# Cooling for classrooms, Lüssiweg 24, Zug, phase 2

Hochbauamt Kanton Zug · Switzerland · Closed

## Outcome

Submissions closed on 23 October 2026. No award has been published yet.

> SIMAP lists 23 October 2026 at 12:00 CEST (UTC+02:00) as the submission deadline. The current source record marks the procedure closed; the latest notice shows no later extension.

- **Buyer:** Hochbauamt Kanton Zug
- **Place:** Zug, canton of Zug
- **Submission deadline:** October 23, 2026 at 10:00 AM UTC
- **Contract value:** Not stated in the notice
- **Contract period:** 4 January to 31 December 2027; the notice says installation is intended during spring and summer school holidays.
- **Published:** August 17, 2026

## Overview

The Canton School in Zug plans decentralized air-conditioning and ventilation units for 25 teaching and specialist rooms in blocks 3 and 5. Installation is intended during the 2027 spring and summer school holidays, so suppliers and installation staff must be available and the work carefully prepared. The procurement is conditional on approval of budget item HB3060.0451 by the Cantonal Council; release is expected no earlier than late 2026 or January 2027. This is an open construction tender without lots. Bids must be submitted sealed; partial bids, variants and subcontractors are not allowed, while consortia are permitted. The notice gives no contract value.

Information based on the public notice

## What the buyer needs

Supply and installation of decentralized cooling and ventilation equipment in 25 classrooms and specialist rooms at the existing Canton School in Zug, blocks 3 and 5. The notice requires holiday scheduling and available suppliers and installation staff.

- The work is to be scheduled during the stated spring and summer 2027 school holidays; suitable suppliers and installation staff must be available.
- Submit the offer sealed and identify the project, BKP and trade on the envelope.
- Partial bids, variants and subcontractors are not permitted; consortia are permitted.

## Tender details

- Buyer: Hochbauamt Kanton Zug
- Country: Switzerland
- Procedure: open
- Classification: Construction and civil works · CPV 45331221
- Notice reference: 34780 · 34780-01
- Scope: Install decentralized cooling and ventilation systems in 25 classrooms and specialist rooms in blocks 3 and 5.
- Work windows: Spring holidays: 17 April to 2 May 2027; summer holidays: 3 July to 15 August 2027.
- Submission deadline: 23 October 2026, 12:00 CEST (UTC+02:00).
- Submission format: Submit the offer sealed and identify the project, BKP and trade on the envelope.
- Participation: No partial bids, variants or subcontractors; consortia are allowed.
- Budget condition: Award of budget item HB3060.0451 remains subject to Cantonal Council approval, expected no earlier than late 2026 or January 2027.

## What to check in the tender documents

- No estimated contract value is published. Detailed eligibility and award criteria are referred to tender documents that were not accessed. The budget appropriation remains subject to Cantonal Council approval.

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate)

## Original notice

**HB3060.0451 Kühlung Schulzimmer Lüssiweg 24 Teil 2, Zug**

Titel: HB3060.0451 Kühlung Schulzimmer Lüssiweg 24 Teil 2, Zug

Auftragsbeschreibung:
Bei dem vorliegenden Projekt handelt es sich um die bestehende Kantonsschule in Zug. Im Trakt 3+5 werden dezentrale Geräte für die Klimatisierung und Be- und Entlüftung in den Unterrichts- sowie Spezialzimmer installiert. Insgesamt werden 25 Zimmer mit entsprechenden Anlagen ausgestattet. Die Umsetzung muss während der Ferienzeit erfolgen. Ziel ist die Umsetzung in den Frühlings- und Sommerferien (17.04. bis 02.05.2027 sowie 03.07. bis 15.08.2027). Es wird eine saubere AVOR benötigt, um den Einbau effizient und termingerecht abwickeln zu können. Entsprechende Lieferanten sowie Montagepersonal müssen verfügbar sein. Die Ausschreibung erfolgt unter Vorbehalt der Budgetgenehmigung durch den Kantonsrat des Kantons Zug (HB3060.0451). Eine entsprechende Freigabe erfolgt somit erst frühstens Ende 2026 resp. Januar 2027.

Ausführungsort: Lüssiweg 24, Trakt 3+5, 6300 Zug.
Ausführungszeitraum: 04.01.2027 bis 31.12.2027; die Arbeiten sind gemäss Auftragsbeschreibung in den Frühlings- und Sommerferien vorgesehen.
Verfahrensart: Offenes Verfahren.
Lose: Keine Lose.
Varianten: Nicht zugelassen. Teilangebote: Nicht zugelassen.
Bietergemeinschaften: Zugelassen. Subunternehmen: Nicht zugelassen.
Einreichung: Das Angebot ist verschlossen einzureichen. Auf dem Briefumschlag sind Projekt, BKP und Arbeitsgattung aufzuführen.
Eignungs- und Zuschlagskriterien: In den Ausschreibungsunterlagen; diese Unterlagen wurden nicht abgerufen.

- Official source: [SIMAP](https://www.simap.ch/de/project-detail/e70b91a0-e4a1-424d-addd-e3fc75d65d91)

## Notice updates

### October 23, 2026 · Version 2 (Classification updated, Tender facts updated, Deadline updated, Source notice details updated, Source references updated, Status changed, Notice update added)

HB3060.0451 Kühlung Schulzimmer Lüssiweg 24 Teil 2, Zug

Titel: HB3060.0451 Kühlung Schulzimmer Lüssiweg 24 Teil 2, Zug

Auftragsbeschreibung:
Bei dem vorliegenden Projekt handelt es sich um die bestehende Kantonsschule in Zug. Im Trakt 3+5 werden dezentrale Geräte für die Klimatisierung und Be- und Entlüftung in den Unterrichts- sowie Spezialzimmer installiert. Insgesamt werden 25 Zimmer mit entsprechenden Anlagen ausgestattet. Die Umsetzung muss während der Ferienzeit erfolgen. Ziel ist die Umsetzung in den Frühlings- und Sommerferien (17.04. bis 02.05.2027 sowie 03.07. bis 15.08.2027). Es wird eine saubere AVOR benötigt, um den Einbau effizient und termingerecht abwickeln zu können. Entsprechende Lieferanten sowie Montagepersonal müssen verfügbar sein. Die Ausschreibung erfolgt unter Vorbehalt der Budgetgenehmigung durch den Kantonsrat des Kantons Zug (HB3060.0451). Eine entsprechende Freigabe erfolgt somit erst frühstens Ende 2026 resp. Januar 2027.

Ausführungsort: Lüssiweg 24, Trakt 3+5, 6300 Zug.
Ausführungszeitraum: 04.01.2027 bis 31.12.2027; die Arbeiten sind gemäss Auftragsbeschreibung in den Frühlings- und Sommerferien vorgesehen.
Verfahrensart: Offenes Verfahren.
Lose: Keine Lose.
Varianten: Nicht zugelassen. Teilangebote: Nicht zugelassen.
Bietergemeinschaften: Zugelassen. Subunternehmen: Nicht zugelassen.
Einreichung: Das Angebot ist verschlossen einzureichen. Auf dem Briefumschlag sind Projekt, BKP und Arbeitsgattung aufzuführen.
Eignungs- und Zuschlagskriterien: In den Ausschreibungsunterlagen; diese Unterlagen wurden nicht abgerufen.

### October 11, 2026 · Version 1 (Published)

HB3060.0451 Kühlung Schulzimmer Lüssiweg 24 Teil 2, Zug

Titel: HB3060.0451 Kühlung Schulzimmer Lüssiweg 24 Teil 2, Zug

Auftragsbeschreibung:
Bei dem vorliegenden Projekt handelt es sich um die bestehende Kantonsschule in Zug. Im Trakt 3+5 werden dezentrale Geräte für die Klimatisierung und Be- und Entlüftung in den Unterrichts- sowie Spezialzimmer installiert. Insgesamt werden 25 Zimmer mit entsprechenden Anlagen ausgestattet. Die Umsetzung muss während der Ferienzeit erfolgen. Ziel ist die Umsetzung in den Frühlings- und Sommerferien (17.04. bis 02.05.2027 sowie 03.07. bis 15.08.2027). Es wird eine saubere AVOR benötigt, um den Einbau effizient und termingerecht abwickeln zu können. Entsprechende Lieferanten sowie Montagepersonal müssen verfügbar sein. Die Ausschreibung erfolgt unter Vorbehalt der Budgetgenehmigung durch den Kantonsrat des Kantons Zug (HB3060.0451). Eine entsprechende Freigabe erfolgt somit erst frühstens Ende 2026 resp. Januar 2027.

Ausführungsort: Lüssiweg 24, Trakt 3+5, 6300 Zug.
Ausführungszeitraum: 04.01.2027 bis 31.12.2027; die Arbeiten sind gemäss Auftragsbeschreibung in den Frühlings- und Sommerferien vorgesehen.
Verfahrensart: Offenes Verfahren.
Lose: Keine Lose.
Varianten: Nicht zugelassen. Teilangebote: Nicht zugelassen.
Bietergemeinschaften: Zugelassen. Subunternehmen: Nicht zugelassen.
Einreichung: Das Angebot ist verschlossen einzureichen. Auf dem Briefumschlag sind Projekt, BKP und Arbeitsgattung aufzuführen.
Eignungs- und Zuschlagskriterien: In den Ausschreibungsunterlagen; diese Unterlagen wurden nicht abgerufen.

## Understand this procurement.

Review the scope, requirements and procurement history with Ziva.

- Understand the requirements
- Find the evidence you need
- Prepare your response

[Get started with Ziva](https://agent.zephior.ai/onboarding/initiate) · [View official notice](https://www.simap.ch/de/project-detail/e70b91a0-e4a1-424d-addd-e3fc75d65d91)

## About this notice

- Official source: SIMAP
- Source retrieved: October 23, 2026
- Page updated: October 23, 2026
- Notice reference: 34780 · 34780-01

## Open tenders like this one

- [KS P works, Hinterburgmühle-Edlibach, Neuheim and Menzingen](https://zephior.com/tenders/c21d8629-44a3-4e6f-bbe6-5ec0f3fc1ab0/ks-p-hinterburgmuhle-edlibach-c21d8629) ([Markdown](https://zephior.com/tenders/c21d8629-44a3-4e6f-bbe6-5ec0f3fc1ab0/ks-p-hinterburgmuhle-edlibach-c21d8629.md)), Tiefbauamt des Kantons Zug
- [Colocation data centre site 4 for the Canton of Bern](https://zephior.com/tenders/ee0b1501-8b06-448c-9e63-47cfd4260399/colocation-data-centre-site-4-for-the-canton-of-bern) ([Markdown](https://zephior.com/tenders/ee0b1501-8b06-448c-9e63-47cfd4260399/colocation-data-centre-site-4-for-the-canton-of-bern.md)), Amt für Informatik und Organisation (AIO)
- [Pitched roof and supporting structure renewal in Zug](https://zephior.com/tenders/26e4df34-2ac4-4287-a3d5-e1ef240e6adc/zug-pitched-roof-g-g-strasse-22-30) ([Markdown](https://zephior.com/tenders/26e4df34-2ac4-4287-a3d5-e1ef240e6adc/zug-pitched-roof-g-g-strasse-22-30.md)), Baudepartement Stadt Zug, Abteilung Hochbau
- [Strategic partners for the Magnolia web platform](https://zephior.com/tenders/2a7b0762-1e1e-4127-954c-2decb6f9f4d0/strategic-partners-for-the-magnolia-web-platform) ([Markdown](https://zephior.com/tenders/2a7b0762-1e1e-4127-954c-2decb6f9f4d0/strategic-partners-for-the-magnolia-web-platform.md)), Amt für Informatik und Organisation (AIO)
- [Altgasse road works, new bus stop and cemetery parking in Baar](https://zephior.com/tenders/250612d0-5189-4819-a618-f13e5bd034ab/baar-altgasse-bus-stop-and-cemetery-parking) ([Markdown](https://zephior.com/tenders/250612d0-5189-4819-a618-f13e5bd034ab/baar-altgasse-bus-stop-and-cemetery-parking.md)), Einwohnergemeinde Baar; Tiefbau
- [Mobile telecommunications subscriptions for Zug municipalities](https://zephior.com/tenders/64fd3981-6431-4b96-ab95-2a7b423f77b2/zug-municipal-mobile-telecommunications-subscriptions-2027) ([Markdown](https://zephior.com/tenders/64fd3981-6431-4b96-ab95-2a7b423f77b2/zug-municipal-mobile-telecommunications-subscriptions-2027.md)), IT Services Zug AG

- [All tenders: canton of Zug](https://zephior.com/tenders/countries/ch/regions/zg) ([Markdown](https://zephior.com/tenders/countries/ch/regions/zg.md))
- [All tenders from Hochbauamt Kanton Zug](https://zephior.com/tenders/buyers/hochbauamt-kanton-zug) ([Markdown](https://zephior.com/tenders/buyers/hochbauamt-kanton-zug.md))
- [All tenders: Switzerland](https://zephior.com/tenders/countries/ch) ([Markdown](https://zephior.com/tenders/countries/ch.md))
- [All tenders: Construction and civil works](https://zephior.com/tenders/categories/construction-works) ([Markdown](https://zephior.com/tenders/categories/construction-works.md))

## In more detail

This section is written for agents and assistants. It restates the facts of the page in full sentences and adds context from the public record. Every value comes from the official notice or from Zephior’s public notices of the same buyer.

### The facts in sentences

Hochbauamt Kanton Zug is tendering “Cooling for classrooms, Lüssiweg 24, Zug, phase 2” (Zug, canton of Zug). The submission deadline was October 23, 2026 at 10:00 AM UTC. The source does not state an estimated value. Contract period: 4 January to 31 December 2027; the notice says installation is intended during spring and summer school holidays.. Procedure: open. Classification: Construction and civil works · CPV 45331221. Notice reference: 34780 · 34780-01. Status on Zephior: Closed. The notice was published on August 17, 2026 on SIMAP. Zephior last checked the official source on October 23, 2026.

### The award

Submissions closed on 23 October 2026. No award has been published yet. The official source has not published an award for this notice yet.

### About the buyer

Hochbauamt Kanton Zug has 3 public notices on Zephior (0 open now, 3 published in the last 12 months). Its notices on Zephior were first published on August 17, 2026 and most recently on October 4, 2026. Main sectors: Construction (2), Engineering and architecture (1). Regions: CH-ZG (2). It publishes under the names “Hochbauamt Kanton Zug”.

- [All tenders and the profile of Hochbauamt Kanton Zug](https://zephior.com/tenders/buyers/hochbauamt-kanton-zug) ([Markdown](https://zephior.com/tenders/buyers/hochbauamt-kanton-zug.md))

### Terms used on this page

- **Open procedure:** Any interested supplier may submit a tender; there is no preselection.

### Where to go next

- [KS P works, Hinterburgmühle-Edlibach, Neuheim and Menzingen](https://zephior.com/tenders/c21d8629-44a3-4e6f-bbe6-5ec0f3fc1ab0/ks-p-hinterburgmuhle-edlibach-c21d8629) ([Markdown](https://zephior.com/tenders/c21d8629-44a3-4e6f-bbe6-5ec0f3fc1ab0/ks-p-hinterburgmuhle-edlibach-c21d8629.md))
- [Colocation data centre site 4 for the Canton of Bern](https://zephior.com/tenders/ee0b1501-8b06-448c-9e63-47cfd4260399/colocation-data-centre-site-4-for-the-canton-of-bern) ([Markdown](https://zephior.com/tenders/ee0b1501-8b06-448c-9e63-47cfd4260399/colocation-data-centre-site-4-for-the-canton-of-bern.md))
- [Pitched roof and supporting structure renewal in Zug](https://zephior.com/tenders/26e4df34-2ac4-4287-a3d5-e1ef240e6adc/zug-pitched-roof-g-g-strasse-22-30) ([Markdown](https://zephior.com/tenders/26e4df34-2ac4-4287-a3d5-e1ef240e6adc/zug-pitched-roof-g-g-strasse-22-30.md))
- [Strategic partners for the Magnolia web platform](https://zephior.com/tenders/2a7b0762-1e1e-4127-954c-2decb6f9f4d0/strategic-partners-for-the-magnolia-web-platform) ([Markdown](https://zephior.com/tenders/2a7b0762-1e1e-4127-954c-2decb6f9f4d0/strategic-partners-for-the-magnolia-web-platform.md))
- [Altgasse road works, new bus stop and cemetery parking in Baar](https://zephior.com/tenders/250612d0-5189-4819-a618-f13e5bd034ab/baar-altgasse-bus-stop-and-cemetery-parking) ([Markdown](https://zephior.com/tenders/250612d0-5189-4819-a618-f13e5bd034ab/baar-altgasse-bus-stop-and-cemetery-parking.md))
- [Mobile telecommunications subscriptions for Zug municipalities](https://zephior.com/tenders/64fd3981-6431-4b96-ab95-2a7b423f77b2/zug-municipal-mobile-telecommunications-subscriptions-2027) ([Markdown](https://zephior.com/tenders/64fd3981-6431-4b96-ab95-2a7b423f77b2/zug-municipal-mobile-telecommunications-subscriptions-2027.md))
- [All tenders: canton of Zug](https://zephior.com/tenders/countries/ch/regions/zg) ([Markdown](https://zephior.com/tenders/countries/ch/regions/zg.md))
- [All tenders from Hochbauamt Kanton Zug](https://zephior.com/tenders/buyers/hochbauamt-kanton-zug) ([Markdown](https://zephior.com/tenders/buyers/hochbauamt-kanton-zug.md))
- [All tenders: Switzerland](https://zephior.com/tenders/countries/ch) ([Markdown](https://zephior.com/tenders/countries/ch.md))
- [All tenders: Construction and civil works](https://zephior.com/tenders/categories/construction-works) ([Markdown](https://zephior.com/tenders/categories/construction-works.md))

### Source-backed public record

```json
{
  "id": "0dc6c79c-6150-44b4-9179-3d4683c560b4",
  "revision": 2,
  "modifiedAt": "2026-10-23T10:03:28.983918+00:00",
  "url": "https://zephior.com/tenders/0dc6c79c-6150-44b4-9179-3d4683c560b4/cooling-classrooms-luessiweg-24-zug-phase-2",
  "status": "closed",
  "recordedStatus": "closed",
  "buyer": {
    "id": "hochbauamt-kanton-zug",
    "name": "Hochbauamt Kanton Zug"
  },
  "category": {
    "de": "Bau und Tiefbau",
    "en": "Construction and civil works",
    "fr": "Travaux de construction et génie civil",
    "id": "construction-works"
  },
  "deadline": {
    "at": "2026-10-23T12:00:00+02:00",
    "date": null,
    "source_ref": "official_notice_api#dates/offerDeadline"
  },
  "award": null,
  "estimatedValue": null,
  "contractPeriod": "4 January to 31 December 2027; the notice says installation is intended during spring and summer school holidays.",
  "region": {
    "country": "CH",
    "code": "CH-ZG",
    "names": {
      "en": "Zug",
      "de": "Zug",
      "fr": "Zoug"
    },
    "locality": "Zug"
  },
  "originalSource": {
    "url": "https://www.simap.ch/de/project-detail/e70b91a0-e4a1-424d-addd-e3fc75d65d91",
    "title": "HB3060.0451 Kühlung Schulzimmer Lüssiweg 24 Teil 2, Zug",
    "issuer": "Hochbauamt Kanton Zug",
    "status": "closed",
    "language": "de",
    "location": "6300 Zug, ZG, CH",
    "deadline_at": "2026-10-23T10:00:00+00:00",
    "description": "Bei dem vorliegenden Projekt handelt es sich um die bestehende Kantonsschule in Zug. Im Trakt 3+5 werden dezentrale Geräte für die Klimatisierung und Be- und Entlüftung in den Unterrichts- sowie Spezialzimmer installiert. Insgesamt werden 25 Zimmer mit entsprechenden Anlagen ausgestattet. Die Umsetzung muss während der Ferienzeit erfolgen. Ziel ist die Umsetzung in den Frühlings- und Sommerferien (17.04. bis 02.05.2027 sowie 03.07. bis 15.08.2027) . Es wird eine saubere AVOR benötigt, um den Einbau effizient und termingerecht abwickeln zu können. Entsprechende Lieferanten sowie Montagepersonal müssen verfügbar sein. Die Ausschreibung erfolgt unter Vorbehalt der Budgetgenehmigung durch den Kantonsrat des Kantons Zug (HB3060.0451). Eine entsprechende Freigabe erfolgt somit erst frühstens Ende 2026 resp. Januar 2027.",
    "country_code": "CH",
    "published_at": "2026-08-17T22:00:00+00:00",
    "contract_type": "construction",
    "deadline_date": null,
    "procedure_type": "open",
    "reference_numbers": [
      "34780",
      "34780-01"
    ],
    "classification_codes": [
      {
        "code": "45331221",
        "system": "CPV",
        "provenance": "source_declared"
      }
    ]
  },
  "sources": [
    {
      "ref": "canonical_snapshot",
      "url": "https://www.simap.ch/de/project-detail/e70b91a0-e4a1-424d-addd-e3fc75d65d91",
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-23T10:01:15.027235Z"
    },
    {
      "ref": "official_project_header",
      "url": "https://www.simap.ch/api/publications/v2/project/e70b91a0-e4a1-424d-addd-e3fc75d65d91/project-header",
      "kind": "official_notice_api",
      "retrieved_at": "2026-10-23T10:01:23.092440Z"
    },
    {
      "ref": "official_notice_api",
      "url": "https://www.simap.ch/api/publications/v1/project/e70b91a0-e4a1-424d-addd-e3fc75d65d91/publication-details/cbe00bdf-c98e-4118-98f7-702eb401de82",
      "kind": "official_notice_api",
      "retrieved_at": "2026-10-23T10:01:23.092274Z"
    }
  ],
  "keyFacts": [
    {
      "label": "Scope",
      "value": "Install decentralized cooling and ventilation systems in 25 classrooms and specialist rooms in blocks 3 and 5.",
      "source_ref": "official_notice_api#/procurement/orderDescription"
    },
    {
      "label": "Work windows",
      "value": "Spring holidays: 17 April to 2 May 2027; summer holidays: 3 July to 15 August 2027.",
      "source_ref": "official_notice_api#/procurement/orderDescription"
    },
    {
      "label": "Submission deadline",
      "value": "23 October 2026, 12:00 CEST (UTC+02:00).",
      "source_ref": "official_notice_api#/dates/offerDeadline"
    },
    {
      "label": "Submission format",
      "value": "Submit the offer sealed and identify the project, BKP and trade on the envelope.",
      "source_ref": "official_notice_api#/project-info/offerSpecificNote"
    },
    {
      "label": "Participation",
      "value": "No partial bids, variants or subcontractors; consortia are allowed.",
      "source_ref": "official_notice_api#/procurement and /terms"
    },
    {
      "label": "Budget condition",
      "value": "Award of budget item HB3060.0451 remains subject to Cantonal Council approval, expected no earlier than late 2026 or January 2027.",
      "source_ref": "official_notice_api#/procurement/orderDescription"
    }
  ],
  "noticeFacts": {
    "lots": [],
    "schedule": [
      {
        "event": "Tender publication",
        "value": "18 August 2026",
        "source_ref": "official_project_header#/latestPublication/dates/publicationDate"
      },
      {
        "event": "Question round date shown in SIMAP",
        "value": "20 September 2026",
        "source_ref": "official_project_header#/latestPublication/dates/qnas"
      },
      {
        "event": "Offer deadline",
        "value": "23 October 2026 at 12:00 +02:00",
        "source_ref": "official_notice_api#/dates/offerDeadline"
      },
      {
        "event": "Planned spring holiday installation",
        "value": "17 April to 2 May 2027",
        "source_ref": "official_notice_api#/procurement/orderDescription"
      },
      {
        "event": "Planned summer holiday installation",
        "value": "3 July to 15 August 2027",
        "source_ref": "official_notice_api#/procurement/orderDescription"
      },
      {
        "event": "Official execution period",
        "value": "4 January to 31 December 2027",
        "source_ref": "official_notice_api#/procurement/executionPeriod"
      }
    ],
    "requirements": [
      {
        "text": "Partial offers are not allowed.",
        "source_ref": "official_notice_api#/procurement/partialOffers"
      },
      {
        "text": "Variants are not allowed.",
        "source_ref": "official_notice_api#/procurement/variants"
      },
      {
        "text": "Consortia are permitted; subcontractors are not permitted.",
        "source_ref": "official_notice_api#/terms"
      },
      {
        "text": "The offer must be submitted sealed, with the project, BKP and trade identified on the envelope.",
        "source_ref": "official_notice_api#/project-info/offerSpecificNote"
      },
      {
        "text": "Suppliers and installation staff must be available to carry out work during the stated school holiday windows.",
        "source_ref": "official_notice_api#/procurement/orderDescription"
      }
    ],
    "award_criteria": [],
    "estimated_value": null
  },
  "historyTotal": 2
}
```