# Smart meter rollout for Murg Flums Energie

Murg Flums Energie · Switzerland · Closed

## Outcome

Submissions closed on 13 November 2026. No award has been published yet.

> The current SIMAP publication 44485-01 and the linked TED notice 652904-2026 show an offer deadline of 13 November 2026 at 00:00 CET. That deadline has passed, so the procurement is now closed. No later correction appears in the current SIMAP project header.

- **Buyer:** Murg Flums Energie
- **Place:** Murg, canton of St. Gallen
- **Offer submission deadline:** November 12, 2026 at 11:00 PM UTC
- **Contract value:** Not stated in the notice
- **Lots:** 3 lots
- **Contract period:** The published execution period for Lot 2 is 1 September 2027 to 31 January 2028. The public record states no execution period for Lots 1 and 3.
- **Published:** September 19, 2026

## Overview

Murg Flums Energie (MFE) plans to replace around 3,200 existing electricity meters in its distribution network with smart meters. The procurement has three postal-code lots: 8897/8898, 8890 and 8877. The services include project coordination, appointment planning, meter logistics, one-for-one replacement of direct meters, approved communication modules, digital installation records and return of old units. Published quantities are estimates; MFE determines actual quantities. Lot 2 is scheduled for 1 September 2027 to 31 January 2028. Deadline: 13 November 2026, 00:00 (UTC+01:00).

Information based on the public notice

## What the buyer needs

Replacement of around 3,200 existing electricity meters with smart meters in three postal-code areas. Services cover project leadership and coordination, appointment notices, logistics, one-for-one replacement of direct meters, installation of approved communication modules, complete records through MFE’s web application and return of old units.

- Consortia and subcontractors are allowed. Variants and partial offers are not allowed. The offer language is German. Submission is digital through SIMAP or external; the public notice does not specify the external method. Award criteria are in the tender documents.

## Lots

- 3dd1abda-1699-461d-8b1c-dd53cecd5c94 · Rollout postal codes 8897 and 8898
- 845c3de9-e575-49d0-9339-eb63d65e953e · Rollout postal code 8890
- ae536aa3-99d2-4253-8746-62e267a83e4e · Rollout postal code 8877

## Tender details

- Buyer: Murg Flums Energie
- Country: Switzerland
- Procedure: open
- Classification: Energy and utilities · CPV 51210000
- Notice reference: 44485 · 44485-01
- Scope: Around 3,200 existing electricity meters; this is a planned total and MFE determines the actual quantity.
- Lots: Lot 1: postal codes 8897 and 8898; Lot 2: 8890; Lot 3: 8877.
- Offer deadline: 13 November 2026, 00:00 (UTC+01:00)
- Offer validity: Through 31 January 2027
- Lot 2 execution period: 1 September 2027 to 31 January 2028. No period is published for Lots 1 and 3.
- Lot 1: Lot 1: postal codes 8897 and 8898
- Lot 2: Lot 2: 8890
- Lot 3: Lot 3: 8877.
- Offer submission deadline: 2026-11-13T00:00:00+01:00

## What to check in the tender documents

- MFE does not allocate the planned total of around 3,200 meters by lot; it will determine actual quantities. The retrieved public notice does not state an estimated contract value or the specific award criteria.

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate)

## Original notice

**MF Energie: Smart Meter Rollout**

Murg Flums Energie (MFE) plant, rund 3’200 bestehende Elektrizitätszähler im eigenen Verteilnetz durch Smart Meter zu ersetzen. 
Der Rollout wird zur besseren operativen Steuerung in mehrere Lose aufgeteilt. Die Losbildung 
erfolgt nach PLZ. Die Lose 1–3 werden den nachfolgend aufgeführten PLZ-Gebieten zugeordnet. Die angegebenen Mengen sind Planmengen; die effektiven 
Mengen werden durch MFE festgelegt.

Los 1: Rollout PLZ 8897 und 8898
Gegenstand und Umfang des Auftrags 
Der Leistungsumfang dieser Ausschreibung beinhaltet insbesondere folgende Dienstleistungen: 
- Projektleitung, Administration, Koordination und Besprechungen mit dem Auftraggeber 
- Avisierung und Koordination der Installationstermine; die allgemeine Vorinformation der 
Bevölkerung erfolgt vorgängig durch MFE 
- Zählerhandling und Logistik in Verantwortung des Auftragnehmers ab dem zentralen Ausgabepunkt in Flums für Lose 1 und 2 beziehungsweise in Murg für Los 3 
- 1:1-Ersatz direktmessender Zähler; es darf jeweils nur ein Zähler gleichzeitig gewechselt 
und der Wechsel muss in einem Arbeitsgang vollständig abgeschlossen werden 
- Montage und Inbetriebnahme zusätzlicher, von MFE freigegebener Kommunikationsmodule nach Rücksprache mit der Projektleitung MFE 
- Vollständige Dokumentation des Installationsprozesses durch den Monteur auf Tablet über 
die von MFE definierte webbasierte Anwendung 
- Demontage und Rückführung der Altgeräte gemäss Vorgaben MFE; kundenseitige Ersatzsteuerungen für Boiler und weitere Verbraucher sind nicht Bestandteil des Vergabeauftrags 
- Standortdokumentation von HAK und HV sowie – sofern Option 1 beauftragt wird – Erfassung von Flexibilitäten wie PV, Wärmepumpen, E-Mobilität und weiteren steuerbaren Verbrauchern mittels «OptiMobile-Tool von MFE» 
- Messung und vollständige Dokumentation der Kurzschlussströme am HAK; Messpunkt 
nach den Bezügersicherungen mittels Hochstrom-Impedanztester

Los 2: Rollout PLZ 8890
Gegenstand und Umfang des Auftrags 
Der Leistungsumfang dieser Ausschreibung beinhaltet insbesondere folgende Dienstleistungen: 
- Projektleitung, Administration, Koordination und Besprechungen mit dem Auftraggeber 
- Avisierung und Koordination der Installationstermine; die allgemeine Vorinformation der 
Bevölkerung erfolgt vorgängig durch MFE 
- Zählerhandling und Logistik in Verantwortung des Auftragnehmers ab dem zentralen Ausgabepunkt in Flums für Lose 1 und 2 beziehungsweise in Murg für Los 3 
- 1:1-Ersatz direktmessender Zähler; es darf jeweils nur ein Zähler gleichzeitig gewechselt 
und der Wechsel muss in einem Arbeitsgang vollständig abgeschlossen werden 
- Montage und Inbetriebnahme zusätzlicher, von MFE freigegebener Kommunikationsmodule nach Rücksprache mit der Projektleitung MFE 
- Vollständige Dokumentation des Installationsprozesses durch den Monteur auf Tablet über 
die von MFE definierte webbasierte Anwendung 
- Demontage und Rückführung der Altgeräte gemäss Vorgaben MFE; kundenseitige Ersatzsteuerungen für Boiler und weitere Verbraucher sind nicht Bestandteil des Vergabeauftrags 
- Standortdokumentation von HAK und HV sowie – sofern Option 1 beauftragt wird – Erfassung von Flexibilitäten wie PV, Wärmepumpen, E-Mobilität und weiteren steuerbaren Verbrauchern mittels «OptiMobile-Tool von MFE» 
- Messung und vollständige Dokumentation der Kurzschlussströme am HAK; Messpunkt 
nach den Bezügersicherungen mittels Hochstrom-Impedanztester

Los 3: Rollout 8877
Gegenstand und Umfang des Auftrags 
Der Leistungsumfang dieser Ausschreibung beinhaltet insbesondere folgende Dienstleistungen: 
- Projektleitung, Administration, Koordination und Besprechungen mit dem Auftraggeber 
- Avisierung und Koordination der Installationstermine; die allgemeine Vorinformation der 
Bevölkerung erfolgt vorgängig durch MFE 
- Zählerhandling und Logistik in Verantwortung des Auftragnehmers ab dem zentralen Ausgabepunkt in Flums für Lose 1 und 2 beziehungsweise in Murg für Los 3 
- 1:1-Ersatz direktmessender Zähler; es darf jeweils nur ein Zähler gleichzeitig gewechselt 
und der Wechsel muss in einem Arbeitsgang vollständig abgeschlossen werden 
- Montage und Inbetriebnahme zusätzlicher, von MFE freigegebener Kommunikationsmodule nach Rücksprache mit der Projektleitung MFE 
- Vollständige Dokumentation des Installationsprozesses durch den Monteur auf Tablet über 
die von MFE definierte webbasierte Anwendung 
- Demontage und Rückführung der Altgeräte gemäss Vorgaben MFE; kundenseitige Ersatzsteuerungen für Boiler und weitere Verbraucher sind nicht Bestandteil des Vergabeauftrags 
- Standortdokumentation von HAK und HV sowie – sofern Option 1 beauftragt wird – Erfassung von Flexibilitäten wie PV, Wärmepumpen, E-Mobilität und weiteren steuerbaren Verbrauchern mittels «OptiMobile-Tool von MFE» 
- Messung und vollständige Dokumentation der Kurzschlussströme am HAK; Messpunkt 
nach den Bezügersicherungen mittels Hochstrom-Impedanztester

- Official source: [SIMAP and TED Europe](https://www.simap.ch/de/project-detail/c810cf10-f8e9-4ab5-a1ec-0832e98c6ff4)

## Notice updates

### November 17, 2026 · Version 4 (Deadline information updated, Summary and analysis updated, Tender facts updated, Deadline updated, Source updated, Source notice details updated, Source references updated, Status changed, Notice update added)

MF Energie: Smart Meter Rollout

Murg Flums Energie (MFE) plant, rund 3’200 bestehende Elektrizitätszähler im eigenen Verteilnetz durch Smart Meter zu ersetzen. 
Der Rollout wird zur besseren operativen Steuerung in mehrere Lose aufgeteilt. Die Losbildung 
erfolgt nach PLZ. Die Lose 1–3 werden den nachfolgend aufgeführten PLZ-Gebieten zugeordnet. Die angegebenen Mengen sind Planmengen; die effektiven 
Mengen werden durch MFE festgelegt.

Los 1: Rollout PLZ 8897 und 8898
Gegenstand und Umfang des Auftrags 
Der Leistungsumfang dieser Ausschreibung beinhaltet insbesondere folgende Dienstleistungen: 
- Projektleitung, Administration, Koordination und Besprechungen mit dem Auftraggeber 
- Avisierung und Koordination der Installationstermine; die allgemeine Vorinformation der 
Bevölkerung erfolgt vorgängig durch MFE 
- Zählerhandling und Logistik in Verantwortung des Auftragnehmers ab dem zentralen Ausgabepunkt in Flums für Lose 1 und 2 beziehungsweise in Murg für Los 3 
- 1:1-Ersatz direktmessender Zähler; es darf jeweils nur ein Zähler gleichzeitig gewechselt 
und der Wechsel muss in einem Arbeitsgang vollständig abgeschlossen werden 
- Montage und Inbetriebnahme zusätzlicher, von MFE freigegebener Kommunikationsmodule nach Rücksprache mit der Projektleitung MFE 
- Vollständige Dokumentation des Installationsprozesses durch den Monteur auf Tablet über 
die von MFE definierte webbasierte Anwendung 
- Demontage und Rückführung der Altgeräte gemäss Vorgaben MFE; kundenseitige Ersatzsteuerungen für Boiler und weitere Verbraucher sind nicht Bestandteil des Vergabeauftrags 
- Standortdokumentation von HAK und HV sowie – sofern Option 1 beauftragt wird – Erfassung von Flexibilitäten wie PV, Wärmepumpen, E-Mobilität und weiteren steuerbaren Verbrauchern mittels «OptiMobile-Tool von MFE» 
- Messung und vollständige Dokumentation der Kurzschlussströme am HAK; Messpunkt 
nach den Bezügersicherungen mittels Hochstrom-Impedanztester

Los 2: Rollout PLZ 8890
Gegenstand und Umfang des Auftrags 
Der Leistungsumfang dieser Ausschreibung beinhaltet insbesondere folgende Dienstleistungen: 
- Projektleitung, Administration, Koordination und Besprechungen mit dem Auftraggeber 
- Avisierung und Koordination der Installationstermine; die allgemeine Vorinformation der 
Bevölkerung erfolgt vorgängig durch MFE 
- Zählerhandling und Logistik in Verantwortung des Auftragnehmers ab dem zentralen Ausgabepunkt in Flums für Lose 1 und 2 beziehungsweise in Murg für Los 3 
- 1:1-Ersatz direktmessender Zähler; es darf jeweils nur ein Zähler gleichzeitig gewechselt 
und der Wechsel muss in einem Arbeitsgang vollständig abgeschlossen werden 
- Montage und Inbetriebnahme zusätzlicher, von MFE freigegebener Kommunikationsmodule nach Rücksprache mit der Projektleitung MFE 
- Vollständige Dokumentation des Installationsprozesses durch den Monteur auf Tablet über 
die von MFE definierte webbasierte Anwendung 
- Demontage und Rückführung der Altgeräte gemäss Vorgaben MFE; kundenseitige Ersatzsteuerungen für Boiler und weitere Verbraucher sind nicht Bestandteil des Vergabeauftrags 
- Standortdokumentation von HAK und HV sowie – sofern Option 1 beauftragt wird – Erfassung von Flexibilitäten wie PV, Wärmepumpen, E-Mobilität und weiteren steuerbaren Verbrauchern mittels «OptiMobile-Tool von MFE» 
- Messung und vollständige Dokumentation der Kurzschlussströme am HAK; Messpunkt 
nach den Bezügersicherungen mittels Hochstrom-Impedanztester

Los 3: Rollout 8877
Gegenstand und Umfang des Auftrags 
Der Leistungsumfang dieser Ausschreibung beinhaltet insbesondere folgende Dienstleistungen: 
- Projektleitung, Administration, Koordination und Besprechungen mit dem Auftraggeber 
- Avisierung und Koordination der Installationstermine; die allgemeine Vorinformation der 
Bevölkerung erfolgt vorgängig durch MFE 
- Zählerhandling und Logistik in Verantwortung des Auftragnehmers ab dem zentralen Ausgabepunkt in Flums für Lose 1 und 2 beziehungsweise in Murg für Los 3 
- 1:1-Ersatz direktmessender Zähler; es darf jeweils nur ein Zähler gleichzeitig gewechselt 
und der Wechsel muss in einem Arbeitsgang vollständig abgeschlossen werden 
- Montage und Inbetriebnahme zusätzlicher, von MFE freigegebener Kommunikationsmodule nach Rücksprache mit der Projektleitung MFE 
- Vollständige Dokumentation des Installationsprozesses durch den Monteur auf Tablet über 
die von MFE definierte webbasierte Anwendung 
- Demontage und Rückführung der Altgeräte gemäss Vorgaben MFE; kundenseitige Ersatzsteuerungen für Boiler und weitere Verbraucher sind nicht Bestandteil des Vergabeauftrags 
- Standortdokumentation von HAK und HV sowie – sofern Option 1 beauftragt wird – Erfassung von Flexibilitäten wie PV, Wärmepumpen, E-Mobilität und weiteren steuerbaren Verbrauchern mittels «OptiMobile-Tool von MFE» 
- Messung und vollständige Dokumentation der Kurzschlussströme am HAK; Messpunkt 
nach den Bezügersicherungen mittels Hochstrom-Impedanztester

### October 23, 2026 · Version 3 (Classification updated, Contract period updated, Summary and analysis updated, Tender facts updated, Original notice updated, Deadline updated, Location updated, Source notice details updated, Source references updated)

MF Energie: Smart Meter Rollout

Murg Flums Energie (MFE) plant, rund 3’200 bestehende Elektrizitätszähler im eigenen Verteilnetz durch Smart Meter zu ersetzen. 
Der Rollout wird zur besseren operativen Steuerung in mehrere Lose aufgeteilt. Die Losbildung 
erfolgt nach PLZ. Die Lose 1–3 werden den nachfolgend aufgeführten PLZ-Gebieten zugeordnet. Die angegebenen Mengen sind Planmengen; die effektiven 
Mengen werden durch MFE festgelegt.

Los 1: Rollout PLZ 8897 und 8898
Gegenstand und Umfang des Auftrags 
Der Leistungsumfang dieser Ausschreibung beinhaltet insbesondere folgende Dienstleistungen: 
- Projektleitung, Administration, Koordination und Besprechungen mit dem Auftraggeber 
- Avisierung und Koordination der Installationstermine; die allgemeine Vorinformation der 
Bevölkerung erfolgt vorgängig durch MFE 
- Zählerhandling und Logistik in Verantwortung des Auftragnehmers ab dem zentralen Ausgabepunkt in Flums für Lose 1 und 2 beziehungsweise in Murg für Los 3 
- 1:1-Ersatz direktmessender Zähler; es darf jeweils nur ein Zähler gleichzeitig gewechselt 
und der Wechsel muss in einem Arbeitsgang vollständig abgeschlossen werden 
- Montage und Inbetriebnahme zusätzlicher, von MFE freigegebener Kommunikationsmodule nach Rücksprache mit der Projektleitung MFE 
- Vollständige Dokumentation des Installationsprozesses durch den Monteur auf Tablet über 
die von MFE definierte webbasierte Anwendung 
- Demontage und Rückführung der Altgeräte gemäss Vorgaben MFE; kundenseitige Ersatzsteuerungen für Boiler und weitere Verbraucher sind nicht Bestandteil des Vergabeauftrags 
- Standortdokumentation von HAK und HV sowie – sofern Option 1 beauftragt wird – Erfassung von Flexibilitäten wie PV, Wärmepumpen, E-Mobilität und weiteren steuerbaren Verbrauchern mittels «OptiMobile-Tool von MFE» 
- Messung und vollständige Dokumentation der Kurzschlussströme am HAK; Messpunkt 
nach den Bezügersicherungen mittels Hochstrom-Impedanztester

Los 2: Rollout PLZ 8890
Gegenstand und Umfang des Auftrags 
Der Leistungsumfang dieser Ausschreibung beinhaltet insbesondere folgende Dienstleistungen: 
- Projektleitung, Administration, Koordination und Besprechungen mit dem Auftraggeber 
- Avisierung und Koordination der Installationstermine; die allgemeine Vorinformation der 
Bevölkerung erfolgt vorgängig durch MFE 
- Zählerhandling und Logistik in Verantwortung des Auftragnehmers ab dem zentralen Ausgabepunkt in Flums für Lose 1 und 2 beziehungsweise in Murg für Los 3 
- 1:1-Ersatz direktmessender Zähler; es darf jeweils nur ein Zähler gleichzeitig gewechselt 
und der Wechsel muss in einem Arbeitsgang vollständig abgeschlossen werden 
- Montage und Inbetriebnahme zusätzlicher, von MFE freigegebener Kommunikationsmodule nach Rücksprache mit der Projektleitung MFE 
- Vollständige Dokumentation des Installationsprozesses durch den Monteur auf Tablet über 
die von MFE definierte webbasierte Anwendung 
- Demontage und Rückführung der Altgeräte gemäss Vorgaben MFE; kundenseitige Ersatzsteuerungen für Boiler und weitere Verbraucher sind nicht Bestandteil des Vergabeauftrags 
- Standortdokumentation von HAK und HV sowie – sofern Option 1 beauftragt wird – Erfassung von Flexibilitäten wie PV, Wärmepumpen, E-Mobilität und weiteren steuerbaren Verbrauchern mittels «OptiMobile-Tool von MFE» 
- Messung und vollständige Dokumentation der Kurzschlussströme am HAK; Messpunkt 
nach den Bezügersicherungen mittels Hochstrom-Impedanztester

Los 3: Rollout 8877
Gegenstand und Umfang des Auftrags 
Der Leistungsumfang dieser Ausschreibung beinhaltet insbesondere folgende Dienstleistungen: 
- Projektleitung, Administration, Koordination und Besprechungen mit dem Auftraggeber 
- Avisierung und Koordination der Installationstermine; die allgemeine Vorinformation der 
Bevölkerung erfolgt vorgängig durch MFE 
- Zählerhandling und Logistik in Verantwortung des Auftragnehmers ab dem zentralen Ausgabepunkt in Flums für Lose 1 und 2 beziehungsweise in Murg für Los 3 
- 1:1-Ersatz direktmessender Zähler; es darf jeweils nur ein Zähler gleichzeitig gewechselt 
und der Wechsel muss in einem Arbeitsgang vollständig abgeschlossen werden 
- Montage und Inbetriebnahme zusätzlicher, von MFE freigegebener Kommunikationsmodule nach Rücksprache mit der Projektleitung MFE 
- Vollständige Dokumentation des Installationsprozesses durch den Monteur auf Tablet über 
die von MFE definierte webbasierte Anwendung 
- Demontage und Rückführung der Altgeräte gemäss Vorgaben MFE; kundenseitige Ersatzsteuerungen für Boiler und weitere Verbraucher sind nicht Bestandteil des Vergabeauftrags 
- Standortdokumentation von HAK und HV sowie – sofern Option 1 beauftragt wird – Erfassung von Flexibilitäten wie PV, Wärmepumpen, E-Mobilität und weiteren steuerbaren Verbrauchern mittels «OptiMobile-Tool von MFE» 
- Messung und vollständige Dokumentation der Kurzschlussströme am HAK; Messpunkt 
nach den Bezügersicherungen mittels Hochstrom-Impedanztester

### October 11, 2026 · Version 2 (Tender facts updated)

MF Energie: Smart Meter Rollout

Murg Flums Energie (MFE) plant, rund 3’200 bestehende Elektrizitätszähler im eigenen Verteil- netz durch Smart Meter zu ersetzen. Der Rollout wird zur besseren operativen Steuerung in mehrere Lose aufgeteilt. Die Losbildung erfolgt nach PLZ. Die Lose 1–3 werden den nachfolgend aufge- führten PLZ-Gebieten zugeordnet. Die angegebenen Mengen sind Planmengen; die effektiven Mengen werden durch MFE festgelegt.

Lose: 1 – Rollout PLZ 8897 und 8898; 2 – Rollout PLZ 8890; 3 – Rollout 8877.

### October 11, 2026 · Version 1 (Published)

MF Energie: Smart Meter Rollout

Murg Flums Energie (MFE) plant, rund 3’200 bestehende Elektrizitätszähler im eigenen Verteil- netz durch Smart Meter zu ersetzen. Der Rollout wird zur besseren operativen Steuerung in mehrere Lose aufgeteilt. Die Losbildung erfolgt nach PLZ. Die Lose 1–3 werden den nachfolgend aufge- führten PLZ-Gebieten zugeordnet. Die angegebenen Mengen sind Planmengen; die effektiven Mengen werden durch MFE festgelegt.

Lose: 1 – Rollout PLZ 8897 und 8898; 2 – Rollout PLZ 8890; 3 – Rollout 8877.

## Understand this procurement.

Review the scope, requirements and procurement history with Ziva.

- Understand the requirements
- Find the evidence you need
- Prepare your response

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate) · [View official notice](https://www.simap.ch/de/project-detail/c810cf10-f8e9-4ab5-a1ec-0832e98c6ff4)

## About this notice

- Official source: SIMAP and TED Europe
- Source retrieved: November 17, 2026
- Page updated: November 17, 2026
- Notice reference: 44485 · 44485-01

## Open tenders like this one

- [110 kV GIS switchgear for three substations](https://zephior.com/tenders/70ec4982-7d80-47f4-a2bf-58a5ff264582/three-110-kv-gis-switchgear-installations-70ec4982) ([Markdown](https://zephior.com/tenders/70ec4982-7d80-47f4-a2bf-58a5ff264582/three-110-kv-gis-switchgear-installations-70ec4982.md)), St. Gallisch Appenzellische Kraftwerke AG (SAK)
- [University of St. Gallen heat and cooling plant renewal: heat pump supply](https://zephior.com/tenders/3b8a2d5f-ade0-4260-bcb0-586218bc27ed/university-of-st-gallen-heat-and-cooling-plant-renewal-heat-pump-supply) ([Markdown](https://zephior.com/tenders/3b8a2d5f-ade0-4260-bcb0-586218bc27ed/university-of-st-gallen-heat-and-cooling-plant-renewal-heat-pump-supply.md)), Kanton St.Gallen, Bau- und Umweltdepartement, Hochbauamt
- [District heating distribution and external connections, Lot 516 Konkordiastrasse West](https://zephior.com/tenders/a9c05714-40b9-42e4-b201-52960f6eeb7c/lucerne-konkordiastrasse-district-heating-lot-516) ([Markdown](https://zephior.com/tenders/a9c05714-40b9-42e4-b201-52960f6eeb7c/lucerne-konkordiastrasse-district-heating-lot-516.md)), St.Galler Stadtwerke
- [Compact fire engine for the Eastern Switzerland fire training centre](https://zephior.com/tenders/e370ee46-8a74-4c3a-aabe-99319d4f089c/compact-fire-engine-for-the-eastern-switzerland-fire-training-centre) ([Markdown](https://zephior.com/tenders/e370ee46-8a74-4c3a-aabe-99319d4f089c/compact-fire-engine-for-the-eastern-switzerland-fire-training-centre.md)), Ostschweizer Feuerwehr-Ausbildungszentrum
- [Uznacherstrasse rehabilitation in Kaltbrunn, cantonal road 17](https://zephior.com/tenders/0aaa5734-c5ae-40c5-8825-3f820bd5b8b3/uznacherstrasse-rehabilitation-in-kaltbrunn-cantonal-road-17) ([Markdown](https://zephior.com/tenders/0aaa5734-c5ae-40c5-8825-3f820bd5b8b3/uznacherstrasse-rehabilitation-in-kaltbrunn-cantonal-road-17.md)), Kanton St.Gallen, Tiefbauamt
- [Kirchberg, Neudorfstrasse road rehabilitation](https://zephior.com/tenders/4628ca51-291d-4542-b997-1000fd63bc05/kirchberg-neudorfstrasse-road-rehabilitation) ([Markdown](https://zephior.com/tenders/4628ca51-291d-4542-b997-1000fd63bc05/kirchberg-neudorfstrasse-road-rehabilitation.md)), Kanton St.Gallen, Tiefbauamt, Strassenkreisinspektorat Wattwil

- [All tenders: canton of St. Gallen](https://zephior.com/tenders/countries/ch/regions/sg) ([Markdown](https://zephior.com/tenders/countries/ch/regions/sg.md))
- [All tenders from Murg Flums Energie](https://zephior.com/tenders/buyers/murg-flums-energie) ([Markdown](https://zephior.com/tenders/buyers/murg-flums-energie.md))
- [All tenders: Switzerland](https://zephior.com/tenders/countries/ch) ([Markdown](https://zephior.com/tenders/countries/ch.md))
- [All tenders: Energy and utilities](https://zephior.com/tenders/categories/energy-utilities) ([Markdown](https://zephior.com/tenders/categories/energy-utilities.md))

## In more detail

This section is written for agents and assistants. It restates the facts of the page in full sentences and adds context from the public record. Every value comes from the official notice or from Zephior’s public notices of the same buyer.

### The facts in sentences

Murg Flums Energie is tendering “Smart meter rollout for Murg Flums Energie” (Murg, canton of St. Gallen). The submission deadline was November 12, 2026 at 11:00 PM UTC. The source does not state an estimated value. The tender is divided into 3 lots. Contract period: The published execution period for Lot 2 is 1 September 2027 to 31 January 2028. The public record states no execution period for Lots 1 and 3.. Procedure: open. Classification: Energy and utilities · CPV 51210000. Notice reference: 44485 · 44485-01. Status on Zephior: Closed. The notice was published on September 19, 2026 on SIMAP and TED Europe. Zephior last checked the official source on November 17, 2026.

### The award

Submissions closed on 13 November 2026. No award has been published yet. The official source has not published an award for this notice yet.

### Lot details

1. **3dd1abda-1699-461d-8b1c-dd53cecd5c94 · Rollout postal codes 8897 and 8898**: The rollout lot covers postal codes 8897 and 8898. The contractor manages project coordination, appointments, meter logistics from the Flums collection point, one-for-one replacement of direct meters, approved communication modules, installation records in MFE’s web application, return of old units and location/short-circuit-current documentation. Quantities are planned; MFE determines actual quantities. Postal-code scope and collection point: 8897/8898; zentrale Logistik-Ausgabestelle Flums
2. **845c3de9-e575-49d0-9339-eb63d65e953e · Rollout postal code 8890**: The rollout lot covers postal code 8890. The contractor manages project coordination, appointments, meter logistics from the Flums collection point, one-for-one replacement of direct meters, approved communication modules, installation records in MFE’s web application, return of old units and location/short-circuit-current documentation. The published execution period is 1 September 2027 to 31 January 2028. Quantities are planned; MFE determines actual quantities. Postal-code scope and collection point: 8890; zentrale Logistik-Ausgabestelle Flums. Published execution period: 1 September 2027 to 31 January 2028.
3. **ae536aa3-99d2-4253-8746-62e267a83e4e · Rollout postal code 8877**: The rollout lot covers postal code 8877. The contractor manages project coordination, appointments, meter logistics from the Murg collection point, one-for-one replacement of direct meters, approved communication modules, installation records in MFE’s web application, return of old units and location/short-circuit-current documentation. Quantities are planned; MFE determines actual quantities. Postal-code scope and collection point: 8877; zentrale Logistik-Ausgabestelle Murg

### About the buyer

Murg Flums Energie has 2 public notices on Zephior (0 open now, 2 published in the last 12 months). Its notices on Zephior were first published on September 19, 2026 and most recently on September 21, 2026. Main sectors: Energy and utilities (2). Regions: CH-SG (1). It publishes under the names “Murg Flums Energie”.

- [All tenders and the profile of Murg Flums Energie](https://zephior.com/tenders/buyers/murg-flums-energie) ([Markdown](https://zephior.com/tenders/buyers/murg-flums-energie.md))

### Terms used on this page

- **Open procedure:** Any interested supplier may submit a tender; there is no preselection.

### Where to go next

- [110 kV GIS switchgear for three substations](https://zephior.com/tenders/70ec4982-7d80-47f4-a2bf-58a5ff264582/three-110-kv-gis-switchgear-installations-70ec4982) ([Markdown](https://zephior.com/tenders/70ec4982-7d80-47f4-a2bf-58a5ff264582/three-110-kv-gis-switchgear-installations-70ec4982.md))
- [University of St. Gallen heat and cooling plant renewal: heat pump supply](https://zephior.com/tenders/3b8a2d5f-ade0-4260-bcb0-586218bc27ed/university-of-st-gallen-heat-and-cooling-plant-renewal-heat-pump-supply) ([Markdown](https://zephior.com/tenders/3b8a2d5f-ade0-4260-bcb0-586218bc27ed/university-of-st-gallen-heat-and-cooling-plant-renewal-heat-pump-supply.md))
- [District heating distribution and external connections, Lot 516 Konkordiastrasse West](https://zephior.com/tenders/a9c05714-40b9-42e4-b201-52960f6eeb7c/lucerne-konkordiastrasse-district-heating-lot-516) ([Markdown](https://zephior.com/tenders/a9c05714-40b9-42e4-b201-52960f6eeb7c/lucerne-konkordiastrasse-district-heating-lot-516.md))
- [Compact fire engine for the Eastern Switzerland fire training centre](https://zephior.com/tenders/e370ee46-8a74-4c3a-aabe-99319d4f089c/compact-fire-engine-for-the-eastern-switzerland-fire-training-centre) ([Markdown](https://zephior.com/tenders/e370ee46-8a74-4c3a-aabe-99319d4f089c/compact-fire-engine-for-the-eastern-switzerland-fire-training-centre.md))
- [Uznacherstrasse rehabilitation in Kaltbrunn, cantonal road 17](https://zephior.com/tenders/0aaa5734-c5ae-40c5-8825-3f820bd5b8b3/uznacherstrasse-rehabilitation-in-kaltbrunn-cantonal-road-17) ([Markdown](https://zephior.com/tenders/0aaa5734-c5ae-40c5-8825-3f820bd5b8b3/uznacherstrasse-rehabilitation-in-kaltbrunn-cantonal-road-17.md))
- [Kirchberg, Neudorfstrasse road rehabilitation](https://zephior.com/tenders/4628ca51-291d-4542-b997-1000fd63bc05/kirchberg-neudorfstrasse-road-rehabilitation) ([Markdown](https://zephior.com/tenders/4628ca51-291d-4542-b997-1000fd63bc05/kirchberg-neudorfstrasse-road-rehabilitation.md))
- [All tenders: canton of St. Gallen](https://zephior.com/tenders/countries/ch/regions/sg) ([Markdown](https://zephior.com/tenders/countries/ch/regions/sg.md))
- [All tenders from Murg Flums Energie](https://zephior.com/tenders/buyers/murg-flums-energie) ([Markdown](https://zephior.com/tenders/buyers/murg-flums-energie.md))
- [All tenders: Switzerland](https://zephior.com/tenders/countries/ch) ([Markdown](https://zephior.com/tenders/countries/ch.md))
- [All tenders: Energy and utilities](https://zephior.com/tenders/categories/energy-utilities) ([Markdown](https://zephior.com/tenders/categories/energy-utilities.md))

### Source-backed public record

```json
{
  "id": "72202799-9af5-4595-b16b-cf2cb7777eb7",
  "revision": 4,
  "modifiedAt": "2026-11-17T05:27:52.452115+00:00",
  "url": "https://zephior.com/tenders/72202799-9af5-4595-b16b-cf2cb7777eb7/murg-flums-energy-smart-meter-rollout",
  "status": "closed",
  "recordedStatus": "closed",
  "buyer": {
    "id": "murg-flums-energie",
    "name": "Murg Flums Energie"
  },
  "category": {
    "de": "Energie und Versorgung",
    "en": "Energy and utilities",
    "fr": "Énergie et réseaux",
    "id": "energy-utilities"
  },
  "deadline": {
    "at": "2026-11-13T00:00:00+01:00",
    "date": null,
    "source_ref": "simap_current_header#/lots/latestPublication/dates/offerDeadline"
  },
  "award": null,
  "estimatedValue": null,
  "contractPeriod": "The published execution period for Lot 2 is 1 September 2027 to 31 January 2028. The public record states no execution period for Lots 1 and 3.",
  "region": {
    "country": "CH",
    "code": "CH-SG",
    "names": {
      "en": "St. Gallen",
      "de": "St. Gallen",
      "fr": "Saint-Gall"
    },
    "locality": "Murg"
  },
  "originalSource": {
    "url": "https://www.simap.ch/de/project-detail/c810cf10-f8e9-4ab5-a1ec-0832e98c6ff4",
    "title": "MF Energie: Smart Meter Rollout",
    "issuer": "Murg Flums Energie",
    "status": "closed",
    "language": "de",
    "location": "8877 Murg, SG, CH",
    "deadline_at": "2026-11-12T23:00:00+00:00",
    "description": "Murg Flums Energie (MFE) plant, rund 3’200 bestehende Elektrizitätszähler im eigenen Verteil- netz durch Smart Meter zu ersetzen. Der Rollout wird zur besseren operativen Steuerung in mehrere Lose aufgeteilt. Die Losbildung erfolgt nach PLZ. Die Lose 1–3 werden den nachfolgend aufge- führten PLZ-Gebieten zugeordnet. Die angegebenen Mengen sind Planmengen; die effektiven Mengen werden durch MFE festgelegt.",
    "country_code": "CH",
    "published_at": "2026-09-19T22:00:00+00:00",
    "contract_type": "service",
    "deadline_date": null,
    "procedure_type": "open",
    "reference_numbers": [
      "44485",
      "44485-01"
    ],
    "classification_codes": [
      {
        "code": "51210000",
        "system": "CPV",
        "provenance": "source_declared"
      }
    ]
  },
  "sources": [
    {
      "ref": "canonical_snapshot",
      "url": "https://www.simap.ch/de/project-detail/c810cf10-f8e9-4ab5-a1ec-0832e98c6ff4",
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-23T10:04:41.733732Z"
    },
    {
      "ref": "official_project_header",
      "url": "https://www.simap.ch/api/publications/v2/project/c810cf10-f8e9-4ab5-a1ec-0832e98c6ff4/project-header",
      "kind": "official_notice_api",
      "retrieved_at": "2026-10-23T10:04:48.970168Z"
    },
    {
      "ref": "official_notice_api_1",
      "url": "https://www.simap.ch/api/publications/v1/project/c810cf10-f8e9-4ab5-a1ec-0832e98c6ff4/publication-details/2fc4c980-ab2b-4930-a2a6-40b658db653a?lotId=3dd1abda-1699-461d-8b1c-dd53cecd5c94",
      "kind": "official_notice_api",
      "retrieved_at": "2026-10-23T10:04:48.930443Z"
    },
    {
      "ref": "official_notice_api_2",
      "url": "https://www.simap.ch/api/publications/v1/project/c810cf10-f8e9-4ab5-a1ec-0832e98c6ff4/publication-details/2fc4c980-ab2b-4930-a2a6-40b658db653a?lotId=845c3de9-e575-49d0-9339-eb63d65e953e",
      "kind": "official_notice_api",
      "retrieved_at": "2026-10-23T10:04:48.959486Z"
    },
    {
      "ref": "official_notice_api_3",
      "url": "https://www.simap.ch/api/publications/v1/project/c810cf10-f8e9-4ab5-a1ec-0832e98c6ff4/publication-details/2fc4c980-ab2b-4930-a2a6-40b658db653a?lotId=ae536aa3-99d2-4253-8746-62e267a83e4e",
      "kind": "official_notice_api",
      "retrieved_at": "2026-10-23T10:04:48.970006Z"
    },
    {
      "ref": "simap_current_search",
      "url": "https://www.simap.ch/api/publications/v2/project/project-search?search=44485",
      "kind": "official_notice_api",
      "retrieved_at": "2026-11-17T05:20:23.306692Z"
    },
    {
      "ref": "simap_current_header",
      "url": "https://www.simap.ch/api/publications/v2/project/c810cf10-f8e9-4ab5-a1ec-0832e98c6ff4/project-header",
      "kind": "official_notice_api",
      "retrieved_at": "2026-11-17T05:20:43.812878Z"
    },
    {
      "ref": "simap_current_detail",
      "url": "https://www.simap.ch/api/publications/v1/project/c810cf10-f8e9-4ab5-a1ec-0832e98c6ff4/publication-details/2fc4c980-ab2b-4930-a2a6-40b658db653a",
      "kind": "official_notice_api",
      "retrieved_at": "2026-11-17T05:20:44.054991Z"
    }
  ],
  "keyFacts": [
    {
      "label": "Buyer",
      "value": "Murg Flums Energie",
      "source_ref": "official_notice_api_1#project-info/procOfficeAddress"
    },
    {
      "label": "Scope",
      "value": "Around 3,200 existing electricity meters; this is a planned total and MFE determines the actual quantity.",
      "source_ref": "official_notice_api_1#procurement/orderDescription"
    },
    {
      "label": "Lots",
      "value": "Lot 1: postal codes 8897 and 8898; Lot 2: 8890; Lot 3: 8877.",
      "source_ref": "official_project_header#lots"
    },
    {
      "label": "Offer deadline",
      "value": "13 November 2026, 00:00 (UTC+01:00)",
      "source_ref": "official_project_header#latestPublication/dates/offerDeadline"
    },
    {
      "label": "Offer validity",
      "value": "Through 31 January 2027",
      "source_ref": "official_notice_api_1#dates/offerValidityDeadlineDate"
    },
    {
      "label": "Lot 2 execution period",
      "value": "1 September 2027 to 31 January 2028. No period is published for Lots 1 and 3.",
      "source_ref": "official_notice_api_2#lots/executionPeriod"
    },
    {
      "label": "Lot 1",
      "value": "Lot 1: postal codes 8897 and 8898",
      "source_ref": "official_notice_api_1#lots/orderAddress"
    },
    {
      "label": "Lot 2",
      "value": "Lot 2: 8890",
      "source_ref": "official_notice_api_2#lots/orderAddress"
    },
    {
      "label": "Lot 3",
      "value": "Lot 3: 8877.",
      "source_ref": "official_notice_api_3#lots/orderAddress"
    },
    {
      "label": "Offer submission deadline",
      "value": "2026-11-13T00:00:00+01:00",
      "source_ref": "simap_current_header#/lots/latestPublication/dates/offerDeadline"
    }
  ],
  "noticeFacts": {
    "lots": [
      {
        "id": "3dd1abda-1699-461d-8b1c-dd53cecd5c94",
        "title": "Rollout postal codes 8897 and 8898",
        "source_ref": "official_notice_api_1#lots/orderDescription",
        "description": "The rollout lot covers postal codes 8897 and 8898. The contractor manages project coordination, appointments, meter logistics from the Flums collection point, one-for-one replacement of direct meters, approved communication modules, installation records in MFE’s web application, return of old units and location/short-circuit-current documentation. Quantities are planned; MFE determines actual quantities. Postal-code scope and collection point: 8897/8898; zentrale Logistik-Ausgabestelle Flums"
      },
      {
        "id": "845c3de9-e575-49d0-9339-eb63d65e953e",
        "title": "Rollout postal code 8890",
        "source_ref": "official_notice_api_2#lots/orderDescription",
        "description": "The rollout lot covers postal code 8890. The contractor manages project coordination, appointments, meter logistics from the Flums collection point, one-for-one replacement of direct meters, approved communication modules, installation records in MFE’s web application, return of old units and location/short-circuit-current documentation. The published execution period is 1 September 2027 to 31 January 2028. Quantities are planned; MFE determines actual quantities. Postal-code scope and collection point: 8890; zentrale Logistik-Ausgabestelle Flums. Published execution period: 1 September 2027 to 31 January 2028."
      },
      {
        "id": "ae536aa3-99d2-4253-8746-62e267a83e4e",
        "title": "Rollout postal code 8877",
        "source_ref": "official_notice_api_3#lots/orderDescription",
        "description": "The rollout lot covers postal code 8877. The contractor manages project coordination, appointments, meter logistics from the Murg collection point, one-for-one replacement of direct meters, approved communication modules, installation records in MFE’s web application, return of old units and location/short-circuit-current documentation. Quantities are planned; MFE determines actual quantities. Postal-code scope and collection point: 8877; zentrale Logistik-Ausgabestelle Murg"
      }
    ],
    "schedule": [
      {
        "event": "Questions deadline",
        "value": "2 October 2026",
        "source_ref": "official_notice_api_1#dates/qnas"
      },
      {
        "event": "Offer deadline",
        "value": "13 November 2026, 00:00 CET (UTC+01:00)",
        "source_ref": "official_project_header#latestPublication/dates/offerDeadline"
      },
      {
        "event": "Offer validity through",
        "value": "31 January 2027",
        "source_ref": "official_notice_api_1#dates/offerValidityDeadlineDate"
      },
      {
        "event": "Lot 2 execution period",
        "value": "1 September 2027 to 31 January 2028",
        "source_ref": "official_notice_api_2#lots/executionPeriod"
      },
      {
        "event": "Current offer submission deadline",
        "value": "2026-11-13T00:00:00+01:00",
        "source_ref": "simap_current_header#/lots/latestPublication/dates/offerDeadline"
      }
    ],
    "requirements": [
      {
        "text": "Consortia and subcontractors are allowed. Variants and partial offers are not allowed. Offers must be in German; the public notice provides digital SIMAP or external submission but does not specify the external method.",
        "source_ref": "official_notice_api_1#terms"
      }
    ],
    "award_criteria": [],
    "estimated_value": null
  },