowiada Wykonawca, chyba, że nie zachodzi związek przyczynowy pomiędzy
              prowadzeniem robót a wyrządzoną szkodą. Wykonawca przyjmie odpowiedzialność w
              szczególności za: 1) szkody i następstwa nieszczęśliwych wypadków dotyczących
              pracowników Wykonawcy oraz osób trzecich przebywających w rejonie prowadzonych robót;
              2) szkody wynikające ze zniszczeń oraz innych zdarzeń w odniesieniu do robót, materiałów
              sprzętu i innego mienia ruchomego związanego z prowadzeniem robót podczas realizacji
              przedmiotu niniejszej umowy; 3) szkody w robotach spowodowane przez niego przy usuwaniu
              wad w okresie gwarancji i rękojmi; 4) niewłaściwe zabezpieczenie terenu budowy oraz
              dopuszczenie na teren budowy osób nieupoważnionych. 6. Zamawiający, zgodnie z zapisami
              art. 99 ust. 5 i art. 101 ust. 4 ustawy Pzp, dopuszcza rozwiązania równoważne dla robót,
              materiałów, systemów spełniające obowiązujące standardy i wymagania. Zamawiający
              zastrzega, że wszędzie tam, gdzie w treści opisu przedmiotu zamówienia, stanowiącego opis
              przedmiotu zamówienia, zostały w opisie tego przedmiotu wskazane znaki towarowe, patenty
              lub pochodzenie urządzeń lub materiałów należy je traktować wyłącznie jako propozycje
              projektanta. Zamawiający dopuszcza metody, materiały, urządzenia, systemy, technologie itp.
              równoważne do przedstawionych w opisie przedmiotu zamówienia. Dopuszcza się więc
              zaproponowanie w ofercie wszelkich równoważnych odpowiedników rynkowych o
              właściwościach nie gorszych niż wskazane przez Zamawiającego. Parametry wskazanego
              standardu określają minimalne warunki techniczne, eksploatacyjne, użytkowe, jakościowe i
              funkcjonalne, jakie ma spełniać przedmiot zamówienia. W ofercie można przyjąć metody,
              materiały, urządzenia, systemy, technologie itp. innych marek i producentów, jednak o
              parametrach technicznych, jakościowych i właściwościach użytkowych oraz funkcjonalnych
              odpowiadających metodom, materiałom, urządzeniom, systemom, technologiom itp. opisanym
              w SWZ. Ponadto zamienne urządzenia przyjęte do wyceny: winny spełniać funkcję, jakiej mają
              służyć, winny być kompatybilne z pozostałymi urządzeniami, aby zespół urządzeń dawał
              zamierzony efekt, nie mogą wpływać na zmianę rodzaju i zakresu robót budowlanych. Na
              żądanie Zamawiającego, Wykonawca ma obowiązek udowodnienia, iż zastosowane
              rozwiązania równoważne pozwolą osiągnąć wszystkie założenia techniczne dla
              przedmiotowego zadania inwestycyjnego, biorąc pod uwagę całość inwestycji, a nie wybrany
              fragment całości. Ciężar udowodnienia, że materiał lub urządzenie jest równoważne w
              stosunku do wymogu określonego przez Zamawiającego spoczywa na Wykonawcy. Jeżeli
              materiały lub/i urządzenia zaoferowane przez Wykonawcę jako równoważne nie będą
              równoważne w świetle przedłożonych przez Wykonawcę dokumentów, oferta tego
              Wykonawcy zostanie odrzucona jako nieodpowiadająca treści SWZ. W przypadku zaś
              opisania przedmiotu zamówienia przez odniesienie do norm, europejskich ocen technicznych,
              aprobat, specyfikacji technicznych i systemów referencji technicznych, Zamawiający
              dopuszcza wykonanie zamówienia z zastosowaniem rozwiązań równoważnych opisywanym.
              W takim wypadku, procedurę opisaną na wstępie niniejszego punktu stosuje się odpowiednio.
              7. Dalsze zapisy w SWZ.
              Internal identifier: Część zamówienia nr 2

674195-2026                                                                                      Page 14/27
     5.1.1. Purpose
            Main nature of the contract: Works
            Main classification (cpv): 45000000 Construction work
            Additional classification (cpv): 45331110 Boiler installation work, 45453000 Overhaul and
            refurbishment work, 71321200 Heating-system design services, 71300000 Engineering
            services, 45331100 Central-heating installation work, 45331000 Heating, ventilation and air-
            conditioning installation work, 45300000 Building installation work, 45400000 Building
            completion work, 45450000 Other building completion work, 45330000 Plumbing and sanitary
            works, 45331000 Heating, ventilation and air-conditioning installation work

     5.1.2. Place of performance
            Country subdivision (NUTS): Radomski (PL921)
            Country: Poland

     5.1.3. Estimated duration
            Start date: 01/12/2026
            Duration end date: 30/06/2027

     5.1.6. General information
            Reserved participation:
            Participation is not reserved.
            Procurement Project fully or partially financed with EU Funds.
            Information about European Union funds:
            Identifier of EU funds: Przedmiotowe zamówienie jest realizowane jest w ramach projektu pn.:
            „Innowacyjne rozwiązania dotyczące Energii elektrycznej i cieplnej Wieniawskiego Klastra
            Energii”, dofinansowanego z Inwestycji B2.2.2 Krajowego Planu Odbudowy i Zwiększania
            Odporności (KPO).
            The procurement is covered by the Government Procurement Agreement (GPA): no
            Additional information: Zamawiający wskazuje datę początkową terminu realizacji zamówienia
            wyłącznie z przyczyn technicznych, bowiem formularz ogłoszenia o zamówieniu nie daje
            możliwości wskazania jedynie daty końcowej terminu realizacji zamówienia.

     5.1.9. Selection criteria
            Sources of selection criteria: Notice
            Criterion: References on specified works
            Description of selection criterion: Warunek dotyczący zdolności zawodowej zostanie
            spełniony, jeżeli Wykonawca wykaże, że w okresie ostatnich pięciu lat przed upływem terminu
            składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, wykonał
            co najmniej: a) 2 (dwa) zadania polegające na budowie, rozbudowie, przebudowie lub
            modernizacji kotłowni zasilanych biomasą, przy czym każde z tych zadań musi obejmować
            swoim zakresem budowę dedykowanego magazynu paliwa (biomasy), a co najmniej jedno z
            tych zadań obejmować kotłownię o mocy nie mniejszej niż 300 kW. i b) 1 (jedna) zadanie
            polegające na budowie, rozbudowie, przebudowie lub modernizacji sieci cieplnej wraz z
            przyłączami o długości co najmniej 1000 m.b., i c) 2 (dwa) zadania polegające na opracowaniu
            dokumentacji projektowej dla instalacji grzewczych wytwarzających energię z biomasy, przy
            czym każda z tych usług (umów) musiała obejmować projektowanie źródeł ciepła o łącznej
            mocy grzewczej nie mniejszej niż 0,5 MW, i d) dostawę i montaż co najmniej 25 węzłów
            cieplnych, realizowanych w jednym zadaniu, i e) 1 (jedna) zadanie polegające na
            uruchomieniu zdalnego systemu monitoringu i telemetrii dla co najmniej 15 węzłów cieplnych.
            Zamawiający wymaga, aby w/w roboty budowlane zostały wykonane należycie. Dokumenty i
            oświadczenia wymagane od Wykonawcy na potwierdzenie spełniania warunków udziału w

674195-2026                                                                                       Page 15/27
              postępowaniu (dla wszystkich części zamówienia): 1) wykaz robót budowlanych wykonanych
              nie wcześniej niż w okresie ostatnich pięciu lat przed upływem terminu składania ofert, a jeżeli
              okres prowadzenia działalności jest krótszy – w tym okresie, wraz z podaniem ich wartości,
              przedmiotu, dat wykonania i podmiotów, na rzecz których roboty te zostały wykonane –
              załącznik nr 5 do SWZ, oraz załączenie dowodów określających, czy te roboty budowlane
              zostały wykonane należycie, przy czym dowodami, o których mowa, są referencje bądź inne
              dokumenty sporządzone przez podmiot, na rzecz którego roboty budowlane zostały
              wykonane, a jeżeli wykonawca z przyczyn niezależnych od niego nie jest w stanie uzyskać
              tych dokumentów - inne odpowiednie dokumenty.

              Criterion: Number of managerial staff
              Description of selection criterion: Warunek dotyczący zdolności zawodowej zostanie
              spełniony, jeżeli wykonawca wykaże, iż dysponuje osobą zdolną do wykonania zamówienia,
              tj.: a) Projektant branży instalacyjnej - kwalifikacje i umiejętności: uprawnienia do
              projektowania w specjalności instalacyjnej w zakresie sieci, instalacji i urządzeń cieplnych,
              wentylacyjnych, gazowych, wodociągowych i kanalizacyjnych bez ograniczeń, uprawniającymi
              do projektowania obiektu budowlanego związanego z obiektem budowlanym stanowiącym
              przedmiot zamówienia* oraz przynależność do Okręgowej Izby Budownictwa, b) Kierownik
              Budowy: - kwalifikacje i umiejętności: uprawnienia do kierowania robotami budowlanymi w
              specjalności sieci, instalacji i urządzeń cieplnych, wentylacyjnych, gazowych, wodociągowych i
              kanalizacyjnych bez ograniczeń, uprawniającymi do kierowania robotami budowlanymi
              związanymi z obiektem budowlanym stanowiącym przedmiot zamówienia* oraz przynależność
              do Okręgowej Izby Budownictwa, - Doświadczenie zawodowe: doświadczenie zawodowe
              obejmujące pełnienie funkcji kierownika budowy lub kierownika robót przy realizacji co
              najmniej 2 (dwóch) odrębnych zadań polegających na budowie, rozbudowie lub modernizacji
              kotłowni zasilanych biomasą o mocy nie mniejszej niż 300 kW każda, przy czym każde z tych
              zadań musi obejmować równoczesną budowę sieci cieplnej o długości nie mniejszej niż 200
              metrów. * dopuszcza się odpowiadające tym uprawnieniom uprawnienia budowlane, które
              zostały wydane na podstawie wcześniej obowiązujących przepisów oraz odpowiadające im
              uprawnienia wydane obywatelom państw Europejskiego Porozumienia o Wolnym Handlu
              (EFTA) – stron umowy o Europejskim Obszarze Gospodarczym oraz Konfederacji
              Szwajcarskiej, z zastrzeżeniem art. 12a oraz innych przepisów ustawy Prawo budowlane oraz
              ustawy z dnia 22 grudnia 2015 r. o zasadach uznawania kwalifikacji zawodowych nabytych w
              państwach członkowskich Unii Europejskiej (t.j. Dz. U. z 2026 r. poz. 166). Zamawiający
              dopuszcza możliwości łączenia funkcji specjalistów przez jedną osobę, pod warunkiem, że
              osoba ta spełnia warunki dla wszystkich łączonych funkcji. Dokumenty i oświadczenia
              wymagane od Wykonawcy na potwierdzenie spełniania warunków udziału w postępowaniu
              (dla wszystkich części zamówienia): 1) wykaz osób, skierowanych przez wykonawcę do
              realizacji zamówienia publicznego, w szczególności odpowiedzialnych za świadczenie usług,
              kontrolę jakości lub kierowanie robotami budowlanymi, wraz z informacjami na temat ich
              kwalifikacji zawodowych, uprawnień, doświadczenia niezbędnych do wykonania Zamówienia,
              a także zakresu wykonywanych przez te osoby czynności oraz informacją o podstawie do
              dysponowania tymi osobami – załącznik nr 6 do SWZ.

   5.1.10. Award criteria
           Criterion:
           Type: Price
           Description: Najniższa Cena
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 50

674195-2026                                                                                            Page 16/27
              Criterion:
              Type: Quality
              Description: Sprawność kotła
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 5
              Criterion:
              Type: Quality
              Description: Emisja pyłu
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Emisja OGC
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Gwarancja producenta dotycząca dobrego wykonania, uruchomienia i przeglądu
              od producenta
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 5
              Criterion:
              Type: Quality
              Description: Posiadanie certyfikatów przez producenta
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 3
              Criterion:
              Type: Quality
              Description: Analiza ryzyka TÜV
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 5
              Criterion:
              Type: Quality
              Description: Przystosowanie do pracy pod nadciśnieniem
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2
              Criterion:
              Type: Quality
              Description: Wyposażenie w system wykorzystania energii reaktywnej (biernej)
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Wyposażenie w system suchej puryfikacji (oczyszczania) gazu
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Systemy Zarządzania producenta rur preizolowanych
              Category of award weight criterion: Weight (percentage, exact)

674195-2026                                                                                    Page 17/27
              Award criterion number: 7,5
              Criterion:
              Type: Quality
              Description: Systemy Zarządzania producenta węzłów cieplnych
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 12,5

   5.1.11. Procurement documents
           Address of the procurement documents: https://ezamowienia.gov.pl/mp-client/search/list/ocds-
           148610-2c2a0486-4d87-4dcf-90af-910e50d175a1

   5.1.12. Terms of procurement
           Terms of submission:
           Electronic submission: Required
           Address for submission: https://ezamowienia.gov.pl/mp-client/search/list/ocds-148610-
           2c2a0486-4d87-4dcf-90af-910e50d175a1
           Languages in which tenders or requests to participate may be submitted: Polish
           Electronic catalogue: Not allowed
           Description of the financial guarantee: 1. Zamawiający przewiduje obowiązek wniesienia
           wadium przed upływem terminu składania ofert, w wysokości dla części zamówienia nr 2 –
           120 000,00 PLN (słownie: sto dwadzieścia tysięcy złotych 00/100). 2. Wadium może być
           wniesione w jednej lub kilku następujących formach: 1) pieniądzu (w tytule przelewu należy
           podać nr sprawy: ZP.2710.15.2026 oraz numer części zamówienia); 2) gwarancjach
           bankowych; 3) gwarancjach ubezpieczeniowych; 4) poręczeniach udzielanych przez podmioty,
           o których mowa w art. 6b ust. 5 pkt 2 ustawy z dnia 9 listopada 2000 r. o utworzeniu polskiej
           Agencji Rozwoju Przedsiębiorczości (t.j. Dz. U. z 2025 r. poz. 98). 3. Wadium wnoszone w
           pieniądzu należy wpłacać przelewem na rachunek bankowy Zamawiającego w Banku
           Spółdzielczym w Przysusze O/Wieniawa, nr rachunku: 05 9145 1040 2000 0055 2000 0032. 4.
           Terminowe wniesienie wadium w formie pieniężnej oznacza, że żądana przez Zamawiającego
           kwota została wpłacona w pełnej wysokości przelewem na wskazany przez niego rachunek
           bankowy. Oznacza to, że wniesienie wadium w tej postaci jest skuteczne dopiero z chwilą
           uznania rachunku Zamawiającego kwotą wadium przed upływem terminu składania ofert. 5. W
           przypadku wniesienia wadium w formie gwarancji lub poręczenia, o których mowa w ust. 3,
           Wykonawca przekazuje Zamawiającemu oryginał gwarancji lub poręczenia w postaci
           elektronicznej, do upływu terminu składania ofert. Zaleca się gwarancję lub poręczenie, o
           których mowa powyżej, dołączyć do dokumentów składanych wraz z ofertą. 6. Wadium
           wniesione w formie poręczeń lub gwarancji będzie akceptowane przez Zamawiającego, jeżeli
           będzie zawierać wszystkie określone ustawą Pzp przypadki utraty wadium przez Wykonawcę,
           klauzulę o nieodwołalności oraz zapewnienie bezwarunkowej wypłaty przez gwaranta na
           pierwsze pisemne żądanie Zamawiającego, pełnej kwoty wadium w przypadkach
           wymienionych w art. 98 ust. 6 ustawy Pzp. 7. Oferta niezabezpieczona wadium zostanie
           odrzucona. Dalsze zapisy w SWZ.
           Deadline for receipt of tenders: 14/10/2026 09:00:00 (UTC+02:00) Eastern European Time,
           Central European Summer Time
           Duration during which the tender must remain valid: 90 Days
           Information about public opening:
           Opening date: 14/10/2026 11:00:00 (UTC+02:00) Eastern European Time, Central European
           Summer Time
           Terms of contract:



674195-2026                                                                                     Page 18/27
              The execution of the contract must be performed within the framework of sheltered
              employment programmes: No
              Electronic invoicing: Required
              Electronic ordering will be used: no
              Electronic payment will be used: yes

   5.1.15. Techniques
           Framework agreement:
           No framework agreement
           Information about the dynamic purchasing system:
           No dynamic purchase system

   5.1.16. Further information, mediation and review
           Mediation organisation: Krajowa Izba Odwoławcza
           Review organisation: Krajowa Izba Odwoławcza
           Information about review deadlines: 1. Wykonawcom, a także innemu podmiotowi, jeżeli ma
           lub miał interes w uzyskaniu zamówienia oraz poniósł lub może ponieść szkodę w wyniku
           naruszenia przez Zamawiającego przepisów ustawy Pzp, przysługują środki ochrony prawnej
           przewidziane w art. 505 i następnych ustawy Pzp. Środki ochrony prawnej wobec ogłoszenia
           wszczynającego postępowanie o udzielenie zamówienia oraz dokumentów zamówienia
           przysługują również organizacjom wpisanym na listę, o której mowa w art. 469 pkt 15 ustawy
           Pzp oraz Rzecznikowi Małych i Średnich Przedsiębiorców. 2. Wobec niezgodnej z przepisami
           ustawy Pzp czynności Zamawiającego podjętej w postępowaniu, w tym na projektowane
           postanowienie umowy, lub w przypadku zaniechania przez Zamawiającego dokonania
           czynności, do których podjęcia zobowiązany jest Zamawiający przepisami ustawy Pzp lub w
           przypadku zaniechania przeprowadzenia postępowania o udzielenie zamówienia na
           podstawie ustawy Pzp, mimo że Zamawiający był do tego obowiązany, Wykonawca może
           wnieść odwołanie. 3. Odwołanie wnosi się do Prezesa Izby w formie pisemnej, w formie
           elektronicznej albo w postaci elektronicznej z tym, że odwołanie i przystąpienie do
           postępowania odwoławczego, wniesione w postaci elektronicznej, wymagają opatrzenia
           podpisem zaufanym. 4. Odwołujący przekazuje Zamawiającemu odwołanie wniesione w
           formie elektronicznej albo postaci elektronicznej albo kopię tego odwołania, jeżeli zostało ono
           wniesione w formie pisemnej, przed upływem terminu do wniesienia odwołania w taki sposób,
           aby mógł on zapoznać się z jego treścią przed upływem tego terminu. 5. Odwołanie wnosi się
           w terminie: 1) 10 dni od dnia przekazania informacji o czynności Zamawiającego stanowiącej
           podstawę jego wniesienia, jeżeli informacja została przekazana przy użyciu środków
           komunikacji elektronicznej; 2) 15 dni od dnia przekazania informacji o czynności
           Zamawiającego stanowiącej podstawę jego wniesienia, jeżeli informacja została przekazana w
           sposób inny niż określony w ppkt 1). 6. Odwołanie wobec treści ogłoszenia o zamówieniu lub
           wobec treści dokumentów zamówienia wnosi się w terminie 10 dni od dnia publikacji
           ogłoszenia w Dzienniku Urzędowym Unii Europejskiej lub zamieszczenia dokumentów
           zamówienia na stronie internetowej Zamawiającego. 7. Odwołanie w przypadkach innych niż
           określone w pkt 5 i 6 wnosi się w terminie 10 dni od dnia, w którym powzięto lub przy
           zachowaniu należytej staranności można było powziąć wiadomość o okolicznościach
           stanowiących podstawę jego wniesienia. 8. Jeżeli Zamawiający nie opublikował ogłoszenia o
           zamiarze zawarcia umowy lub mimo takiego obowiązku nie przesłał Wykonawcy
           zawiadomienia o wyborze najkorzystniejszej oferty, odwołanie wnosi się nie później niż w
           terminie: 1) 30 dni od dnia publikacji w Dzienniku Urzędowym Unii Europejskiej ogłoszenia o
           udzieleniu zamówienia, 2) 6 miesięcy od dnia zawarcia umowy, jeżeli Zamawiający nie
           opublikował w Dzienniku Urzędowym Unii Europejskiej ogłoszenia o udzieleniu zamówienia. 9.


674195-2026                                                                                       Page 19/27
              Na orzeczenie Krajowej Izby Odwoławczej oraz postanowienie Prezesa Izby, stronom oraz
              uczestnikom postępowania odwoławczego przysługuje skarga do sądu. Szczegółowo kwestie
              dotyczące skargi do sądu uregulowane zostały w art. 579-590 ustawy Pzp.
              Organisation providing more information on the review procedures: Krajowa Izba Odwoławcza

      5.1. Lot: LOT-0003
           Title: Budowa instalacji fotowoltaicznych oraz magazynów energii na Budynkach Użyteczności
           Publicznej
           Description: 1. W ramach części zamówienia nr 3 Wykonawca zobowiązany będzie do: 1)
           zaprojektowania i budowy instalacji fotowoltaicznych oraz magazynów energii na Budynkach
           Użyteczności Publicznej; 2) opracowania dokumentacji wykonawczej; 3) dostawy i montażu
           kompletnych instalacji układów fotowoltaicznych wraz magazynami energii oraz podłączenie
           ich do istniejących już systemów energetycznych; 4) wdrożenia systemu zarządzania energią,
           monitorowania, zarządzania produkcją i dystrybucją energii, optymalizacji, integracji systemów
           pomiarowych, raportowania i analizy danych; - w zakresie opisanym w Programie
           Funkcjonalno–Użytkowym 2. Szczegóły zakres przedmiotu niniejszego zamówienia precyzują
           dla części zamówienia nr 3 – załącznik nr 8 do SWZ – Program Funkcjonalno-Użytkowy,
           właściwy dla tych części zamówienia, zaś wymogi dotyczące realizacji zamówienia załącznik
           nr 9b do SWZ – Projekt umowy. 3. Pożądane jest, aby przed złożeniem Oferty Wykonawca
           przeprowadził wizję lokalną terenów, na których zlokalizowane będą roboty objęte
           przedmiotem niniejszego zamówienia. Przeprowadzenie wizji nie jest warunkiem dla złożenia
           oferty w niniejszym postępowaniu. Koszty dokonania wizji lokalnej terenu budowy poniesie
           Wykonawca. 4. Roboty budowlane stanowiące przedmiot niniejszego zamówienia należy
           wykonać zgodnie z niniejszą SWZ, Opisem Przedmiotu Zamówienia (OPZ), Projektem Umowy
           oraz zgodnie z zasadami sztuki budowlanej, wiedzy technicznej, obowiązującymi przepisami i
           normami. Zobowiązanie wykonania robót zgodnie z powyższymi dokumentami nie zwalnia
           Wykonawcy m. in. od obowiązku weryfikacji tej dokumentacji w trakcie trwania umowy i
           zgłaszania Zamawiającemu wykrytych w niej wad czy uchybień skutkujących możliwością
           niedochowania warunków umowy lub naruszeniem przepisów prawa. 5. Od dnia odbioru placu
           budowy Wykonawca odpowiada za wszystkie zdarzenia, które zaistnieją podczas
           wykonywania umowy. Za wszystkie wyrządzone komukolwiek szkody podczas budowy lub w
           związku z budową odpowiada Wykonawca, chyba, że nie zachodzi związek przyczynowy
           pomiędzy prowadzeniem robót a wyrządzoną szkodą. Wykonawca przyjmie odpowiedzialność
           w szczególności za: 1) szkody i następstwa nieszczęśliwych wypadków dotyczących
           pracowników Wykonawcy oraz osób trzecich przebywających w rejonie prowadzonych robót;
           2) szkody wynikające ze zniszczeń oraz innych zdarzeń w odniesieniu do robót, materiałów
           sprzętu i innego mienia ruchomego związanego z prowadzeniem robót podczas realizacji
           przedmiotu niniejszej umowy; 3) szkody w robotach spowodowane przez niego przy usuwaniu
           wad w okresie gwarancji i rękojmi; 4) niewłaściwe zabezpieczenie terenu budowy oraz
           dopuszczenie na teren budowy osób nieupoważnionych. 6. Zamawiający, zgodnie z zapisami
           art. 99 ust. 5 i art. 101 ust. 4 ustawy Pzp, dopuszcza rozwiązania równoważne dla robót,
           materiałów, systemów spełniające obowiązujące standardy i wymagania. Zamawiający
           zastrzega, że wszędzie tam, gdzie w treści opisu przedmiotu zamówienia, stanowiącego opis
           przedmiotu zamówienia, zostały w opisie tego przedmiotu wskazane znaki towarowe, patenty
           lub pochodzenie urządzeń lub materiałów należy je traktować wyłącznie jako propozycje
           projektanta. Zamawiający dopuszcza metody, materiały, urządzenia, systemy, technologie itp.
           równoważne do przedstawionych w opisie przedmiotu zamówienia. Dopuszcza się więc
           zaproponowanie w ofercie wszelkich równoważnych odpowiedników rynkowych o
           właściwościach nie gorszych niż wskazane przez Zamawiającego. Parametry wskazanego
           standardu określają minimalne warunki techniczne, eksploatacyjne, użytkowe, jakościowe i

674195-2026                                                                                      Page 20/27
              funkcjonalne, jakie ma spełniać przedmiot zamówienia. W ofercie można przyjąć metody,
              materiały, urządzenia, systemy, technologie itp. innych marek i producentów, jednak o
              parametrach technicznych, jakościowych i właściwościach użytkowych oraz funkcjonalnych
              odpowiadających metodom, materiałom, urządzeniom, systemom, technologiom itp. opisanym
              w SWZ. Ponadto zamienne urządzenia przyjęte do wyceny: winny spełniać funkcję, jakiej mają
              służyć, winny być kompatybilne z pozostałymi urządzeniami, aby zespół urządzeń dawał
              zamierzony efekt, nie mogą wpływać na zmianę rodzaju i zakresu robót budowlanych. Na
              żądanie Zamawiającego, Wykonawca ma obowiązek udowodnienia, iż zastosowane
              rozwiązania równoważne pozwolą osiągnąć wszystkie założenia techniczne dla
              przedmiotowego zadania inwestycyjnego, biorąc pod uwagę całość inwestycji, a nie wybrany
              fragment całości. Ciężar udowodnienia, że materiał lub urządzenie jest równoważne w
              stosunku do wymogu określonego przez Zamawiającego spoczywa na Wykonawcy. Jeżeli
              materiały lub/i urządzenia zaoferowane przez Wykonawcę jako równoważne nie będą
              równoważne w świetle przedłożonych przez Wykonawcę dokumentów, oferta tego
              Wykonawcy zostanie odrzucona jako nieodpowiadająca treści SWZ. W przypadku zaś
              opisania przedmiotu zamówienia przez odniesienie do norm, europejskich ocen technicznych,
              aprobat, specyfikacji technicznych i systemów referencji technicznych, Zamawiający
              dopuszcza wykonanie zamówienia z zastosowaniem rozwiązań równoważnych opisywanym.
              W takim wypadku, procedurę opisaną na wstępie niniejszego punktu stosuje się odpowiednio.
              7. Dalsze zapisy w SWZ.
              Internal identifier: Część zamówienia nr 3

     5.1.1. Purpose
            Main nature of the contract: Works
            Main classification (cpv): 45000000 Construction work
            Additional classification (cpv): 09300000 Electricity, heating, solar and nuclear energy,
            45300000 Building installation work, 71321200 Heating-system design services, 45311100
            Electrical wiring work, 45311200 Electrical fitting work, 45315100 Electrical engineering
            installation works, 45315300 Electricity supply installations, 71320000 Engineering design
            services, 71323100 Electrical power systems design services

     5.1.2. Place of performance
            Country subdivision (NUTS): Radomski (PL921)
            Country: Poland

     5.1.3. Estimated duration
            Start date: 01/12/2026
            Duration end date: 30/06/2027

     5.1.6. General information
            Reserved participation:
            Participation is not reserved.
            Procurement Project fully or partially financed with EU Funds.
            Information about European Union funds:
            Identifier of EU funds: Przedmiotowe zamówienie jest realizowane jest w ramach projektu pn.:
            „Innowacyjne rozwiązania dotyczące Energii elektrycznej i cieplnej Wieniawskiego Klastra
            Energii”, dofinansowanego z Inwestycji B2.2.2 Krajowego Planu Odbudowy i Zwiększania
            Odporności (KPO).
            The procurement is covered by the Government Procurement Agreement (GPA): no




674195-2026                                                                                       Page 21/27
              Additional information: Zamawiający wskazuje datę początkową terminu realizacji zamówienia
              wyłącznie z przyczyn technicznych, bowiem formularz ogłoszenia o zamówieniu nie daje
              możliwości wskazania jedynie daty końcowej terminu realizacji zamówienia.

     5.1.9. Selection criteria
            Sources of selection criteria: Notice
            Criterion: References on specified works
            Description of selection criterion: Warunek dotyczący zdolności zawodowej zostanie
            spełniony, jeżeli Wykonawca wykaże, że w okresie ostatnich pięciu lat przed upływem terminu
            składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, wykonał
            co najmniej 1 (jedno) zadanie obejmujące: dostawę i montaż instalacji fotowoltaicznych w co
            najmniej 2 budynkach użyteczności publicznej, przy czym moc każdej instalacji wynosiła nie
            mniej niż 25 kW, oraz dostawę i montaż co najmniej 2 magazynów energii, przy czym moc
            każdego magazynu energii wynosiła nie mniej niż 10 kW lub pojemność każdego magazynu
            energii wynosiła nie mniej niż 10 kWh. Zamawiający wymaga, aby w/w dostawy zostały
            wykonane należycie. Dokumenty i oświadczenia wymagane od Wykonawcy na potwierdzenie
            spełniania warunków udziału w postępowaniu (dla wszystkich części zamówienia): 1) wykaz
            dostaw wykonanych nie wcześniej niż w okresie ostatnich pięciu lat przed upływem terminu
            składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, wraz z
            podaniem ich wartości, przedmiotu, dat wykonania i podmiotów, na rzecz których dostawy te
            zostały wykonane – załącznik nr 5 do SWZ, oraz załączenie dowodów określających czy
            dostawy te zostały wykonane należycie, przy czym dowodami, o których mowa, są referencje
            bądź inne dokumenty wystawione przez podmiot, na rzecz którego dostawy były wykonywane,
            a jeżeli Wykonawca z przyczyn niezależnych od niego nie jest w stanie uzyskać tych
            dokumentów – oświadczenie Wykonawcy.

              Criterion: Number of managerial staff
              Description of selection criterion: Warunek dotyczący zdolności technicznej zostanie
              spełniony, jeżeli wykonawca wykaże, iż dysponuje osobami zdolnymi do wykonania
              zamówienia, tj.: a) Projektant branży elektrycznej - kwalifikacje i umiejętności: uprawnienia do
              projektowania w specjalności instalacji i urządzeń elektrycznych i elektroenergetycznych,
              uprawniającymi do projektowania obiektu budowlanego związanego z obiektem budowlanym
              stanowiącym przedmiot zamówienia* oraz przynależność do Okręgowej Izby Budownictwa, b)
              Kierownik Budowy: - kwalifikacje i umiejętności: uprawnienia do kierowania robotami
              budowlanymi w specjalności instalacji i urządzeń elektrycznych i elektroenergetycznych,
              uprawniającymi do kierowania robotami budowlanymi związanymi z obiektem budowlanym
              stanowiącym przedmiot zamówienia* oraz przynależność do Okręgowej Izby Budownictwa, *
              dopuszcza się odpowiadające tym uprawnieniom uprawnienia budowlane, które zostały
              wydane na podstawie wcześniej obowiązujących przepisów oraz odpowiadające im
              uprawnienia wydane obywatelom państw Europejskiego Porozumienia o Wolnym Handlu
              (EFTA) – stron umowy o Europejskim Obszarze Gospodarczym oraz Konfederacji
              Szwajcarskiej, z zastrzeżeniem art. 12a oraz innych przepisów ustawy Prawo budowlane oraz
              ustawy z dnia 22 grudnia 2015 r. o zasadach uznawania kwalifikacji zawodowych nabytych w
              państwach członkowskich Unii Europejskiej (t.j. Dz. U. z 2023 r. poz. 334 z późn. zm.).
              Zamawiający dopuszcza możliwości łączenia funkcji specjalistów przez jedną osobę (również
              w ramach części zamówienia), pod warunkiem, że osoba ta spełnia warunki dla wszystkich
              łączonych funkcji. Dokumenty i oświadczenia wymagane od Wykonawcy na potwierdzenie
              spełniania warunków udziału w postępowaniu (dla wszystkich części zamówienia): 1) wykaz
              osób, skierowanych przez wykonawcę do realizacji zamówienia publicznego, w szczególności
              odpowiedzialnych za świadczenie usług, kontrolę jakości lub kierowanie robotami

674195-2026                                                                                            Page 22/27
              budowlanymi, wraz z informacjami na temat ich kwalifikacji zawodowych, uprawnień,
              doświadczenia niezbędnych do wykonania Zamówienia, a także zakresu wykonywanych przez
              te osoby czynności oraz informacją o podstawie do dysponowania tymi osobami – załącznik nr
              6 do SWZ.

   5.1.10. Award criteria
           Criterion:
           Type: Price
           Description: Najniższa Cena
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 50
           Criterion:
           Type: Quality
           Description: Technologia Back-Contact lub zero BusBar
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 5
           Criterion:
           Type: Quality
           Description: Kula gradowa 55 mm
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 15
           Criterion:
           Type: Quality
           Description: Gwarancja spadku efektywności w ciągu 30 lat do maksymalnie 88%
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 5
           Criterion:
           Type: Quality
           Description: Przedłużenie gwarancji producenta falownika
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 5
           Criterion:
           Type: Quality
           Description: Przedłużenie gwarancji producenta magazynu energii
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 10
           Criterion:
           Type: Quality
           Description: Moduł przeciwpożarowy
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 2,5
           Criterion:
           Type: Quality
           Description: Maty grzewcze
           Category of award weight criterion: Weight (percentage, exact)
           Award criterion number: 2,5
           Criterion:
           Type: Quality
           Description: Metalowa obudowa
           Category of award weight criterion: Weight (percentage, exact)

674195-2026                                                                                      Page 23/27
              Award criterion number: 2,5
              Criterion:
              Type: Quality
              Description: Wbudowany BMS na poziomie każdego modułu
              Category of award weight criterion: Weight (percentage, exact)
              Award criterion number: 2,5

   5.1.11. Procurement documents
           Address of the procurement documents: https://ezamowienia.gov.pl/mp-client/search/list/ocds-
           148610-2c2a0486-4d87-4dcf-90af-910e50d175a1

   5.1.12. Terms of procurement
           Terms of submission:
           Electronic submission: Required
           Address for submission: https://ezamowienia.gov.pl/mp-client/search/list/ocds-148610-
           2c2a0486-4d87-4dcf-90af-910e50d175a1
           Languages in which tenders or requests to participate may be submitted: Polish
           Electronic catalogue: Not allowed
           Description of the financial guarantee: 1. Zamawiający przewiduje obowiązek wniesienia
           wadium przed upływem terminu składania ofert, w wysokości dla części zamówienia nr 3 – 10
           000,00 PLN (słownie: dziesięć tysięcy złotych 00/100). 2. Wadium może być wniesione w
           jednej lub kilku następujących formach: 1) pieniądzu (w tytule przelewu należy podać nr
           sprawy: ZP.2710.15.2026 oraz numer części zamówienia); 2) gwarancjach bankowych; 3)
           gwarancjach ubezpieczeniowych; 4) poręczeniach udzielanych przez podmioty, o których
           mowa w art. 6b ust. 5 pkt 2 ustawy z dnia 9 listopada 2000 r. o utworzeniu polskiej Agencji
           Rozwoju Przedsiębiorczości (t.j. Dz. U. z 2025 r. poz. 98). 3. Wadium wnoszone w pieniądzu
           należy wpłacać przelewem na rachunek bankowy Zamawiającego w Banku Spółdzielczym w
           Przysusze O/Wieniawa, nr rachunku: 05 9145 1040 2000 0055 2000 0032. 4. Terminowe
           wniesienie wadium w formie pieniężnej oznacza, że żądana przez Zamawiającego kwota
           została wpłacona w pełnej wysokości przelewem na wskazany przez niego rachunek
           bankowy. Oznacza to, że wniesienie wadium w tej postaci jest skuteczne dopiero z chwilą
           uznania rachunku Zamawiającego kwotą wadium przed upływem terminu składania ofert. 5. W
           przypadku wniesienia wadium w formie gwarancji lub poręczenia, o których mowa w ust. 3,
           Wykonawca przekazuje Zamawiającemu oryginał gwarancji lub poręczenia w postaci
           elektronicznej, do upływu terminu składania ofert. Zaleca się gwarancję lub poręczenie, o
           których mowa powyżej, dołączyć do dokumentów składanych wraz z ofertą. 6. Wadium
           wniesione w formie poręczeń lub gwarancji będzie akceptowane przez Zamawiającego, jeżeli
           będzie zawierać wszystkie określone ustawą Pzp przypadki utraty wadium przez Wykonawcę,
           klauzulę o nieodwołalności oraz zapewnienie bezwarunkowej wypłaty przez gwaranta na
           pierwsze pisemne żądanie Zamawiającego, pełnej kwoty wadium w przypadkach
           wymienionych w art. 98 ust. 6 ustawy Pzp. 7. Oferta niezabezpieczona wadium zostanie
           odrzucona. Dalsze zapisy w SWZ.
           Deadline for receipt of tenders: 14/10/2026 09:00:00 (UTC+02:00) Eastern European Time,
           Central European Summer Time
           Duration during which the tender must remain valid: 90 Days
           Information about public opening:
           Opening date: 14/10/2026 11:00:00 (UTC+02:00) Eastern European Time, Central European
           Summer Time
           Terms of contract:



674195-2026                                                                                     Page 24/27
              The execution of the contract must be performed within the framework of sheltered
              employment programmes: No
              Electronic invoicing: Required
              Electronic ordering will be used: no
              Electronic payment will be used: yes

   5.1.15. Techniques
           Framework agreement:
           No framework agreement
           Information about the dynamic purchasing system:
           No dynamic purchase system

   5.1.16. Further information, mediation and review
           Mediation organisation: Krajowa Izba Odwoławcza
           Review organisation: Krajowa Izba Odwoławcza
           Information about review deadlines: 1. Wykonawcom, a także innemu podmiotowi, jeżeli ma
           lub miał interes w uzyskaniu zamówienia oraz poniósł lub może ponieść szkodę w wyniku
           naruszenia przez Zamawiającego przepisów ustawy Pzp, przysługują środki ochrony prawnej
           przewidziane w art. 505 i następnych ustawy Pzp. Środki ochrony prawnej wobec ogłoszenia
           wszczynającego postępowanie o udzielenie zamówienia oraz dokumentów zamówienia
           przysługują również organizacjom wpisanym na listę, o której mowa w art. 469 pkt 15 ustawy
           Pzp oraz Rzecznikowi Małych i Średnich Przedsiębiorców. 2. Wobec niezgodnej z przepisami
           ustawy Pzp czynności Zamawiającego podjętej w postępowaniu, w tym na projektowane
           postanowienie umowy, lub w przypadku zaniechania przez Zamawiającego dokonania
           czynności, do których podjęcia zobowiązany jest Zamawiający przepisami ustawy Pzp lub w
           przypadku zaniechania przeprowadzenia postępowania o udzielenie zamówienia na
           podstawie ustawy Pzp, mimo że Zamawiający był do tego obowiązany, Wykonawca może
           wnieść odwołanie. 3. Odwołanie wnosi się do Prezesa Izby w formie pisemnej, w formie
           elektronicznej albo w postaci elektronicznej z tym, że odwołanie i przystąpienie do
           postępowania odwoławczego, wniesione w postaci elektronicznej, wymagają opatrzenia
           podpisem zaufanym. 4. Odwołujący przekazuje Zamawiającemu odwołanie wniesione w
           formie elektronicznej albo postaci elektronicznej albo kopię tego odwołania, jeżeli zostało ono
           wniesione w formie pisemnej, przed upływem terminu do wniesienia odwołania w taki sposób,
           aby mógł on zapoznać się z jego treścią przed upływem tego terminu. 5. Odwołanie wnosi się
           w terminie: 1) 10 dni od dnia przekazania informacji o czynności Zamawiającego stanowiącej
           podstawę jego wniesienia, jeżeli informacja została przekazana przy użyciu środków
           komunikacji elektronicznej; 2) 15 dni od dnia przekazania informacji o czynności
           Zamawiającego stanowiącej podstawę jego wniesienia, jeżeli informacja została przekazana w
           sposób inny niż określony w ppkt 1). 6. Odwołanie wobec treści ogłoszenia o zamówieniu lub
           wobec treści dokumentów zamówienia wnosi się w terminie 10 dni od dnia publikacji
           ogłoszenia w Dzienniku Urzędowym Unii Europejskiej lub zamieszczenia dokumentów
           zamówienia na stronie internetowej Zamawiającego. 7. Odwołanie w przypadkach innych niż
           określone w pkt 5 i 6 wnosi się w terminie 10 dni od dnia, w którym powzięto lub przy
           zachowaniu należytej staranności można było powziąć wiadomość o okolicznościach
           stanowiących podstawę jego wniesienia. 8. Jeżeli Zamawiający nie opublikował ogłoszenia o
           zamiarze zawarcia umowy lub mimo takiego obowiązku nie przesłał Wykonawcy
           zawiadomienia o wyborze najkorzystniejszej oferty, odwołanie wnosi się nie później niż w
           terminie: 1) 30 dni od dnia publikacji w Dzienniku Urzędowym Unii Europejskiej ogłoszenia o
           udzieleniu zamówienia, 2) 6 miesięcy od dnia zawarcia umowy, jeżeli Zamawiający nie
           opublikował w Dzienniku Urzędowym Unii Europejskiej ogłoszenia o udzieleniu zamówienia. 9.


674195-2026                                                                                       Page 25/27
              Na orzeczenie Krajowej Izby Odwoławczej oraz postanowienie Prezesa Izby, stronom oraz
              uczestnikom postępowania odwoławczego przysługuje skarga do sądu. Szczegółowo kwestie
              dotyczące skargi do sądu uregulowane zostały w art. 579-590 ustawy Pzp.
              Organisation providing more information on the review procedures: Krajowa Izba Odwoławcza

   8. Organisations

      8.1. ORG-0002
           Official name: Krajowa Izba Odwoławcza
           Registration number: 5262239325
           Postal address: ul. Postępu 17A
           Town: Warszawa
           Postcode: 02-676
           Country subdivision (NUTS): Miasto Warszawa (PL911)
           Country: Poland
           Email: odwolania@uzp.gov.pl
           Telephone: (22) 458 78 01
           Internet address: https://www.gov.pl/web/uzp/krajowa-izba-odwolawcza
           Roles of this organisation:
           Review organisation
           Organisation providing more information on the review procedures
           Mediation organisation

      8.1. ORG-0003
           Official name: Gmina Wieniawa
           Registration number: 6010081434
           Postal address: ul. Kochanowskiego 88
           Town: Wieniawa
           Postcode: 26-432
           Country subdivision (NUTS): Radomski (PL921)
           Country: Poland
           Email: sekretariat@gminawieniawa.pl
           Telephone: +48 48 673 00 01
           Fax: +48 48 377 73 07
           Internet address: https://samorzad.gov.pl/web/gmina-wieniawa
           Roles of this organisation:
           Buyer

      8.1. ORG-0000
           Official name: Publications Office of the European Union
           Registration number: PUBL
           Town: Luxembourg
           Postcode: 2417
           Country subdivision (NUTS): Luxembourg (LU000)
           Country: Luxembourg
           Email: ted@publications.europa.eu
           Telephone: +352 29291
           Internet address: https://op.europa.eu
           Roles of this organisation:
           TED eSender


674195-2026                                                                                     Page 26/27
   10. Change

              Version of the previous notice to be changed: 609531-2026
              Main reason for change: Information updated

   Notice information

              Notice identifier/version: 4e23ba81-d80d-4889-a855-2f9f6ad07d2e - 01
              Form type: Competition
              Notice type: Contract or concession notice – standard regime
              Notice subtype: 16
              Notice dispatch date: 29/09/2026 11:04:48 (UTC+00:00) Western European Time, GMT
              Languages in which this notice is officially available: Polish
              Notice publication number: 674195-2026
              OJ S issue number: 189/2026
              Publication date: 30/09/2026




674195-2026                                                                                  Page 27/27

### October 13, 2026 · Version 1 (Published)

Полша – Строителни и монтажни работи – Innowacyjne rozwiązania dotyczące energii cieplnej i elektrycznej Wieniawskiego Klastra Energii

1. Przedmiotem zamówienia są roboty budowlane i dostawa wraz z montażem w ramach zadania inwestycyjnego pod nazwą: „Innowacyjne rozwiązania dotyczące energii cieplnej i elektrycznej Wieniawskiego Klastra Energii”. 2. Zamówienie podzielone zostało na trzy następujących części: 1) Część zamówienia nr 1 – „Utworzenie magazynu na zrębki drzewne, utworzenie kotłowni biomasowej i montaż kotła, utworzenie sieci i węzłów ciepłowniczych, instalację kogeneracji wraz z systemem przygotowania paliwa, utworzenie magazynu ciepła o pojemności 3,5 MWh oraz wdrożenie systemu zarządzania energią w miejscowości Wieniawa”; 2) Część zamówienia nr 2 – „Utworzenie magazynu na zrębki drzewne wraz z budynkiem kotłowni, dostawę i montaż kotła, utworzenie kogeneracji wraz z systemem przygotowania paliwa, utworzenie sieci i węzłów ciepłowniczych oraz utworzenie magazynu ciepła o pojemności 3,5 MWh w miejscowości Sokolniki Mokre”; 3) Część zamówienia nr 3 – „Budowa instalacji fotowoltaicznych oraz magazynów energii na Budynkach Użyteczności Publicznej”. 3. W ramach części zamówienia nr 1 – Wykonawca zobowiązany będzie: 1) wykonać dokumentację(e) projektową(e), w tym Projekt(y) Budowalny(e), Projekt(y) Techniczny(e) i Projekt(y) Wykonawczy(e), kosztorys(y) wraz z przedmiarem(ami) robót, specyfikację techniczną wykonania i odbioru robót wraz z uzyskaniem prawomocnej(ych) decyzji o pozwoleniu na budowę albo zgłoszenia(eń) robót – dla całego zakresu opisanego w Programie Funkcjonalno–Użytkowym, a także przygotować do zatwierdzenia przez Zamawiającego Harmonogram budowy; 2) wykonać roboty budowlane, w oparciu o opracowaną(e) i zaakceptowaną(e) przez Zamawiającego dokumentację(e) projektowo- kosztorysową(e), o której(ych) mowa w pkt 1) powyżej, i uzyskaną(e) prawomocną(e) decyzję (e) o pozwoleniu na budowę albo zgłoszenie(a) robót oraz uzyskać prawomocne pozwolenie (a) na użytkowania albo zgłoszenie(a) zakończenia robót (o ile dotyczy); 3) wykonać wdrożenie systemu zarządzania energią, monitorowania, zarządzania produkcją i dystrybucją energii, optymalizacji, integracji systemów pomiarowych, raportowania i analizy danych. 4. W ramach części zamówienia nr 2 – Wykonawca zobowiązany będzie: 1) wykonać dokumentację (e) projektową(e), w tym Projekt(y) Budowalny(e), Projekt(y) Techniczny(e) i Projekt(y) Wykonawczy(e), kosztorys(y) wraz z przedmiarem(ami) robót, specyfikację techniczną wykonania i odbioru robót wraz z uzyskaniem prawomocnej(ych) decyzji o pozwoleniu na budowę albo zgłoszenia(eń) robót – dla całego zakresu opisanego w Programie Funkcjonalno– Użytkowym, a także przygotować do zatwierdzenia przez Zamawiającego Harmonogram budowy; 2) wykonać roboty budowlane, w oparciu o opracowaną(e) i zaakceptowaną(e) przez Zamawiającego dokumentację(e) projektowo-kosztorysową(e), o której(ych) mowa w pkt 1) powyżej, i uzyskaną(e) prawomocną(e) decyzję(e) o pozwoleniu na budowę albo zgłoszenie (a) robót oraz uzyskać prawomocne pozwolenie(a) na użytkowania albo zgłoszenie(a) zakończenia robót (o ile dotyczy); 3) wykonać wdrożenie systemu zarządzania energią, monitorowania, zarządzania produkcją i dystrybucją energii, optymalizacji, integracji systemów pomiarowych, raportowania i analizy danych. 5. W ramach części zamówienia nr 3 Wykonawca zobowiązany będzie do: 1) zaprojektowania i budowy instalacji fotowoltaicznych oraz magazynów energii na Budynkach Użyteczności Publicznej; 2) opracowania dokumentacji wykonawczej; 3) dostawy i montażu kompletnych instalacji układów fotowoltaicznych wraz magazynami energii oraz podłączenie ich do istniejących już systemów energetycznych; 4) wdrożenia systemu zarządzania energią, monitorowania, zarządzania produkcją i dystrybucją energii, optymalizacji, integracji systemów pomiarowych, raportowania i analizy danych; - w zakresie opisanym w Programie Funkcjonalno–Użytkowym. 6. Szczegóły zakres przedmiotu niniejszego zamówienia precyzują: 1) dla części zamówienia nr 1 i 2 – załącznik nr 8 do SWZ – Program Funkcjonalno-Użytkowy, właściwy dla tych części zamówienia, zaś wymogi dotyczące realizacji zamówienia załącznik nr 9a do SWZ – Projekt umowy; 2) dla części zamówienia nr 3 – załącznik nr 8 do SWZ – Program Funkcjonalno- Użytkowy, właściwy dla tej części zamówienia, zaś wymogi dotyczące realizacji zamówienia załącznik nr 9b do SWZ – Projekt umowy. 7. Pożądane jest, aby przed złożeniem Oferty Wykonawca przeprowadził wizję lokalną terenów, na których zlokalizowane będą roboty objęte przedmiotem niniejszego zamówienia. Przeprowadzenie wizji nie jest warunkiem dla złożenia oferty w niniejszym postępowaniu. Koszty dokonania wizji lokalnej terenu budowy poniesie Wykonawca. 8. Roboty budowlane stanowiące przedmiot niniejszego zamówienia należy wykonać zgodnie z niniejszą SWZ, Opisem Przedmiotu Zamówienia (OPZ), Projektem Umowy oraz zgodnie z zasadami sztuki budowlanej, wiedzy technicznej, obowiązującymi przepisami i normami. Zobowiązanie wykonania robót zgodnie z powyższymi dokumentami nie zwalnia Wykonawcy m. in. od obowiązku weryfikacji tej dokumentacji w trakcie trwania umowy i zgłaszania Zamawiającemu wykrytych w niej wad czy uchybień skutkujących możliwością niedochowania warunków umowy lub naruszeniem przepisów prawa. 9. Od dnia odbioru placu budowy Wykonawca odpowiada za wszystkie zdarzenia, które zaistnieją podczas wykonywania umowy. Za wszystkie wyrządzone komukolwiek szkody podczas budowy lub w związku z budową odpowiada Wykonawca, chyba, że nie zachodzi związek przyczynowy pomiędzy prowadzeniem robót a wyrządzoną szkodą. Wykonawca przyjmie odpowiedzialność w szczególności za: 1) szkody i następstwa nieszczęśliwych wypadków dotyczących pracowników Wykonawcy oraz osób trzecich przebywających w rejonie prowadzonych robót; 2) szkody wynikające ze zniszczeń oraz innych zdarzeń w odniesieniu do robót, materiałów sprzętu i innego mienia ruchomego związanego z prowadzeniem robót podczas realizacji przedmiotu niniejszej umowy; Dalsze zapisy w SWZ.

## Understand this procurement.

Review the scope, requirements and procurement history with Ziva.

- Understand the requirements
- Find the evidence you need
- Prepare your response

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate) · [View official notice](https://ted.europa.eu/en/notice/-/detail/674195-2026)

## About this notice

- Official source: TED
- Source retrieved: October 15, 2026
- Page updated: October 15, 2026
- Notice reference: 674195-2026

## Open tenders like this one

- [New electric buses for public transport in Koziegłowy](https://zephior.com/tenders/352c9d8c-a362-4359-9648-f8e168547fd9/electric-buses-public-transport-kozieglowy-transkom) ([Markdown](https://zephior.com/tenders/352c9d8c-a362-4359-9648-f8e168547fd9/electric-buses-public-transport-kozieglowy-transkom.md)), Przedsiębiorstwo Wielobranżowe Transkom Sp. z o.o.
- [Design documentation for the expansion of Voivodeship Road 689 through Hajnówka](https://zephior.com/tenders/d4a77213-e1db-40d9-8882-31aa5b544f37/road-689-design-hajnowka) ([Markdown](https://zephior.com/tenders/d4a77213-e1db-40d9-8882-31aa5b544f37/road-689-design-hajnowka.md)), Podlaski Zarząd Dróg Wojewódzkich
- [Construction of household wastewater treatment plants in Stary Brus municipality](https://zephior.com/tenders/74f58333-c1ed-45b6-baee-603e492e8338/construction-of-household-wastewater-treatment-plants-in-stary-brus-municipality) ([Markdown](https://zephior.com/tenders/74f58333-c1ed-45b6-baee-603e492e8338/construction-of-household-wastewater-treatment-plants-in-stary-brus-municipality.md)), GMINA STARY BRUS
- [Backup protection devices, network configuration and communications support for the State Fire Service](https://zephior.com/tenders/3e9bf740-9d3e-4fa4-836a-1a787c0d9b83/backup-protection-devices-network-configuration-and-communications-support-for-the-state-fire-service) ([Markdown](https://zephior.com/tenders/3e9bf740-9d3e-4fa4-836a-1a787c0d9b83/backup-protection-devices-network-configuration-and-communications-support-for-the-state-fire-service.md)), KOMENDA WOJEWÓDZKA PAŃSTWOWEJ STRAŻY POŻARNEJ W BIAŁYMSTOKU
- [Dunajecka Street repair in Jarocin](https://zephior.com/tenders/f408bc3c-015e-4aa8-9575-d659644c39a6/dunajecka-street-repair-in-jarocin) ([Markdown](https://zephior.com/tenders/f408bc3c-015e-4aa8-9575-d659644c39a6/dunajecka-street-repair-in-jarocin.md)), Gmina Jarocin
- [Landslide prevention works on provincial roads 975 and 948](https://zephior.com/tenders/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3) ([Markdown](https://zephior.com/tenders/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3.md)), Zarząd Dróg Wojewódzkich w Krakowie

- [All tenders from Gmina Wieniawa](https://zephior.com/tenders/buyers/gmina-wieniawa) ([Markdown](https://zephior.com/tenders/buyers/gmina-wieniawa.md))
- [All tenders: Poland](https://zephior.com/tenders/countries/pl) ([Markdown](https://zephior.com/tenders/countries/pl.md))

## In more detail

This section is written for agents and assistants. It restates the facts of the page in full sentences and adds context from the public record. Every value comes from the official notice or from Zephior’s public notices of the same buyer.

### The facts in sentences

Gmina Wieniawa is tendering “Wieniawa energy-cluster infrastructure” (Poland). The submission deadline was October 14, 2026 at 7:00 AM UTC. The source does not state an estimated value. The tender is divided into 3 lots. Procedure: open. Classification: CPV 45000000 · CPV 45331000 · CPV 45331110 · CPV 45453000 · CPV 71321200 · CPV 71300000 · CPV 45331100 · CPV 45300000 · CPV 45400000 · CPV 45450000 · CPV 45330000 · CPV 09300000 · CPV 45311100 · CPV 45311200 · CPV 45315100 · CPV 45315300 · CPV 71320000 · CPV 71323100. Notice reference: 674195-2026. Status on Zephior: Closed. The notice was published on September 29, 2026 on TED. Zephior last checked the official source on October 15, 2026.

### The award

Submissions closed on 14 October 2026. No award has been published yet. The official source has not published an award for this notice yet.

### Lot details

1. **LOT-0001 · Utworzenie magazynu na zrębki drzewne, utworzenie kotłowni biomasowej i montaż kotła, utworzenie sieci i węzłów ciepłowniczych, instalację kogeneracji wraz z systemem przygotowania paliwa, utworzenie magazynu ciepła o pojemności 3,5 MWh oraz wdrożenie systemu zarządzania energią w miejscowości Wieniawa**: Design, permits, construction, cogeneration and energy management for the Wieniawa energy cluster.
2. **LOT-0002 · Utworzenie magazynu na zrębki drzewne wraz z budynkiem kotłowni, dostawę i montaż kotła, utworzenie kogeneracji wraz z systemem przygotowania paliwa, utworzenie sieci i węzłów ciepłowniczych oraz utworzenie magazynu ciepła o pojemności 3,5 MWh w miejscowości Sokolniki Mokre**: Design, permits and construction of biomass heat and cogeneration infrastructure in Sokolniki Mokre.
3. **LOT-0003 · Budowa instalacji fotowoltaicznych oraz magazynów energii na Budynkach Użyteczności Publicznej**: Design and installation of photovoltaic systems and energy storage at public buildings.

### About the buyer

Gmina Wieniawa has 3 public notices on Zephior (0 open now, 3 published in the last 12 months). Its notices on Zephior were first published on September 29, 2026 and most recently on October 13, 2026. Main sectors: Construction (2). It publishes under the names “Gmina Wieniawa”.

- [All tenders and the profile of Gmina Wieniawa](https://zephior.com/tenders/buyers/gmina-wieniawa) ([Markdown](https://zephior.com/tenders/buyers/gmina-wieniawa.md))

### Terms used on this page

- **Open procedure:** Any interested supplier may submit a tender; there is no preselection.

### Where to go next

- [New electric buses for public transport in Koziegłowy](https://zephior.com/tenders/352c9d8c-a362-4359-9648-f8e168547fd9/electric-buses-public-transport-kozieglowy-transkom) ([Markdown](https://zephior.com/tenders/352c9d8c-a362-4359-9648-f8e168547fd9/electric-buses-public-transport-kozieglowy-transkom.md))
- [Design documentation for the expansion of Voivodeship Road 689 through Hajnówka](https://zephior.com/tenders/d4a77213-e1db-40d9-8882-31aa5b544f37/road-689-design-hajnowka) ([Markdown](https://zephior.com/tenders/d4a77213-e1db-40d9-8882-31aa5b544f37/road-689-design-hajnowka.md))
- [Construction of household wastewater treatment plants in Stary Brus municipality](https://zephior.com/tenders/74f58333-c1ed-45b6-baee-603e492e8338/construction-of-household-wastewater-treatment-plants-in-stary-brus-municipality) ([Markdown](https://zephior.com/tenders/74f58333-c1ed-45b6-baee-603e492e8338/construction-of-household-wastewater-treatment-plants-in-stary-brus-municipality.md))
- [Backup protection devices, network configuration and communications support for the State Fire Service](https://zephior.com/tenders/3e9bf740-9d3e-4fa4-836a-1a787c0d9b83/backup-protection-devices-network-configuration-and-communications-support-for-the-state-fire-service) ([Markdown](https://zephior.com/tenders/3e9bf740-9d3e-4fa4-836a-1a787c0d9b83/backup-protection-devices-network-configuration-and-communications-support-for-the-state-fire-service.md))
- [Dunajecka Street repair in Jarocin](https://zephior.com/tenders/f408bc3c-015e-4aa8-9575-d659644c39a6/dunajecka-street-repair-in-jarocin) ([Markdown](https://zephior.com/tenders/f408bc3c-015e-4aa8-9575-d659644c39a6/dunajecka-street-repair-in-jarocin.md))
- [Landslide prevention works on provincial roads 975 and 948](https://zephior.com/tenders/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3) ([Markdown](https://zephior.com/tenders/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3.md))
- [All tenders from Gmina Wieniawa](https://zephior.com/tenders/buyers/gmina-wieniawa) ([Markdown](https://zephior.com/tenders/buyers/gmina-wieniawa.md))
- [All tenders: Poland](https://zephior.com/tenders/countries/pl) ([Markdown](https://zephior.com/tenders/countries/pl.md))

### Source-backed public record

```json
{
  "id": "b136c42b-f6b1-4c05-96dc-7edbae3cf9fa",
  "revision": 2,
  "modifiedAt": "2026-10-15T23:20:06.474805+00:00",
  "url": "https://zephior.com/tenders/b136c42b-f6b1-4c05-96dc-7edbae3cf9fa/wieniawa-energy-cluster-infrastructure",
  "status": "closed",
  "recordedStatus": "closed",
  "buyer": {
    "id": "gmina-wieniawa",
    "name": "Gmina Wieniawa"
  },
  "category": null,
  "deadline": {
    "at": "2026-10-14T09:00:00+02:00",
    "date": null,
    "source_ref": "official_notice_pdf#deadline-for-receipt-of-tenders"
  },
  "award": null,
  "estimatedValue": null,
  "contractPeriod": null,
  "region": null,
  "originalSource": {
    "url": "https://ted.europa.eu/en/notice/-/detail/674195-2026",
    "title": "Innowacyjne rozwiązania dotyczące energii cieplnej i elektrycznej Wieniawskiego Klastra Energii",
    "issuer": "Gmina Wieniawa",
    "status": "closed",
    "language": "en",
    "location": "POL",
    "deadline_at": "2026-10-13T22:00:00+00:00",
    "description": null,
    "country_code": "PL",
    "published_at": "2026-09-29T22:00:00+00:00",
    "contract_type": null,
    "deadline_date": null,
    "procedure_type": "open",
    "reference_numbers": [
      "674195-2026"
    ],
    "classification_codes": [
      {
        "code": "45000000",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "45331000",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "45331110",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "45453000",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "71321200",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "71300000",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "45331100",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "45300000",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "45400000",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "45450000",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "45330000",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "09300000",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "45311100",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "45311200",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "45315100",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "45315300",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "71320000",
        "system": "CPV",
        "provenance": "source_declared"
      },
      {
        "code": "71323100",
        "system": "CPV",
        "provenance": "source_declared"
      }
    ]
  },
  "sources": [
    {
      "ref": "canonical_snapshot",
      "url": "https://ted.europa.eu/en/notice/-/detail/674195-2026",
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-13T22:03:45.463404Z"
    },
    {
      "ref": "official_notice_pdf",
      "url": "https://ted.europa.eu/en/notice/685583-2026/pdf",
      "kind": "official_notice_pdf",
      "retrieved_at": "2026-10-15T23:13:45.548394Z"
    }
  ],
  "keyFacts": [
    {
      "label": "Scope",
      "value": "Three lots: energy-cluster infrastructure in Wieniawa, analogous heat/biomass/cogeneration infrastructure in Sokolniki Mokre, and photovoltaic installations with energy storage at public buildings.",
      "source_ref": "official_notice_pdf#lots"
    },
    {
      "label": "Delivery of works",
      "value": "The notice requires design documentation, permits or notifications, construction/installation and an energy-management system; detailed functional programmes are referenced separately.",
      "source_ref": "official_notice_pdf#scope"
    },
    {
      "label": "Submission",
      "value": "Tender deadline: 14 October 2026, 09:00 UTC+02. The tender must remain valid for 90 days.",
      "source_ref": "official_notice_pdf#deadline"
    }
  ],
  "noticeFacts": {
    "lots": [
      {
        "id": "LOT-0001",
        "title": "Utworzenie magazynu na zrębki drzewne, utworzenie kotłowni biomasowej i montaż kotła, utworzenie sieci i węzłów ciepłowniczych, instalację kogeneracji wraz z systemem przygotowania paliwa, utworzenie magazynu ciepła o pojemności 3,5 MWh oraz wdrożenie systemu zarządzania energią w miejscowości Wieniawa",
        "source_ref": "official_notice_pdf#LOT-0001",
        "description": "Design, permits, construction, cogeneration and energy management for the Wieniawa energy cluster."
      },
      {
        "id": "LOT-0002",
        "title": "Utworzenie magazynu na zrębki drzewne wraz z budynkiem kotłowni, dostawę i montaż kotła, utworzenie kogeneracji wraz z systemem przygotowania paliwa, utworzenie sieci i węzłów ciepłowniczych oraz utworzenie magazynu ciepła o pojemności 3,5 MWh w miejscowości Sokolniki Mokre",
        "source_ref": "official_notice_pdf#LOT-0002",
        "description": "Design, permits and construction of biomass heat and cogeneration infrastructure in Sokolniki Mokre."
      },
      {
        "id": "LOT-0003",
        "title": "Budowa instalacji fotowoltaicznych oraz magazynów energii na Budynkach Użyteczności Publicznej",
        "source_ref": "official_notice_pdf#LOT-0003",
        "description": "Design and installation of photovoltaic systems and energy storage at public buildings."
      }
    ],
    "schedule": [
      {
        "event": "Tender validity",
        "value": "90 days",
        "source_ref": "official_notice_pdf#terms-of-submission"
      },
      {
        "event": "Submission deadline",
        "value": "2026-10-14 09:00 UTC+02:00",
        "source_ref": "official_notice_pdf#deadline"
      }
    ],
    "requirements": [
      {
        "text": "Przeprowadzenie wizji lokalnej jest pożądane, ale nie jest warunkiem złożenia oferty.",
        "source_ref": "official_notice_pdf#site-visit"
      }
    ],
    "award_criteria": [],
    "estimated_value": null
  },
  "historyTotal": 2
}
```