# N21 Les Toules: rehabilitation of four bridges

Bundesamt für Strassen ASTRA – Abteilung Strasseninfrastruktur West, Filiale Thun · Switzerland · Closed

## Outcome

Submissions closed on 20 November 2026. No award has been published yet.

- **Buyer:** Bundesamt für Strassen ASTRA – Abteilung Strasseninfrastruktur West, Filiale Thun
- **Place:** Bourg-Saint-Pierre, along national road N21 near the Galerie des Toules, Switzerland
- **Submission deadline: 20 November 2026, 23:59 UTC+01:00:** November 20, 2026 at 10:59 PM UTC
- **Contract value:** Not stated in the notice
- **Lots:** 1 lot
- **Contract period:** 2027 (works); broader short-term measures run 2027–2029
- **Published:** September 24, 2026

## Overview

ASTRA seeks works to repair and strengthen four bridges or half-bridges on the N21 at Bourg-Saint-Pierre, covering about 342 metres of structures between km 34.240 and km 39.490. Traffic must remain open throughout the 2027 works. The published award model allocates 40% to price and 60% to construction time, proposal quality, supplier quality and the works programme. Offers are accepted in German, French or Italian in two paper copies plus a USB copy; the deadline is 20 November 2026 at 23:59 UTC+01:00.

Information based on the public notice

## What the buyer needs

Repair and reinforcement of four named bridge structures on the N21 at Galerie des Toules, with road traffic maintained during the 2027 works. The notice distinguishes this contract from later short-term measures and separate rockfall-protection work.

- Submit the complete bid twice on paper and once electronically on USB including the SIA interface, in a sealed envelope marked with the official project title.
- Offers may be submitted in German, French or Italian.
- Variants are not permitted; offer validity is 180 days.
- Selection requirements are referred to the official SIMAP publication; the detailed eligibility criteria were not retrieved in the public API fields.

## Lots

- LOT-0000 · N21.12 MP-190074 - NEB Les Toules court terme - Assainissement et renforcement de 4 ponts/demi-ponts (ID 12132)

## Tender details

- Buyer: Bundesamt für Strassen ASTRA – Abteilung Strasseninfrastruktur West, Filiale Thun
- Country: Switzerland
- Procedure: open
- Classification: Construction and civil works · CPV 45000000
- Notice reference: 663322-2026
- Bridge structures: Valsorey 3 (200 m), Les Toules 1 (62 m), Les Toules 2 (35 m) and Ballerônes (45 m); 342 m total
- Traffic: N21 remains open throughout the works

## What to check in the tender documents

- Detailed selection and exclusion requirements are referenced to the SIMAP publication; the companion publication could not be matched in public SIMAP search.
- No monetary estimate is present in the public notice fields.

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate)

## Original notice

**N21.12 MP-190074 - NEB Les Toules court terme - Assainissement et renforcement de 4 ponts/demi-ponts (ID 12132)**

Official published title (deu):
Schweiz – Bauarbeiten – N21.12 MP-190074 - NEB Les Toules court terme - Assainissement et renforcement de 4 ponts/demi-ponts (ID 12132)

Official published title (fra):
Suisse – Travaux de construction – N21.12 MP-190074 - NEB Les Toules court terme - Assainissement et renforcement de 4 ponts/demi-ponts (ID 12132)

Official scope and description (fra):
Le présent marché consiste en l’assainissement et renforcement de 4 ponts/demi-ponts situés sur la route nationale N21 à Bourg-Saint-Pierre (plus précisément au niveau de la Galerie des Toules, entre les Km 34.240 et 39.490) : G3441 – Pont Valsorey 3 : Longueur : 200 m, ~Km 34.4 à 34.6 ; G3631 – Demi-pont des Toules 1 (70–72) : Longueur : 62 m, ~Km 36.3 à 36.4 ; G3661 – Demi-pont des Toules 2 (76e–77c) : Longueur : 35 m, ~Km 36.5 à 36.5 ; G3791 – Pont Ballerônes : Longueur : 45 m, ~Km 37.8 à 37.8. Les travaux sont à réaliser en 2027. Le trafic de la N21 (route nationale de 3ème classe bidirectionnelle) sera maintenu pendant toute la durée des travaux. Ces travaux s’inscrivent dans le cadre plus général du projet MP-190074 N21.12-001 NEB Les Toules court terme, mesures transitoires, qui consiste à rétablir ne niveau de service et de sécurité des ouvrages en attendant la définition des mesures à long terme. Le solde des mesures transitoires, qui ne fait pas l’objet du présent appel d’offres, se déroulera de 2028 à 2029. Des mesures de protection contre les chutes de pierres sont également en cours de réalisation et prévues à l’horizon 2030, les mesures en question ne font pas non plus l’objet du présent appel d’offres.

Official scope and description (deu):
Der vorliegende Auftrag umfasst die Instandsetzung und Verstärkung von vier Brücken/ Hangbrücke an der Nationalstrasse N21 in Bourg-Saint-Pierre (genauer im Bereich der Galerie des Toules zwischen km 34.240 und km 39.490): • G3441 – Pont Valsorey 3: Länge 200 m, ca. km 34.4 bis 34.6; • G3631 – Demi-Pont des Toules 1 (70–72): Länge 62 m, ca. km 36.3 bis 36.4; • G3661 – Demi-Pont des Toules 2 (76e–77c): Länge 35 m, ca. km 36.5; • G3791 –Pont Ballerônes: Länge 45 m, ca. km 37.8. Die Bauarbeiten sind für das Jahr 2027 vorgesehen. Der Verkehr auf der N21 (Nationalstrasse 3. Klasse mit Gegenverkehr) wird während der gesamten Bauzeit aufrechterhalten. Diese Arbeiten sind Teil des übergeordneten Projekts MP-190074 N21.12-001 NEB Les Toules kurzfristige Massnahmen (UeMa), dessen Ziel die Wiederherstellung des erforderlichen Nutzungs- und Sicherheitsniveaus der Bauwerke bis zur Festlegung der langfristigen Massnahmen ist. Die übrigen Übergangsmassnahmen, welche nicht Gegenstand der vorliegenden Ausschreibung sind, werden im Zeitraum 2028 bis 2029 umgesetzt. Zusätzlich werden Massnahmen zum Schutz vor Steinschlag ausgeführt beziehungsweise sind bis etwa 2030 geplant, die auch nicht welche nicht Gegenstand der vorliegenden Ausschreibung sind.

Official variants rule:
not-allowed

- Official source: [TED](https://ted.europa.eu/en/notice/-/detail/663322-2026)

## Notice updates

### October 18, 2026 · Version 2 (Classification updated)

Швейцария – Строителни и монтажни работи – N21.12 MP-190074 - NEB Les Toules court terme - Assainissement et renforcement de 4 ponts/demi-ponts (ID 12132)

Official published title (deu):
Schweiz – Bauarbeiten – N21.12 MP-190074 - NEB Les Toules court terme - Assainissement et renforcement de 4 ponts/demi-ponts (ID 12132)

Official published title (fra):
Suisse – Travaux de construction – N21.12 MP-190074 - NEB Les Toules court terme - Assainissement et renforcement de 4 ponts/demi-ponts (ID 12132)

Official scope and description (fra):
Le présent marché consiste en l’assainissement et renforcement de 4 ponts/demi-ponts situés sur la route nationale N21 à Bourg-Saint-Pierre (plus précisément au niveau de la Galerie des Toules, entre les Km 34.240 et 39.490) : G3441 – Pont Valsorey 3 : Longueur : 200 m, ~Km 34.4 à 34.6 ; G3631 – Demi-pont des Toules 1 (70–72) : Longueur : 62 m, ~Km 36.3 à 36.4 ; G3661 – Demi-pont des Toules 2 (76e–77c) : Longueur : 35 m, ~Km 36.5 à 36.5 ; G3791 – Pont Ballerônes : Longueur : 45 m, ~Km 37.8 à 37.8. Les travaux sont à réaliser en 2027. Le trafic de la N21 (route nationale de 3ème classe bidirectionnelle) sera maintenu pendant toute la durée des travaux. Ces travaux s’inscrivent dans le cadre plus général du projet MP-190074 N21.12-001 NEB Les Toules court terme, mesures transitoires, qui consiste à rétablir ne niveau de service et de sécurité des ouvrages en attendant la définition des mesures à long terme. Le solde des mesures transitoires, qui ne fait pas l’objet du présent appel d’offres, se déroulera de 2028 à 2029. Des mesures de protection contre les chutes de pierres sont également en cours de réalisation et prévues à l’horizon 2030, les mesures en question ne font pas non plus l’objet du présent appel d’offres.

Official scope and description (deu):
Der vorliegende Auftrag umfasst die Instandsetzung und Verstärkung von vier Brücken/ Hangbrücke an der Nationalstrasse N21 in Bourg-Saint-Pierre (genauer im Bereich der Galerie des Toules zwischen km 34.240 und km 39.490): • G3441 – Pont Valsorey 3: Länge 200 m, ca. km 34.4 bis 34.6; • G3631 – Demi-Pont des Toules 1 (70–72): Länge 62 m, ca. km 36.3 bis 36.4; • G3661 – Demi-Pont des Toules 2 (76e–77c): Länge 35 m, ca. km 36.5; • G3791 –Pont Ballerônes: Länge 45 m, ca. km 37.8. Die Bauarbeiten sind für das Jahr 2027 vorgesehen. Der Verkehr auf der N21 (Nationalstrasse 3. Klasse mit Gegenverkehr) wird während der gesamten Bauzeit aufrechterhalten. Diese Arbeiten sind Teil des übergeordneten Projekts MP-190074 N21.12-001 NEB Les Toules kurzfristige Massnahmen (UeMa), dessen Ziel die Wiederherstellung des erforderlichen Nutzungs- und Sicherheitsniveaus der Bauwerke bis zur Festlegung der langfristigen Massnahmen ist. Die übrigen Übergangsmassnahmen, welche nicht Gegenstand der vorliegenden Ausschreibung sind, werden im Zeitraum 2028 bis 2029 umgesetzt. Zusätzlich werden Massnahmen zum Schutz vor Steinschlag ausgeführt beziehungsweise sind bis etwa 2030 geplant, die auch nicht welche nicht Gegenstand der vorliegenden Ausschreibung sind.

Official variants rule:
not-allowed

### October 12, 2026 · Version 1 (Published)

Швейцария – Строителни и монтажни работи – N21.12 MP-190074 - NEB Les Toules court terme - Assainissement et renforcement de 4 ponts/demi-ponts (ID 12132)

Official published title (deu):
Schweiz – Bauarbeiten – N21.12 MP-190074 - NEB Les Toules court terme - Assainissement et renforcement de 4 ponts/demi-ponts (ID 12132)

Official published title (fra):
Suisse – Travaux de construction – N21.12 MP-190074 - NEB Les Toules court terme - Assainissement et renforcement de 4 ponts/demi-ponts (ID 12132)

Official scope and description (fra):
Le présent marché consiste en l’assainissement et renforcement de 4 ponts/demi-ponts situés sur la route nationale N21 à Bourg-Saint-Pierre (plus précisément au niveau de la Galerie des Toules, entre les Km 34.240 et 39.490) : G3441 – Pont Valsorey 3 : Longueur : 200 m, ~Km 34.4 à 34.6 ; G3631 – Demi-pont des Toules 1 (70–72) : Longueur : 62 m, ~Km 36.3 à 36.4 ; G3661 – Demi-pont des Toules 2 (76e–77c) : Longueur : 35 m, ~Km 36.5 à 36.5 ; G3791 – Pont Ballerônes : Longueur : 45 m, ~Km 37.8 à 37.8. Les travaux sont à réaliser en 2027. Le trafic de la N21 (route nationale de 3ème classe bidirectionnelle) sera maintenu pendant toute la durée des travaux. Ces travaux s’inscrivent dans le cadre plus général du projet MP-190074 N21.12-001 NEB Les Toules court terme, mesures transitoires, qui consiste à rétablir ne niveau de service et de sécurité des ouvrages en attendant la définition des mesures à long terme. Le solde des mesures transitoires, qui ne fait pas l’objet du présent appel d’offres, se déroulera de 2028 à 2029. Des mesures de protection contre les chutes de pierres sont également en cours de réalisation et prévues à l’horizon 2030, les mesures en question ne font pas non plus l’objet du présent appel d’offres.

Official scope and description (deu):
Der vorliegende Auftrag umfasst die Instandsetzung und Verstärkung von vier Brücken/ Hangbrücke an der Nationalstrasse N21 in Bourg-Saint-Pierre (genauer im Bereich der Galerie des Toules zwischen km 34.240 und km 39.490): • G3441 – Pont Valsorey 3: Länge 200 m, ca. km 34.4 bis 34.6; • G3631 – Demi-Pont des Toules 1 (70–72): Länge 62 m, ca. km 36.3 bis 36.4; • G3661 – Demi-Pont des Toules 2 (76e–77c): Länge 35 m, ca. km 36.5; • G3791 –Pont Ballerônes: Länge 45 m, ca. km 37.8. Die Bauarbeiten sind für das Jahr 2027 vorgesehen. Der Verkehr auf der N21 (Nationalstrasse 3. Klasse mit Gegenverkehr) wird während der gesamten Bauzeit aufrechterhalten. Diese Arbeiten sind Teil des übergeordneten Projekts MP-190074 N21.12-001 NEB Les Toules kurzfristige Massnahmen (UeMa), dessen Ziel die Wiederherstellung des erforderlichen Nutzungs- und Sicherheitsniveaus der Bauwerke bis zur Festlegung der langfristigen Massnahmen ist. Die übrigen Übergangsmassnahmen, welche nicht Gegenstand der vorliegenden Ausschreibung sind, werden im Zeitraum 2028 bis 2029 umgesetzt. Zusätzlich werden Massnahmen zum Schutz vor Steinschlag ausgeführt beziehungsweise sind bis etwa 2030 geplant, die auch nicht welche nicht Gegenstand der vorliegenden Ausschreibung sind.

Official variants rule:
not-allowed

## Understand this procurement.

Review the scope, requirements and procurement history with Ziva.

- Understand the requirements
- Find the evidence you need
- Prepare your response

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate) · [View official notice](https://ted.europa.eu/en/notice/-/detail/663322-2026)

## About this notice

- Official source: TED
- Source retrieved: October 12, 2026
- Page updated: November 13, 2026
- Notice reference: 663322-2026

## Open tenders like this one

- [Heating, cooling and plumbing works at Balerna care home](https://zephior.com/tenders/acd2c713-b4b3-4705-8bd2-2857b067a0d4/balerna-care-home-heating-cooling-plumbing-05-ccc) ([Markdown](https://zephior.com/tenders/acd2c713-b4b3-4705-8bd2-2857b067a0d4/balerna-care-home-heating-cooling-plumbing-05-ccc.md)), Comune di Balerna
- [COSAHL orientation school: composite screeds](https://zephior.com/tenders/49a2c5e3-eeaa-498d-85fc-e1645d661f23/cosahl-school-screeds-composite-underlayers) ([Markdown](https://zephior.com/tenders/49a2c5e3-eeaa-498d-85fc-e1645d661f23/cosahl-school-screeds-composite-underlayers.md)), COSAHL - Association du cycle d’orientation de la Sarine-Campagne et du Haut-Lac français
- [Renewal of the Righi overpass on SBB line 230](https://zephior.com/tenders/b4ab01bc-8177-4c9d-91c7-1d70191d3030/renewal-righi-overpass-sbb-line-230-delemont) ([Markdown](https://zephior.com/tenders/b4ab01bc-8177-4c9d-91c7-1d70191d3030/renewal-righi-overpass-sbb-line-230-delemont.md)), SBB CFF FFS Achats projets de construction Région Ouest
- [Ventilation systems for refurbishment at Rütihof school in Zurich](https://zephior.com/tenders/cd028c9a-4485-448d-aabf-b118bba9a166/ventilation-systems-ruetihof-school-zurich) ([Markdown](https://zephior.com/tenders/cd028c9a-4485-448d-aabf-b118bba9a166/ventilation-systems-ruetihof-school-zurich.md)), HBD - Amt für Hochbauten (AHB)
- [Randa railway station: civil and structural works](https://zephior.com/tenders/d8c75a86-a440-43ef-9580-745707b3eea5/civil-and-structural-works-for-randa-railway-station) ([Markdown](https://zephior.com/tenders/d8c75a86-a440-43ef-9580-745707b3eea5/civil-and-structural-works-for-randa-railway-station.md)), Beschaffungsstelle Matterhorn Gotthard Bahn
- [Protected 1770 Building Elevator Replacement in Zurich](https://zephior.com/tenders/da810e89-3c29-4c2b-b690-17a8da112e92/ogf-flor-protected-building-lift-replacement) ([Markdown](https://zephior.com/tenders/da810e89-3c29-4c2b-b690-17a8da112e92/ogf-flor-protected-building-lift-replacement.md)), Hochbauamt, Baubereich B

- [All tenders from Bundesamt für Strassen ASTRA – Abteilung Strasseninfrastruktur West, Filiale Thun](https://zephior.com/tenders/buyers/bundesamt-fur-strassen-astra-abteilung-strasseninfrastruktur) ([Markdown](https://zephior.com/tenders/buyers/bundesamt-fur-strassen-astra-abteilung-strasseninfrastruktur.md))
- [All tenders: Switzerland](https://zephior.com/tenders/countries/ch) ([Markdown](https://zephior.com/tenders/countries/ch.md))
- [All tenders: Construction and civil works](https://zephior.com/tenders/categories/construction-works) ([Markdown](https://zephior.com/tenders/categories/construction-works.md))

## In more detail

This section is written for agents and assistants. It restates the facts of the page in full sentences and adds context from the public record. Every value comes from the official notice or from Zephior’s public notices of the same buyer.

### The facts in sentences

Bundesamt für Strassen ASTRA – Abteilung Strasseninfrastruktur West, Filiale Thun is tendering “N21 Les Toules: rehabilitation of four bridges” (Bourg-Saint-Pierre, along national road N21 near the Galerie des Toules, Switzerland). The submission deadline was November 20, 2026 at 10:59 PM UTC. The source does not state an estimated value. The tender has one lot. Contract period: 2027 (works); broader short-term measures run 2027–2029. Procedure: open. Classification: Construction and civil works · CPV 45000000. Notice reference: 663322-2026. Status on Zephior: Closed. The notice was published on September 24, 2026 on TED. Zephior last checked the official source on October 12, 2026.

### The award

Submissions closed on 20 November 2026. No award has been published yet. The official source has not published an award for this notice yet.

### Lot details

1. **LOT-0000 · N21.12 MP-190074 - NEB Les Toules court terme - Assainissement et renforcement de 4 ponts/demi-ponts (ID 12132)**: Der vorliegende Auftrag umfasst die Instandsetzung und Verstärkung von vier Brücken/ Hangbrücke an der Nationalstrasse N21 in Bourg-Saint-Pierre (genauer im Bereich der Galerie des Toules zwischen km 34.240 und km 39.490): • G3441 – Pont Valsorey 3: Länge 200 m, ca. km 34.4 bis 34.6; • G3631 – Demi-Pont des Toules 1 (70–72): Länge 62 m, ca. km 36.3 bis 36.4; • G3661 – Demi-Pont des Toules 2 (76e–77c): Länge 35 m, ca. km 36.5; • G3791 –Pont Ballerônes: Länge 45 m, ca. km 37.8. Die Bauarbeiten sind für das Jahr 2027 vorgesehen. Der Verkehr auf der N21 (Nationalstrasse 3. Klasse mit Gegenverkehr) wird während der gesamten Bauzeit aufrechterhalten. Diese Arbeiten sind Teil des übergeordneten Projekts MP-190074 N21.12-001 NEB Les Toules kurzfristige Massnahmen (UeMa), dessen Ziel die Wiederherstellung des erforderlichen Nutzungs- und Sicherheitsniveaus der Bauwerke bis zur Festlegung der langfristigen Massnahmen ist. Die übrigen Übergangsmassnahmen, welche nicht Gegenstand der vorliegenden Ausschreibung sind, werden im Zeitraum 2028 bis 2029 umgesetzt. Zusätzlich werden Massnahmen zum Schutz vor Steinschlag ausgeführt beziehungsweise sind bis etwa 2030 geplant, die auch nicht welche nicht Gegenstand der vorliegenden Ausschreibung sind.

### About the buyer

Bundesamt für Strassen ASTRA – Abteilung Strasseninfrastruktur West, Filiale Thun has 3 public notices on Zephior (0 open now, 3 published in the last 12 months). Its notices on Zephior were first published on August 16, 2026 and most recently on September 24, 2026. Main sectors: Construction (3). It publishes under the names “Bundesamt für Strassen ASTRA - Abteilung Strasseninfrastruktur West - Filiale Thun”.

- [All tenders and the profile of Bundesamt für Strassen ASTRA – Abteilung Strasseninfrastruktur West, Filiale Thun](https://zephior.com/tenders/buyers/bundesamt-fur-strassen-astra-abteilung-strasseninfrastruktur) ([Markdown](https://zephior.com/tenders/buyers/bundesamt-fur-strassen-astra-abteilung-strasseninfrastruktur.md))

### Terms used on this page

- **Open procedure:** Any interested supplier may submit a tender; there is no preselection.

### Where to go next

- [Heating, cooling and plumbing works at Balerna care home](https://zephior.com/tenders/acd2c713-b4b3-4705-8bd2-2857b067a0d4/balerna-care-home-heating-cooling-plumbing-05-ccc) ([Markdown](https://zephior.com/tenders/acd2c713-b4b3-4705-8bd2-2857b067a0d4/balerna-care-home-heating-cooling-plumbing-05-ccc.md))
- [COSAHL orientation school: composite screeds](https://zephior.com/tenders/49a2c5e3-eeaa-498d-85fc-e1645d661f23/cosahl-school-screeds-composite-underlayers) ([Markdown](https://zephior.com/tenders/49a2c5e3-eeaa-498d-85fc-e1645d661f23/cosahl-school-screeds-composite-underlayers.md))
- [Renewal of the Righi overpass on SBB line 230](https://zephior.com/tenders/b4ab01bc-8177-4c9d-91c7-1d70191d3030/renewal-righi-overpass-sbb-line-230-delemont) ([Markdown](https://zephior.com/tenders/b4ab01bc-8177-4c9d-91c7-1d70191d3030/renewal-righi-overpass-sbb-line-230-delemont.md))
- [Ventilation systems for refurbishment at Rütihof school in Zurich](https://zephior.com/tenders/cd028c9a-4485-448d-aabf-b118bba9a166/ventilation-systems-ruetihof-school-zurich) ([Markdown](https://zephior.com/tenders/cd028c9a-4485-448d-aabf-b118bba9a166/ventilation-systems-ruetihof-school-zurich.md))
- [Randa railway station: civil and structural works](https://zephior.com/tenders/d8c75a86-a440-43ef-9580-745707b3eea5/civil-and-structural-works-for-randa-railway-station) ([Markdown](https://zephior.com/tenders/d8c75a86-a440-43ef-9580-745707b3eea5/civil-and-structural-works-for-randa-railway-station.md))
- [Protected 1770 Building Elevator Replacement in Zurich](https://zephior.com/tenders/da810e89-3c29-4c2b-b690-17a8da112e92/ogf-flor-protected-building-lift-replacement) ([Markdown](https://zephior.com/tenders/da810e89-3c29-4c2b-b690-17a8da112e92/ogf-flor-protected-building-lift-replacement.md))
- [All tenders from Bundesamt für Strassen ASTRA – Abteilung Strasseninfrastruktur West, Filiale Thun](https://zephior.com/tenders/buyers/bundesamt-fur-strassen-astra-abteilung-strasseninfrastruktur) ([Markdown](https://zephior.com/tenders/buyers/bundesamt-fur-strassen-astra-abteilung-strasseninfrastruktur.md))
- [All tenders: Switzerland](https://zephior.com/tenders/countries/ch) ([Markdown](https://zephior.com/tenders/countries/ch.md))
- [All tenders: Construction and civil works](https://zephior.com/tenders/categories/construction-works) ([Markdown](https://zephior.com/tenders/categories/construction-works.md))

### Source-backed public record

```json
{
  "id": "a8e1debb-bd67-4e9f-9def-b2c0932cc569",
  "revision": 2,
  "modifiedAt": "2026-11-13T22:59:00+00:00",
  "url": "https://zephior.com/tenders/a8e1debb-bd67-4e9f-9def-b2c0932cc569/n21-les-toules-rehabilitation-of-four-bridges",
  "status": "closed",
  "recordedStatus": "open",
  "buyer": {
    "id": "bundesamt-fur-strassen-astra-abteilung-strasseninfrastruktur",
    "name": "Bundesamt für Strassen ASTRA – Abteilung Strasseninfrastruktur West, Filiale Thun"
  },
  "category": {
    "de": "Bau und Tiefbau",
    "en": "Construction and civil works",
    "fr": "Travaux de construction et génie civil",
    "id": "construction-works"
  },
  "deadline": {
    "at": "2026-11-20T23:59:00+01:00",
    "date": null,
    "source_ref": "ted_search#deadline-receipt-tender-date-lot;deadline-receipt-tender-time-lot"
  },
  "award": null,
  "estimatedValue": null,
  "contractPeriod": "2027 (works); broader short-term measures run 2027–2029",
  "region": null,
  "originalSource": {
    "url": "https://ted.europa.eu/en/notice/-/detail/663322-2026",
    "title": "N21.12 MP-190074 - NEB Les Toules court terme - Assainissement et renforcement de 4 ponts/demi-ponts (ID 12132)",
    "issuer": "Bundesamt für Strassen ASTRA - Abteilung Strasseninfrastruktur West - Filiale Thun",
    "status": "open",
    "language": "en",
    "location": "CHE",
    "deadline_at": "2026-11-19T23:00:00+00:00",
    "description": null,
    "country_code": "CH",
    "published_at": "2026-09-24T22:00:00+00:00",
    "contract_type": null,
    "deadline_date": null,
    "procedure_type": "open",
    "reference_numbers": [
      "663322-2026"
    ],
    "classification_codes": [
      {
        "code": "45000000",
        "system": "CPV",
        "provenance": "source_declared"
      }
    ]
  },
  "sources": [
    {
      "ref": "canonical_snapshot",
      "url": "https://ted.europa.eu/en/notice/-/detail/663322-2026",
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-12T10:15:34.025533Z"
    },
    {
      "ref": "ted_search",
      "url": "https://api.ted.europa.eu/v3/notices/search",
      "kind": "official_notice_api",
      "retrieved_at": "2026-10-12T10:16:53.227296Z"
    },
    {
      "ref": "ted_lot_fields",
      "url": "https://api.ted.europa.eu/v3/notices/search",
      "kind": "official_notice_api",
      "retrieved_at": "2026-10-12T10:22:04.132591Z"
    },
    {
      "ref": "ted_condition_fields",
      "url": "https://api.ted.europa.eu/v3/notices/search",
      "kind": "official_notice_api",
      "retrieved_at": "2026-10-12T10:23:25.138742Z"
    }
  ],
  "keyFacts": [
    {
      "label": "Bridge structures",
      "value": "Valsorey 3 (200 m), Les Toules 1 (62 m), Les Toules 2 (35 m) and Ballerônes (45 m); 342 m total",
      "source_ref": "ted_search#description-lot"
    },
    {
      "label": "Traffic",
      "value": "N21 remains open throughout the works",
      "source_ref": "ted_search#description-lot"
    }
  ],
  "noticeFacts": {
    "lots": [
      {
        "id": "LOT-0000",
        "title": "N21.12 MP-190074 - NEB Les Toules court terme - Assainissement et renforcement de 4 ponts/demi-ponts (ID 12132)",
        "source_ref": "ted_lot_fields#identifier-lot;title-lot;description-lot",
        "description": "Der vorliegende Auftrag umfasst die Instandsetzung und Verstärkung von vier Brücken/ Hangbrücke an der Nationalstrasse N21 in Bourg-Saint-Pierre (genauer im Bereich der Galerie des Toules zwischen km 34.240 und km 39.490): • G3441 – Pont Valsorey 3: Länge 200 m, ca. km 34.4 bis 34.6; • G3631 – Demi-Pont des Toules 1 (70–72): Länge 62 m, ca. km 36.3 bis 36.4; • G3661 – Demi-Pont des Toules 2 (76e–77c): Länge 35 m, ca. km 36.5; • G3791 –Pont Ballerônes: Länge 45 m, ca. km 37.8. Die Bauarbeiten sind für das Jahr 2027 vorgesehen. Der Verkehr auf der N21 (Nationalstrasse 3. Klasse mit Gegenverkehr) wird während der gesamten Bauzeit aufrechterhalten. Diese Arbeiten sind Teil des übergeordneten Projekts MP-190074 N21.12-001 NEB Les Toules kurzfristige Massnahmen (UeMa), dessen Ziel die Wiederherstellung des erforderlichen Nutzungs- und Sicherheitsniveaus der Bauwerke bis zur Festlegung der langfristigen Massnahmen ist. Die übrigen Übergangsmassnahmen, welche nicht Gegenstand der vorliegenden Ausschreibung sind, werden im Zeitraum 2028 bis 2029 umgesetzt. Zusätzlich werden Massnahmen zum Schutz vor Steinschlag ausgeführt beziehungsweise sind bis etwa 2030 geplant, die auch nicht welche nicht Gegenstand der vorliegenden Ausschreibung sind."
      }
    ],
    "schedule": [
      {
        "event": "Works period",
        "value": "2027; traffic maintained throughout works",
        "source_ref": "ted_search#contract-duration-start-date-lot;contract-duration-end-date-lot;description-lot"
      }
    ],
    "requirements": [
      {
        "text": "Submit the complete bid twice on paper and once electronically on USB including the SIA interface, in a sealed envelope marked with the official project title.",
        "source_ref": "ted_condition_fields#submission-nonelectronic-description-lot;variant-allowed-lot;selection-criterion-description-lot"
      },
      {
        "text": "Offers may be submitted in German, French or Italian.",
        "source_ref": "ted_condition_fields#submission-nonelectronic-description-lot;variant-allowed-lot;selection-criterion-description-lot"
      },
      {
        "text": "Variants are not permitted; offer validity is 180 days.",
        "source_ref": "ted_condition_fields#submission-nonelectronic-description-lot;variant-allowed-lot;selection-criterion-description-lot"
      },
      {
        "text": "Selection requirements are referred to the official SIMAP publication; the detailed eligibility criteria were not retrieved in the public API fields.",
        "source_ref": "ted_condition_fields#submission-nonelectronic-description-lot;variant-allowed-lot;selection-criterion-description-lot"
      }
    ],
    "award_criteria": [
      {
        "text": "ZK1 PREIS [40%] — Bewertungskriterien: Angebotspreis gemäss Angebotsunterlagen (ohne MWST, inklusive Rabatt).",
        "source_ref": "ted_search#award-criterion-name-lot;award-criterion-description-lot"
      },
      {
        "text": "ZK2 BAUZEIT [15%] — Bewertungskriterien: - Dauer der Arbeiten bis zur Abnahme des Bauwerks und zur Verkehrsfreigabe der Verkehrsfläche; - Beschreibung und Angabe der verfügbaren Reserven in Tagen; - Beschreibung der vorgesehenen Beschleunigungsmassnahmen mit Angabe des Zeitgewinns in Tagen.",
        "source_ref": "ted_search#award-criterion-name-lot;award-criterion-description-lot"
      },
      {
        "text": "ZK3 QUALITÄT / PLAUSIBILITÄT DES ANGEBOTS [15%] — ZK3.1 Technische Bericht [10%] Bewertungskriterien: - Analyse der aus Sicht des Anbieters auszuführenden Leistungen; - Organisation und Organigramm des Anbieters; - Organisation der Baustelleneinrichtungen, incl. Zufahrten und des detaillierte Installationsplans; - Liste der eingesetzten Maschinen und Geräte; - Beurteilung / Analyse der Verkehrsführung; - Angaben / Analyse zum Bauablauf; - Beurteilung / Kommentar zur Umsetzung eines Notfallkonzepts. ZK3.2 QM-Konzept und Risikoanalyse [5%] Bewertungskriterien: - Vorgesehenes Qualitätsmanagement bezogen auf das Projekt; - Beschreibung und Beurteilung der bestehenden Risiken.",
        "source_ref": "ted_search#award-criterion-name-lot;award-criterion-description-lot"
      },
      {
        "text": "ZK4 QUALITÄT DES ANBIETERS [15%] — Bewertungskriterien: Die Bewertung der Schlüsselperson (*) erfolgt auf der Grundlage eines Referenzobjekts (max. 2 A4-Seiten) und berücksichtigt dessen Vergleichbarkeit mit der im vorliegenden Ausschreibungsverfahren zu vergebende Aufgabe (Komplexität und Fachbereich). Zusätzlich werden die allgemeine Berufserfahrung, die Aus- und Weiterbildung, die Erfahrung, die fachlichen und führungsspezifischen Kompetenzen sowie die im eingereichten Lebenslauf angegebenen Funktionen innerhalb des Unternehmens berücksichtigt (Lebenslauf von maximal 2 A4-Seiten). (*) Als Schlüsselperson gilt:Bauführer (mit Funktion als Verantwortlicher der Baustellenführung und Hauptansprechpartner des Bauherrn sowie der örtlichen Bauleitung).",
        "source_ref": "ted_search#award-criterion-name-lot;award-criterion-description-lot"
      },
      {
        "text": "ZK5 QUALITÄT UND PLAUSIBILITÄT DES BAUPROGRAMMS MIT DEN BAUABLÄUFEN [15%] — Dieses ZK dient der Beurteilung der Qualität des Bauprogramms hinsichtlich der Planung, Organisation und Priorisierung der für die Fertigstellung der Arbeiten erforderlichen Tätigkeiten. Dabei sind die technischen und logistischen Randbedingungen der Ausführung zu berücksichtigen, insbesondere die Verkehrsführung während der Bauarbeiten Bewertungskriterien: - Beschreibung der Leistungsvorgaben hinsichtlich Personal- und Maschineneinsatz (z. B. Personalbestand, Anzahl und Grösse der Teams, Teamzusammensetzung, Arbeitszyklen, Leistungen der Hauptarbeiten usw.); - Optimierung der Termine: Definition, Vorgehensweise, Schichtarbeit, Anpassung des Bauablaufs usw.; - Erläuterung des Bauablaufs gemäss Terminprogramm (Phasen und Teilphasen), kritischer Terminpfad der Arbeiten, Identifikation der Beschaffungs- und Herstellungsfristen sowie Berücksichtigung arbeitsfreier Zeiten; - Identifikation der wichtigsten technischen und organisatorischen Meilensteine sowie Einhaltung der vertraglich festgelegten Meilensteine.",
        "source_ref": "ted_search#award-criterion-name-lot;award-criterion-description-lot"
      }
    ],