Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan · Bhoutan · Clôturé

## Résultat

Le dépôt des offres a pris fin le 22 octobre 2026. Aucune attribution n’a encore été publiée.

- **Acheteur:** Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan
- **Lieu:** Bhoutan
- **22 octobre 2026 à 10:00, heure du Bhoutan:** 22 octobre 2026 à 04:00 UTC
- **Montant du marché:** Non précisé dans l’avis
- **Lots:** 3 lots
- **Publié le:** 8 octobre 202

## Vue d’ensemble

Le Department of Surface Transport du Bhoutan invite des candidats à la préqualification pour trois lots routiers et de ponts sur le corridor Gelephu–Tareythang, couvrant 12,6 km et cinq grands ponts. Le lot I couvre les km 0,000–3,868 ; le lot II les km 3,868–8,453 ; le lot III les km 8,453–12,600. L’avis décrit chaussées, revêtements, drainage, protection de talus, tunnel et ponts. Clôture des candidatures le 22 octobre 2026 à 10:00 heure du Bhoutan (04:00 UTC) ; ouverture à 10:30 heure locale.

Informations fondées sur l’avis public

## Ce dont l’acheteur a besoin

L’avis est une invitation à la préqualification pour ACCESS–Bhutan, références ACCESS/DOST/WD-1, WD-2 et WD-3, publiée par le Department of Surface Transport. Il décrit trois lots de routes et ponts totalisant 12 600 m et cinq grands ponts ; le lot I est à quatre voies et les lots II et III à deux voies. Les types et portées des ponts figurent dans le texte original. La préqualification est ouverte aux candidats éligibles. Aucune valeur estimative n’est indiquée et l’appel d’offres était prévu en octobre 2026.

## Lots

- Package I · Road and bridge works, km 0.000–3.868; four-lane carriageway
- Package II · Road and bridge works, km 3.868–8.453; two-lane carriageway
- Package III · Road, tunnel and bridge works, km 8.453–12.600; two-lane carriageway

## Détails du marché

- Acheteur: Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan
- Pays: Bhoutan
- Procédure: Request for Bids
- Classification: Construction de routes et ponts · WORLD\_BANK P181278
- Référence de l’avis: OP00457042
- Date limite de remise: 22 octobre 2026 à 10:00, heure du Bhoutan (04:00 UTC)

## Avis original

**Construction of Gelephu - Tareythang roads and bridges on Southern East-West Highway Package-I; from Ch 0.0m to 3868.0m**

Specific Procurement Notice
                                           Invitation for Prequalification

Country: Kingdom of Bhutan

Name of Project: Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) – Bhutan Project

Contract Title: Construction of Gelephu-Tareythang Road and Bridges

Loan No./Credit No./Grant No: IDA 77560 (Credit)/IDAE4310 (grant)

Prequalification Reference No: ACCESS/DOST/WD-1, ACCESS/DOST/WD-2 and ACCESS/DOST/WD-3

1. The Royal Government of Bhutan has received financing from the World Bank toward the cost of the
proposed Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) – Bhutan Project, and
intends to apply part of the proceeds toward payments under the contracts for ACCESS/DOST/WD-1,
ACCESS/DOST/WD-2, and ACCESS/DOST/WD-3 for the Construction of Gelephu-Tareythang Road and
Bridges.

2. The Department of Surface Transport (DoST), Ministry of Infrastructure and Transport (MoIT), Royal
Government of Bhutan, intends to prequalify contractors for the following work packages under the Gelephu-
Tareythang Road Project involving the construction of 12,600 m of roadway and major bridge structures. The
project comprises five major bridges with bridge lengths varying from 320 m to 1020 m, including PSC I-Girder
and Cast-in-Situ Balanced Cantilever superstructures. The longest structure is the Mau River Bridge with a total
length of 1020 m. The project corridor starts from Gelephu Town and terminates at Tareythang.

The contract packages are described below:

    i.        Package I: Segment 1 to 5 (km 0.000 to km 3.868)



    Construction of a 4-lane carriageway including earthworks, pavement, drainage, slope protection works, and
    associated ancillary works. The package also includes construction of the following two major bridges:


    •     Gelephu Bridge – PSC I-Girder Bridge of span configuration (2 × 40) m; and
    •     Mau River Bridge – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration: (3 x 6) +
          [60 + (6 x 90) + 60] + (3 x 60) m

    ii.       Package II: Segment 5 to 8 (km 3.868 to km 8.453)

Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross-
drainage structures, culverts, slope stabilization, and protection work and associated ancillary works. The package
includes the following major bridges including pile foundations and associated structural works:


    •     Taklai & Jengkhurung Rivers Bridge – PSC I-Girder Bridge of span configuration 8 x (2 × 50) m ; and



                                                                                        Tele: 02 321434(PA) Ext: 139
                                         དཔལ་%ན་འ(ག་ག*ང་། གཞི་/ེན་མཁོ་ཆས་དང་ 6ེལ་འ7ེན་་8ན་ཁག
                                               འ"ོ་འ%ལ་'ེལ་འ)ེན་ལས་,ངས།
                                      ROYAL GOVERNMENT OF BHUTAN
                                MINISTRY OF INFRASTRUCTURE AND TRANSPORT
                                    DEPARTMENT OF SURFACE TRANSPORT

    •      Langer River Bridge – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 ×
           90 + 60 m).

    iii.       Package III: Segment 8 to 10 (km 8.453 to km 12.600)

Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross
drainage structures, culverts, Cuts and Cover tunnel (nearly 30 m below the ground level), slope stabilization,
anchor works, soil nailing. The package includes construction of the following bridge structures:


    •      Singye River Bridge – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 × 90
           + 60 ) m; and
    •      Tareythang Bridge at km 10.880 – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration:
           (60 + 90 + 60) m.

It is expected that the Request for Bids (RFB) will be issued in October 2026.

3. Prequalification will be conducted in accordance with the procedures specified in the World Bank’s Procurement
Regulations for IPF Borrowers, Fifth Edition, September 2023 (“Procurement Regulations”), and is open to all eligible
Applicants as defined in the Procurement Regulations.

4. Interested eligible Applicants may obtain further information from the Department of Surface Transport, Ministry
of Infrastructure and Transport, at the address provided below during office hours from 0900 to 1700 hours (Bhutan
Standard Time, GMT +6:00). The Prequalification Document may be downloaded free of charge from the official
website of the Department of Surface Transport, Ministry of Infrastructure and Transport, Royal Government of
Bhutan. The document can be downloaded from https://moit.gov.bt from July 20, 2026. Applicants are encouraged to
register their contact details to receive clarifications, addenda, and other updates, if any. The Employer shall not be
responsible for any failure or delay in downloading the document due to internet connectivity issues, browser
incompatibility, or other technical problems at the Applicant’s end.

5. Applications for prequalification should be submitted in clearly marked envelopes and delivered to the
address below by 1000 hours (Bhutan Time, GMT + 0600 hours) on: October 22, 2026 and will be opened on
the same date at 1030 hours (Bhutan Time, GMT + 0600 hours). Late applications may be rejected.

Chief Engineer
Construction Division
Department of Surface Transport (DoST)
Ministry of Infrastructure & Transport (MoIT)
City: Thimphu
ZIP/Postal Code: 11001
Country: Bhutan
Telephone: PABX No.: 975-2-322086
Email id and website: cmpradhan@moit.gov.bt and www.moit.gov.bt







                                                                                         Tele: 02 321434(PA) Ext: 139

- Source officielle: [World Bank procurement notice (canonical snapshot)](https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00457042)
- [Avis officiel au format PDF](https://moit.gov.bt/wp-content/uploads/2026/10/Revised-SPN-for-PQDdocx.pdf)

## Mises à jour de l’avis

### 12 octobre 2026 · Version 2 (Résumé et analyse mis à jour, Avis original mis à jour, Échéance mise à jour, Références mises à jour)

Construction of Gelephu - Tareythang roads and bridges on Southern East-West Highway Package-I; from Ch 0.0m to 3868.0m

Specific Procurement Notice
                                           Invitation for Prequalification

Country: Kingdom of Bhutan

Name of Project: Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) – Bhutan Project

Contract Title: Construction of Gelephu-Tareythang Road and Bridges

Loan No./Credit No./Grant No: IDA 77560 (Credit)/IDAE4310 (grant)

Prequalification Reference No: ACCESS/DOST/WD-1, ACCESS/DOST/WD-2 and ACCESS/DOST/WD-3

1. The Royal Government of Bhutan has received financing from the World Bank toward the cost of the
proposed Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) – Bhutan Project, and
intends to apply part of the proceeds toward payments under the contracts for ACCESS/DOST/WD-1,
ACCESS/DOST/WD-2, and ACCESS/DOST/WD-3 for the Construction of Gelephu-Tareythang Road and
Bridges.

2. The Department of Surface Transport (DoST), Ministry of Infrastructure and Transport (MoIT), Royal
Government of Bhutan, intends to prequalify contractors for the following work packages under the Gelephu-
Tareythang Road Project involving the construction of 12,600 m of roadway and major bridge structures. The
project comprises five major bridges with bridge lengths varying from 320 m to 1020 m, including PSC I-Girder
and Cast-in-Situ Balanced Cantilever superstructures. The longest structure is the Mau River Bridge with a total
length of 1020 m. The project corridor starts from Gelephu Town and terminates at Tareythang.

The contract packages are described below:

    i.        Package I: Segment 1 to 5 (km 0.000 to km 3.868)



    Construction of a 4-lane carriageway including earthworks, pavement, drainage, slope protection works, and
    associated ancillary works. The package also includes construction of the following two major bridges:


    •     Gelephu Bridge – PSC I-Girder Bridge of span configuration (2 × 40) m; and
    •     Mau River Bridge – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration: (3 x 6) +
          [60 + (6 x 90) + 60] + (3 x 60) m

    ii.       Package II: Segment 5 to 8 (km 3.868 to km 8.453)

Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross-
drainage structures, culverts, slope stabilization, and protection work and associated ancillary works. The package
includes the following major bridges including pile foundations and associated structural works:


    •     Taklai & Jengkhurung Rivers Bridge – PSC I-Girder Bridge of span configuration 8 x (2 × 50) m ; and



                                                                                        Tele: 02 321434(PA) Ext: 139
                                         དཔལ་%ན་འ(ག་ག*ང་། གཞི་/ེན་མཁོ་ཆས་དང་ 6ེལ་འ7ེན་་8ན་ཁག
                                               འ"ོ་འ%ལ་'ེལ་འ)ེན་ལས་,ངས།
                                      ROYAL GOVERNMENT OF BHUTAN
                                MINISTRY OF INFRASTRUCTURE AND TRANSPORT
                                    DEPARTMENT OF SURFACE TRANSPORT

    •      Langer River Bridge – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 ×
           90 + 60 m).

    iii.       Package III: Segment 8 to 10 (km 8.453 to km 12.600)

Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross
drainage structures, culverts, Cuts and Cover tunnel (nearly 30 m below the ground level), slope stabilization,
anchor works, soil nailing. The package includes construction of the following bridge structures:


    •      Singye River Bridge – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 × 90
           + 60 ) m; and
    •      Tareythang Bridge at km 10.880 – Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration:
           (60 + 90 + 60) m.

It is expected that the Request for Bids (RFB) will be issued in October 2026.

3. Prequalification will be conducted in accordance with the procedures specified in the World Bank’s Procurement
Regulations for IPF Borrowers, Fifth Edition, September 2023 (“Procurement Regulations”), and is open to all eligible
Applicants as defined in the Procurement Regulations.

4. Interested eligible Applicants may obtain further information from the Department of Surface Transport, Ministry
of Infrastructure and Transport, at the address provided below during office hours from 0900 to 1700 hours (Bhutan
Standard Time, GMT +6:00). The Prequalification Document may be downloaded free of charge from the official
website of the Department of Surface Transport, Ministry of Infrastructure and Transport, Royal Government of
Bhutan. The document can be downloaded from https://moit.gov.bt from July 20, 2026. Applicants are encouraged to
register their contact details to receive clarifications, addenda, and other updates, if any. The Employer shall not be
responsible for any failure or delay in downloading the document due to internet connectivity issues, browser
incompatibility, or other technical problems at the Applicant’s end.

5. Applications for prequalification should be submitted in clearly marked envelopes and delivered to the
address below by 1000 hours (Bhutan Time, GMT + 0600 hours) on: October 22, 2026 and will be opened on
the same date at 1030 hours (Bhutan Time, GMT + 0600 hours). Late applications may be rejected.

Chief Engineer
Construction Division
Department of Surface Transport (DoST)
Ministry of Infrastructure & Transport (MoIT)
City: Thimphu
ZIP/Postal Code: 11001
Country: Bhutan
Telephone: PABX No.: 975-2-322086
Email id and website: cmpradhan@moit.gov.bt and www.moit.gov.bt







                                                                                         Tele: 02 321434(PA) Ext: 139

### 12 octobre 2026 · Version 1 (Publié)

Construction of Gelephu - Tareythang roads and bridges on Southern East-West Highway Package-I; from Ch 0.0m to 3868.0m

Specific Procurement Notice Invitation for Prequalification Country: Kingdom of Bhutan Name of Project: Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) &ndash; Bhutan Project Contract Title: Construction of Gelephu-Tareythang Road and Bridges Loan No./Credit No./Grant No: IDA 77560 (Credit)/IDAE4310 (grant) Prequalification Reference No : ACCESS/DOST/WD-1, ACCESS/DOST/WD-2 and ACCESS/DOST/WD-3 1. The Royal Government of Bhutan has received financing from the World Bank toward the cost of the proposed Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) &ndash; Bhutan Project , and intends to apply part of the proceeds toward payments under the contracts for ACCESS/DOST/WD-1, ACCESS/DOST/WD-2, and ACCESS/DOST/WD-3 for the Construction of Gelephu-Tareythang Road and Bridges. 2. The Department of Surface Transport (DoST), Ministry of Infrastructure and Transport (MoIT), Royal Government of Bhutan, intends to prequalify contractors for the following work packages under the Gelephu-Tareythang Road Project involving the construction of 12,600 m of roadway and major bridge structures. The project comprises five major bridges with bridge lengths varying from 320 m to 1020 m, including PSC I-Girder and Cast-in-Situ Balanced Cantilever superstructures. The longest structure is the Mau River Bridge with a total length of 1020 m. The project corridor starts from Gelephu Town and terminates at Tareythang. The contract packages are described below: Package I: Segment 1 to 5 (km 0.000 to km 3.868) Construction of a 4-lane carriageway including earthworks, pavement, drainage, slope protection works, and associated ancillary works. The package also includes construction of the following two major bridges: Gelephu Bridge &ndash; PSC I-Girder Bridge of span configuration (2 &times; 40) m; and Mau River Bridge &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration: (3 x 6) + [60 + (6 x 90) + 60] + (3 x 60) m Package II: Segment 5 to 8 (km 3.868 to km 8.453) Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross-drainage structures, culverts, slope stabilization, and protection work and associated ancillary works. The package includes the following major bridges including pile foundations and associated structural works: Taklai & Jengkhurung Rivers Bridge &ndash; PSC I-Girder Bridge of span configuration 8 x (2 &times; 50) m ; and Langer River Bridge &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 &times; 90 + 60 m). Package III: Segment 8 to 10 (km 8.453 to km 12.600) Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross drainage structures, culverts, Cuts and Cover tunnel (nearly 30 m below the ground level), slope stabilization, anchor works, soil nailing. The package includes construction of the following bridge structures: Singye River Bridge &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 &times; 90 + 60 ) m; and Tareythang Bridge at km 10.880 &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration: (60 + 90 + 60) m. It is expected that the Request for Bids (RFB) will be issued in October 2026. 3. Prequalification will be conducted in accordance with the procedures specified in the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, Fifth Edition, September 2023 (&ldquo;Procurement Regulations&rdquo;), and is open to all eligible Applicants as defined in the Procurement Regulations. 4. Interested eligible Applicants may obtain further information from the Department of Surface Transport, Ministry of Infrastructure and Transport, at the address provided below during office hours from 0900 to 1700 hours (Bhutan Standard Time, GMT +6:00). The Prequalification Document may be downloaded free of charge from the official website of the Department of Surface Transport, Ministry of Infrastructure and Transport, Royal Government of Bhutan. The document can be downloaded from https://moit.gov.bt/specific-procurement-notice-for-pre-qualification-of-contractors-for-construction-of-gelephu-tareythang-road-and-bridges/ from July 20, 2026. Applicants are encouraged to register their contact details to receive clarifications, addenda, and other updates, if any. The Employer shall not be responsible for any failure or delay in downloading the document due to internet connectivity issues, browser incompatibility, or other technical problems at the Applicant&rsquo;s end. 5. Applications for prequalification should be submitted in clearly marked envelopes and delivered to the address below by 1000 hours (Bhutan Time, GMT + 0600 hours) on: October 22, 2026 and will be opened on the same date at 1030 hours (Bhutan Time, GMT + 0600 hours). Late applications may be rejected. Chief Engineer Construction Division Department of Surface Transport (DoST) Ministry of Infrastructure & Transport (MoIT) City: Thimphu ZIP/Postal Code: 11001 Country: Bhutan Telephone: PABX No.: 975-2-322086 Email id and website: cmpradhan@moit.gov.bt and www.moit.gov.bt

## Comprendre ce marché.

Explorez le périmètre, les exigences et l’historique avec Ziva.

- Comprendre les exigences
- Trouver les preuves nécessaires
- Préparer votre réponse

[Commencer avec Ziva](https://agent.zephior.ai/onboarding/initiate) · [Consulter l’avis officiel](https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00457042)

## À propos de cet avis

- Source officielle: World Bank procurement notice (canonical snapshot)
- Source consultée: 12 octobre 2026
- Page mise à jour: 22 octobre 2026
- Référence de l’avis: OP00457042

## Autres appels d’offres

- [Tous les appels d’offres de Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan](https://zephior.com/fr/tenders/buyers/department-of-surface-transport-ministry-of-infrastructure) ([Markdown](https://zephior.com/fr/tenders/buyers/department-of-surface-transport-ministry-of-infrastructure.md))
- [Tous les appels d’offres : Bhoutan](https://zephior.com/fr/tenders/countries/bt) ([Markdown](https://zephior.com/fr/tenders/countries/bt.md))
- [Tous les appels d’offres : Construction de routes et ponts](https://zephior.com/fr/tenders/categories/road-bridge-construction) ([Markdown](https://zephior.com/fr/tenders/categories/road-bridge-construction.md))

## En détail

Cette section est rédigée pour les agents et assistants. Elle reprend les faits de la page en phrases complètes et ajoute le contexte des données publiques. Chaque valeur provient de l’avis officiel ou des avis publics du même acheteur sur Zephior.

### Les faits en phrases

Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan met en concurrence « Préqualification : lots routiers et ponts Gelephu–Tareythang » (Bhoutan). La date limite de remise des offres était le 22 octobre 2026 à 04:00 UTC. La source n’indique pas de valeur estimée. Le marché est divisé en 3 lots. Procédure : Request for Bids. Classification : Construction de routes et ponts · WORLD\_BANK P181278. Référence de l’avis : OP00457042. Statut sur Zephior : Clôturé. L’avis a été publié le 8 octobre 202 sur World Bank procurement notice (canonical snapshot). Zephior a vérifié la source officielle pour la dernière fois le 12 octobre 2026.

### L’attribution

Le dépôt des offres a pris fin le 22 octobre 2026. Aucune attribution n’a encore été publiée. La source officielle n’a pas encore publié d’attribution pour cet avis.

### Détail des lots

1. **Package I · Road and bridge works, km 0.000–3.868; four-lane carriageway**: Includes Gelephu Bridge and Mau River Bridge.
2. **Package II · Road and bridge works, km 3.868–8.453; two-lane carriageway**: Includes Taklai & Jengkhurung Rivers Bridge and Langer River Bridge.
3. **Package III · Road, tunnel and bridge works, km 8.453–12.600; two-lane carriageway**: Includes Singye River Bridge and Tareythang Bridge.

### À propos de l’acheteur

Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan compte 2 avis publics sur Zephior (ouverts actuellement : 0, publiés au cours des 12 derniers mois : 0). Ses avis sur Zephior ont été publiés pour la première fois le 8 octobre 202 et en dernier le 12 octobre 202. Principaux secteurs : BTP et construction (2). Il publie sous les noms “Department of Surface Transport, Ministry of Infrastructure and Transport”.

- [Tous les appels d’offres et le profil de Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan](https://zephior.com/fr/tenders/buyers/department-of-surface-transport-ministry-of-infrastructure) ([Markdown](https://zephior.com/fr/tenders/buyers/department-of-surface-transport-ministry-of-infrastructure.md))

### Pour aller plus loin

- [Tous les appels d’offres de Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan](https://zephior.com/fr/tenders/buyers/department-of-surface-transport-ministry-of-infrastructure) ([Markdown](https://zephior.com/fr/tenders/buyers/department-of-surface-transport-ministry-of-infrastructure.md))
- [Tous les appels d’offres : Bhoutan](https://zephior.com/fr/tenders/countries/bt) ([Markdown](https://zephior.com/fr/tenders/countries/bt.md))
- [Tous les appels d’offres : Construction de routes et ponts](https://zephior.com/fr/tenders/categories/road-bridge-construction) ([Markdown](https://zephior.com/fr/tenders/categories/road-bridge-construction.md))

### Données publiques sourcées

```json
{
  "id": "d908c8e2-f019-49d9-ba8f-c49f7122fefa",
  "revision": 2,
  "modifiedAt": "2026-10-22T04:00:00+00:00",
  "url": "https://zephior.com/fr/tenders/d908c8e2-f019-49d9-ba8f-c49f7122fefa/prequalification-lots-routiers-et-ponts-gelephu-tareythang",
  "status": "closed",
  "recordedStatus": "open",
  "buyer": {
    "id": "department-of-surface-transport-ministry-of-infrastructure",
    "name": "Department of Surface Transport, Ministry of Infrastructure and Transport, Bhutan"
  },
  "category": {
    "de": "Straßen- und Brückenbau",
    "en": "Road and bridge construction",
    "fr": "Construction de routes et ponts",
    "id": "road-bridge-construction"
  },
  "deadline": {
    "at": "2026-10-22T04:00:00+00:00",
    "date": null,
    "source_ref": "b210-06-revised-SPN#applications-deadline (10:00 Bhutan Time, GMT +0600)"
  },
  "award": null,
  "estimatedValue": null,
  "contractPeriod": null,
  "region": null,
  "originalSource": {
    "url": "https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00457042",
    "title": "Construction of Gelephu - Tareythang roads and bridges on Southern East-West Highway Package-I; from Ch 0.0m to 3868.0m",
    "issuer": "Department of Surface Transport, Ministry of Infrastructure and Transport",
    "status": "open",
    "language": "en",
    "location": "Bhutan",
    "deadline_at": "2026-10-22T10:00:00+00:00",
    "description": "Specific Procurement Notice Invitation for Prequalification Country: Kingdom of Bhutan Name of Project: Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) &ndash; Bhutan Project Contract Title: Construction of Gelephu-Tareythang Road and Bridges Loan No./Credit No./Grant No: IDA 77560 (Credit)/IDAE4310 (grant) Prequalification Reference No : ACCESS/DOST/WD-1, ACCESS/DOST/WD-2 and ACCESS/DOST/WD-3 1. The Royal Government of Bhutan has received financing from the World Bank toward the cost of the proposed Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) &ndash; Bhutan Project , and intends to apply part of the proceeds toward payments under the contracts for ACCESS/DOST/WD-1, ACCESS/DOST/WD-2, and ACCESS/DOST/WD-3 for the Construction of Gelephu-Tareythang Road and Bridges. 2. The Department of Surface Transport (DoST), Ministry of Infrastructure and Transport (MoIT), Royal Government of Bhutan, intends to prequalify contractors for the following work packages under the Gelephu-Tareythang Road Project involving the construction of 12,600 m of roadway and major bridge structures. The project comprises five major bridges with bridge lengths varying from 320 m to 1020 m, including PSC I-Girder and Cast-in-Situ Balanced Cantilever superstructures. The longest structure is the Mau River Bridge with a total length of 1020 m. The project corridor starts from Gelephu Town and terminates at Tareythang. The contract packages are described below: Package I: Segment 1 to 5 (km 0.000 to km 3.868) Construction of a 4-lane carriageway including earthworks, pavement, drainage, slope protection works, and associated ancillary works. The package also includes construction of the following two major bridges: Gelephu Bridge &ndash; PSC I-Girder Bridge of span configuration (2 &times; 40) m; and Mau River Bridge &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration: (3 x 6) + [60 + (6 x 90) + 60] + (3 x 60) m Package II: Segment 5 to 8 (km 3.868 to km 8.453) Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross-drainage structures, culverts, slope stabilization, and protection work and associated ancillary works. The package includes the following major bridges including pile foundations and associated structural works: Taklai & Jengkhurung Rivers Bridge &ndash; PSC I-Girder Bridge of span configuration 8 x (2 &times; 50) m ; and Langer River Bridge &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 &times; 90 + 60 m). Package III: Segment 8 to 10 (km 8.453 to km 12.600) Construction of a 2-lane carriageway including earthworks, formation works, subgrade, pavement layers, cross drainage structures, culverts, Cuts and Cover tunnel (nearly 30 m below the ground level), slope stabilization, anchor works, soil nailing. The package includes construction of the following bridge structures: Singye River Bridge &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration (60 + 3 &times; 90 + 60 ) m; and Tareythang Bridge at km 10.880 &ndash; Cast-in-Situ Balanced Cantilever Box Girder Bridge of span configuration: (60 + 90 + 60) m. It is expected that the Request for Bids (RFB) will be issued in October 2026. 3. Prequalification will be conducted in accordance with the procedures specified in the World Bank&rsquo;s Procurement Regulations for IPF Borrowers, Fifth Edition, September 2023 (&ldquo;Procurement Regulations&rdquo;), and is open to all eligible Applicants as defined in the Procurement Regulations. 4. Interested eligible Applicants may obtain further information from the Department of Surface Transport, Ministry of Infrastructure and Transport, at the address provided below during office hours from 0900 to 1700 hours (Bhutan Standard Time, GMT +6:00). The Prequalification Document may be downloaded free of charge from the official website of the Department of Surface Transport, Ministry of Infrastructure and Transport, Royal Government of Bhutan. The document can be downloaded from https://moit.gov.bt/specific-procurement-notice-for-pre-qualification-of-contractors-for-construction-of-gelephu-tareythang-road-and-bridges/ from July 20, 2026. Applicants are encouraged to register their contact details to receive clarifications, addenda, and other updates, if any. The Employer shall not be responsible for any failure or delay in downloading the document due to internet connectivity issues, browser incompatibility, or other technical problems at the Applicant&rsquo;s end. 5. Applications for prequalification should be submitted in clearly marked envelopes and delivered to the address below by 1000 hours (Bhutan Time, GMT + 0600 hours) on: October 22, 2026 and will be opened on the same date at 1030 hours (Bhutan Time, GMT + 0600 hours). Late applications may be rejected. Chief Engineer Construction Division Department of Surface Transport (DoST) Ministry of Infrastructure & Transport (MoIT) City: Thimphu ZIP/Postal Code: 11001 Country: Bhutan Telephone: PABX No.: 975-2-322086 Email id and website: cmpradhan@moit.gov.bt and www.moit.gov.bt",
    "country_code": "BT",
    "published_at": "0202-10-08T00:00:00+00:00",
    "contract_type": "CW",
    "deadline_date": null,
    "procedure_type": "Request for Bids",
    "reference_numbers": [
      "OP00457042"
    ],
    "classification_codes": [
      {
        "code": "P181278",
        "system": "WORLD_BANK",
        "provenance": "source_declared"
      }
    ]
  },
  "sources": [
    {
      "ref": "b210-06-canonical_snapshot",
      "url": "https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00457042",
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-12T16:39:18.359186Z"
    },
    {
      "ref": "canonical_snapshot",
      "url": "https://projects.worldbank.org/en/projects-operations/procurement-detail/OP00457042",
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-12T16:38:50.600713Z"
    },
    {
      "ref": "b210-06-revised-SPN",
      "url": "https://moit.gov.bt/wp-content/uploads/2026/10/Revised-SPN-for-PQDdocx.pdf",
      "kind": "official_notice_pdf",
      "retrieved_at": "2026-10-12T16:44:54.423791Z"
    }
  ],
  "keyFacts": [
    {
      "label": "Référence de l’avis",
      "value": "OP00457042",
      "source_ref": "canonical_snapshot#/reference_numbers"
    },
    {
      "label": "Date limite de remise",
      "value": "22 octobre 2026 à 10:00, heure du Bhoutan (04:00 UTC)",
      "source_ref": "b210-06-revised-SPN#applications-deadline"
    }
  ],
  "noticeFacts": {
    "lots": [
      {
        "id": "Package I",
        "title": "Road and bridge works, km 0.000–3.868; four-lane carriageway",
        "source_ref": "canonical_snapshot#/description",
        "description": "Includes Gelephu Bridge and Mau River Bridge."
      },
      {
        "id": "Package II",
        "title": "Road and bridge works, km 3.868–8.453; two-lane carriageway",
        "source_ref": "canonical_snapshot#/description",
        "description": "Includes Taklai & Jengkhurung Rivers Bridge and Langer River Bridge."
      },
      {
        "id": "Package III",
        "title": "Road, tunnel and bridge works, km 8.453–12.600; two-lane carriageway",
        "source_ref": "canonical_snapshot#/description",
        "description": "Includes Singye River Bridge and Tareythang Bridge."
      }
    ],
    "schedule": [],
    "requirements": [],
    "award_criteria": [],
    "estimated_value": null
  },
  "historyTotal": 2
}
```