# Roadmaps für Ground-Entry-Point-as-a-Service — RFI

Space Development Agency, U.S. Department of the Air Force · Vereinigte Staaten · Geschlossen

## Ergebnis

Die Eingabefrist endete am 14. Oktober 2026. Ein Zuschlag ist noch nicht veröffentlicht.

> Das RFI-PDF nennt den 14. Oktober 2026 um 16:00 Uhr EST (UTC−05:00) als Antwortfrist; SAM.gov nennt 16:00 Uhr America/New\_York (UTC−04:00). Die veröffentlichte Frist folgt SAM.gov.

- **Auftraggeber:** Space Development Agency, U.S. Department of the Air Force
- **Ort:** Vereinigte Staaten
- **Frist für RFI-Antworten:** 14. Oktober 2026 um 20:00 UTC
- **Auftragswert:** In der Bekanntmachung nicht angegeben
- **Veröffentlicht:** 8. Oktober 2026

## Überblick

Die Space Development Agency bittet die Industrie um Informationen zu kommerziell gemieteten Ground Entry Points (GEP) für die Proliferated Warfighter Space Architecture. Die abgeschlossene RFI dient ausschließlich der Markterkundung. Erfragt werden bestehende und geplante Fähigkeiten im militärischen Ka-Band, Abdeckung, Leistung, Integration, Zeitpläne, Genehmigungen, Cybersicherheit, Service-Level und Geschäftsmodelle. Es handelt sich weder um eine Angebotsaufforderung noch um eine Zusage für eine spätere Ausschreibung oder Vergabe.

Informationen aus der öffentlichen Bekanntmachung

## Was der Auftraggeber benötigt

Markterkundung zu kommerziell gemieteten Ground Entry Points und möglichen Industriefähigkeiten; diese RFI führt zu keiner Vergabe.

- Interessierte Unternehmen können gemäß den RFI-Anweisungen Informationen zu ihren Fähigkeiten einreichen.
- Für das CUI-Dokument mit den Annahmen müssen Interessenten laut Bekanntmachung NIST-Konformität nachweisen und den Zugang bei der SDA beantragen.

## Details

- Auftraggeber: Space Development Agency, U.S. Department of the Air Force
- Land: Vereinigte Staaten
- Verfahren: Request for Information / Markterkundung
- Klassifizierung: IT, Software und Telekommunikation · NAICS 517810 · PSC DG11
- Bekanntmachungsreferenz: 3ddf26f9c38c4a10beaa29ff727bcf52 · SDA-SN-26-0018
- Antwortfrist: 14. Oktober 2026, 16:00 Uhr America/New\_York (20:00 UTC)
- Zweck: Bewertung industrieller Fähigkeiten für kommerziell gemietete Ground Entry Points zur Unterstützung von SDA-Raumfahrzeugen
- Technische Eckdaten: Verfügbarkeit über 98 %; Gesamtdatenrate im Downlink 14 Gbit/s; militärisches Ka-Band; 12 Ebenen mit je 9 Raumfahrzeugen; Nennhöhe 1.000 km ±50 km

## Was in den Vergabeunterlagen zu prüfen ist

- Es sind weder ein Zuschlag noch ein Auftragnehmer, Auftragswert oder verbindlicher Kauf genannt.
- Die zugangsbeschränkte CUI-Tabelle und das nur für zugelassene Teilnehmer verfügbare Q&A sind hier nicht enthalten.

[Mit Ziva loslegen](https://agent.zephior.ai/onboarding/initiate)

## Originalbekanntmachung

**GEP-as-a-Service Development Roadmaps**

REQUEST FOR INFORMATION

Announcement Number: SDA-SN-26-0018
RFI Title: GEP-as-a-Service Development Roadmaps
NAICS Code: 517810 – All Other Telecommunications Size Standard: $40M

1. DISCLAIMER
This is a Request for Information (RFI) issued solely for information and planning
purposes. It does not constitute a Request for Proposal or a promise to issue an RFP in
the future. This notice does not commit the Government to contract for any supply or
service. Responses to this notice are not offers and cannot be accepted by the
Government to form a binding contract. No reimbursement will be made for any costs
associated with responding to this notice.

CAUTION: This market survey is being conducted to identify potential sources that may
possess the expertise, capabilities, and experience to meet the requirements of
persistent radio frequency Ground Entry Point (GEP) needs for use by the SDA.
Contractors/Institutions responding to this market research are placed on notice that
participation in this survey may not ensure participation in future solicitations or
contract awards. The government will not reimburse participants for any expenses
associated with their participation in this survey.

INSTRUCTIONS:

   1. Below is a document containing a description of need/requirement and a
      Contractor Capability Survey, which allows you to provide your company’s
      capability.
   2. If, after reviewing these documents, you desire to participate in the market
      research, you should provide documentation that supports your company’s
      capability in meeting these requirements. Failure to provide documentation may
      result in the government being unable to adequately assess your capabilities. If
      you lack sufficient experience in a particular area, please provide details
      explaining how you would overcome the lack of experience and/or capabilities in
      order to perform that portion of the requirement (i.e., teaming, subcontracting,
      etc.).
   3. Small businesses are encouraged to participate in this Market Research.


2. PURPOSE
The Space Development Agency seeks information on industry’s ability to support the
Proliferated Warﬁghter Space Architecture (PWSA) Space Vehicles (SVs) with
commercially leased Ground Entry Points (GEPs). Although this RFI is primarily focused
on capabilities that could be onboarded in the Tranche 3 timeframe (FY28-31), these
installations will be expected to, at a minimum, provide terrestrial links with PWSA SVs
including the Tranche 2, 3, and 4+ constellations through RF Mil-Ka-band
communication. As the terrestrial link to a proliferated communications constellation,
the GEP transmits uplink commands to the SVs and relays received data back to the
Operation Center (OC) for decryption and routing to end users through secure channels.

3. REQUIREMENTS DESCRIPTION

   •   Availability: >98%
   •   Capacity: 14 Gbps total downlink
   •   RF Frequency Band: mil-Ka
   •   # of planes: 12
   •   SVs per plane: 9
   •   SV Altitude: 1000 km +/-50 km

4. CONTRACTOR CAPABILITY SURVEY
Interested businesses are invited to respond by providing the following:

Part I – Business Information:

   •   Company Name:
   •   Address:
   •   CAGE Code and UEI:
   •   Point of Contact (Name, Email, Phone):
   •   Website:
   •   Business Size and Socioeconomic Status under NAICS {NAICS Code and
       Description} (e.g., Small Business, Woman-Owned, Veteran-Owned, 8(a),
       HUBZone, etc.)

Part II – Capabilities and Experience:

4.1 Technical Capabilities & Notional GEP Architecture
4.1.1 Provide descriptions of existing and planned global GEP footprints to ensure they
can support SDA’s orbital planes. This should include:
   •   Identification of existing Contractor-owned or Contractor-operated antennas that
       could be immediately leveraged as either scheduled or dedicated GEP-as-a-
       Service (GaaS) resources for this effort.
   •   A map/geographic coordinates of current and planned Ka-band apertures,
       specifically targeting high-latitude zones (>70° N/S) for high inclination space
       vehicles and mid-latitude zones (35°–45° N/S) for low inclination vehicles.
   •   Antenna sizes, Gain-to-Noise-Temperature ratio (G/T), and polarization
       capabilities (e.g., LHCP/RHCP software-defined switches).
   •   Tracking and horizon profile information including maximum azimuth/elevation
       tracking velocities and acceleration rates to ensure antennas can handle high-
       elevation LEO overhead passes without losing tracking lock.
   •   Site-specific rain fade mitigation strategies, including site diversity
       (uplink/downlink handover to adjacent antennas during localized weather events)
       and automated uplink power control (UPC).

4.1.2. Describe your organization’s capability and standard methodology for providing
Military Ka-band GaaS to the Space Development Agency (SDA) that meets all
assumptions and technical baselines outlined in the SDA Mil Ka-band GEP Assumptions
Table (Attachment 1)(CUI).

4.1.3. If the notional architecture leverages Mil Ka-band antennas from multiple distinct
hardware vendors, describe your methodology for:
   • Integrating antennas from different vendors into a unified framework with SDA
       networks and ground systems.
   • Performing uniform Mil Ka-band compatibility testing with Tranche 3 space
       segment contractors across differing hardware baselines.

4.1.4. If your capability is to design, build, or deploy new GaaS Mil Ka-band antennas,
describe the following for both Continental United States (CONUS) and Outside
Continental United States (OCONUS) locations:
   • Planned antenna quantities, reflector sizes, G/T, polarization capabilities and
       target geographic regions or notional coordinates.
   • Conceptual approaches to integrating these newly developed GaaS antennas
       with SDA ground systems, tactical edge nodes, and optical/fiber networks.
   • Definition of typical organizational roles and responsibilities for the development,
       integration, testing, and ultimate transition to operations.

4.2 Schedule/Timeline, Compatibility, and Testing
4.2.1. Provide a notional schedule or historical timeline based on experience, for
making both existing and new GaaS antennas operational. Provide a timeline that
demonstrates the:
   • Hardware/software development phase.
   • Integration and verification test campaign (including end-to-end integration
       testing with SDA ground systems).
   • Transition to operations activities/events.

4.2.2 Describe standard methodologies and historical approaches, and specialized test
equipment required for performing Mil Ka-band radio frequency (RF) compatibility
testing with designated SDA space segment contractors to ensure seamless link
margins, handoffs, and bit error rate (BER) thresholds.
4.3 Spectrum, Licensing, Regulatory, Location and Operational Considerations (including
interoperability)
4.3.1 Provide information indicating the legal/regulatory and technical flexibility to
communicate with T3 SVVs, to include status of ITU filings and national regulatory
approvals (such as NTIA and FCC in the US or local international equivalents) for Ka-
band uplink/downlink operations at each existing GEP location.
4.3.2 Describe the typical design and implementation of digital intermediate frequency
(Digital IF) interfaces, including whether they support standard open interoperability
frameworks like DIFI (Digital IF Interoperability Consortium). If custom approaches are
applied, describe how existing PWSA modems can seamlessly interface with their
commercial digitizers.
4.3.3 Provide a framework and defined roles and responsibilities for obtaining all
necessary approvals for GEP site development and operations. This must include
physical site approvals, civil engineering permits, RF frequency authorizations, and host-
nation telecom licenses.
4.3.4 Explicitly state all assumptions regarding:
   •   International landing rights and host-nation spectrum access.
   •   Status of Forces Agreements (SOFA) for OCONUS deployments.
   •   National and international frequency approval pipelines.
   •   Local RF deconfliction and emissions control (EMCON) management.
   •   Site-loading constraints (e.g., structural, power, and environmental).


4.3.5 Outline any assumptions on changes to existing domestic or international laws,
regulatory frameworks, or Department policies that would be required to fully enact a
notional operational roadmap.

4.4 Cybersecurity, Information Assurance, and other Security Policy Compliance
(Department of War relevant)
Note: Commercial GaaS providers should demonstrate their ability to isolate
government data and protect national security assets.
4.4.1 Provide the clearance levels of existing or planned GaaS facilities (e.g., cleared
facility status, ability to host SCIFs or classified processing enclaves).
4.4.2 Provide compliance status with government cybersecurity mandates, such as
NIST SP 800-171, CMMC (Cybersecurity Maturity Model Certification) Level 2 or higher,
or FedRAMP authorizations for -cloud-based mission control software.
4.4.3 Provide a description and architectural details on how logical or physical isolation
of SDA mission data from commercial customer data is typically achieved during
downlinks, processing, and fiber backhaul transit.
4.4.4 Provide a conceptual cybersecurity framework for GaaS antennas, specifically
focusing on the process, artifacts, and controls required to obtain a formal Approval to
Connect (ATC) and Authority to Operate (ATO) to secure government networks.
4.4.5 Describe how your typical GaaS architecture satisfies Risk Management
Framework (RMF) controls, protects Telemetry, Tracking, and Command (TT&C) links,
and secures mission data at rest and in transit at the ground station (GEP) edge.

4.5 Commercial Business Model, SLAs, and Cost Drivers
4.5.1 Describe your approach to providing standard Service Level Agreement (SLA) for
the GaaS antennas which includes monthly/quarterly/annual usage and performance
metrics and describes customer access to this data.
4.5.2 Describe the operational approach to prioritization of mission use. Specifically
address how the system arbitrates competing demands, including dual-band operations
(e.g., S-band vs. Ka-band usage conflicts), and handles preemption rights between SDA,
other military customers, and commercial users.
4.5.3 Describe how Priority Access or Preemption Rights for government missions
during critical orbital passes or operational emergencies are typically guaranteed or
assured within your commercial models.
4.5.4 Describe the commercial billing units available in the market or typically used by
your organization (e.g., price per minute of pass time, data volume-based pricing, or flat-
rate monthly antenna reservations).
4.5.5 Provide the pass-scheduling algorithms standardly utilized.
4.5.6 Provide Rough Order of Magnitude (ROM) estimates and typical cost drivers for
annual GaaS antenna usage/leasing costs (including projected annual
inflation/escalation percentages) for both dedicated antennas and pay-by-the-minute
(or other unit) operational profiles.
   •   Note: If you do not plan to provide GaaS antennas via a pay-by-the-minute (or
       other unit) framework and only provide GaaS antennas as dedicated resources
       leased by SDA, state this explicitly.
4.5.7 Provide the minimum lease duration required for standard business models. If
different lease durations (e.g., 1-year, 3-year, 5-year commitments) result in different
annual costs structures, provide an overview of these options.
4.5.8 Provide the standard commercial metrics for Link Availability (e.g., 99.9% uptime
target accounting for weather), mean time to restore (MTTR) hardware failures, and
packet delivery latency thresholds under adverse weather, and data delivery latency
from antenna edge to SDA’s cloud landing zone to be used.
4.5.9 Identify typical non-recurring integration and compatibility testing costs required
to onboard onto the Tranche 3 network.
4.5.10 Identify potential additional cost drivers, fees, or surcharges that are typically
passed onto the Government (e.g., localized power surcharges, fiber cross-connect
fees, host-nation regulatory taxes).

5. RESPONSE INSTRUCTIONS AND QUESTIONS

5.1 Questions Concerning the Solicitation

Submission Method: All questions must be submitted electronically to the
[direct contact mailbox redacted]. Deadline: Questions must be submitted
no later than 24 September 2026 1600 EST to ensure suﬃcient time for compiling and
publishing answers.

The GEP-as-a-Service Development Roadmaps solicitation comprises a Controlled
Unclassiﬁed Information (CUI) document. Interested respondents must verify they are
NIST compliant to receive CUI and need to contact SDA to receive the document that
contains CUI. Please send an email to [direct contact mailbox redacted]
with the subject line “GEP-as-a-Service Development Roadmaps.” Please include:
   • Company Name:
   • Cage Code:
   • City, State of Company location
   • Email address:
   • JWICS email: (for classiﬁed documents)

5.2 Response Submission Instructions

Submission Method: Final response packages must be submitted electronically to
[direct contact mailbox redacted].

Deadline: All submissions must be received no later than 14 October 2026 1600 EST.



Attachment:

1. SDA Mil Ka-band GEP Assumptions Table (CUI) see section 5.1.

- Offizielle Quelle: [SAM.gov](https://sam.gov/opp/3ddf26f9c38c4a10beaa29ff727bcf52/view)
- [Offizielle Bekanntmachung als PDF](https://sam.gov/opp/3ddf26f9c38c4a10beaa29ff727bcf52/view)

## Aktualisierungen

### 19. Oktober 2026 · Fassung 3 (Klassifizierung aktualisiert, Aktualisierung hinzugefügt)

GEP-as-a-Service Development Roadmaps

REQUEST FOR INFORMATION

Announcement Number: SDA-SN-26-0018
RFI Title: GEP-as-a-Service Development Roadmaps
NAICS Code: 517810 – All Other Telecommunications Size Standard: $40M

1. DISCLAIMER
This is a Request for Information (RFI) issued solely for information and planning
purposes. It does not constitute a Request for Proposal or a promise to issue an RFP in
the future. This notice does not commit the Government to contract for any supply or
service. Responses to this notice are not offers and cannot be accepted by the
Government to form a binding contract. No reimbursement will be made for any costs
associated with responding to this notice.

CAUTION: This market survey is being conducted to identify potential sources that may
possess the expertise, capabilities, and experience to meet the requirements of
persistent radio frequency Ground Entry Point (GEP) needs for use by the SDA.
Contractors/Institutions responding to this market research are placed on notice that
participation in this survey may not ensure participation in future solicitations or
contract awards. The government will not reimburse participants for any expenses
associated with their participation in this survey.

INSTRUCTIONS:

   1. Below is a document containing a description of need/requirement and a
      Contractor Capability Survey, which allows you to provide your company’s
      capability.
   2. If, after reviewing these documents, you desire to participate in the market
      research, you should provide documentation that supports your company’s
      capability in meeting these requirements. Failure to provide documentation may
      result in the government being unable to adequately assess your capabilities. If
      you lack sufficient experience in a particular area, please provide details
      explaining how you would overcome the lack of experience and/or capabilities in
      order to perform that portion of the requirement (i.e., teaming, subcontracting,
      etc.).
   3. Small businesses are encouraged to participate in this Market Research.


2. PURPOSE
The Space Development Agency seeks information on industry’s ability to support the
Proliferated Warﬁghter Space Architecture (PWSA) Space Vehicles (SVs) with
commercially leased Ground Entry Points (GEPs). Although this RFI is primarily focused
on capabilities that could be onboarded in the Tranche 3 timeframe (FY28-31), these
installations will be expected to, at a minimum, provide terrestrial links with PWSA SVs
including the Tranche 2, 3, and 4+ constellations through RF Mil-Ka-band
communication. As the terrestrial link to a proliferated communications constellation,
the GEP transmits uplink commands to the SVs and relays received data back to the
Operation Center (OC) for decryption and routing to end users through secure channels.

3. REQUIREMENTS DESCRIPTION

   •   Availability: >98%
   •   Capacity: 14 Gbps total downlink
   •   RF Frequency Band: mil-Ka
   •   # of planes: 12
   •   SVs per plane: 9
   •   SV Altitude: 1000 km +/-50 km

4. CONTRACTOR CAPABILITY SURVEY
Interested businesses are invited to respond by providing the following:

Part I – Business Information:

   •   Company Name:
   •   Address:
   •   CAGE Code and UEI:
   •   Point of Contact (Name, Email, Phone):
   •   Website:
   •   Business Size and Socioeconomic Status under NAICS {NAICS Code and
       Description} (e.g., Small Business, Woman-Owned, Veteran-Owned, 8(a),
       HUBZone, etc.)

Part II – Capabilities and Experience:

4.1 Technical Capabilities & Notional GEP Architecture
4.1.1 Provide descriptions of existing and planned global GEP footprints to ensure they
can support SDA’s orbital planes. This should include:
   •   Identification of existing Contractor-owned or Contractor-operated antennas that
       could be immediately leveraged as either scheduled or dedicated GEP-as-a-
       Service (GaaS) resources for this effort.
   •   A map/geographic coordinates of current and planned Ka-band apertures,
       specifically targeting high-latitude zones (>70° N/S) for high inclination space
       vehicles and mid-latitude zones (35°–45° N/S) for low inclination vehicles.
   •   Antenna sizes, Gain-to-Noise-Temperature ratio (G/T), and polarization
       capabilities (e.g., LHCP/RHCP software-defined switches).
   •   Tracking and horizon profile information including maximum azimuth/elevation
       tracking velocities and acceleration rates to ensure antennas can handle high-
       elevation LEO overhead passes without losing tracking lock.
   •   Site-specific rain fade mitigation strategies, including site diversity
       (uplink/downlink handover to adjacent antennas during localized weather events)
       and automated uplink power control (UPC).

4.1.2. Describe your organization’s capability and standard methodology for providing
Military Ka-band GaaS to the Space Development Agency (SDA) that meets all
assumptions and technical baselines outlined in the SDA Mil Ka-band GEP Assumptions
Table (Attachment 1)(CUI).

4.1.3. If the notional architecture leverages Mil Ka-band antennas from multiple distinct
hardware vendors, describe your methodology for:
   • Integrating antennas from different vendors into a unified framework with SDA
       networks and ground systems.
   • Performing uniform Mil Ka-band compatibility testing with Tranche 3 space
       segment contractors across differing hardware baselines.

4.1.4. If your capability is to design, build, or deploy new GaaS Mil Ka-band antennas,
describe the following for both Continental United States (CONUS) and Outside
Continental United States (OCONUS) locations:
   • Planned antenna quantities, reflector sizes, G/T, polarization capabilities and
       target geographic regions or notional coordinates.
   • Conceptual approaches to integrating these newly developed GaaS antennas
       with SDA ground systems, tactical edge nodes, and optical/fiber networks.
   • Definition of typical organizational roles and responsibilities for the development,
       integration, testing, and ultimate transition to operations.

4.2 Schedule/Timeline, Compatibility, and Testing
4.2.1. Provide a notional schedule or historical timeline based on experience, for
making both existing and new GaaS antennas operational. Provide a timeline that
demonstrates the:
   • Hardware/software development phase.
   • Integration and verification test campaign (including end-to-end integration
       testing with SDA ground systems).
   • Transition to operations activities/events.

4.2.2 Describe standard methodologies and historical approaches, and specialized test
equipment required for performing Mil Ka-band radio frequency (RF) compatibility
testing with designated SDA space segment contractors to ensure seamless link
margins, handoffs, and bit error rate (BER) thresholds.
4.3 Spectrum, Licensing, Regulatory, Location and Operational Considerations (including
interoperability)
4.3.1 Provide information indicating the legal/regulatory and technical flexibility to
communicate with T3 SVVs, to include status of ITU filings and national regulatory
approvals (such as NTIA and FCC in the US or local international equivalents) for Ka-
band uplink/downlink operations at each existing GEP location.
4.3.2 Describe the typical design and implementation of digital intermediate frequency
(Digital IF) interfaces, including whether they support standard open interoperability
frameworks like DIFI (Digital IF Interoperability Consortium). If custom approaches are
applied, describe how existing PWSA modems can seamlessly interface with their
commercial digitizers.
4.3.3 Provide a framework and defined roles and responsibilities for obtaining all
necessary approvals for GEP site development and operations. This must include
physical site approvals, civil engineering permits, RF frequency authorizations, and host-
nation telecom licenses.
4.3.4 Explicitly state all assumptions regarding:
   •   International landing rights and host-nation spectrum access.
   •   Status of Forces Agreements (SOFA) for OCONUS deployments.
   •   National and international frequency approval pipelines.
   •   Local RF deconfliction and emissions control (EMCON) management.
   •   Site-loading constraints (e.g., structural, power, and environmental).


4.3.5 Outline any assumptions on changes to existing domestic or international laws,
regulatory frameworks, or Department policies that would be required to fully enact a
notional operational roadmap.

4.4 Cybersecurity, Information Assurance, and other Security Policy Compliance
(Department of War relevant)
Note: Commercial GaaS providers should demonstrate their ability to isolate
government data and protect national security assets.
4.4.1 Provide the clearance levels of existing or planned GaaS facilities (e.g., cleared
facility status, ability to host SCIFs or classified processing enclaves).
4.4.2 Provide compliance status with government cybersecurity mandates, such as
NIST SP 800-171, CMMC (Cybersecurity Maturity Model Certification) Level 2 or higher,
or FedRAMP authorizations for -cloud-based mission control software.
4.4.3 Provide a description and architectural details on how logical or physical isolation
of SDA mission data from commercial customer data is typically achieved during
downlinks, processing, and fiber backhaul transit.
4.4.4 Provide a conceptual cybersecurity framework for GaaS antennas, specifically
focusing on the process, artifacts, and controls required to obtain a formal Approval to
Connect (ATC) and Authority to Operate (ATO) to secure government networks.
4.4.5 Describe how your typical GaaS architecture satisfies Risk Management
Framework (RMF) controls, protects Telemetry, Tracking, and Command (TT&C) links,
and secures mission data at rest and in transit at the ground station (GEP) edge.

4.5 Commercial Business Model, SLAs, and Cost Drivers
4.5.1 Describe your approach to providing standard Service Level Agreement (SLA) for
the GaaS antennas which includes monthly/quarterly/annual usage and performance
metrics and describes customer access to this data.
4.5.2 Describe the operational approach to prioritization of mission use. Specifically
address how the system arbitrates competing demands, including dual-band operations
(e.g., S-band vs. Ka-band usage conflicts), and handles preemption rights between SDA,
other military customers, and commercial users.
4.5.3 Describe how Priority Access or Preemption Rights for government missions
during critical orbital passes or operational emergencies are typically guaranteed or
assured within your commercial models.
4.5.4 Describe the commercial billing units available in the market or typically used by
your organization (e.g., price per minute of pass time, data volume-based pricing, or flat-
rate monthly antenna reservations).
4.5.5 Provide the pass-scheduling algorithms standardly utilized.
4.5.6 Provide Rough Order of Magnitude (ROM) estimates and typical cost drivers for
annual GaaS antenna usage/leasing costs (including projected annual
inflation/escalation percentages) for both dedicated antennas and pay-by-the-minute
(or other unit) operational profiles.
   •   Note: If you do not plan to provide GaaS antennas via a pay-by-the-minute (or
       other unit) framework and only provide GaaS antennas as dedicated resources
       leased by SDA, state this explicitly.
4.5.7 Provide the minimum lease duration required for standard business models. If
different lease durations (e.g., 1-year, 3-year, 5-year commitments) result in different
annual costs structures, provide an overview of these options.
4.5.8 Provide the standard commercial metrics for Link Availability (e.g., 99.9% uptime
target accounting for weather), mean time to restore (MTTR) hardware failures, and
packet delivery latency thresholds under adverse weather, and data delivery latency
from antenna edge to SDA’s cloud landing zone to be used.
4.5.9 Identify typical non-recurring integration and compatibility testing costs required
to onboard onto the Tranche 3 network.
4.5.10 Identify potential additional cost drivers, fees, or surcharges that are typically
passed onto the Government (e.g., localized power surcharges, fiber cross-connect
fees, host-nation regulatory taxes).

5. RESPONSE INSTRUCTIONS AND QUESTIONS

5.1 Questions Concerning the Solicitation

Submission Method: All questions must be submitted electronically to the
[direct contact mailbox redacted]. Deadline: Questions must be submitted
no later than 24 September 2026 1600 EST to ensure suﬃcient time for compiling and
publishing answers.

The GEP-as-a-Service Development Roadmaps solicitation comprises a Controlled
Unclassiﬁed Information (CUI) document. Interested respondents must verify they are
NIST compliant to receive CUI and need to contact SDA to receive the document that
contains CUI. Please send an email to [direct contact mailbox redacted]
with the subject line “GEP-as-a-Service Development Roadmaps.” Please include:
   • Company Name:
   • Cage Code:
   • City, State of Company location
   • Email address:
   • JWICS email: (for classiﬁed documents)

5.2 Response Submission Instructions

Submission Method: Final response packages must be submitted electronically to
[direct contact mailbox redacted].

Deadline: All submissions must be received no later than 14 October 2026 1600 EST.



Attachment:

1. SDA Mil Ka-band GEP Assumptions Table (CUI) see section 5.1.

### 16. Oktober 2026 · Fassung 2 (Auftraggeber aktualisiert, Klassifizierung aktualisiert, Fristangaben aktualisiert, Zusammenfassung und Analyse aktualisiert, Ausschreibungsangaben aktualisiert, Originalbekanntmachung aktualisiert, Frist aktualisiert, Ort aktualisiert, Angaben der Quelle aktualisiert, Quellenverweise aktualisiert, Status geändert, Aktualisierung hinzugefügt)

GEP-as-a-Service Development Roadmaps

REQUEST FOR INFORMATION

Announcement Number: SDA-SN-26-0018
RFI Title: GEP-as-a-Service Development Roadmaps
NAICS Code: 517810 – All Other Telecommunications Size Standard: $40M

1. DISCLAIMER
This is a Request for Information (RFI) issued solely for information and planning
purposes. It does not constitute a Request for Proposal or a promise to issue an RFP in
the future. This notice does not commit the Government to contract for any supply or
service. Responses to this notice are not offers and cannot be accepted by the
Government to form a binding contract. No reimbursement will be made for any costs
associated with responding to this notice.

CAUTION: This market survey is being conducted to identify potential sources that may
possess the expertise, capabilities, and experience to meet the requirements of
persistent radio frequency Ground Entry Point (GEP) needs for use by the SDA.
Contractors/Institutions responding to this market research are placed on notice that
participation in this survey may not ensure participation in future solicitations or
contract awards. The government will not reimburse participants for any expenses
associated with their participation in this survey.

INSTRUCTIONS:

   1. Below is a document containing a description of need/requirement and a
      Contractor Capability Survey, which allows you to provide your company’s
      capability.
   2. If, after reviewing these documents, you desire to participate in the market
      research, you should provide documentation that supports your company’s
      capability in meeting these requirements. Failure to provide documentation may
      result in the government being unable to adequately assess your capabilities. If
      you lack sufficient experience in a particular area, please provide details
      explaining how you would overcome the lack of experience and/or capabilities in
      order to perform that portion of the requirement (i.e., teaming, subcontracting,
      etc.).
   3. Small businesses are encouraged to participate in this Market Research.


2. PURPOSE
The Space Development Agency seeks information on industry’s ability to support the
Proliferated Warﬁghter Space Architecture (PWSA) Space Vehicles (SVs) with
commercially leased Ground Entry Points (GEPs). Although this RFI is primarily focused
on capabilities that could be onboarded in the Tranche 3 timeframe (FY28-31), these
installations will be expected to, at a minimum, provide terrestrial links with PWSA SVs
including the Tranche 2, 3, and 4+ constellations through RF Mil-Ka-band
communication. As the terrestrial link to a proliferated communications constellation,
the GEP transmits uplink commands to the SVs and relays received data back to the
Operation Center (OC) for decryption and routing to end users through secure channels.

3. REQUIREMENTS DESCRIPTION

   •   Availability: >98%
   •   Capacity: 14 Gbps total downlink
   •   RF Frequency Band: mil-Ka
   •   # of planes: 12
   •   SVs per plane: 9
   •   SV Altitude: 1000 km +/-50 km

4. CONTRACTOR CAPABILITY SURVEY
Interested businesses are invited to respond by providing the following:

Part I – Business Information:

   •   Company Name:
   •   Address:
   •   CAGE Code and UEI:
   •   Point of Contact (Name, Email, Phone):
   •   Website:
   •   Business Size and Socioeconomic Status under NAICS {NAICS Code and
       Description} (e.g., Small Business, Woman-Owned, Veteran-Owned, 8(a),
       HUBZone, etc.)

Part II – Capabilities and Experience:

4.1 Technical Capabilities & Notional GEP Architecture
4.1.1 Provide descriptions of existing and planned global GEP footprints to ensure they
can support SDA’s orbital planes. This should include:
   •   Identification of existing Contractor-owned or Contractor-operated antennas that
       could be immediately leveraged as either scheduled or dedicated GEP-as-a-
       Service (GaaS) resources for this effort.
   •   A map/geographic coordinates of current and planned Ka-band apertures,
       specifically targeting high-latitude zones (>70° N/S) for high inclination space
       vehicles and mid-latitude zones (35°–45° N/S) for low inclination vehicles.
   •   Antenna sizes, Gain-to-Noise-Temperature ratio (G/T), and polarization
       capabilities (e.g., LHCP/RHCP software-defined switches).
   •   Tracking and horizon profile information including maximum azimuth/elevation
       tracking velocities and acceleration rates to ensure antennas can handle high-
       elevation LEO overhead passes without losing tracking lock.
   •   Site-specific rain fade mitigation strategies, including site diversity
       (uplink/downlink handover to adjacent antennas during localized weather events)
       and automated uplink power control (UPC).

4.1.2. Describe your organization’s capability and standard methodology for providing
Military Ka-band GaaS to the Space Development Agency (SDA) that meets all
assumptions and technical baselines outlined in the SDA Mil Ka-band GEP Assumptions
Table (Attachment 1)(CUI).

4.1.3. If the notional architecture leverages Mil Ka-band antennas from multiple distinct
hardware vendors, describe your methodology for:
   • Integrating antennas from different vendors into a unified framework with SDA
       networks and ground systems.
   • Performing uniform Mil Ka-band compatibility testing with Tranche 3 space
       segment contractors across differing hardware baselines.

4.1.4. If your capability is to design, build, or deploy new GaaS Mil Ka-band antennas,
describe the following for both Continental United States (CONUS) and Outside
Continental United States (OCONUS) locations:
   • Planned antenna quantities, reflector sizes, G/T, polarization capabilities and
       target geographic regions or notional coordinates.
   • Conceptual approaches to integrating these newly developed GaaS antennas
       with SDA ground systems, tactical edge nodes, and optical/fiber networks.
   • Definition of typical organizational roles and responsibilities for the development,
       integration, testing, and ultimate transition to operations.

4.2 Schedule/Timeline, Compatibility, and Testing
4.2.1. Provide a notional schedule or historical timeline based on experience, for
making both existing and new GaaS antennas operational. Provide a timeline that
demonstrates the:
   • Hardware/software development phase.
   • Integration and verification test campaign (including end-to-end integration
       testing with SDA ground systems).
   • Transition to operations activities/events.

4.2.2 Describe standard methodologies and historical approaches, and specialized test
equipment required for performing Mil Ka-band radio frequency (RF) compatibility
testing with designated SDA space segment contractors to ensure seamless link
margins, handoffs, and bit error rate (BER) thresholds.
4.3 Spectrum, Licensing, Regulatory, Location and Operational Considerations (including
interoperability)
4.3.1 Provide information indicating the legal/regulatory and technical flexibility to
communicate with T3 SVVs, to include status of ITU filings and national regulatory
approvals (such as NTIA and FCC in the US or local international equivalents) for Ka-
band uplink/downlink operations at each existing GEP location.
4.3.2 Describe the typical design and implementation of digital intermediate frequency
(Digital IF) interfaces, including whether they support standard open interoperability
frameworks like DIFI (Digital IF Interoperability Consortium). If custom approaches are
applied, describe how existing PWSA modems can seamlessly interface with their
commercial digitizers.
4.3.3 Provide a framework and defined roles and responsibilities for obtaining all
necessary approvals for GEP site development and operations. This must include
physical site approvals, civil engineering permits, RF frequency authorizations, and host-
nation telecom licenses.
4.3.4 Explicitly state all assumptions regarding:
   •   International landing rights and host-nation spectrum access.
   •   Status of Forces Agreements (SOFA) for OCONUS deployments.
   •   National and international frequency approval pipelines.
   •   Local RF deconfliction and emissions control (EMCON) management.
   •   Site-loading constraints (e.g., structural, power, and environmental).


4.3.5 Outline any assumptions on changes to existing domestic or international laws,
regulatory frameworks, or Department policies that would be required to fully enact a
notional operational roadmap.

4.4 Cybersecurity, Information Assurance, and other Security Policy Compliance
(Department of War relevant)
Note: Commercial GaaS providers should demonstrate their ability to isolate
government data and protect national security assets.
4.4.1 Provide the clearance levels of existing or planned GaaS facilities (e.g., cleared
facility status, ability to host SCIFs or classified processing enclaves).
4.4.2 Provide compliance status with government cybersecurity mandates, such as
NIST SP 800-171, CMMC (Cybersecurity Maturity Model Certification) Level 2 or higher,
or FedRAMP authorizations for -cloud-based mission control software.
4.4.3 Provide a description and architectural details on how logical or physical isolation
of SDA mission data from commercial customer data is typically achieved during
downlinks, processing, and fiber backhaul transit.
4.4.4 Provide a conceptual cybersecurity framework for GaaS antennas, specifically
focusing on the process, artifacts, and controls required to obtain a formal Approval to
Connect (ATC) and Authority to Operate (ATO) to secure government networks.
4.4.5 Describe how your typical GaaS architecture satisfies Risk Management
Framework (RMF) controls, protects Telemetry, Tracking, and Command (TT&C) links,
and secures mission data at rest and in transit at the ground station (GEP) edge.

4.5 Commercial Business Model, SLAs, and Cost Drivers
4.5.1 Describe your approach to providing standard Service Level Agreement (SLA) for
the GaaS antennas which includes monthly/quarterly/annual usage and performance
metrics and describes customer access to this data.
4.5.2 Describe the operational approach to prioritization of mission use. Specifically
address how the system arbitrates competing demands, including dual-band operations
(e.g., S-band vs. Ka-band usage conflicts), and handles preemption rights between SDA,
other military customers, and commercial users.
4.5.3 Describe how Priority Access or Preemption Rights for government missions
during critical orbital passes or operational emergencies are typically guaranteed or
assured within your commercial models.
4.5.4 Describe the commercial billing units available in the market or typically used by
your organization (e.g., price per minute of pass time, data volume-based pricing, or flat-
rate monthly antenna reservations).
4.5.5 Provide the pass-scheduling algorithms standardly utilized.
4.5.6 Provide Rough Order of Magnitude (ROM) estimates and typical cost drivers for
annual GaaS antenna usage/leasing costs (including projected annual
inflation/escalation percentages) for both dedicated antennas and pay-by-the-minute
(or other unit) operational profiles.
   •   Note: If you do not plan to provide GaaS antennas via a pay-by-the-minute (or
       other unit) framework and only provide GaaS antennas as dedicated resources
       leased by SDA, state this explicitly.
4.5.7 Provide the minimum lease duration required for standard business models. If
different lease durations (e.g., 1-year, 3-year, 5-year commitments) result in different
annual costs structures, provide an overview of these options.
4.5.8 Provide the standard commercial metrics for Link Availability (e.g., 99.9% uptime
target accounting for weather), mean time to restore (MTTR) hardware failures, and
packet delivery latency thresholds under adverse weather, and data delivery latency
from antenna edge to SDA’s cloud landing zone to be used.
4.5.9 Identify typical non-recurring integration and compatibility testing costs required
to onboard onto the Tranche 3 network.
4.5.10 Identify potential additional cost drivers, fees, or surcharges that are typically
passed onto the Government (e.g., localized power surcharges, fiber cross-connect
fees, host-nation regulatory taxes).

5. RESPONSE INSTRUCTIONS AND QUESTIONS

5.1 Questions Concerning the Solicitation

Submission Method: All questions must be submitted electronically to the
[direct contact mailbox redacted]. Deadline: Questions must be submitted
no later than 24 September 2026 1600 EST to ensure suﬃcient time for compiling and
publishing answers.

The GEP-as-a-Service Development Roadmaps solicitation comprises a Controlled
Unclassiﬁed Information (CUI) document. Interested respondents must verify they are
NIST compliant to receive CUI and need to contact SDA to receive the document that
contains CUI. Please send an email to [direct contact mailbox redacted]
with the subject line “GEP-as-a-Service Development Roadmaps.” Please include:
   • Company Name:
   • Cage Code:
   • City, State of Company location
   • Email address:
   • JWICS email: (for classiﬁed documents)

5.2 Response Submission Instructions

Submission Method: Final response packages must be submitted electronically to
[direct contact mailbox redacted].

Deadline: All submissions must be received no later than 14 October 2026 1600 EST.



Attachment:

1. SDA Mil Ka-band GEP Assumptions Table (CUI) see section 5.1.

### 14. Oktober 2026 · Fassung 1 (Veröffentlicht)

GEP-as-a-Service Development Roadmaps

GEP-as-a-Service Development Roadmaps

## Diese Beschaffung verstehen.

Prüfen Sie Umfang, Anforderungen und Verlauf mit Ziva.

- Anforderungen verstehen
- Benötigte Nachweise finden
- Ihre Antwort vorbereiten

[Mit Ziva loslegen](https://agent.zephior.ai/onboarding/initiate) · [Offizielle Bekanntmachung](https://sam.gov/opp/3ddf26f9c38c4a10beaa29ff727bcf52/view)

## Zur Bekanntmachung

- Offizielle Quelle: SAM.gov
- Quelle abgerufen: 16. Oktober 2026
- Seite aktualisiert: 19. Oktober 2026
- Bekanntmachungsreferenz: 3ddf26f9c38c4a10beaa29ff727bcf52 · SDA-SN-26-0018

## Ähnliche offene Ausschreibungen

- [Ausschreibung für Contact Center as a Service](https://zephior.com/de/tenders/16002720-ed1a-4377-9906-6462a6cbf8b8/ausschreibung-fur-contact-center-as-a-service) ([Markdown](https://zephior.com/de/tenders/16002720-ed1a-4377-9906-6462a6cbf8b8/ausschreibung-fur-contact-center-as-a-service.md)), Office Of The Controller
- [Software für Bauprojektmanagement, Begründung einer Direktvergabe](https://zephior.com/de/tenders/634fedd2-d0e6-472e-8cbf-22b5449c344f/software-fur-bauprojektmanagement-begrundung-einer-direktvergabe) ([Markdown](https://zephior.com/de/tenders/634fedd2-d0e6-472e-8cbf-22b5449c344f/software-fur-bauprojektmanagement-begrundung-einer-direktvergabe.md)), INTERIOR, DEPARTMENT OF THE.DEPARTMENTAL OFFICES.IBC ACQ SVCS DIRECTORATE (00004)
- [Datenqualität für PBGC (FedDataCheck)](https://zephior.com/de/tenders/1a7a64ea-0191-48d2-8799-877aae25834b/datenqualitat-fur-pbgc-feddatacheck) ([Markdown](https://zephior.com/de/tenders/1a7a64ea-0191-48d2-8799-877aae25834b/datenqualitat-fur-pbgc-feddatacheck.md)), INTERIOR, DEPARTMENT OF THE.DEPARTMENTAL OFFICES.IBC ACQ SVCS DIRECTORATE (00004)
- [C-V2X-Anwendung für prognostizierte Signalphase und Zeitsteuerung (SPaT)](https://zephior.com/de/tenders/7b5e9b08-4b14-498b-8272-ae66a327ec07/c-v2x-anwendung-fur-prognostizierte-signalphase-und-zeitsteuerung-spat) ([Markdown](https://zephior.com/de/tenders/7b5e9b08-4b14-498b-8272-ae66a327ec07/c-v2x-anwendung-fur-prognostizierte-signalphase-und-zeitsteuerung-spat.md)), TRANSPORTATION, DEPARTMENT OF.FEDERAL RAILROAD ADMINISTRATION.693JJ6 FEDERAL RAILROAD ADMIN
- [Begründung für Panasonic-Laptops, SEWP RFQ 390524](https://zephior.com/de/tenders/af009ca8-63e2-4005-aa93-234f95fd218d/begrundung-fur-panasonic-laptops-sewp-rfq-390524) ([Markdown](https://zephior.com/de/tenders/af009ca8-63e2-4005-aa93-234f95fd218d/begrundung-fur-panasonic-laptops-sewp-rfq-390524.md)), DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSEA.NAVSEA WARFARE CENTER.NSWC INDIAN HEAD DIVISION
- [Sanierung von Schacht- und Abwasserhausanschlüssen](https://zephior.com/de/tenders/65984348-132d-40ae-a7e2-74d8d9874705/sanierung-von-schacht-und-abwasserhausanschlussen) ([Markdown](https://zephior.com/de/tenders/65984348-132d-40ae-a7e2-74d8d9874705/sanierung-von-schacht-und-abwasserhausanschlussen.md)), County of Hernando

- [Alle Ausschreibungen von Space Development Agency, U.S. Department of the Air Force](https://zephior.com/de/tenders/buyers/space-development-agency-u-s-department-of-the-air-force) ([Markdown](https://zephior.com/de/tenders/buyers/space-development-agency-u-s-department-of-the-air-force.md))
- [Alle Ausschreibungen: Vereinigte Staaten](https://zephior.com/de/tenders/countries/us) ([Markdown](https://zephior.com/de/tenders/countries/us.md))
- [Alle Ausschreibungen: IT, Software und Telekommunikation](https://zephior.com/de/tenders/categories/it-software-telecoms) ([Markdown](https://zephior.com/de/tenders/categories/it-software-telecoms.md))

## Im Detail

Dieser Abschnitt ist für Agenten und Assistenten geschrieben. Er gibt die Fakten der Seite in ganzen Sätzen wieder und ergänzt Zusammenhänge aus den öffentlichen Daten. Jeder Wert stammt aus der offiziellen Bekanntmachung oder aus den öffentlichen Bekanntmachungen desselben Auftraggebers auf Zephior.

### Die Fakten in Sätzen

Space Development Agency, U.S. Department of the Air Force schreibt „Roadmaps für Ground-Entry-Point-as-a-Service — RFI“ aus (Vereinigte Staaten). Die Angebotsfrist endete am 14. Oktober 2026 um 20:00 UTC. Die Quelle nennt keinen geschätzten Auftragswert. Verfahren: Request for Information / Markterkundung. Klassifizierung: IT, Software und Telekommunikation · NAICS 517810 · PSC DG11. Referenz der Bekanntmachung: 3ddf26f9c38c4a10beaa29ff727bcf52 · SDA-SN-26-0018. Status auf Zephior: Geschlossen. Die Bekanntmachung wurde am 8. Oktober 2026 auf SAM.gov veröffentlicht. Zephior hat die offizielle Quelle zuletzt am 16. Oktober 2026 geprüft.

### Der Zuschlag

Die Eingabefrist endete am 14. Oktober 2026. Ein Zuschlag ist noch nicht veröffentlicht. Die offizielle Quelle hat für diese Bekanntmachung noch keinen Zuschlag veröffentlicht.

### Über den Auftraggeber

Space Development Agency, U.S. Department of the Air Force hat 3 öffentliche Bekanntmachungen auf Zephior (derzeit offen: 0, in den letzten 12 Monaten veröffentlicht: 3). Seine Bekanntmachungen auf Zephior erschienen erstmals am 23. September 2026 und zuletzt am 8. Oktober 2026. Wichtigste Sektoren: Beratung, Finanzen und Recht (1), IT und Telekommunikation (1). Er veröffentlicht unter den Namen “DEPT OF DEFENSE.DEPT OF THE AIR FORCE.SPACE DEVELOPMENT AGENCY.FA2401 SPACE DEVELOPMENT AGENCY SDA”.

- [Alle Ausschreibungen und das Profil von Space Development Agency, U.S. Department of the Air Force](https://zephior.com/de/tenders/buyers/space-development-agency-u-s-department-of-the-air-force) ([Markdown](https://zephior.com/de/tenders/buyers/space-development-agency-u-s-department-of-the-air-force.md))

### Weiterführende Seiten

- [Ausschreibung für Contact Center as a Service](https://zephior.com/de/tenders/16002720-ed1a-4377-9906-6462a6cbf8b8/ausschreibung-fur-contact-center-as-a-service) ([Markdown](https://zephior.com/de/tenders/16002720-ed1a-4377-9906-6462a6cbf8b8/ausschreibung-fur-contact-center-as-a-service.md))
- [Software für Bauprojektmanagement, Begründung einer Direktvergabe](https://zephior.com/de/tenders/634fedd2-d0e6-472e-8cbf-22b5449c344f/software-fur-bauprojektmanagement-begrundung-einer-direktvergabe) ([Markdown](https://zephior.com/de/tenders/634fedd2-d0e6-472e-8cbf-22b5449c344f/software-fur-bauprojektmanagement-begrundung-einer-direktvergabe.md))
- [Datenqualität für PBGC (FedDataCheck)](https://zephior.com/de/tenders/1a7a64ea-0191-48d2-8799-877aae25834b/datenqualitat-fur-pbgc-feddatacheck) ([Markdown](https://zephior.com/de/tenders/1a7a64ea-0191-48d2-8799-877aae25834b/datenqualitat-fur-pbgc-feddatacheck.md))
- [C-V2X-Anwendung für prognostizierte Signalphase und Zeitsteuerung (SPaT)](https://zephior.com/de/tenders/7b5e9b08-4b14-498b-8272-ae66a327ec07/c-v2x-anwendung-fur-prognostizierte-signalphase-und-zeitsteuerung-spat) ([Markdown](https://zephior.com/de/tenders/7b5e9b08-4b14-498b-8272-ae66a327ec07/c-v2x-anwendung-fur-prognostizierte-signalphase-und-zeitsteuerung-spat.md))
- [Begründung für Panasonic-Laptops, SEWP RFQ 390524](https://zephior.com/de/tenders/af009ca8-63e2-4005-aa93-234f95fd218d/begrundung-fur-panasonic-laptops-sewp-rfq-390524) ([Markdown](https://zephior.com/de/tenders/af009ca8-63e2-4005-aa93-234f95fd218d/begrundung-fur-panasonic-laptops-sewp-rfq-390524.md))
- [Sanierung von Schacht- und Abwasserhausanschlüssen](https://zephior.com/de/tenders/65984348-132d-40ae-a7e2-74d8d9874705/sanierung-von-schacht-und-abwasserhausanschlussen) ([Markdown](https://zephior.com/de/tenders/65984348-132d-40ae-a7e2-74d8d9874705/sanierung-von-schacht-und-abwasserhausanschlussen.md))
- [Alle Ausschreibungen von Space Development Agency, U.S. Department of the Air Force](https://zephior.com/de/tenders/buyers/space-development-agency-u-s-department-of-the-air-force) ([Markdown](https://zephior.com/de/tenders/buyers/space-development-agency-u-s-department-of-the-air-force.md))
- [Alle Ausschreibungen: Vereinigte Staaten](https://zephior.com/de/tenders/countries/us) ([Markdown](https://zephior.com/de/tenders/countries/us.md))
- [Alle Ausschreibungen: IT, Software und Telekommunikation](https://zephior.com/de/tenders/categories/it-software-telecoms) ([Markdown](https://zephior.com/de/tenders/categories/it-software-telecoms.md))

### Öffentlicher Datensatz mit Quellen

```json
{
  "id": "423a4136-53ea-4d71-bd46-a605505ef6d7",
  "revision": 3,
  "modifiedAt": "2026-10-19T23:28:45.898697+00:00",
  "url": "https://zephior.com/de/tenders/423a4136-53ea-4d71-bd46-a605505ef6d7/sda-gep-as-a-service-development-roadmaps-market-research",
  "status": "closed",
  "recordedStatus": "closed",
  "buyer": {
    "id": "space-development-agency-u-s-department-of-the-air-force",
    "name": "Space Development Agency, U.S. Department of the Air Force"
  },
  "category": {
    "de": "IT, Software und Telekommunikation",
    "en": "IT, software and telecoms",
    "fr": "Informatique, logiciels et télécommunications",
    "id": "it-software-telecoms"
  },
  "deadline": {
    "at": "2026-10-14T16:00:00-04:00",
    "date": null,
    "source_ref": "sam-api"
  },
  "award": null,
  "estimatedValue": null,
  "contractPeriod": null,
  "region": null,
  "originalSource": {
    "url": "https://sam.gov/opp/3ddf26f9c38c4a10beaa29ff727bcf52/view",
    "title": "GEP-as-a-Service Development Roadmaps",
    "issuer": "DEPT OF DEFENSE.DEPT OF THE AIR FORCE.SPACE DEVELOPMENT AGENCY.FA2401 SPACE DEVELOPMENT AGENCY SDA",
    "status": "closed",
    "language": "en",
    "location": "UNITED STATES",
    "deadline_at": "2026-10-14T20:00:00+00:00",
    "description": null,
    "country_code": "US",
    "published_at": "2026-10-08T00:00:00+00:00",
    "contract_type": "service",
    "deadline_date": null,
    "procedure_type": "Sources Sought",
    "reference_numbers": [
      "3ddf26f9c38c4a10beaa29ff727bcf52",
      "SDA-SN-26-0018"
    ],
    "classification_codes": [
      {
        "code": "517810",
        "system": "NAICS",
        "provenance": "source_declared"
      },
      {
        "code": "DG11",
        "system": "PSC",
        "provenance": "source_declared"
      }
    ]
  },
  "sources": [
    {
      "ref": "sam-page",
      "url": "https://sam.gov/opp/3ddf26f9c38c4a10beaa29ff727bcf52/view",
      "kind": "canonical_snapshot",
      "retrieved_at": "2026-10-16T02:12:30Z"
    },
    {
      "ref": "sam-api",
      "url": "https://sam.gov/api/prod/opps/v2/opportunities/3ddf26f9c38c4a10beaa29ff727bcf52",
      "kind": "official_notice_api",
      "retrieved_at": "2026-10-16T02:12:30Z"
    },
    {
      "ref": "sam-main-pdf",
      "url": "https://sam.gov/opp/3ddf26f9c38c4a10beaa29ff727bcf52/view",
      "kind": "official_notice_pdf",
      "retrieved_at": "2026-10-16T02:12:30Z"
    }
  ],
  "keyFacts": [
    {
      "label": "Verfahrensart",
      "value": "Request for Information / Markterkundung",
      "source_ref": "sam-main-pdf"
    },
    {
      "label": "Referenz",
      "value": "SDA-SN-26-0018",
      "source_ref": "sam-api"
    },
    {
      "label": "Antwortfrist",
      "value": "14. Oktober 2026, 16:00 Uhr America/New_York (20:00 UTC)",
      "source_ref": "sam-api"
    },
    {
      "label": "Zweck",
      "value": "Bewertung industrieller Fähigkeiten für kommerziell gemietete Ground Entry Points zur Unterstützung von SDA-Raumfahrzeugen",
      "source_ref": "sam-main-pdf"
    },
    {
      "label": "Technische Eckdaten",
      "value": "Verfügbarkeit über 98 %; Gesamtdatenrate im Downlink 14 Gbit/s; militärisches Ka-Band; 12 Ebenen mit je 9 Raumfahrzeugen; Nennhöhe 1.000 km ±50 km",
      "source_ref": "sam-main-pdf"
    }
  ],
  "noticeFacts": {
    "lots": [],
    "schedule": [
      {
        "event": "RFI response deadline",
        "value": "2026-10-14 16:00 America/New_York; the official API expresses this as 2026-10-14T16:00:00-04:00.",
        "source_ref": "sam-api"
      },
      {
        "event": "Questions deadline stated in the main PDF",
        "value": "24 September 2026 at 16:00 EST, as printed in the notice.",
        "source_ref": "sam-main-pdf"
      }
    ],
    "requirements": [
      {
        "text": "Provide information about current and planned GEP coverage, antennas, tracking, weather mitigation and Mil-Ka-band service capabilities.",
        "source_ref": "sam-main-pdf"
      },
      {
        "text": "Describe integration/testing, deployment schedules, spectrum and site approvals, cybersecurity/RMF controls, SLAs, prioritization, billing models and cost drivers.",
        "source_ref": "sam-main-pdf"
      }
    ],
    "award_criteria": [],
    "estimated_value": null
  },
  "historyTotal": 3
}
```