# Construction of the 220/110 kV Wigry power substation

Polskie Sieci Elektroenergetyczne Spółka Akcyjna · Poland · Closed

## Outcome

Submissions closed on 20 November 2026. No award has been published yet.

- **Buyer:** Polskie Sieci Elektroenergetyczne Spółka Akcyjna
- **Place:** Poland
- **TED deadline: 20 November 2026 at 11:00 UTC+01:00 (10:00 UTC); canonical snapshot: 19 November at 23:00 UTC.:** November 20, 2026 at 10:00 AM UTC
- **Contract value:** Not stated in the notice
- **Lots:** 1 lot
- **Contract period:** TED date boundaries: 30 June 2027 (+02:00) through 15 February 2032 (+01:00).
- **Published:** October 4, 2026

## Overview

Polskie Sieci Elektroenergetyczne is conducting an open works procurement to design and build the 220/110 kV Wigry substation as part of the Poland–Lithuania Harmony Link project. The notice describes four options and one lot. Price accounts for 100% of the award criterion. TED lists extensive financial and technical experience conditions. Its deadline is eleven hours later than the available notice information.

Information based on the public notice

## What the buyer needs

Design and construction/installation of the Wigry 220/110 kV substation, with four optional scopes. One formal works lot.

- Financial standing: current ratio of at least 1.0 in at least two of the last three financial years, adjusted for shorter trading history.
- Annual turnover of at least PLN 61,000,000 in the latest financial year (or the full period of activity if shorter); consortium members may collectively meet the stated conditions only as specified in the notice, while the notice disallows combining two or more entities to meet the financial conditions.
- Within the last 10 years, construction or modernization of at least two 110 kV or higher bays in an air-insulated AC substation in the ENTSO-E area, including specified switching, instrument-transformer and protection-automation equipment and commissioning.
- At least two accepted detailed designs within the last 10 years for qualifying 110 kV or higher AIS bay construction/modernization, covering electrical and civil/structural disciplines and meeting the stated standards or demonstrable equivalents.

## Lots

- LOT-0001 · Budowa stacji elektroenergetycznej 220/110 kV Wigry

## Tender details

- Buyer: Polskie Sieci Elektroenergetyczne Spółka Akcyjna
- Country: Poland
- Procedure: open
- Classification: CPV 45000000
- Notice reference: 682541-2026
- Exact TED notice: 682541-2026; notice UUID f600e281-a67f-486f-b7b0-b98dd117599b; procedure ceabbf01-e788-477f-8556-6d8ed6c220f6; amendment context references 574501-2026.
- Scope: Construction of the 220/110 kV Wigry substation as part of the Poland–Lithuania interconnection (Harmony Link) and Suwałki Special Economic Zone connection; design and construction/installation works, with four described options.
- Formal lot: One works lot, LOT-0001, internal reference 2026/WNP-0284.
- Award criterion: Price, 100%.
- Bid deadline: TED: 20 November 2026, 11:00 UTC+01:00 (10:00 UTC); available notice information: 19 November 2026, 23:00 UTC.
- Contract period: TED date boundaries: start 30 June 2027 (+02:00) and end 15 February 2032 (+01:00).
- Estimated monetary value: No estimated value appears in the retrieved TED fields.

## What to check in the tender documents

- The exact rendered TED PDF, HTML and XML endpoints all returned HTTP 429. The available API contains the public notice text; the functional programme and contract template referenced by the notice were not accessed.
- The API does not provide an estimated monetary value or award outcome.
- TED gives the bid deadline 11 hours later than the leased timestamp; both are preserved.

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate)

## Original notice

**Budowa stacji elektroenergetycznej 220/110 kV Wigry**

Tytuł: Budowa stacji elektroenergetycznej 220/110 kV Wigry

1. Przedmiotem zamówienia jest budowa stacji 220/110 Wigry w ramach projektu „Połączenia międzysystemowego między Polską a Litwą (obecnie znane jako Harmony Link) wraz z przyłączeniem Suwalskiej Specjalnej Strefy Ekonomicznej”. Zakres prac obejmuje prace projektowe i roboty budowlano-montażowe. Ponadto Zamawiający przewiduje możliwość skorzystania z praw opcji: Opcja nr 1 (z możliwością dwukrotnego zastosowania i niezależnie od siebie) - wyposażenie pola rezerwowego R220 kV, została opisana w pkt. 1.2.1 Części II SWZ PFU. Opcja nr 2 (z możliwością jednokrotnego zastosowania) – wyposażenie pola rezerwowego R110 kV, została opisana w pkt. 1.2.2 Części II SWZ PFU. Opcja nr 3 - zapewnienie przez Wykonawcę stałej obsługi ruchowej i eksploatacyjnej SE Wigry, została opisana w pkt. 1.2.3 Części II SWZ PFU. Opcja nr 4 – Opcja Nadzoru została opisana w pkt. 2.8. oraz 11.26 Części IV SWZ Wzór umowy. 2. Szczegółowy opis przedmiotu zamówienia znajduje się w Części II SWZ Program Funkcjonalno-Użytkowy. 3. Nazwy i kody Wspólnego Słownika Zamówień: 45000000 – 7 Roboty budowlane. 4. Każdorazowo, we wszystkich przypadkach, w których Zamawiający opisując przedmiot zamówienia przez odniesienie do norm, ocen technicznych, specyfikacji technicznych i systemów referencji technicznych, o których mowa w art. 101 ust. 1 pkt 2 i ust. 3 ustawy Zamawiający dopuszcza rozwiązania równoważne opisywanym, jeżeli pozwolą one uzyskać cechy lub parametry nie gorsze niż przywołane. Powyższe oznacza, że wykonawca może zastosować rozwiązania opisane przez Zamawiającego „lub równoważne”. 5. Zgodnie z art. 101 ust. 5 ustawy, Wykonawca, który powołuje się na rozwiązania równoważne opisywanym przez Zamawiającego, jest obowiązany wykazać, że oferowane przez niego dostawy, spełniają wymagania określone przez Zamawiającego, pod warunkiem, że Wykonawca udowodni w ofercie, w szczególności za pomocą przedmiotowych środków dowodowych, o których mowa w art. 104-107 ustawy, że proponowane rozwiązania w równoważnym stopniu spełniają wymagania określone w opisie przedmiotu zamówienia. 6.Zamówienie realizowane jest w ramach projektu współfinansowanego przez Unię Europejską ze środków instrumentu Łącząc Europę (Connecting Europe Facilty). 7. Stosownie do postanowień art. 438 ustawy w związku z art. 95 ust. 1 ustawy, Zamawiający określa wymagania związane z realizacją zamówienia w zakresie zatrudnienia przez wykonawcę lub podwykonawcę na podstawie stosunku pracy osób wykonujących wskazane przez Zamawiającego czynności w zakresie realizacji zamówienia, jeżeli wykonanie tych czynności polega na wykonywaniu pracy w sposób określony w art. 22 § 1 ustawy z dnia 26 czerwca 1974 r. - Kodeks pracy (Dz.U. z 2023 r. poz. 1465 tj.). Wymagania zawarte są w Części II oraz IV SWZ.

Opis LOT-0001: Szczegółowy opis przedmiotu zamówienia znajduje się w Części II SWZ Program Funkcjonalno-Użytkowy

Warunki udziału przekazane w polach ogłoszenia:
Ze względu na ograniczoną liczbę znaków w Ogłoszeniu o zamówieniu, Zamawiający informuje, że pełna treść warunków udziału w postępowaniu została wskazana w Rozdz. VII Części I SWZ. 1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki udziału w postępowaniu określone przez Zamawiającego oraz nie podlegają wykluczeniu w oparciu o podstawy wskazane w Rozdz. VI Części I SWZ. 2. Zamawiający określa następujące warunki udziału w postępowaniu: a) w co najmniej dwóch, z ostatnich trzech lat obrotowych, a jeżeli okres prowadzenia działalności jest krótszy niż trzy lata obrotowe, to w ostatnich dwóch latach obrotowych, a jeżeli okres prowadzenia działalności jest krótszy niż dwa lata obrotowe, to w ostatnim roku obrotowym oraz całym pozostałym okresie prowadzenia działalności, a jeżeli okres prowadzenia działalności jest krótszy niż rok obrotowy to w całym okresie prowadzenia działalności, Wykonawca wykaże wskaźnik płynności bieżącej wynoszący nie mniej niż 1,0. Zamawiający informuje, że wskaźnik płynności bieżącej Wykonawca ustali zgodnie ze wzorem określonym w Rozdz. VII pkt 2, ppkt 2.3 lit. a) Części I SWZ. W przypadku Wykonawców wspólnie ubiegających się o zamówienie (konsorcjum) co najmniej jeden z Wykonawców (członków konsorcjum) musi wykazać łącznie spełnienie warunków udziału w postępowaniu opisanych w ppkt 2.3. lit. a), ppkt 2.3. lit. b) Części I SWZ. W przypadku polegania przez Wykonawcę na sytuacji ekonomicznej lub finansowej innego podmiotu, z treści zobowiązania tego podmiotu musi wynikać łączne spełnienie warunków udziału w postępowaniu opisanych w ppkt 2.3. lit. a), ppkt 2.3. lit. b) Części I SWZ oraz realność udostępnionych zasobów. Zamawiający nie dopuszcza łączenia potencjałów dwóch lub większej liczby podmiotów w celu wykazania spełnienia tych warunków. Wartości podane we właściwych dokumentach w walucie innej niż złoty polski należy przeliczyć wg średniego kursu danej waluty ogłoszonego przez NBP na dzień, na który prezentowane są dane, a jeśli dane są prezentowane za dany okres - na ostatni dzień tego okresu.

1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki udziału w postępowaniu określone przez Zamawiającego oraz nie podlegają wykluczeniu w oparciu o podstawy wskazane w Rozdz. VI Części I SWZ. 2. Zamawiający określa następujące warunki udziału w postępowaniu: b) Wykonawca wykaże, iż w ciągu ostatniego roku obrotowego, (a jeżeli okres prowadzenia działalności jest krótszy niż rok obrotowy, to w całym okresie prowadzenia działalności) osiągnął obrót* w wysokości, co najmniej 61 000 000,00 zł (słownie: sześćdziesiąt jeden milionów złotych 00/100). *Jako obrót Zamawiający przyjmuje sumę przychodów netto ze sprzedaży produktów, towarów i materiałów. W przypadku Wykonawców wspólnie ubiegających się o zamówienie (konsorcjum) co najmniej jeden z Wykonawców (członków konsorcjum) musi wykazać łącznie spełnienie warunków udziału w postępowaniu opisanych w ppkt 2.3. lit. a), ppkt 2.3. lit. b) Części I SWZ. W przypadku polegania przez Wykonawcę na sytuacji ekonomicznej lub finansowej innego podmiotu, z treści zobowiązania tego podmiotu musi wynikać łączne spełnienie warunków udziału w postępowaniu opisanych w ppkt 2.3. lit. a), ppkt 2.3. lit. b) Części I SWZ oraz realność udostępnionych zasobów. Zamawiający nie dopuszcza łączenia potencjałów dwóch lub większej liczby podmiotów w celu wykazania spełnienia tych warunków. Wartości podane we właściwych dokumentach w walucie innej niż złoty polski należy przeliczyć wg średniego kursu danej waluty ogłoszonego przez NBP na dzień, na który prezentowane są dane, a jeśli dane są prezentowane za dany okres - na ostatni dzień tego okresu.

1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki udziału w postępowaniu określone przez Zamawiającego oraz nie podlegają wykluczeniu w oparciu o podstawy wskazane w Rozdz. VI Części I SWZ. 2. Zamawiający określa następujące warunki udziału w postępowaniu: a) W okresie ostatnich 10 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, Wykonawca wybudował lub przebudował (zmodernizował) co najmniej 2 pola w obrębie jednej stacji o napięciu 110 kV lub wyższym na rozdzielni/rozdzielniach napowietrznej/napowietrznych (AIS, tzn. Air Insulated Switchgear) prądu przemiennego na obszarze ENTSO-E. Za budowę, przebudowę (modernizację) pola na rozdzielni napowietrznej (AIS, tzn. Air Insulated Switchgear) prądu przemiennego uznane zostanie dokonanie zabudowy co najmniej (łącznie): wyłącznika, przekładników prądowych i napięciowych (także kombinowanych) oraz automatyki zabezpieczeniowej. Zakres prac obejmuje również uruchomienie pola rozumiane jako uzyskanie pozytywnego wyniku próby napięciowej i obciążeniowej pozwalającej na jego eksploatację. W przypadku niżej wskazanych rozdzielni: i. w układzie 3/2W – jako budowę, przebudowę (modernizację) pola rozumie się wykonanie co najmniej jednego mostka (bez uwzględniania mostka „środkowego”) w gałęzi wraz z odejściem dla linii lub (auto)transformatora lub dławika uwzględniającego dokonanie zabudowy co najmniej (łącznie): wyłącznika, przekładników prądowych i napięciowych (także kombinowanych) oraz automatyki zabezpieczeniowej. Zakres prac obejmuje również uruchomienie pola rozumiane jako uzyskanie pozytywnego wyniku próby napięciowej i obciążeniowej pozwalającej na jego eksploatację; ii. w układzie 2W – jako budowę, przebudowę (modernizację) pola rozumie się wykonanie co najmniej jednej gałęzi wraz z odejściem dla linii lub (auto)transformatora lub dławika uwzględniającego dokonanie zabudowy co najmniej (łącznie): wyłącznika, przekładników prądowych i napięciowych (także kombinowanych) oraz automatyki zabezpieczeniowej. Zakres prac obejmuje również uruchomienie pola rozumiane jako uzyskanie pozytywnego wyniku próby napięciowej i obciążeniowej pozwalającej na jego eksploatację.

1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki udziału w postępowaniu określone przez Zamawiającego oraz nie podlegają wykluczeniu w oparciu o podstawy wskazane w Rozdz. VI Części I SWZ. 2. Zamawiający określa następujące warunki udziału w postępowaniu: b) W okresie ostatnich 10 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, Wykonawca wykonał co najmniej 2 odebrane projekty wykonawcze (obejmujący minimum branżę elektryczną i branżę konstrukcyjno-budowlaną, w ramach odrębnych umów z Inwestorem) na budowę lub przebudowę (modernizację), których zakres obejmuje łącznie co najmniej 2 pola o napięciu 110 kV lub wyższym, na rozdzielni/rozdzielniach napowietrznej/napowietrznych (AIS, tzn. Air Insulated Switchgear) prądu przemiennego na obszarze ENTSO-E. Za datę wykonania projektu wykonawczego Zamawiający rozumie datę jego pozytywnego zaopiniowania, a w przypadku braku takiej opinii datę odbioru projektu wykonawczego, przez podmiot na rzecz którego projekty zostały wykonane. Projekt wykonawczy powinien być wykonany w oparciu o polską normę PN-EN 61936 -1 oraz PN-EN 50522 lub normę europejską EN 61936-1 oraz EN 50522, lub być „równoważny”, z uwzględnieniem, że jeżeli Wykonawca powołuje się na fakt wykonania projektu wykonawczego „równoważnego”, tj. w oparciu o rozwiązania równoważne rozwiązaniom wynikającym z ww. norm, zobowiązany jest wówczas ten fakt wykazać Zamawiającemu w sposób i w formie nie budzących wątpliwości. Za wykonanie projektu wykonawczego, o którym mowa powyżej, uznane zostanie zaprojektowanie budowy, przebudowy (modernizacji) pola obejmujące zabudowę co najmniej (łącznie): wyłącznika, przekładników prądowych i napięciowych (także kombinowanych) oraz automatyki zabezpieczeniowej. W przypadku niżej wskazanych rozdzielni: i. w układzie 3/2W – jako budowę, przebudowę (modernizację) pola rozumie się wykonanie co najmniej jednego mostka (bez uwzględniania mostka „środkowego”) w gałęzi wraz z odejściem dla linii lub (auto)transformatora lub dławika uwzględniającego dokonanie zabudowy co najmniej (łącznie): wyłącznika, przekładników prądowych i napięciowych (także kombinowanych) oraz automatyki zabezpieczeniowej; ii. w układzie 2W – jako budowę, przebudowę (modernizację) pola rozumie się wykonanie co najmniej jednej gałęzi wraz z odejściem dla linii lub (auto)transformatora lub dławika uwzględniającego dokonanie zabudowy co najmniej (łącznie): wyłącznika, przekładników prądowych i napięciowych (także kombinowanych) oraz automatyki zabezpieczeniowej

Kryterium udzielenia: 100%

- Official source: [Tenders Electronic Daily (TED), European Union](https://ted.europa.eu/en/notice/-/detail/682541-2026)

## Understand this procurement.

Review the scope, requirements and procurement history with Ziva.

- Understand the requirements
- Find the evidence you need
- Prepare your response

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate) · [View official notice](https://ted.europa.eu/en/notice/-/detail/682541-2026)

## About this notice

- Official source: Tenders Electronic Daily (TED), European Union
- Source retrieved: October 13, 2026
- Page updated: November 13, 2026
- Notice reference: 682541-2026

## Open tenders from Polskie Sieci Elektroenergetyczne Spółka Akcyjna

- [Construction of the 400 kV Krzemienica substation – Stage I](https://zephior.com/tenders/eb431b90-bc32-4f61-8d5a-8867f348348f/krzemienica-400-kv-substation-construction-stage-one) ([Markdown](https://zephior.com/tenders/eb431b90-bc32-4f61-8d5a-8867f348348f/krzemienica-400-kv-substation-construction-stage-one.md)), Polskie Sieci Elektroenergetyczne Spółka Akcyjna

## Open tenders like this one

- [New electric buses for public transport in Koziegłowy](https://zephior.com/tenders/352c9d8c-a362-4359-9648-f8e168547fd9/electric-buses-public-transport-kozieglowy-transkom) ([Markdown](https://zephior.com/tenders/352c9d8c-a362-4359-9648-f8e168547fd9/electric-buses-public-transport-kozieglowy-transkom.md)), Przedsiębiorstwo Wielobranżowe Transkom Sp. z o.o.
- [Design documentation for the expansion of Voivodeship Road 689 through Hajnówka](https://zephior.com/tenders/d4a77213-e1db-40d9-8882-31aa5b544f37/road-689-design-hajnowka) ([Markdown](https://zephior.com/tenders/d4a77213-e1db-40d9-8882-31aa5b544f37/road-689-design-hajnowka.md)), Podlaski Zarząd Dróg Wojewódzkich
- [Construction of household wastewater treatment plants in Stary Brus municipality](https://zephior.com/tenders/74f58333-c1ed-45b6-baee-603e492e8338/construction-of-household-wastewater-treatment-plants-in-stary-brus-municipality) ([Markdown](https://zephior.com/tenders/74f58333-c1ed-45b6-baee-603e492e8338/construction-of-household-wastewater-treatment-plants-in-stary-brus-municipality.md)), GMINA STARY BRUS
- [Backup protection devices, network configuration and communications support for the State Fire Service](https://zephior.com/tenders/3e9bf740-9d3e-4fa4-836a-1a787c0d9b83/backup-protection-devices-network-configuration-and-communications-support-for-the-state-fire-service) ([Markdown](https://zephior.com/tenders/3e9bf740-9d3e-4fa4-836a-1a787c0d9b83/backup-protection-devices-network-configuration-and-communications-support-for-the-state-fire-service.md)), KOMENDA WOJEWÓDZKA PAŃSTWOWEJ STRAŻY POŻARNEJ W BIAŁYMSTOKU
- [Dunajecka Street repair in Jarocin](https://zephior.com/tenders/f408bc3c-015e-4aa8-9575-d659644c39a6/dunajecka-street-repair-in-jarocin) ([Markdown](https://zephior.com/tenders/f408bc3c-015e-4aa8-9575-d659644c39a6/dunajecka-street-repair-in-jarocin.md)), Gmina Jarocin
- [Landslide prevention works on provincial roads 975 and 948](https://zephior.com/tenders/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3) ([Markdown](https://zephior.com/tenders/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3.md)), Zarząd Dróg Wojewódzkich w Krakowie

- [All tenders from Polskie Sieci Elektroenergetyczne Spółka Akcyjna](https://zephior.com/tenders/buyers/polskie-sieci-elektroenergetyczne-spolka-akcyjna) ([Markdown](https://zephior.com/tenders/buyers/polskie-sieci-elektroenergetyczne-spolka-akcyjna.md))
- [All tenders: Poland](https://zephior.com/tenders/countries/pl) ([Markdown](https://zephior.com/tenders/countries/pl.md))

## In more detail

This section is written for agents and assistants. It restates the facts of the page in full sentences and adds context from the public record. Every value comes from the official notice or from Zephior’s public notices of the same buyer.

### The facts in sentences

Polskie Sieci Elektroenergetyczne Spółka Akcyjna is tendering “Construction of the 220/110 kV Wigry power substation” (Poland). The submission deadline was November 20, 2026 at 10:00 AM UTC. The source does not state an estimated value. The tender has one lot. Contract period: TED date boundaries: 30 June 2027 (+02:00) through 15 February 2032 (+01:00).. Procedure: open. Classification: CPV 45000000. Notice reference: 682541-2026. Status on Zephior: Closed. The notice was published on October 4, 2026 on Tenders Electronic Daily (TED), European Union. Zephior last checked the official source on October 13, 2026.

### The award

Submissions closed on 20 November 2026. No award has been published yet. The official source has not published an award for this notice yet.

### Lot details

1. **LOT-0001 · Budowa stacji elektroenergetycznej 220/110 kV Wigry**: Szczegółowy opis przedmiotu zamówienia znajduje się w Części II SWZ Program Funkcjonalno-Użytkowy

### About the buyer

Polskie Sieci Elektroenergetyczne Spółka Akcyjna has 10 public notices on Zephior (1 open now, 10 published in the last 12 months). Its notices on Zephior were first published on September 29, 2026 and most recently on October 15, 2026. Main sectors: Construction (3), Machinery and equipment (2), Energy and utilities (1). It publishes under the names “Polskie Sieci Elektroenergetyczne Spółka Akcyjna”.

- [All tenders and the profile of Polskie Sieci Elektroenergetyczne Spółka Akcyjna](https://zephior.com/tenders/buyers/polskie-sieci-elektroenergetyczne-spolka-akcyjna) ([Markdown](https://zephior.com/tenders/buyers/polskie-sieci-elektroenergetyczne-spolka-akcyjna.md))

### Terms used on this page

- **Open procedure:** Any interested supplier may submit a tender; there is no preselection.

### Where to go next

- [New electric buses for public transport in Koziegłowy](https://zephior.com/tenders/352c9d8c-a362-4359-9648-f8e168547fd9/electric-buses-public-transport-kozieglowy-transkom) ([Markdown](https://zephior.com/tenders/352c9d8c-a362-4359-9648-f8e168547fd9/electric-buses-public-transport-kozieglowy-transkom.md))
- [Design documentation for the expansion of Voivodeship Road 689 through Hajnówka](https://zephior.com/tenders/d4a77213-e1db-40d9-8882-31aa5b544f37/road-689-design-hajnowka) ([Markdown](https://zephior.com/tenders/d4a77213-e1db-40d9-8882-31aa5b544f37/road-689-design-hajnowka.md))
- [Construction of household wastewater treatment plants in Stary Brus municipality](https://zephior.com/tenders/74f58333-c1ed-45b6-baee-603e492e8338/construction-of-household-wastewater-treatment-plants-in-stary-brus-municipality) ([Markdown](https://zephior.com/tenders/74f58333-c1ed-45b6-baee-603e492e8338/construction-of-household-wastewater-treatment-plants-in-stary-brus-municipality.md))
- [Backup protection devices, network configuration and communications support for the State Fire Service](https://zephior.com/tenders/3e9bf740-9d3e-4fa4-836a-1a787c0d9b83/backup-protection-devices-network-configuration-and-communications-support-for-the-state-fire-service) ([Markdown](https://zephior.com/tenders/3e9bf740-9d3e-4fa4-836a-1a787c0d9b83/backup-protection-devices-network-configuration-and-communications-support-for-the-state-fire-service.md))
- [Dunajecka Street repair in Jarocin](https://zephior.com/tenders/f408bc3c-015e-4aa8-9575-d659644c39a6/dunajecka-street-repair-in-jarocin) ([Markdown](https://zephior.com/tenders/f408bc3c-015e-4aa8-9575-d659644c39a6/dunajecka-street-repair-in-jarocin.md))
- [Landslide prevention works on provincial roads 975 and 948](https://zephior.com/tenders/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3) ([Markdown](https://zephior.com/tenders/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3/8314478d-3f0a-4e42-a9d0-ea5acdf3b0c3.md))
- [Construction of the 400 kV Krzemienica substation – Stage I](https://zephior.com/tenders/eb431b90-bc32-4f61-8d5a-8867f348348f/krzemienica-400-kv-substation-construction-stage-one) ([Markdown](https://zephior.com/tenders/eb431b90-bc32-4f61-8d5a-8867f348348f/krzemienica-400-kv-substation-construction-stage-one.md))
- [All tenders from Polskie Sieci Elektroenergetyczne Spółka Akcyjna](https://zephior.com/tenders/buyers/polskie-sieci-elektroenergetyczne-spolka-akcyjna) ([Markdown](https://zephior.com/tenders/buyers/polskie-sieci-elektroenergetyczne-spolka-akcyjna.md))
- [All tenders: Poland](https://zephior.com/tenders/countries/pl) ([Markdown](https://zephior.com/tenders/countries/pl.md))

### Source-backed public record

```json
{
  "id": "5d20b6bf-80d7-4d19-9f6b-7a912eb54969",
  "revision": 1,
  "modifiedAt": "2026-11-13T10:00:00+00:00",
  "url": "https://zephior.com/tenders/5d20b6bf-80d7-4d19-9f6b-7a912eb54969/wigry-220-110-kv-substation-construction",
  "status": "closed",
  "recordedStatus": "open",
  "buyer": {
    "id": "polskie-sieci-elektroenergetyczne-spolka-akcyjna",
    "name": "Polskie Sieci Elektroenergetyczne Spółka Akcyjna"
  },
  "category": null,
  "deadline": {
    "at": "2026-11-20T11:00:00+01:00",
    "date": null,
    "source_ref": "ted_notice#deadline-receipt-tender-time-lot"
  },
  "award": null,
  "estimatedValue": null,
  "contractPeriod": "TED date boundaries: 30 June 2027 (+02:00) through 15 February 2032 (+01:00).",
  "region": null,
  "originalSource": {
    "url": "https://ted.europa.eu/en/notice/-/detail/682541-2026",
    "title": "Budowa stacji elektroenergetycznej 220/110 kV Wigry",
    "issuer": "Polskie Sieci Elektroenergetyczne Spółka Akcyjna",
    "status": "open",
    "language": "en",
    "location": "POL",
    "deadline_at": "2026-11-19T23:00:00+00:00",
    "description": null,
    "country_code": "PL",
    "published_at": "2026-10-04T22:00:00+00:00",
    "contract_type": null,
    "deadline_date": null,
    "procedure_type": "open",
    "reference_numbers": [
      "682541-2026"
    ],
    "classification_codes": [
      {
        "code": "45000000",
        "system": "CPV",
        "provenance": "source_declared"
      }
    ]
  },
  "sources": [
    {
      "ref": "canonical_snapshot",
      "url": "https://ted.europa.eu/en/notice/-/detail/682541-2026",
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-13T11:52:08.273411Z"
    },
    {
      "ref": "ted_notice",
      "url": "https://api.ted.europa.eu/v3/notices/search",
      "kind": "official_notice_api",
      "retrieved_at": "2026-10-13T12:09:46.553494Z"
    }
  ],
  "keyFacts": [
    {
      "label": "Exact TED notice",
      "value": "682541-2026; notice UUID f600e281-a67f-486f-b7b0-b98dd117599b; procedure ceabbf01-e788-477f-8556-6d8ed6c220f6; amendment context references 574501-2026.",
      "source_ref": "ted_notice#publication-number"
    },
    {
      "label": "Scope",
      "value": "Construction of the 220/110 kV Wigry substation as part of the Poland–Lithuania interconnection (Harmony Link) and Suwałki Special Economic Zone connection; design and construction/installation works, with four described options.",
      "source_ref": "ted_notice#description-proc"
    },
    {
      "label": "Formal lot",
      "value": "One works lot, LOT-0001, internal reference 2026/WNP-0284.",
      "source_ref": "ted_notice#identifier-lot"
    },
    {
      "label": "Award criterion",
      "value": "Price, 100%.",
      "source_ref": "ted_notice#award-criterion-description-lot"
    },
    {
      "label": "Bid deadline",
      "value": "TED: 20 November 2026, 11:00 UTC+01:00 (10:00 UTC); available notice information: 19 November 2026, 23:00 UTC.",
      "source_ref": "ted_notice#deadline-receipt-tender-date-lot"
    },
    {
      "label": "Contract period",
      "value": "TED date boundaries: start 30 June 2027 (+02:00) and end 15 February 2032 (+01:00).",
      "source_ref": "ted_notice#contract-duration-start-date-lot"
    },
    {
      "label": "Estimated monetary value",
      "value": "No estimated value appears in the retrieved TED fields.",
      "source_ref": "ted_notice#estimated-value-proc"
    }
  ],
  "noticeFacts": {
    "lots": [
      {
        "id": "LOT-0001",
        "title": "Budowa stacji elektroenergetycznej 220/110 kV Wigry",
        "source_ref": "ted_notice#description-lot",
        "description": "Szczegółowy opis przedmiotu zamówienia znajduje się w Części II SWZ Program Funkcjonalno-Użytkowy"
      }
    ],
    "schedule": [
      {
        "event": "Submission deadline",
        "value": "20 November 2026 at 11:00 UTC+01:00 (10:00 UTC); canonical snapshot: 19 November at 23:00 UTC.",
        "source_ref": "ted_notice#deadline-receipt-tender-time-lot"
      },
      {
        "event": "Contract period",
        "value": "30 June 2027 (+02:00) through 15 February 2032 (+01:00), as provided by TED date fields.",
        "source_ref": "ted_notice#contract-duration-start-date-lot"
      }
    ],
    "requirements": [
      {
        "text": "Ze względu na ograniczoną liczbę znaków w Ogłoszeniu o zamówieniu, Zamawiający informuje, że pełna treść warunków udziału w postępowaniu została wskazana w Rozdz. VII Części I SWZ. 1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki udziału w postępowaniu określone przez Zamawiającego oraz nie podlegają wykluczeniu w oparciu o podstawy wskazane w Rozdz. VI Części I SWZ. 2. Zamawiający określa następujące warunki udziału w postępowaniu: a) w co najmniej dwóch, z ostatnich trzech lat obrotowych, a jeżeli okres prowadzenia działalności jest krótszy niż trzy lata obrotowe, to w ostatnich dwóch latach obrotowych, a jeżeli okres prowadzenia działalności jest krótszy niż dwa lata obrotowe, to w ostatnim roku obrotowym oraz całym pozostałym okresie prowadzenia działalności, a jeżeli okres prowadzenia działalności jest krótszy niż rok obrotowy to w całym okresie prowadzenia działalności, Wykonawca wykaże wskaźnik płynności bieżącej wynoszący nie mniej niż 1,0. Zamawiający informuje, że wskaźnik płynności bieżącej Wykonawca ustali zgodnie ze wzorem określonym w Rozdz. VII pkt 2, ppkt 2.3 lit. a) Części I SWZ. W przypadku Wykonawców wspólnie ubiegających się o zamówienie (konsorcjum) co najmniej jeden z Wykonawców (członków konsorcjum) musi wykazać łącznie spełnienie warunków udziału w postępowaniu opisanych w ppkt 2.3. lit. a), ppkt 2.3. lit. b) Części I SWZ. W przypadku polegania przez Wykonawcę na sytuacji ekonomicznej lub finansowej innego podmiotu, z treści zobowiązania tego podmiotu musi wynikać łączne spełnienie warunków udziału w postępowaniu opisanych w ppkt 2.3. lit. a), ppkt 2.3. lit. b) Części I SWZ oraz realność udostępnionych zasobów. Zamawiający nie dopuszcza łączenia potencjałów dwóch lub większej liczby podmiotów w celu wykazania spełnienia tych warunków. Wartości podane we właściwych dokumentach w walucie innej niż złoty polski należy przeliczyć wg średniego kursu danej waluty ogłoszonego przez NBP na dzień, na który prezentowane są dane, a jeśli dane są prezentowane za dany okres - na ostatni dzień tego okresu.",
        "source_ref": "ted_notice#selection-criterion-description-lot"
      },
      {
        "text": "1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki udziału w postępowaniu określone przez Zamawiającego oraz nie podlegają wykluczeniu w oparciu o podstawy wskazane w Rozdz. VI Części I SWZ. 2. Zamawiający określa następujące warunki udziału w postępowaniu: b) Wykonawca wykaże, iż w ciągu ostatniego roku obrotowego, (a jeżeli okres prowadzenia działalności jest krótszy niż rok obrotowy, to w całym okresie prowadzenia działalności) osiągnął obrót* w wysokości, co najmniej 61 000 000,00 zł (słownie: sześćdziesiąt jeden milionów złotych 00/100). *Jako obrót Zamawiający przyjmuje sumę przychodów netto ze sprzedaży produktów, towarów i materiałów. W przypadku Wykonawców wspólnie ubiegających się o zamówienie (konsorcjum) co najmniej jeden z Wykonawców (członków konsorcjum) musi wykazać łącznie spełnienie warunków udziału w postępowaniu opisanych w ppkt 2.3. lit. a), ppkt 2.3. lit. b) Części I SWZ. W przypadku polegania przez Wykonawcę na sytuacji ekonomicznej lub finansowej innego podmiotu, z treści zobowiązania tego podmiotu musi wynikać łączne spełnienie warunków udziału w postępowaniu opisanych w ppkt 2.3. lit. a), ppkt 2.3. lit. b) Części I SWZ oraz realność udostępnionych zasobów. Zamawiający nie dopuszcza łączenia potencjałów dwóch lub większej liczby podmiotów w celu wykazania spełnienia tych warunków. Wartości podane we właściwych dokumentach w walucie innej niż złoty polski należy przeliczyć wg średniego kursu danej waluty ogłoszonego przez NBP na dzień, na który prezentowane są dane, a jeśli dane są prezentowane za dany okres - na ostatni dzień tego okresu.",
        "source_ref": "ted_notice#selection-criterion-description-lot"
      },
      {
        "text": "1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki udziału w postępowaniu określone przez Zamawiającego oraz nie podlegają wykluczeniu w oparciu o podstawy wskazane w Rozdz. VI Części I SWZ. 2. Zamawiający określa następujące warunki udziału w postępowaniu: a) W okresie ostatnich 10 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, Wykonawca wybudował lub przebudował (zmodernizował) co najmniej 2 pola w obrębie jednej stacji o napięciu 110 kV lub wyższym na rozdzielni/rozdzielniach napowietrznej/napowietrznych (AIS, tzn. Air Insulated Switchgear) prądu przemiennego na obszarze ENTSO-E. Za budowę, przebudowę (modernizację) pola na rozdzielni napowietrznej (AIS, tzn. Air Insulated Switchgear) prądu przemiennego uznane zostanie dokonanie zabudowy co najmniej (łącznie): wyłącznika, przekładników prądowych i napięciowych (także kombinowanych) oraz automatyki zabezpieczeniowej. Zakres prac obejmuje również uruchomienie pola rozumiane jako uzyskanie pozytywnego wyniku próby napięciowej i obciążeniowej pozwalającej na jego eksploatację. W przypadku niżej wskazanych rozdzielni: i. w układzie 3/2W – jako budowę, przebudowę (modernizację) pola rozumie się wykonanie co najmniej jednego mostka (bez uwzględniania mostka „środkowego”) w gałęzi wraz z odejściem dla linii lub (auto)transformatora lub dławika uwzględniającego dokonanie zabudowy co najmniej (łącznie): wyłącznika, przekładników prądowych i napięciowych (także kombinowanych) oraz automatyki zabezpieczeniowej. Zakres prac obejmuje również uruchomienie pola rozumiane jako uzyskanie pozytywnego wyniku próby napięciowej i obciążeniowej pozwalającej na jego eksploatację; ii. w układzie 2W – jako budowę, przebudowę (modernizację) pola rozumie się wykonanie co najmniej jednej gałęzi wraz z odejściem dla linii lub (auto)transformatora lub dławika uwzględniającego dokonanie zabudowy co najmniej (łącznie): wyłącznika, przekładników prądowych i napięciowych (także kombinowanych) oraz automatyki zabezpieczeniowej. Zakres prac obejmuje również uruchomienie pola rozumiane jako uzyskanie pozytywnego wyniku próby napięciowej i obciążeniowej pozwalającej na jego eksploatację.",
        "source_ref": "ted_notice#selection-criterion-description-lot"
      },
      {
        "text": "1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki udziału w postępowaniu określone przez Zamawiającego oraz nie podlegają wykluczeniu w oparciu o podstawy wskazane w Rozdz. VI Części I SWZ. 2. Zamawiający określa następujące warunki udziału w postępowaniu: b) W okresie ostatnich 10 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, Wykonawca wykonał co najmniej 2 odebrane projekty wykonawcze (obejmujący minimum branżę elektryczną i branżę konstrukcyjno-budowlaną, w ramach odrębnych umów z Inwestorem) na budowę lub przebudowę (modernizację), których zakres obejmuje łącznie co najmniej 2 pola o napięciu 110 kV lub wyższym, na rozdzielni/rozdzielniach napowietrznej/napowietrznych (AIS, tzn. Air Insulated Switchgear) prądu przemiennego na obszarze ENTSO-E. Za datę wykonania projektu wykonawczego Zamawiający rozumie datę jego pozytywnego zaopiniowania, a w przypadku braku takiej opinii datę odbioru projektu wykonawczego, przez podmiot na rzecz którego projekty zostały wykonane. Projekt wykonawczy powinien być wykonany w oparciu o polską normę PN-EN 61936 -1 oraz PN-EN 50522 lub normę europejską EN 61936-1 oraz EN 50522, lub być „równoważny”, z uwzględnieniem, że jeżeli Wykonawca powołuje się na fakt wykonania projektu wykonawczego „równoważnego”, tj. w oparciu o rozwiązania równoważne rozwiązaniom wynikającym z ww. norm, zobowiązany jest wówczas ten fakt wykazać Zamawiającemu w sposób i w formie nie budzących wątpliwości. Za wykonanie projektu wykonawczego, o którym mowa powyżej, uznane zostanie zaprojektowanie budowy, przebudowy (modernizacji) pola obejmujące zabudowę co najmniej (łącznie): wyłącznika, przekładników prądowych i napięciowych (także kombinowanych) oraz automatyki zabezpieczeniowej. W przypadku niżej wskazanych rozdzielni: i. w układzie 3/2W – jako budowę, przebudowę (modernizację) pola rozumie się wykonanie co najmniej jednego mostka (bez uwzględniania mostka „środkowego”) w gałęzi wraz z odejściem dla linii lub (auto)transformatora lub dławika uwzględniającego dokonanie zabudowy co najmniej (łącznie): wyłącznika, przekładników prądowych i napięciowych (także kombinowanych) oraz automatyki zabezpieczeniowej; ii. w układzie 2W – jako budowę, przebudowę (modernizację) pola rozumie się wykonanie co najmniej jednej gałęzi wraz z odejściem dla linii lub (auto)transformatora lub dławika uwzględniającego dokonanie zabudowy co najmniej (łącznie): wyłącznika, przekładników prądowych i napięciowych (także kombinowanych) oraz automatyki zabezpieczeniowej",
        "source_ref": "ted_notice#selection-criterion-description-lot"
      }
    ],
    "award_criteria": [
      {
        "text": "Price, 100%.",
        "source_ref": "ted_notice#award-criterion-description-lot"
      }
    ],
    "estimated_value": null
  },